The Influence of Price Offers for Procurement of Goods and Services on the Quality of Road Constructions

Similar documents
ISSN (Print) : Agus Suroso Kristanto et al. / International Journal of Engineering and Technology (IJET)

Implementation Analysis of the Self-Management Contract System and Contract System Long Segment on Road Performance

Scholars Bulletin. DOI: /sb

Analysis Of Factors Causing Delays On Harun Nafsi - Hm Rifadin Street In Samarinda East Kalimantan Maintenance Project

The Influences of Leadership Style and Job Satisfaction on Employee Performance

Compliance with Public Procurement Act and its Correlation with Procurement Performance of Senior High Schools in Ghana

The Influence Of Leadership, Work Environment, And Innovative Work Behavior On Performance

FACTORS AFFECTING PROCUREMENT PERFORMANCE OF PUBLIC UNIVERSITIES IN NAIROBI COUNTY

Frequency Analysis of Genesis Risk In Construction Projects

The Impact of Human Resource Management Functions in Achieving Competitive Advantage Applied Study in Jordan Islamic Bank

5 CHAPTER: DATA COLLECTION AND ANALYSIS

Zulpan Hadi and Suryawan Murtiadi Master of Civil Engineering, Postgraduate Study Program, University of Mataram, Indonesia

Potato Chips Market Positioning Analysis Based on Consumer Perception in Small Medium Enterprises

An Exploration of the Relationship between Construction Cost and Duration in Highway Projects

Factors Causing Rework at Building Construction in The Department of Highways and Settlements of Aceh Province

Cost Estimate Modelling of PrestressedConcrete Bridge at the Public Worksand Housing Department of Bina MargaEast JavaProvince Indonesia

THE STUDY ON THE GREEN CONSTRUCTION IMPLEMENTATION FOR BUILDING CONSTRUCTION IN BANDUNG

REQUEST FOR PROPOSALS (RFP) - Project for Data Cleaning of Industrial Property Documents of Indonesia

An Evaluation of Implementation of Quality Management System ISO 9001:2008 on Contractor for Six Senses Uluwatu Villa Resort Bali Project

APPLICATION OF MULTIPLE LINEAR REGRESSION MODEL IN THE MANAGEMENT OF PHARMACEUTICAL SUPPLIES

Casework Technical Support (Social Welfare - Project Management)

The Influence of Capacity Development on the Values of Good Governance

CONSTRUCTION PROCUREMENT IN THE AREA OF ELECTRONIC REVERSE AUCTIONS

FARMERS MOTIVATION IN BANKING AGRICULTURE CREDIT LOANS

The Influence of Perceived Organizational Support and Transformational Leadership on Employees Change Readiness in PT Makmur Bintang Plastindo Medan

ATTACHMENT 1 COVER LETTER AND INSTRUCTIONS ON TENDERING PROCEDURES. CPG/2124/2017 Political Economy Analysis (PEA) of Colombia s Agriculture Sector

Influence Satisfaction, Compensation and Work Discipline the Employee Performance at PT. Lion Air in Batam

Beauty Sumarauw., D.P.E. Saerang., M. Pandowo. Analysis The Influence

An evaluation of the Irish Remote Interpreting Service (IRIS) Request for Tenders

Comparative Research on States of Cross-Border Electricity Supplier Logistics

THE INFLUENCE OF ORGANIZATIONAL VALUES TOWARD VISION ACHIEVEMENT: CASE STUDY AT SBM-ITB


Implementation of Application Quality Management (ISO) 9001:2008 for the Business Development Process

The Review of the Relationship between Marketing Performance and Competitive Advantage in Commercial Banks

Shahzaib Roshanali Noorani 1. Eric Mathuva 2. Paul Mwenda 3

POLICY ON UNISA PUBLIC TENDERS Overview

KillTest *KIJGT 3WCNKV[ $GVVGT 5GTXKEG Q&A NZZV ]]] QORRZKYZ IUS =K ULLKX LXKK [VJGZK YKX\OIK LUX UTK _KGX

THE EFFECT OF TELLER SERVICE QUALITY AND SATISFACTION ON CUSTOMER LOYALTY OF PT BANK MANDIRI TBK MERAUKE BRANCH

The Impact of Bullwhip Effect in e-business on the Automotive Industry (Case Study: Saipa)

The Importance of Working Discipline to Improve Employee's Working Productivity of Motor Vessel Manufacturing Company in Makassar Shipyard

European Journal of Business and Management ISSN (Paper) ISSN (Online) Vol.7, No.36, 2015

Instagram Electronic Word of Mouth s Effect Towards Purchasing Decision Arromanis Corner Store, Bandung, Indonesia

THE RELATIONSHIP BETWEEN TV ADVERTISING COST AND BRAND AWARENESS FOR FOOD PRODUCT CATEGORY IN INDONESIA (FEBRUARY 2010)

