TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

Similar documents
M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

CHAPTER 8 WATER SUPPLY SYSTEM

APPENDIX B STANDARD CONSTRUCTION DRAWING NOTES

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances

CHAPTER 5 WATER SYSTEM DESIGN STANDARDS

SECTION MEASUREMENT AND PAYMENT

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

TERRADYN CONSULTANTS, LLC

WATER MAIN EXTENSION DESIGN REQUIREMENTS

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

FREELAND WATER & SEWER DISTRICT BERCOT ROAD INTERTIE STUDY

EXHIBIT E SCHEDULE OF UNIT PRICES

SANBORN COUNTY

BIDS WILL BE CONSIDERED NON-RESPONSIVE WITHOUT THE REQUIRED SIGNATURE ACKNOWLEDGING THE FOLLOWING:

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS

West Bountiful City. Water System Capital Facilities Plan

City of Logan Sanitary Sewer Design Standards

CULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix B

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA

General Rules and Regulations

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

TABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 115 WATER DISTRIBUTION SYSTEM GENERAL SIZING LINES 115.

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

Chapter 3: Permit Procedures and Requirements

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

SECTION WATER MAINS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA TMWA Capital Project No.: October 3, 2018

CONSTRUCTION PLANS FOR ENTERPRISE RENTAL CAR

Construction operations shall be conducted in a manner to provide DOT forces access to the Maintenance Yard on a continuous basis.

Index. Composition and Order of Plan Set. Utility Plan... 5

F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it.

SECTION MEASUREMENT AND PAYMENT

A. Introduction 7 1. Purpose 7 2. Authority 7 3. Contact 8 4. Plan Submittal Process 8 B. Design Standards General 11 a. Future Extensions 11

BRICK TOWNSHIP MUNICIPAL UTILITIES AUTHORITY BRETON WOODS SECTION 1 WATER MAIN REPLACEMENT ADDENDUM #2

SECTION WATER DISTRIBUTION SYSTEM

The developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.

Job Order Sewer Repair Services

DOCUMENT ADDENDA AND MODIFICATIONS

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION WASTEWATER FORCE MAINS

SEWER SYSTEM DESIGN GUIDELINES

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Sample. Bid Proposal. Not Valid for Use

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

4A General Information A. Concept... 1 B. Conditions... 1

Attachment D-1: Civil/Structural Scope of Work

SECTION 10.0 PIPE TRENCHES Excavation and Preparation of Trench

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System

STATE UNIVERSITY CONSTRUCTION FUND

PUBLIC WORKS DEPARTMENT GENERAL NOTES

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST

Project: Developer/Designer: Reviewer:

SECTION TRENCHING

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION...7-1

REGIONAL CONSTRUCTION STANDARDS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

STORM DRAINAGE DESIGN MANUAL

Klickitat County. On-Site Sewage System. Construction Manual

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

a. Unless otherwise specified, all lengths shall be horizontal distances.

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE,

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

DISTRICT OF HOPE SUPPLEMENTARY SPECIFICATIONS

Ivins City Standard Specifications for Design and Construction Part 2 Engineering and Design Standards

BID FORM (LUMP SUM CONTRACT)

CUYAHOGA COUNTY ENGINEER

SPECIFICATIONS & SPECIAL PROVISIONS FOR DESIGN AND CONSTRUCTION CITY OF MONTCLAIR - ENGINEERING DIVISION

ZONING CLEARANCE PLAN REVIEW CHECKLIST. Based on the Revised Town of Carefree Zoning Ordinance

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

T a b l e o f C o n t e n t s

I - 15 CORRIDOR CAMPUS MASTER PLAN DRAFT EIR MT. SAN JACINTO COMMUNITY COLLEGE DISTRICT. Appendices

SECTION MINOR CONCRETE

Wastewater Capital Projects Management Standard Construction Specification. 9.0 Pipe Testing, Inspection and Acceptance

CHAPTER 6. Sanitary Sewer

Addendum No. 1 Page 1 of 2

SPECIAL SPECIFICATION 6664 Level (3) Communications System

SPECIAL SPECIFICATION 6666 Charter Communications System

CITY OF MILTON CONSTRUCTION NOTES

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit

SECTION 1 GENERAL NOTES

CONSTRUCTION PROCEDURE

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete.

