Managing Contraction and Stress in an Ambient Pressure Insulated 9%Ni Subsea Cryogenic Pipeline

Similar documents
MATERIAL. III-1 Mechanical Finite Element Analysis and Engineering Critical Assessment Study

GTT Pluto II Subsea Cryogenic Pipeline

Offshore Pipeline Technology Challenges & Solutions

Enabling safe and reliable offshore LNG transfer operations By Vincent Lagarrigue, Marketing & Project Manager within Trelleborg Industrial Solutions

FIRETEX Hydrocarbon Series. Epoxy Passive Fire Protection

DOUBLE WALLED PIPING SYSTEMS

Fusion Bonded Joint: An innovative technology for cost efficient plastic-lined pipe installation and operation

FW LNG-PIPE Liquid Natural Gas -162 C FW STEEL-CASED PIPE-IN-PIPE systems for LNG-Powered Ships

Technical Inquiries for API Standard 620, Design & Construction of Large, Welded, Low-Pressure Storage Tanks Last updated February 2014

USS-LIBERTY TC. Proprietary TightFit TM. Thread Casing Connection

ABS and DNV Type Approved Products

Pipeline Bundles. subsea partner of choice

ATI Datalloy HP TM Alloy

AT&V. Cryogenic/Refrigerated Storage Presentation Rev 18

The world s first commercial LNG fuel tank made of high manganese austenitic steel

TRICON DOUBLE-CON PLUS

Marine Facilities for LNG Carrier Transfer Alternatives

Updated Design Methods for HPHT Equipment Kenneth Young, Chris Alexander, Richard Biel, Stress Engineering Services; Earl Shanks, DTC International

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

FIRETEX Hydrocarbon Series. Epoxy Passive Fire Protection

UPC Locations. Brazil through Houston, TX

Abstract. 1.0 Introduction

BiMetal Pipe CRA Pipe Overlay Cladding Pipe Prefabrication

ATI 201 HP /ATI 201L HP

9. VACUUM TANK 9. VACUUM TANK

LNG in the United States

Modelling thickness limits transition joints between pipes of different thickness

HIGH TECHNOLOGY PRODUCTS AND SERVICES FOR YOUR MOST DEMANDING CORROSIVE CHEMICAL ENVIRONMENTS

56 600# Monoblock Joints

TERRATORQUE HELICAL ANCHORS AND HELICAL PILING PRODUCT CATALOG

June 18, MACTEC Engineering and Consulting, Inc. 396 Plasters Avenue, NE Atlanta, GA Fax:

Strain Limits for Concrete Filled Steel Tubes in AASHTO Seismic Provisions. PIs: Mervyn Kowalsky and James Nau RA: Nicole King

Storage & loading on site SOFREGAZ

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

Advances In ILI Allow Assessing Unpiggable Pipelines. By Lisa Barkdull and Ian Smith, Quest Integrity Group, Houston

Composite Repairs Past, Present, and Future Composite Repair Users Group Quarterly Meeting (Houston, Texas) Wednesday, December 11, 2013

Materials and Welding. Capability & Experience

Specification for Pipe Fittings

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

COMPARISON OF LIMIT LOAD, LINEAR AND NONLINEAR FE ANALYSES OF STRESSES IN A LARGE NOZZLE-TO-SHELL DIAMETER RATIO APPLICATION

HISC Performance Validation of DSS Welds for Large-Strain, HP/HT Subsea Applications

Reliability of a cryogenic liquid storage vessel.

Tianjin Nolite Steel Co. Ltd.

From the desk of G. A. Aaker, Jr., PE.

Design, Specifications and Future Challenges for Cryogenic Valves

Title: Rectification of 20/90 Dragline. B Prabhakar Rao Manager, Coal and Coke Oven(C-1), MECON Limited, Ranchi.

Review of ASME Guidance Articles on Repair Strategies

In this reprint from World Pipelines April 2015, Land & Marine. highlights its recent and current projects and announces the

Development and Testing of a Post-Installed Deepwater Monitoring System Using Fiber-Optic Sensors

MATERIALS & MATERIAL GRADE SELECTIONS

ASME B31.3 CUMULATIVE INDEX INTERPRETATIONS VOLS SUBJECT INDEX. Assembly and Erection Authorized Inspector (see Owner s Inspector)

Thermoflex Tubing! Reinforced Thermoplastic Gathering, Disposal and Injection Lines! Overview and Case Studies!!! December 17, 2009!

