MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

Similar documents
MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES TABLE OF CONTENTS

VTCA CONFERENCE Structure and Bridge Update. Kendal R. Walus, PE State Structure and Bridge Engineer. April 13, 2018

LRFD Bridge Design Manual Changes

PUBLIC INFORMATION MEETING June 24, 2015

Baseline Document Change Announcement

TRANSVERSE SECTION TABLE OF CONTENTS CHAPTER 9

ARCHITECTURAL TREATMENT TABLE OF CONTENTS CHAPTER 5

LOCATION AND DESIGN DIVISION

Specification Changes and Their Effect on Plans. Bridge Construction Issues. BRG VTC April, 2010

Guidelines for Checking Final Design Bridge Plans

Parapet/railing terminal walls shall be located on the superstructure.

Structural - Engineering Review Checklist

Prestressed Concrete Structure Tutorial

Chapter 4 Bridge Program Drawings

Corrosion Resistant Reinforcing Steel (CRR)

JULY 2016 LRFD BRIDGE DESIGN 11-1

DRAINAGE TABLE OF CONTENTS CHAPTER 22

JOINTS TABLE OF CONTENTS CHAPTER 14

PennDOT e-notification No. 13

ESTIMATED QUANTITIES SHEET CHECK LIST

Bridge Construction. Nick Haltvick North Region Bridge Construction Engineer May 17, Bridge Office mndot.gov/bridge/construction.

LRFD BRIDGE MANUAL PART II: STANDARD DETAILS CONVENTIONAL CONSTRUCTION DRAWING NUMBER, DESCRIPTION, DATE OF ISSUE

2013 VIRGINIA CONCRETE CONFERENCE LESSONS LEARNED / CHALLENGES NOVA MEGAPROJECTS PROGRAM STRUCTURE AND BRIDGE FIELD PERSPECTIVE. Fawaz K. Saraf, P.E.

SCOPE OF WORK AND DELIVERABLES

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY

VDOT s Experience with Reinforced Concrete and Metal Culverts

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE

B R I D G E O F F I C E

2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE

B R I D G E O F F I C E

How Loads Are Distributed

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc.

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.

FEBRUARY 2019 LRFD BRIDGE DESIGN 5-1

CHAPTER 11: WALLS.

JULY 2014 LRFD BRIDGE DESIGN 5-1

Baseline Document Change Announcement

CHEF MENTEUR BRIDGE REPLACEMENT

AASHTOWare BrDR Prestressed Concrete Bridge Tutorial PS15 - Two Span PS Adjacent Box With Straight Strands

The MnDOT Bridge Load Rating Manual Scope of Work and Deliverables

SOUTHEAST TEXAS CONTINUING EDUCATION BRIDGE INSPECTION, MAINTENANCE AND REPAIR

REHABILITATION PACKAGE 4-a

December 19, 2012 ADDENDUM NO. 11. To Prospective Bidders and Others on:

Design and Rating of Steel Bridges

TITLE SHEET TABLE OF CONTENTS CHAPTER 2

Chapter 13 Bridge Load Rating

PENNDOT e-notification

BRIDGE STANDARD PLANS AND SPECIAL DETAILS ADAM LANCASTER, P.E. FEB. 27, 2018

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE

MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK

NORFOLK SOUTHERN RAILWAY COMPANY FILES: BR & BR

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

BRADD Software Executive Summary

AASHTOWare BrD 6.8. BrR and BrD Tutorial. PS7-3 Stem PS Bridge Example

STANDARDIZED CONCRETE BRIDGES IN TEXAS. John Holt, PE, Texas Department of Transportation Ronald Medlock, PE, Texas Department of Transportation

Mn/DOT BRIDGE INSPECTION REPORT

DESIGN AND ANALYSIS OF PRECAST CONCRETE BRIDGES IN AREAS OF HIGH OR MODERATE SEISMICITY

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

COMMONWEALTH of VIRGINIA

NEW JERSEY DEPARTMENT OF TRANSPORTATION MEMORANDUM

BrM Annual User Group Meeting Welcome Structure and Bridge. Kendal R. Walus, PE State Structure and Bridge Engineer September 12, 2017

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Applications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction

I2-0 LIST OF ACTIVE SSDs

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

Construction Cost Estimation Preparation Manual (Metric Units)

MEMORANDUM. TO: District Engineers DATE: June 30, SUBJECT: New Miscellaneous Bridge Standard Drawings (English)

BrD Superstructure Tutorial

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2

OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 W. BROAD ST., COLUMBUS, OHIO

Questions Due: 12/11/14; Proposals Due 12/30/14: each by 2:00PM Central Standard Time

SOUTH MEDFORD INTERCHANGE BRIDGES

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY

BRIDGE DESIGN MEMORANDUM DM0115

Chapter 1. General Design Information. Section 1.03 Loads and Load Factors. Introduction. Load Modifying Factors

Bijan Khaleghi, Ph, D. P.E., S.E.

STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDA VIRGINIA DEPARTMENT OF TRANSPORATION

NORFOLK SOUTHERN CORPORATION UNDERPASS GRADE SEPARATION DESIGN CRITERIA

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

Ironton Russell Bridge Project

Bonner Bridge Replacement Update:

STEEL TABLE OF CONTENTS CHAPTER 11

Modeling and Design of Bridge Super Structure and Sub Structure

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION

LIST OF ACTIVE STRUCTURAL STANDARD DRAWINGS (SSDs)

Cast in place concrete parapet and Ministry standard sidewalk railing.

Consultant: Client: MINISTRY OF EXTERNAL AFFAIRS NEW DELHI IRCON INFRASTRUCTURE & SERVICES LIMITED DIMENSION DETAILS OF RCC SUPERSTRUCTURE.

Transcription:

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION DESIGN AIDS AND TYPICAL DETAILS VIRGINIA DEPARTMENT OF TRANSPORTATION

VDOT GOVERNANCE DOCUMENT VDOT Manual of the Structure and Bridge Division: Part 02: Design Aids and Typical Details OWNING DIVISION: Structure and Bridge DATE OF ISSUANCE: 01/30/2018

COMMONWEALTH of VIRGINIA Stephen Brich COMMISSIONER DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, 23219-2000 January 30, 2018 SUBJECT: Manual of the Structure and Bridge Division Part 2 Design Aids Typical Details MEMORANDUM TO: Holders of Manual VOIDED: Chapter 23 Piles (included AASHTO Standard Specification calculations) NEW ISSUES: Chapter 23 Piles (complete chapter replacement with AASHTO LRFD Specification calculations and laterally loaded pile analysis example) REVISIONS: CHAPTER 2: 02.TOC-1 and -2 02.00 Updated list of major changes. 02.02-1 Updated IIM reference for FHWA-534 reference code. 02.02-6 Added SP401, SS401 and SS431 to the list. 02.02-7 Added SP for Corrosion Resistant Steel Plate Girders to the list. Updated Engineered Cementitious Concrete section reference. 02.03-3 Updated instructions for structural steel. Added Virginia Pier Caps to unpainted ASTM A709 Grade 50W General Note. Added General Note for ASTM A709 Grade 50CR. 02.03-4 Updated superstructure concrete note for Lightweight concrete. 02.04-4 and -5 Revised Checklist 9 headers to indicate projects with/without road title sheets and removed note requiring signed sheet filing in the CO Plan File Room from Tier 1 project content. VirginiaDOT.org WE KEEP VIRGINIA MOVING

Page 2 January 30, 2018 REVISIONS:(cont d) CHAPTER 2 (cont d): 02.04-8 thru -11 Added note for bridge projects that have a road title sheet. 02.06-1 Revised first paragraph. CHAPTER 3: 03.TOC-1 and -2 03.07-1 Added bid items for 20 and 24 driving tests for PSC stainless steel strand piles. 03.07-2 Added bid items for 20 and 24 driving tests for PSC CFRP strand piles. 03.10-2 Revised sheet footer. CHAPTER 6: 06.TOC-1 thru -3 06.00 Updated list of major changes. 06.01-2 Revised Note H. 06.01-5 Added reference to Bridge Only definition. 06.04-12 Added note to Typical Section of Shared Use Path with design speed < 45 mph referencing raised median typical section for Roadway with Shoulder. 06.04-13 Revised Typical Section of Shared Use Path with design speed < 45 mph to include raised median and added note referencing raised sidewalk typical section for Roadway with Curb. 06.04-14 Updated Note E for raised median revisions and added content where ramps on the bridge cross the shared use path. 06.08-1 Updated Bridge Only definition in second paragraph and added reference to current IIM-S&B-95. Updated project requirements example list and referenced locations. 06.08-3 Combined first two paragraphs into one and revised. Updated references to current Road Design Manual location. 06.08-5 Updated references to current Road Design Manual location and removed callouts to specific fixed object attachment standards. 06.08-7 Added note requiring inclusion of sheets depicting locations and appropriate grading for guardrail and terminals in the plan set. Removed callouts to specific guardrail standards and specific guardrail detail content. Revised details shown for properly terminated radial guardrail. 06.08-9 Updated references to current Road Design Manual location. 06.08-10 Removed callouts to specific guardrail standards.