Section 7 Design Criteria Irrigation and Drainage Facilities

COTTONWOOD IMPROVEMENT DISTRICT SALT LAKE COUNTY SERVICE AREA #3 SOLITUDE IMPROVEMENT DISTRICT TOWN OF ALTA WATERSHED SERVICE LINE SPECIFICATIONS

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer

Transcription:

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany, NJ 07054 May, 2004 PCI NO. 274

COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION TOWN OF MOUNT PLEASANT TABLE OF CONTENTS 1. BACKGROUND... 3 2. PROJECT DESCRIPTION... 5 3. EXISTING CONDITIONS... 5 4. PROPOSED IMPROVEMENTS... 6 5. COST EVALUATION... 8 APPENDIX...11 REFERENCES...12 DRAWINGS...13

COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION 1. Background Town of Mount Pleasant Westchester County, New York The Town of Mount Pleasant is located in the center of Westchester County, New York. The Town s water system is presently divided into several water districts; refer to drawing 1. In order to comply with the filtration avoidance compliance requirements, the Town s three (3) major districts are currently being consolidated into one service district. The new Commerce Street Pump Station and the elevated water storage tanks (total capacity-4.0 million gallons) located in the Valhalla section of the town, will act as a primary water source to the consolidated area. The proposed water main extension project is located within this consolidated area, which is located adjacent to the existing Thornwood and Valhalla Water Districts; refer to the attached location plan. The consolidation of these water districts has already been decided upon by the Town officials and consequently, Professional Consulting, LLC. (PCI), has been involved in the consolidation of water districts and rehabilitation for the water mains in Town of Mount Pleasant. The construction phase of the consolidation work is near completion. The new consolidated water distribution mains are interconnected with pressure reducing valves (PRV) and control devices. This arrangement will help in maintaining adequate pressures in the service areas. The distribution PRV chambers are located as such, which allows the maximum available pressures to the proposed Rolling Hills service area. Currently, the project area s domestic water demand is satisfied by the ground water source. These are individual homeowners wells; no fire service mains are present in the area. This report is being prepared to provide the budget cost evaluation of the Rolling Hills Area Water Main Extension work. Based on our review of the existing water distribution system, review of the available documents, and the field investigation conducted by PCI, we recommend that the proposed project area water mains be connected to the high-pressure zone of the new consolidated water district. The report conceptualizes the possible water main interconnections, the current and projected water demands, suggested layout and sizes of the proposed water mains for the optimal operation of the distribution network, and the cost break down of the project. The project includes the following streets and one easement area for the water main extension (also refer to drawing 2): Rolling Hills Road Hilltop Lane Westerly Lane 3

Project Location 4

Westerly Lane South Aspen Way Grandview Lane Jennifer Lane Lillian Avenue Easement (connects to Westerly Lane) 2. Project Description The project consists of the Water Main Extension to the Rolling Hills section of the Town. This section predominantly services the residential development comprising of single-family houses. Presently, part of area is currently within the Valhalla Water District and the majority of the remaining area is described as a non-districted water service area of the Town; refer to drawing 1. The proposed project will include construction of approximately 11,500 linear feet of 10-inch diameter water mains. These mains will be laid in the existing right-of ways, which currently provides housing for other buried and overhead utilities to the residents. These mains will provide individual service connections to all existing houses in the area, and will be connected to proposed fire hydrants. Location of hydrants and valves will comply with the requirements of the Health Department and the Recommended Standards for Water Works. The attached conceptual water main plan shows the proposed layout of the water mains, hydrants, and valves (refer to drawing 5). These mains will be connected to the existing water distribution system via three different locations. All of the proposed interconnection mains are at maximum hydraulic gradient zone of the district, approximately 710 feet. The proposed distribution network is tied to the existing system via an easement run off of Belleview Avenue to Westerly Lane, which is an existing easement, as shown on drawing 3. 3. Existing Conditions The current multiple independent but interrelated water districts are joined into one water district or distribution system as a result of Phase I construction. The Joint District is fed primarily from a single connection with the New York City s Catskill Aqueduct. The Joint District is spread out over a relatively large area, with hills and valleys ranging from 200-feet to 645-feet in elevation (refer to drawing 3). The proposed project area is located in the hilly section of the Town. The area has apparent rock outcrops. The utilities in the service area are approximately depicted in drawing 4, which include telephone and electric lines, sanitary and storm sewer mains, catch basins, manhole, and stream crossings. Additional information requests have already been filed with the existing utility authorities, information provided is approximate and shall be verified prior to the startup of design work. However, based on site inspections, it appears that gas lines are present in Hilltop Lane adjacent to Rolling Hills Road, which extend towards High Acres Drive. The site has numerous rocks outcrops and hilly terrain. 5