EVALUATION REPORT. PFC-5551 Reissued April 1, Filing Category: DESIGN Steel (038)

. SECTION HANGERS AND SUPPORTS

Use of Underwater Dry Welding for In Situ Repair to Offshore Structures. Elleftheria Deligeorges; Jai Tulsi

Titanium Tubular Technology

Comparison of Predicted and Measured Residual Stresses in a Pipeline Girth Weld

Development of SPB LNG Fuel Tank for Ships

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry

Shell & Tube Heat Exchangers

Section 906. STRUCTURAL STEEL

INNOVATIVE MARINE TERMINAL CONFIGURATIONS

Testing. Test drainage products according to the applicable AASHTO or ASTM specification, except as otherwise noted.

Thermal Expansion & Helical Buckling of Pipe-in-Pipe Flowline Systems

Offshore Equipment. Yutaek Seo

Can Today s Fracture Mechanics address Future Pipelines Integrity?

Design Concept and Features of the Mitsubishi LNG-FPSO (Floating Production, Storage and Offloading Unit)

STRESS ANALYSIS OF A 46-INCH REACTOR FEED/EFFLUENT EXCHANGER

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

New designed XLPE-insulated cables substituting paper-insulated pipe type cables

Coiled Tubing for Downhole Applications

LNG VACUUM INSULATED PIPE SOLUTIONS.

Container Securing Devices

Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications

HYBRID COMPOSITE REPAIR for OFFSHORE RISERS

Outokumpu 2507 UNS S32750

CRUX Grout Seals. +44(0) Call us on ++44(0)

SPE DISTINGUISHED LECTURER SERIES is funded principally SPE FOUNDATION

Part 0 - Classification and Surveys Classification and Surveys I Classification and Surveys I

ATI ATI 2205 Alloy (UNS S31803 and S32205) Duplex Stainless Steel. Technical Data Sheet

With the recent proliferation of its use in

Bestobell Oilfield Products. Jetfire and Fireflex fire and vapour barrier seals Engineered sealing solutions. Bestobell Oilfield Products

Previous Conclusions

Ship Transportation of Natural Gas

Fatigue strength of knuckle joints - a key parameter in ship design D. Beghin Marine Division, Bureau Veritas, Paris, France

Guidance for Structural Strength Assessment of Pump Tower of LNG Carriers

Addressing Common Drilling Challenges Using Solid Expandable Tubular Technology By Larry Book, Enventure Global Technology, L.L.C.

Current issues within the UK steel supply chain for the offshore wind industry

armaflex cryogenic systems for oil & gas FLEXIBLE INSULATION SYSTEMS FOR INDUSTRIAL PROCESS PIPEWORK AND TANKS.

CONNECTOR B L O C K S H E A R. Design for Composite Structural Action BLOCK SHEAR CONNECTOR APPLICATION. Airspace

Design of an LNG Tank for Accidental Loads in Finland. 1. Introduction

LNG Plant Overview. Seminar with Supplier Association Murmanshelf Murmansk, 15 May 2012 Jostein Pettersen

Plymouth Feedwater Heater Tubing F O R T H E P O W E R G E N E R AT I O N I N D U S T R Y

DUO-THERM 505 Specification Guide

Creating Optimal LNG Storage Solutions. 40 in detail

SECTION DECORATIVE METAL AND GLASS RAILING

INVAR M93 PIPES AND TUBES FOR LNG TRANSFER LINES WELDING PROCESSES. Stainless & Nickel Alloys

The following sub-systems are provided and the integration of these is described below:

SANDVIK 254 SMO TUBE AND PIPE, SEAMLESS

Transcription:

Rice Global E&C Forum, Houston, Texas Managing Contraction and Stress in an Ambient Pressure Insulated 9%Ni Subsea Cryogenic Pipeline C. Neal Prescott, Jeff Zhang Fluor Offshore Solutions, USA 14 November 2008

Acknowledgements Fluor Client Fluor Management Fluor Subsea LNG Pipeline Team Cabot Corporation Eisenbau Krämer Corus Tubes Brück Astro Technology Southwest Ocean Services / Sampson Rope Det Norske Veritas (DNV) American Bureau of Shipping (ABS) 14 November 2008 Rice Global E&C Forum - Houston 2

Presentation Outline Offshore Transfer of LNG Options Ambient Pressure Insulated 9% Ni Steel Subsea LNG Pipeline Technology Key Technology Issues Case Study Conclusions 14 November 2008 Rice Global E&C Forum - Houston 3