Page 3 January 30, 2018 REVISIONS:(cont d) CHAPTER 11: 11.TOC-1 11.TOC-4 Revised date and added ASTM A709 Grade 50CR steel section. 11.00-1 and -2 Updated list of major changes. 11.01-1 Revised ASTM A709 Grade 50W note. 11.01-2 Revised materials note where uncoated weathering steel is not recommended and added ASTM A709 Grade 50CR note. 11.02-2 Revised minimum/maximum deck overhang content. 11.11-1 Added General Information for ASTM A709 Grade 50CR Steel. CHAPTER 12: 12.TOC-1 12.TOC-3 thru -5 Revised dates and file numbers per section changes. Added PSC inverted T-beam section to 12.07, moved PSC pile section to 12.08 and removed PSC deck panel section. Moved sections to next sheet as needed and revised dates. 12.00-1 and -2 Moved prestressed concrete deck panel note from independent section to Introduction. Updated list of major changes. 12.03-1 and -2 Added minimum/maximum overhang and minimum number of beams content. Moved some content to sheet 2. Merged detail reference contents. 12.03-5 thru -8 Changed references from girder to beam. 12.04-7 and -8 Changed references from girder to beam. 12.05-4 Fixed spelling of shall in PSC waterproofing requirements. 12.07-1 thru -14 Inserted Prestressed Concrete Inverted T-beam content replacing previous Section 12.07 content. 12.08-1 thru -7 Moved Prestressed Concrete Pile content from Section 12.07 to Section 12.08. Previous Prestressed Concrete Deck Panel content was moved to File No. 12.00-1. CHAPTER 17: 17.TOC-1 17.00-1 Updated list of major changes. 17.01-1 thru -7 Updated total number of sheets in section and revised dates. 17.01-1 Added inverted T-beam superstructures to list of jointless abutment alternatives for semi-integral abutments. Updated and included File No. reference in pile support requirement for all abutment types adjacent to MSE walls.

Page 4 January 30, 2018 REVISIONS:(cont d) CHAPTER 17 (cont d): 17.01-3 Added inverted T-beam superstructures to jointless abutment type list. 17.01-8 Inserted new content for supporting abutment spread footings on MSE walls. 17.01-9 thru -18 Updated File No. s, sheet numbers and total number of sheets due to insertion. 17.01-11 and -12 Updated File No. reference, required Virginia Pier Cap at pier/bent joint locations and reduced selection hierarchy requirement from design waiver to design approval. 17.01-13 thru -15 Updated File No. references. RETAIN THIS MEMO IN FRONT OF INDEX TO /original signed/ Junyi Meng, P.E. Assistant State Structure and Bridge Engineer For: Kendal R. Walus, P.E. State Structure and Bridge Engineer

COMMONWEALTH of VIRGINIA Charles A. Kilpatrick, P.E. COMMISSIONER DEPARTMENT OF TRANSPORTATION 1401 EAST BROAD STREET RICHMOND, 23219-2000 July 27, 2017 SUBJECT: Manual of the Structure and Bridge Division Part 2 Design Aids Typical Details MEMORANDUM TO: Holders of Manual VOIDED: None NEW ISSUES: None REVISIONS: CHAPTER 1: 01.02 thru 01.11 and 1.19 Removed Vol. V from all footer File No. blocks. Changed last thru 1.22 revised dates only on sheets where other content was changed. 01.TOC-1 and -4 thru -7 01.TOC-5 Updated cell titles. 01.TOC-7 Removed header for non-existent section. 01.01-5 thru -7 Updated bridge seed file content. 01.01-9 Updated manual reference. 01.02-2 and -3 Updated project block in title sheet depictions. 01.13-1 and -6 Updated bridge seed file and working units content. 01.16-1 and -2 Provided additional sealed and signed information for title sheets and restructured order of content. 01.20-6 Removed CP10 and CP16 cell depictions. VirginiaDOT.org WE KEEP VIRGINIA MOVING

