PUR Sensor Installation with PAGEL V2/40

Similar documents
Linear Drainage Z886. Perma-Trench. Installation Instructions. 100mm Clear Opening

Zurn Z886. 6" Perma-Trench. Installation Instructions

Sanitation Marketing Toolkit MANUAL FOR PRODUCTION AND INSTALLATION OF POUR-FLUSH LATRINES

MPA tested! Quality for Professionals. plus Color. Cement Based Jointing Mortar. For light to heavy traffic loads. Cement-based, polymer-modified,

LINEAR DRAINAGE. Z886 Perma-Trench. 6" Perma-Trench Installation Instructions

BioPrism Solid Surface

CHARACTERISTICS / ADVANTAGES

3-component epoxy self-smoothing screed

Construction. SikaRepair 223. Application Instructions. Sika Corporation

Construction. SikaRepair 223. Application Instructions. Sika Corporation

Bio-Sand Filtration Filter Construction Guidelines

Double Tidy Rail. Assembly Instructions- Please keep for future reference. Important - Please read these instructions fully before starting assembly

D.I.Y DAMP COURSING APPLICATION INSTRUCTIONS

DUAL EXPANSION. facilitate casting and ensure the total filling of voids even in tight or complex spaces and when working on large surfaces.

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

INSTALLATION GUIDE Sika SolarMount 1 Exposition East West

30mm Height Linear Drain Shower Trays

Wire-pull casings. Large-volume pull-in aid and opening for cable exit and accessory installation. Enclosure system for concrete ceilings and walls

SITE HANDBOOK. Repair of Concrete Structures. - Patch Repair and Spray Applications

Grizzly TM Part Number Spectrum Lane ~ Missoula MT ~

Interiors Sources Decor LLC. Method Statement BLOCK WORK. Civil Works 6/26/2016

Intercrete 4802 Application Guidelines

Accent Floor Heating. Tmat System Installation Manual. Floor heating system

DETAIL INSTRUCTION No. 1

Construction. 3-part cement and epoxy combination micro mortar for surface sealing. Product Description 1 1/5. Tests

Construction. SikaTop 111 Plus. Application Instructions. Sika Corporation

Construction. Sika Armatec 110. Application Instructions. Sika Corporation

Construction. Sika Armatec 110. Application Instructions. Sika Corporation

Construction. SikaRepair SHA. Application Instructions. Sika Corporation

EJOT Solar Fastenings. Installation Manual

ARDEX GUIDE SPECIFICATION ARDEX FDM Full Depth Repair Mortar Concrete Repair Mortar with Corrosion Inhibitor

Knauf AQUAPANEL Interior Ceiling System

FLOORING INSTALLATION INSTRUCTIONS

Applications. Properties. Swelling capacity in contact with water. Density. Weight

ARDEX GUIDE SPECIFICATION ARDEX GPS GENERAL PATCH & SKIMCOAT Trowelable underlayment

ACO DRAIN Site Installation Manual

SQ-1 ROOF TRUSS WEG-IT TABLE

PRODUCT DATA SHEET Sika Level-315 F

Construction. One component cementitious mortar fibre reinforced for flexible waterproofing. Product Description. Product Data. Form.

FIVE STAR PRODUCTS, INC.

Fiberglass Dispenser Sump

Construction. Cementitious self levelling, fast hardening, underlayment for use 2-10mm, and 10-30mm with added aggregate. Product Description

Single Post Anchor Part Number Spectrum Lane ~ Missoula MT ~

Jointing Mortar. How To Instructions. Jointing Mortar: Equipment you may need include:

adjustable fusion shower pan surface mounted on subfloor installation guide

Reinforced concrete double walls

Data Sheet 3115 Englisch

DECKING COMPOSITE. Installation Manual 2016

Water resistant bonding agent and mortar additive

SHEP POXY ROADS & HIGHWAYS FAST SET HIGH MODULUS, STRUCTURAL, EPOXY GEL

FAST SETTING and FAST CURING MORTAR NATCEM 35

PATENT PENDING FLAT ROOF PV SYSTEM. FDGlight

adjustable fusion shower pan on wood joists installation guide

Undertile Heating Mat Installation Manual

PRODUCT DATA SHEET Sikadur 31 CF Normal (formerly Sikadur 731)