The project area is predominantly residential, comprising of 111 single-family houses. The estimated population served in the location is approximately 450 500. At an estimated average demand of 125 GPCD, the approximate water demand of the proposed service area is 0.056 0.062 MGD (average 0.06 MGD). Based on the existing demand pattern of the neighboring districted sections, the following is an estimated demand table for the proposed Rolling Hills service area: Average Day Demand Max. Day Demand Max. Hourly Demand 42 gpm 122 gpm 218 gpm The fire flow demand is estimated at 500gpm to 700gpm, for the proposed service area extension. 4. Proposed Improvements The new water main arrangement is proposed to interconnect the non-districted project area with the consolidated water districts at three locations. These are located at Rolling Hills Road, Jennifer Lane, and Westerly Lane (refer to drawing 5). This is proposed to provide adequate looping to the distribution system and to assist during maintenance and repairs of the distribution system. These interconnections are presently located in the Thornwood and Valhalla water districts. The distribution mains at the interconnection points range in diameter from 8-10 inches. For the proposed distribution system, we recommend new mains to be cement lined ductile iron main with10-inch in diameter. This should assist in controlling the head loss in the system during high demand periods. The new distribution will consist of approximately 25 hydrants and 50 control valves. We have developed the Town hydraulic model with proposed water main extension. The purpose of the model is to simulate or mimic the system and to test and predict its responses under various domestic and fire demand conditions and emergency scenarios. This is a powerful tool to aid in the logical and economical planning for consolidation and the water main extensions. The proposed water main extension, as shown in the attached topographic plan, varies in elevation from 400 ft to 560 ft (information obtained from existing town topographic maps). The new storage tanks in Valhalla will service these areas at the hydraulic gradient of 710 ft. The street high and low elevations are summarized below: 6

Street Name Elevation (ft) Slope (ft/ft) Length of Slope (ft) Aspen Way 460 430 0.040 750 Grandview Lane 485 525 0.066 600 Hilltop Lane 425 510 500 0.071 0.038 1,200 262 Rolling Hills Road 420 475 502 415 430 0.037 0.030 0.055 0.023 1,458 885 1,561 648 Jennifer Lane 425 405 0.066 300 Westerly Lane 501 550 0.025 1,900 Westerly Lane South 540 520 0.016 1,200 The hydraulic model confirmed pressure in the proposed extension during the average daily demand conditions to be in the range of 56 psi to 122 psi. A simulated fire demand of 500 gpm results in available pressure above the minimum 20-psi in the zone. The old distribution system surrounding the High Hills Area maintained a lower hydraulic gradient of 592 ft (TWD) and 684 ft (VWD). The new-elevated Valhalla tanks at hydraulic gradient of 710 (VWD new) made it possible to service the proposed Rolling Hills Area at higher pressures mentioned above. Following is the tabulated description of the proposed distribution system: Road Length Proposed Water No. of No. of (ft) Main Size Valves Hydrants Rolling Hills 4,500 10 10 10 Hilltop Lane 1,700 10 6 2 Westerly Lane 1,900 10 8 5 Westerly Lane South 1,200 10 4 1 Aspen Way 750 10 4 1 Grandview Lane 600 10 4 1 Jennifer Lane 300 10 4 1 Lillian Avenue Easement 400 10 4 1 Total 11,350 44 22 7

5. Cost Evaluation The project cost is prepared based upon the above-described conceptual design of the water main distribution at Rolling Hills Area. All material used for the water mains and their fittings shall conform to the ANSI/NSF standards to maintain treated water quality. The minimum 10- feet horizontal and 18-inches vertical distance shall be provided between the water mains and the sewers. In exceptional cases where meeting the above requirement is not workable, and based on the plan approval from the Westchester County Department of Health (WCDOH), we propose that the water mains be encased in K-Crete. The additional cost of the encasement of water mains with K-Crete is added to the cost of the water mains. Based on the size and location of existing interconnecting water mains, and the head loss analysis through, we have designed the size of the water main to be 10-inches in diameter. Proposed water mains shall be cement lined ductile iron pipe (CLDIP). The project area is located at an elevated rocky section of the Town. Based on our site inspection and presence of rock outcrops, we estimated approximately 50% of the trench excavation in rock. Rock quantities as presented in the table below are based on this assumption. We recommend boring and probing shall be conducted prior to the start of the design work. Estimated cost of borings and probing is added to the cost presented. Location and distribution of hydrants and valves are shown in the attached conceptual plans (refer to drawings 5, 5A & 5B), the proposed layout satisfies the requirement of the Recommended Standards for Water Works. Due to the elevated location of the proposed water main extension, we propose installation of air relief valve chamber(s) and additional pre-cast valve chambers at stream crossings. The location and requirements for these chambers and their valve arrangements will be determined during final design work. In order to calculate a more accurate budget cost estimate for construction and design work, we have supplemented our cost evaluation work by obtaining preliminary cost estimate from local surveying and boring/probing companies (refer to Appendix I). Also, in addition to our review of recent bid evaluations for similar work designed and administered by PCI, we have coordinated the proposed contract work cost breakdown with local qualified contractors who have previously submitted their bids for similar work in the Westchester County area. The following construction cost is based on installation of water main within the roadway section of the Right Of Way (R.O.W.). The restoration cost as presented below is based on trench restoration only. This is approximately a 5-ft wide asphalt surface restoration. Should the Town decide to pave the entire width of the roadway, additional cost of approximately $ 250,000 should be budgeted. Based on the details and assumptions as described above, the following is the proposed project budget construction cost estimate: 8