Page 2 July 27, 2017 REVISIONS:(cont d) CHAPTER 1 (cont d): 01.20-9 thru -11 Updated bid items in ESTQ1, ESTQ2 and ESTQ3 cell depictions. Split FSHT cell into FSHTT1 and FSHTT2 (Tier 1 and Tier 2) and updated project block and signatures in cell depictions. 01.20-14 and -15 Updated signature titles in PDD, PDD3 and PDD4 cell depictions. 01.20-19 thru -21 Updated SBC1, SBC2, SBC3, SBF1, SBF2 and SBF3 cells. 01.22-3 Updated bottom rail size in BC15L and BC15R cell depictions. 01.22-11 Updated rail shape in KCCL8, KCCR8, KCL8 and KCR8 cell depictions. CHAPTER 2: 02.04 thru 02.07 Removed Vol. V from all footer File No. blocks. Changed last revised dates only on sheets where other content was changed. 02.TOC-1 and -2 02.01-1 thru -6 Updated General Notes to current VDOT Road and Bridge Standards. 02.01-6 Added General Notes for current VDOT Work Area Protection Manual and construction tolerances. Updated signature block content. 02.01-7 and -8 Updated abutment types for Check List Items 3, 4, 24 and 25. 02.02-1 thru -9 Updated number of sheets for additional sheet. 02.02-1 Updated sketch for changes to Blocks 7 and 10. 02.02-2 Revised NBIS to Federal Structure Number in Block 7 information. Revised Block 10 information to Federal Stewardship and Oversight Code and updated terminology. 02.02-6 thru -9 Updated Special Provisions and Copied Notes content to reflect 2016 Road and Bridge Specifications and current policy requiring an additional sheet. Updated list of those no longer applicable. 02.03-2 Updated General Note for current VDOT Road and Bridge Standards. 02.03-3 Updated General Note for current VDOT Work Area Protection Manual. 02.03-4 Revised heat curving notes for plate girders and rolled beams. 02.04-8 thru -11 Made miscellaneous changes for consistency between sheets. 02.04-10 Updated title sheet cell title. 02.04-11 Updated for FSHTT1 cell addition and PDD4 cell change. 02.04-12 Updated title sheet cell title in Note 3 and title block depiction. 02.05-1 Updated CADD sheet number and signature title block. Clarified Consultant Plans By instructions.

Page 3 July 27, 2017 REVISIONS:(cont d) CHAPTER 3: 03.TOC-1 thru -3 03.00 Updated list of major changes. 03.01-1 and -4 Added missing checklist references. Updated prestressed concrete pile bid items in Estimated Quantities Substructure Only table and added corresponding notes. Updated Index of Sheets. 03.01-6 Removed unnecessary reference in Check List Item 19. 03.05-1 Added requirement for non-standard Pay Items, their descriptions, and their measurements, to be developed into Project Specific Specifications instead of including on Plans. 03.05-3 Removed Footnotes 19 and 20 not used on current bid items. 03.06-2 and -8 Added bid items for deck slab closure, shear keys and Virginia Adjacent Member Connection (VAMC) block-outs. 03.07-1 and -2 Removed driving test and loading test bid items for prohibited prestressed concrete pile sizes. 03.07-3 Updated prestressed concrete pile size descriptions and removed prohibited pile sizes. Added bid items for prestressed concrete piles with other strand materials. 03.07-4 Moved bid items from previous sheet to this sheet. 03.10-1 and -2 Removed driving test and loading test bid items for prohibited prestressed concrete pile sizes. 03.10-3 Updated prestressed concrete pile size descriptions and removed prohibited pile sizes. Added bid items for prestressed concrete piles with other strand materials. 03.12-2 and -6 Added non-standard retaining structure bid item. CHAPTER 5: All files Removed Vol. V from all footer File No. blocks. Changed last revised dates only on sheets where other content was changed. 05.TOC-1 05.01-2 Clarified that the cost of the bridge shall not include bridge-related CEI costs or contingency in the calculation of all limits. Referred to bridge funding instead of a specific bridge funding source. 05.02-8 Removed statement prohibiting medallion use with other textures.

Page 4 July 27, 2017 REVISIONS:(cont d) CHAPTER 6: 06.00 thru 06.03 and Removed Vol. V from all footer File No. blocks. Changed last 06.05 thru 06.08 revised dates only on sheets where other content was changed. 06.TOC-1 and -2 06.00 Updated list of major changes. 06.01-1 thru -5 Updated number of sheets. 06.01-4 Revised approval requirements in third line of Note O. Updated FHWA approval note for design exceptions for parapet/rail. 06.01-5 and -6 Revised design waiver requirements to coincide with changes made to Part 1 of this manual and expanded to two sheets. 06.02-13 Revised criteria for multiple lane ramp structures. 06.02-15 Updated sheet reference. 06.04-14 and -15 Added minimum width for bridge safety inspection to Note B. Note H moved from sheet 14 to 15. CHAPTER 15: 15.TOC-1 15.01-7 Revised Spread Footing Data Table. 15.02-2 and -3 Added anchor bolt sleeves to Cap Length Criteria and Sample Anchor Bolt Layouts. 15.03-1 Added anchor bolt sleeves to TYPICAL ANCHOR BOLT LAYOUT and SECTION A-A. Added bearing sheet reference. Re-spaced stirrup bars to clear anchor bolt sleeves and added note for adjustment. 15.03-5 Added anchor bolt sleeves to Check List Item 11. 15.03-6 Updated reference in Check List Item 28. CHAPTER 17: 17.TOC-1, -2, -5, -7 and -8 17.TOC-1 Updated sheet titles and file numbers in Section 17.01. 17.00 Updated list of major changes. 17.01-1 thru -17 Updated number of sheets for additional sheet. 17.01-7 Added requirement that all abutment types adjacent to MSE walls shall be pile supported for bridges over Interstates. 17.01-8 and -9 Added Abutment Protection Requirements and moved General Terminology to additional page. Updated footer sheet titles. 17.01-10 and -12 Updated sheet references. 17.03-7 Added anchor bolt sleeves to Anchor Bolt Layout Details.