ARDEX A 38 MIX Rapid Set, Premixed Screed

Resin Bound Installation Guide

SKATE ON LAYKOLD Specification

Non- Combustible Sheathing Board for Steel Frame applications

Platform stair lift PLG7

Linear Drainage ZF806 ZF812

Agilent Enhancer Cell

R3 Cementitious Pore Sealer and Levelling Mortar

Channel Drain Shower Base. Aqua Line pro. Installation Instructions

Standard Practice for Molding Roller-Compacted Concrete in Cylinder Molds Using a Vibrating Hammer 1

Ubau Flo Shower Element Installation Manual

Construction. 2-part epoxy impregnation resin. 1 Sikadur /5. Product Data Sheet Edition No. 01 (October 2015) Sikadur -330.

L-JACK Termination Procedure

PCCell BED 1-2 and PCCell BED 1-3

fusion shower pan on wood joists installation guide

Reinforced concrete double walls

Rough-in frame and flush-mount panel installation instructions

ARDEX A 38TM Rapid Set Screed

Specialty Concrete Repair Epoxy Grouts. Adhesives & Sealants Chemical Grouts & Polyurethanes. Coatings & Waterprooing Concrete Repair & Overlays

Range Point Monuments

BioPrism Solid Surface

Glass Block Installation System. simple, quick, safe, mortar-free. Glass Block Installation System

TECHNICAL BULLETIN TB102

FIVE STAR PRODUCTS, INC. (800)

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. RobinsonBrick.com

Coatings CSI Format Section 07160

Solar Powered TS1000 Installation Pictures. (Trench and Fill Method) City of Vallejo, CA

WATERPROOFING CONCRETE TIE HOLES USING XYPEX

Technical Data Sheet StoCrete TG 252

//STUDIOMAMA - OUTDOOR KITCHEN - FOR TEN 2010 //

6 Closet light. Model Due to continuing improvements, actual product may differ slightly from the product described herein.

CAST-IN-PLACE CONCRETE SLOTTED FLOORS FOR SWINE

SECTION A1 EXCAVATION AND BACKFILL GENERAL

Installation Instructions TrafficLED Levelling Console

CHARACTERISTICS / ADVANTAGES

CHOCKFAST INSTALLATION PROCEDURE

Re-Grouting Floor Joints in Commercial Kitchens and Industrial Applications

1. Rapid Set Cement. 2. Methods of preparation. 3. How to stage a job site. 4. Installation Mix, place, finish. 5. Coloring the TRU.

PPC Cement TUTORIAL. how to screed a floor

METHOD FOR OBTAINING AND TESTING DRILLED CORES FROM PCCP AND PRECAST GIRDERS (Kansas Test Method KT-49)

Data Sheet 832 Englisch

V 2.0 ASSEMBLY GUIDE. TS Platform Scale Series 2

Construction. Sikadur Part Epoxy Impregnation Resin. Product Data Sheet Version 04/03/2011(Corporate edition 02/09/2010)

PACTORep Fixer EASF AVAILABILITY. Working Hardening 3h 2h 1h30 1h Anchor Installation Resistance Admissible loads

VERsacourt LED Light System Installation Instructions

Transcription:

PUR Sensor Installation with PAGEL V2/40 Installation Manual for Concrete Roads Issued 24.11.2011 Sensor Line - Gesellschaft für optoelektronische Sensoren mbh Carl-Poellath-Str. 19 D-86259 Schrobenhausen - Germany - Tel.: +49 (0) 8252 / 8943-0 Fax.:+49 (0) 8252 / 8943-11 Email: sensorline@sensorline.de www.sensorline.de - 1 -