Typical Dock, Trestle & Pipelines Dredged Turning Basin Dredged 9-km Ships Channel 1..2-km Rock Groin Breakwater Onshore Gas Liquefaction Facility Cryogenic Pipelines on 6-km trestle Offshore Loading Terminal 14 November 2008 Rice Global E&C Forum - Houston 4

Offshore Trestles / Causeways (Fluor Case History) Aramco Ju Aymah LPG Terminal Saudi Arabia 10-km trestle Mid-1970 s Original trestle cost estimate $68 million Final installed cost $268 million Problems with pile driving and construction schedule. 14 November 2008 Rice Global E&C Forum - Houston 5

Typical Dock, Subsea Pipelines Dredged Turning Basin Dredged 9-km Ships Channel Onshore Gas Liquefaction Facility 6-km Cryogenic Pipelines Offshore Loading Terminal 1..2-km Rock Groin Breakwater 14 November 2008 Rice Global E&C Forum - Houston 6

Ambient Pressure Insulated 9% Ni Steel Subsea LNG Pipeline Aerogel Insulation (Cabot Nanogel TM Expansion Pack TM ) ASTM A 553 Type 1 (9% Ni Steel) Product Pipe Fluor Patent Pending Design Concrete Weight Coating (if required) External Carbon Steel Casing Pipe (or 9% Ni Steel if required) 14 November 2008 Rice Global E&C Forum - Houston 7

Contraction Reduction Bulkheads 14 November 2008 Rice Global E&C Forum - Houston 8

Ambient Pressure Insulated 9% Ni Steel Subsea LNG Pipeline Configuration 9% Ni Steel for Product Line 9% Ni Steel Bulkheads at Ends Ambient Pressure in Annular Space Nitrogen filled, slight overpressure Vent tubes Aerogel Insulation Monitoring System Simple Fabrication and Assembly, Proven Installation Techniques Fluor Patent Pending Design 14 November 2008 Rice Global E&C Forum - Houston 9

Comparison of Pipe Material Costs Material Relative Yield Stress Yield Stress Cost (MPa) @ 0 o C (MPa) @ -196 o C Invar TM 36% Ni 14 270 650 9% Ni Steel 6 585 847 316L Stainless Steel 5 250 400 API X52 Carbon Steel 1 359 14 November 2008 Rice Global E&C Forum - Houston 10

Comparison of Costs (7 km LNG Pipeline Fluor and 3 rd Party Studies) Not to Scale Trestle + Polyfoam Subsea Competitors 25% - 45% Fluor 60% 14 November 2008 Rice Global E&C Forum - Houston 11

Key Technical Issues 9% Ni Steel Welding Procedure Weld Mechanical Properties CTE Mismatch between Weld and Pipe Bulkhead Fabrication Procedure Mechanical Integrity Stress and thermal load on connecting systems Contraction Fatigue Life Brittle Fracture Insulation Material Recent Technology Developments Have Resolved All Issues 14 November 2008 Rice Global E&C Forum - Houston 12

9%Ni Plates 9% Nickel Steel Pipe Have been widely used for cryogenic storage tanks since the 1960 s. Have proven to be well suited for cryogenic service. 9%Ni Pipe EisenBau Krämer has 3 mills in Germany and are specialists in Longitudinal Welded Large Diameter Pipe 14 November 2008 Rice Global E&C Forum - Houston 13

9% Ni Welding Technology Development EBK started development 5 years ago Numerous welding consumables and welding procedures investigated Welding Procedure now ready for project application Matched plate strength Applicable to both longitudinal and girth welds CTE mismatch issue resolved Welding Procedure qualified by ABS and DNV for longitudinal and girth welding 14 November 2008 Rice Global E&C Forum - Houston 14

World s First 9%Ni Steel Line Pipe 9Ni Pipe during Production Steel: ASTM 553 Type I (Source: EisenBau Krämer) 14 November 2008 Rice Global E&C Forum - Houston 15

9Ni Pipe Weld longitudinal weld girth weld Source: EBK, Stainless Steel World America 2008, Houston, 9-10 September 2008, Paper PS08040 14 November 2008 Rice Global E&C Forum - Houston 16

9% Ni Welding Technology Development Corus Tubes started development 4 years ago Now manufactures 9%Ni Alloy Pipe on its UOE double submerged arc welded (DSAW) mill in Hartlepool, UK. Longitudinal Welding Procedure has been developed to generate material properties in the weld that exceed those in the parent plate. Girth Welding Procedure now being developed. 14 November 2008 Rice Global E&C Forum - Houston 17