A. Probable Construction Cost Estimate: Item No. Estimated Quantity Description Unit Price Total Price 1. Lump Sum Insurance, bonds, permits & temporary construction facilities L.S. $ 70,000 2. 8,000 LF Installation of 10 ductile iron cement $ 200 lined water main encased with K-Crete Per Foot $ 1,600,000 3. 3,500 LF Installation of 10 ductile iron cement $ 150 lined water main Per Foot $ 525,000 4. 50 LF Installation of additional 8 ductile iron $ 150 cement lined water main Per Foot $ 7,500 5. 50 LF Installation of additional 6 ductile iron $ 150 cement lined water main Per Foot $ 7,500 6. 8,000 Additional Installation of 10 ductile iron $ 3.0 Pounds pipe fittings Per lb. $ 24,000 7. 1,000 Additional Installation of 6 & 8 ductile $ 3.0 Pounds iron pipe fittings Per lb. $ 3,000 8. 120 Installation of water service connections $ 2,500 $ 300,000 9. 4 Installation of 6 gate valves $ 3,500 $ 14,000 10. 4 Installation of 8 gate valves $ 3,500 $ 14,000 11. 45 Installation of 10 gate valves $ 2,750 $ 123,750 12. 25 Installation of Hydrant Assemblies $ 6,500 $ 162,500 13. Lump Sum Demolition L.S. $ 20,000 14. 100 Tons Additional Base Course Type 1 $ 125 (D.O.T. Item No. 403.11) Per Ton $ 12,500 15. 80 Tons Additional Binder Course Type 3 $ 125 (D.O.T. Item No. 403.13) Per Ton $ 10,000 16. 50 Tons Additional Wearing Course Type 6F $ 125 (D.O.T. Item No. 403.1701) Per Ton $ 6,250 17. 100 Additional Dense Graded Aggregate $ 40 Cu. yds. (D.O.T. Item No. 4) Per Cu. Yd. $ 4,000 18. 3,300 $ 250 Rock Excavation Cu. Yds. Per Cu. Yd. $ 825,000 19. 20. 100 Cu. Yds. 6,000 LF/Inch Dia./VF Additional Foundation Material and Imported Granular Backfill Material Reconstruction of uncharted and mismarked utilities 21. 15 Test Pits $ 35 Per Cu. Yd. $ 2.0 Per LF/Inch Dia./VF $ 1,500 $ 3,500 $ 12,000 $ 22,500 9

22. 50 $ 250 Additional Concrete Cu. Yds. Per Cu. Yd. $ 12,500 23. 3 Furnish and Install Pre-cast Chamber $ 7,500 $ 22,500 24. 250 LF Additional Concrete Curb $ 30 Per LF $ 7,500 25. 5000 $ 3.0 Additional Vegetation Sq. Ft. Per Sq. Ft. $ 15,000 26. --- Contingencies and extra work N/A $ 50,000 Total $ 3,874,500 approximately $ 3,900,000 The costs presented here are based on year 2004 design and year 2005 construction schedule. These costs should be adjusted based on future CPI factors. In addition to the above-presented cost breakdown, the individual homeowners need to make their individual house service connections independently. This cost is dependent on the length of service and the type of sub-grade conditions. We estimate this cost approximately in the range of $ 3,500 - $ 5,000 per service connection. B. Design and Construction Administration Budget: Based on the scope of work described above, we have estimated the project construction period to be approximately 8 to 10 months. We have contacted surveyors and boring contractors for their cost information for the proposed work as described herein. Based on the scope and estimated duration of the project, we have prepared the following design/ engineering budget fee for this work: 1. Surveying $ 50,000 2. Borings/ Probing evaluation $ 25,000 3. Design & Regulatory Compliance Budget $ 195,000 $ 273,000 ( 5% - 7% of Construction Cost Estimate) 4. Construction Administration $ 235,000 - $ 315,000 ( 6% - 8% of Construction Cost Estimate) $ 663,000 approximately $ 665,000 10

APPENDIX Surveying & Boring/ Probing Estimates 11

REFERENCES Joint Water District Project and Distribution System Computer Model, Town of Mount Pleasant, Westchester County, New York, January 2001. Northern Water Districts Consolidation Study, Town of Mount Pleasant, Westchester County, New York, June 1995. Town wide Water System study, Town of Mount Pleasant, Westchester County, New York, March 1995. Recommended Standards for Water Works, 2003 Edition. Record Maps provided by Water and Sewer Department, Town of Mount Pleasant, New York. 12

DRAWINGS 13