Page 5 July 27, 2017 REVISIONS:(cont d) CHAPTER 17 (cont d): 17.07-3 thru -10 Updated sheet numbers, section mark sheet numbers and dates for typical arrangement of plan sheets. 17.07-3 and -7 Added anchor bolt sleeves to TYP. ANCHOR BOLT LAYOUT and SECTION A-A.. 17.11-3 and -6 Added TYPICAL ANCHOR BOLT LAYOUT with anchor bolts sleeves. Added anchor bolt sleeves to SECTION A-A. Revised notes. 17.11-4 and -7 Moved TYPICAL ANCHOR BOLT LAYOUT to previous sheet. Removed LIMITS OF SELECT BACKFILL and related notes. 17.11-5 and -8 Updated sheet references. 17.13-2 thru -4 Updated substructure reference lines for full integral and semiintegral sections. Added existing ground line to all cut sections. RETAIN THIS MEMO IN FRONT OF INDEX TO /original signed/ Junyi Meng, P.E. Assistant State Structure and Bridge Engineer For: Kendal R. Walus, P.E. State Structure and Bridge Engineer

RELEASE LETTERS DESIGN AIDS AND TYPICAL DETAILS A complete set of all release (revision) letters is located at the following link: http://www.virginiadot.org/business/bridge_archives.asp

TABLE OF CONTENTS DESIGN AIDS AND TYPICAL DETAILS FILE NO. 01.TOC 02.TOC 03.TOC 04.TOC 05.TOC 06.TOC 07.TOC 08.TOC 09.TOC 10.TOC 11.TOC 12.TOC 13.TOC 14.TOC 15.TOC 16.TOC 17.TOC 18.TOC 19.TOC 20.TOC 21.TOC 22.TOC 23.TOC TITLE Chapter 1 General Drafting Procedures Chapter 2 Title Sheet Chapter 3 Estimated Quantities Sheet Chapter 4 Interior Sheet Chapter 5 Architectural Treatment Chapter 6 Geometrics Chapter 7 Reinforcing Steel Chapter 8 Concrete Design Aids Chapter 9 Transverse Section Chapter 10 Concrete Deck Slab Chapter 11 Steel Chapter 12 Prestressed and Post-Tensioned Concrete Chapter 13 Bearings Chapter 14 Joints Chapter 15 Pier Details Chapter 16 Geometry Chapter 17 Abutments (includes jointless philosophy) Chapter 18 Retaining Walls Chapter 19 Approach Slabs Chapter 20 Intentionally Left Blank Chapter 21 Slope Protection Chapter 22 Drainage Chapter 23 Piles DESIGN AIDS AND TYPICAL DETAILS TABLE OF CONTENTS DATE: 18May2016 SHEET i of ii FILE NO. TOC-i

TABLE OF CONTENTS DESIGN AIDS AND TYPICAL DETAILS FILE NO. TITLE 24.TOC 25.TOC 26.TOC 27.TOC 28.TOC 29.TOC 30.TOC 31.TOC 32.TOC 33.TOC 34.TOC Chapter 24 Seismic Considerations Chapter 25 Parapets / Rails / Medians / Sidewalks Chapter 26 Boring Logs Chapter 27 Navigation Lights Chapter 28 Fender System Chapter 29 Utilities Attached to Bridge Structures Chapter 30 Fencing (Pedestrian) Chapter 31 Traffic Control Devices Chapter 32 Maintenance / Repair Plans Chapter 33 Bridge Widening Chapter 34 SAAP Contracts DESIGN AIDS AND TYPICAL DETAILS TABLE OF CONTENTS DATE: 18May2016 SHEET ii of ii FILE NO. TOC-ii