Cabot Nanogel Expansion Pack Insulation System Hydrophobic Elastically Compressible Low Conductivity High-Efficiency Aerogel Insulation System 14 November 2008 Rice Global E&C Forum - Houston 18

History of Aerogel 1931: Aerogel invented by Dr. Steven Kistler 1950: Monsanto commercialized an aerogel under trade name Santocell. Exited business in 1970 because of high production costs using old manufacturing method. 1950: First patent issued on use of aerogel for cryogenic storage tank by Air Products 1961: Patent issued to Chicago Bridge & Iron for aerogel in cryogenic storage tanks 1996: NASA uses aerogel for thermal insulation on Mars spacecraft 1996-1998: New cost-efficient aerogel manufacturing processes developed by Cabot and others 2004: Aerogel first used in deepwater subsea oil pipelines 2008: Cabot Nanogel Compression Packs to be used for world's longest aerogel-insulated subsea tieback in US Gulf of Mexico (Helix Danny project) 14 November 2008 Rice Global E&C Forum - Houston 19

Nanogel Expansion Pack -Cryogenic Vibration Test (Photo Source: Cabot Corporation) This is one of the mechanical and thermal tests performed on Nanogel Expansion Packs to confirm suitability to LNG service 14 November 2008 Rice Global E&C Forum - Houston 20

Case Study 8 KM 14 November 2008 Rice Global E&C Forum - Houston 21

Pipelines LNG Pipelines (2) LPG Pipelines (2) LPG Cool-Down Pipeline LNG BOG Return Pipeline Utilities Pipelines (10) Power and Communication Cables (2) 14 November 2008 Rice Global E&C Forum - Houston 22

Monitoring System Multiple Redundancies for Highly Reliability Temperature Measurements along Pipeline Leak Detection by Temperature and Annulus Pressure Intrusion Detection Bulkhead Monitoring PLET Monitoring Annulus Venting 14 November 2008 Rice Global E&C Forum - Houston 23

Redundancies and Safety Margin Strength of 9% Ni Steel SMYS at room T used in the design Bulkheads: inherent 100% redundancy Two conical sections Fatigue life 900 times the number of likely complete full thermal cycles (10) Monitoring System 14 November 2008 Rice Global E&C Forum - Houston 24

Thermal Hydraulic Performance Loading Satisfies Pressure and Heat Gain Limits LNG Pipeline: OHTC = 0.107 W/m 2 /K including spacer effect LNG Recycle Boil-Off Gas Rate Satisfactory Commissioning: One Week Duration Natural Warm-Up: One Month LNG purging can expedite warm-up 14 November 2008 Rice Global E&C Forum - Houston 25

Pipeline Contraction and Stress Software ABAQUS FEA software for main pipeline AUTOPIPE for connection piping Multiple end condition (anchored/free) combinations Parameters sensitivity studies: soil, burial, dimensions, length, water depth 380 Stress (MPa) 360 340 320 300 Inner Pipe Stress Onshore end anchored Offshore end free 0 1000 2000 3000 4000 5000 6000 7000 8000 X Distance (m) 14 November 2008 Rice Global E&C Forum - Houston 26

Pipeline Analysis Results 32 X44 LNG Pipeline, Onshore Anchored, Offshore Free Max inner pipe stress 374 MPa 64% SMYS Max outer pipe stress 106 MPa 24% SMYS Offshore end displacement 200 mm Onshore anchor displ. 62 mm Onshore anchor load 4351 kn Pipeline max vert. displ. 15 mm Pipeline stress within limit, and contraction acceptable for all sensitivity cases, and for other dimensions and length 14 November 2008 Rice Global E&C Forum - Houston 27

LNG Bulkhead FEA Analysis Stresses well within allowable values Linearized Stress is used in ASME Code to compare with Allowable acceptable acceptable acceptable 14 November 2008 Rice Global E&C Forum - Houston 28

LNG Bulkhead Buckling Calculation Compressive forces in split-sleeve are checked for buckling Maximum compressive stress is 10817 psi Well below limit of 43308 psi No Risk for Buckling 14 November 2008 Rice Global E&C Forum - Houston 29

LNG Bulkhead Brittle Fracture Calculation Brittle fracture analysis per API 579 considered due to low product temperature Bulkhead radius and LNG pipe-to-bulkhead weld are critical areas Assumed 360 circumferential flaw with depth of ¼ thickness Factor of 2.0 applied to stresses at welds to account for discontinuities at or near surface. 14 November 2008 Rice Global E&C Forum - Houston 30