1. Assemble all tools and materials for the installation. Make sure that all safety equipment is available and that all operators are properly trained in the use of any power tool. 2. Mark the location of the PUR sensor. Mark a cut being a minimum of 70 mm wide and at least 50 mm longer than the length of the sensor. At the same time mark the location for the conduit. 3. Cut the opening at least 50 mm deep over the entire area. Exact procedures for this will be determined locally. Make the necessary cuts for the conduit. Use a jackhammer to remove the concrete to at least 40 mm at all points deep (see sketch slot dimensions). An electric jackhammer or a small pneumatic one will probably be better than a large pneumatic hammer. The finished opening must be at least 70 mm wide and 40 mm deep over the whole length and at least 50 mm longer than the length of the PUR sensor (see sketch slot dimensions). 70-90 1 to 2mm ROAD - SURFACE min,40 4. Clean out all rubble and vacuum all dust. 5. Make sure that the concrete surface (slot walls and bottom) is wet and completely water-saturated during all times until the end of the installation process! Make also sure that there are no water puddles in the slot (see User Manual Pagel V2/40). - 2 -

6. Position the PUR sensor beside the slot. 7. Clip the hanger bars on the sensor so that it can be positioned over the opening. Clip one hanger to the beginning and one to end of the sensor strip and at least one hanger bar every 25-30 cm. The hanger bars ensure the right leveling of the PUR sensor to the road surface. The hanger bars have to be screwed or loaded as to avoid a floating up of the strips because PUR sensors are much lighter than the mortar. Make sure that all hanger bars are correctly clipped to the sensor. See image on page 1. 8. Position the PUR sensor into the slot. Be sure to achieve an even and nearly exact height for the whole slot. Fix the hanger bars to the road with screws or suited weights. 9. Run the conduit to the proper location. CAREFULLY pull the passive cables through the conduit. Once pulled in, check again if light is going through the feeder cables and sensor. Remove both end caps of the connectors and point one connector at the sun. You should see a light at the other connector's end. 10. Tighten all spaces leading outwardly. 11. Mix the necessary amount of special mortar Pagel V2/40. Use accurately 3.25 liter of water for one bag cement (25 kg). Fill about 90% of the necessary amount of water in a bowl that is wide enough and add the complete sack of mortar. Mix for about 3 minutes with a heavy duty, slow speed electric drill and mixing paddle (see User Manual Pagel V2/40). After this add the rest of the water and mix for a further 2 minutes. - 3 -

12. Fill up the slot with fluid mortar. Pour only into one opening between PUR sensor and the road. The mortar needs to run below the strip and fill up the space under it completely to avoid air encapsulations. This would cause sensitivity problems of the PUR sensor. Then fill up all spaces up to street surface. 13. Wait until the mortar is hard enough to finish it with a trowel. Do not scrape off all of the mortar but just as much so that there is a good bonding between road, cement and PUR sensor. 14. Remove the hanger bars and clean the mortar smoothly off the sensor with a trowel. Do not over-trowel. 15. Protect the mortar from direct solar radiation, keep it wet and wait at least 2 hours until the mortar is hardened. After that you can open the lane. 16. If there is direct solar radiation, wind or high temperatures, make sure that the mortar is constantly wet for at least 3 to 5 days. Otherwise, the cement will form cracks. - 4 -

Materials & Equipment List Hanger bars (by Sensor Line GmbH) Necessary amount of mortar Pagel V2/40 Quantity required is about 6 kg/m PUR Sensor. Screws and dowel, or weights (for fixing the hanger bars onto the pavement) Hammer drill with drill bits Electric screwdriver Road saw with narrow blade Electric jackhammer or small pneumatic jackhammer Heavy duty slow speed electric drill Mixing paddle At least 3 buckets (for mixing mortar, water for mortar, additional water for smoothing mortar) Set of scales for exact weighing of V2/40 and water Spatulas und smoothing trowels Conduit inner diameter at least 20 mm Important notice All the information contained herein is believed to be accurate and reliable. However, SENSOR LINE assumes no responsibility for its use or for any infringements of patents or other rights of third parties that may result from its use. No license is granted by implication or otherwise under any patent rights of SENSOR LINE GmbH. SENSOR LINE GMBH SHALL NOT BE LIABLE FOR ANY SPECIAL, INCIDENTAL, OR CONSEQUENTIAL DAMAGES RELATED TO THE USE OF THIS PRODUCT. All rights reserved. Reproduction or adaptation of any part of this documentation beyond without permission of the Copyright owner is unlawful. Copyright 2011 by: - 5 -