LNG Bulkhead Brittle Fracture Calculation Fatigue/strength results fall within accepted values. Component OD (in) t (in) Crack Size (in) T ( F) K 1 (ksi in) K 1C (ksi in) CVN (ft lbs) Bulkhead Radius 37.0 0.75 0.1875 20 59.16 105 73 Inner Pipe 32.0 0.375 0.09375-256 59.18 70 33 Mid Bulkhead 32.5 0.75 0.1875-256 53.48 70 33 Bulkhead Mid Leg 38.0 0.75 0.1875-93 40.42 70 33 Welds Outer Casing 44.0 0.75 0.1875 37 0.112 70 33 Outer Pipe 44.0 0.75 0.1875 53 24.72 53 20 14 November 2008 Rice Global E&C Forum - Houston 31

LNG Bulkhead Fatigue Calculation All allowable cycles are well above the defined cycles for each event. 14 November 2008 Rice Global E&C Forum - Houston 32

Design Code /Criteria Check Issue Analysis Results Applicable Codes/Notes Pipe Stress - Max Stresses: ASME B31.4 Longitudinal Inner Pipe = 374 MPa Allowable = 80% SMYS (64% SMYS) Outer Pipe = 120 MPa (27% SMYS) Bulkhead Stress Max. Stress = 359 MPa ASME Sec VIII Div 2 Allowable = 3 X Sm = 100 ksi (690 MPa) Membrane+ Bending Stresses Fatigue Min fatigue life: Bulkhead 8996 Full thermal cycles Small local plastic region allowed per code ASME Sec VIII, Appendices 4 and 5 Fatigue life conservatively based on carbon steel curve. 14 November 2008 Rice Global E&C Forum - Houston 33

Design Code/Criteria Check Issue Analysis Results Applicable Codes/Notes Brittle Fracture Bulkhead radius: 0.1875 deep defect allowed K 1 = 59.2 ksi*in 1/2 Bulkhead welds: 0.09375 deep defect allowed at inner pipe K 1 = 59.2 ksi* in 1/2 API 579 Bulkhead radius: Allowable K 1C = 105 ksi* in 1/2 Bulkhead welds: Allowable K 1C = 70 ksi* in 1/2 Buckling Max stresses: Split sleeve = 74 MPa compression ASME Code case 2286 Max Allowable Stresses: Split Sleeve = 300 MPa (local) 299 MPa (column) 14 November 2008 Rice Global E&C Forum - Houston 34

Fabrication Lay down and Storage Launch and Assembly Main Rail 1200 - m 1-km Pipeline Strings Fabricate 500-m pipe sections Hydro-Test 500-m pipe sections Assemble 500-m Pipe-in-Pipe Test Monitoring & Vent Systems Weld 2 x 500-m Sections together Field Joint Insert Nitrogen & Deploy Insulation String Make-Up Area 140-m 60-m 200-m 14 November 2008 Rice Global E&C Forum - Houston 35 35

Layout of Fabrication Facility 14 November 2008 Rice Global E&C Forum - Houston 36

Pipeline Installation - Pulling General Area of Pipe Pull Barge set-up for intermediate pipe-pull operations. General Area of Pipe Pull Barge set-up for final pipe-pull operations. 14 November 2008 Rice Global E&C Forum - Houston 37

Heavy Lift Barge for PLET and Platform Installation 14 November 2008 Rice Global E&C Forum - Houston 38

Qualification by Certification Agencies ABS Approval in Principle Issued April 2006 Fit for Service Certificate Issued October 2008 DNV Approval in Principle Issued March 2006 In final review for issuing Fitness for Service Certificate; expected date is end of Nov 2008 14 November 2008 Rice Global E&C Forum - Houston 39

14 November 2008 Rice Global E&C Forum - Houston 40

Conclusions Technology breakthrough on welding enables the application of 9% Ni steel in subsea LNG pipelines The Case Study on the ambient pressure insulated 9%Ni steel subsea LNG pipelines show that The stresses in the LNG pipe and bulkheads satisfy design codes with significant margins Contraction are acceptable Fatigue life is 900 times the number of thermal cycles likely to be encountered Thermal performance is satisfactory The pipeline technology provides significant cost advantage The pipeline technology has received Fit for Service certification, is ready for project use 14 November 2008 Rice Global E&C Forum - Houston 41

Thank You! 14 November 2008 Rice Global E&C Forum - Houston 42