Student Interest Analysis At Hasanuddin University And Alauddin State Islamic University In Public Transportation

STATISTICS PART Instructor: Dr. Samir Safi Name:

FORCASTING THE NUMBER OF BIDDERS IN THE IRAQI SCHOOL PROJECTS TENDERS

Sukemi Kadiman Doctorale Student, Human Resources Management The State University of Jakarta, Indonesia

Determinants The Quality of OPD Financial Statements (Empirical Study on OPD in Madura)

Accepted: March 25, 2012 Published: May 27, Abstract

The Impact of Sustainability Reports toward the Firm Value

R.O.C. Phone: Fax: b Department of Civil Engineering, National Chiao Tung University, Hsinchu, Taiwan

Elements of abnormally low tenders: A comparative analysis of EU procurement directive and case law

Mini Tender PART A External Wall Insulation, Mechanical and Electrical Installation

CONSUMER ACCEPTANCE TOWARDS ONLINE GROCERY SHOPPING IN MALANG, EAST JAVA, INDONESIA

ATTACHMENT 1 COVER LETTER AND INSTRUCTIONS ON TENDERING PROCEDURES

Competitiveness Benchmarking. Khashayar Ataie Director of International Affairs IPC Group, IRAN Member of Global Benchmarking Network 11 Dec 2018

SUPPLY CHAIN MANAGEMENT OF DIESEL MUFFLER COMPANY: A CASE STUDY

THE FACTORS THAT INFLUENCES THE NIGHT CULINARY TRADERS S REVENUE IN PEMATANGSIANTAR CITY (STUDY CASE: SIANTAR SQUARE)

Note for Drafting Public Procurement Regulations

Dr. Ignatius Jeffrey 1, Mahmud Soleman 2 ABSTRACT. Keywords: Work Discipline, Achievement Motivation, Career Path, Employee Performance

Explanation of Factors Affecting the Export of Flowers in Iran: A Case Study in Alborz Province

The Influence of Internal Communication and Perceived Organizational Support on Employee Engagement in PT. INDONESIA ASAHAN ALUMINIUM (PERSERO)

INFLUENCE OF BRAND ASSOCIATION TOWARD BRAND LOYALTY OF WEIDENMANN

IMPACT ANALYSIS OF WORKING CONDITION, SALARY, CORPORATE OWNERSHIP AND FAIRNESS ON EMPLOYEE JOB SATISFACTION IN PT. BPR PRISMADANA MANADO

The Effect of Transformational and Transactional Leadership Style to Trust, Self Efficacy and Team Cooperation

PUBLIC PROCUREMENT LAW OF MONGOLIA CHAPTER ONE GENERAL PROVISIONS

FACTORS AFFECTING JOB STRESS AMONG IT PROFESSIONALS IN APPAREL INDUSTRY: A CASE STUDY IN SRI LANKA

INSTRUCTIONS TO BIDDERS

ADVISORY. Indonesia s New Construction Law. Overview. Main Provisions. 26 January 2017

JAM 16, 2 Received, January 2018 Revised, March 2018 Accepted, May 2018

Research Journal of Finance and Accounting ISSN (Paper) ISSN (Online) Vol.8, No.12, 2017

PRICE Cost Analytics

FACTORS OF CONSUMER BEHAVIOR THAT AFFECT PURCHASING DECISIONS ON BLACKBERRY SMARTPHONE

INTRODUCTION TO DECREE 15 ON PPP

Helsinki, D(2011) Open call for tender ECHA/2011/66 Framework contract for the provision of Enterprise Content Management Services and Solutions

Economic Policy Package (Phase XV)

Section 4 - Bidding Forms

Implementing the Modern Management Systems in TQM Companies and the Surveillance Companies Performance

Scholars Journal of Economics, Business and Management e-issn

Qualitative Evaluation and Selecting the Optimum Public Private Partnership System for Transportation

The Influence of Incentive and Motivation toward the Employee Achievement (A Case Study on Ganesha Operation in Tebing Tinggi)

Keywords Administration, Bookkeeping, Inventory, Reporting, Fixed Assets. Jel Classification M48, H7.

DOCUMENT BID PROPOSAL

Kuwait Chapter of Arabian Journal of Business and Management Review

CHAPTER V RESULT AND ANALYSIS

Contract and Procurement Fraud

Explaining Brand Preference in Online Community: A Study of Kaskus, The Largest Indonesian Community

Hellenic Court of Audit, Greece

Amity School District 4J

CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS

Stakeholder Knowledge of Sustainable Road Implementation In Buru Regency

EMPLOYEE S PERFORMANCE THORUGH EDUCATION AND TRAINING AS WELL AS RENUMERATION

Deadline for documents submission June 11, 2009 before 12:00 hours (local time)

CHAPTER 1 INTRODUCTION

TENDERING #3 Tendering (CONS6811) Lara Tookey

Best Practice Summary Surabaya, Indonesia

Municipality of the District of Lunenburg POLICY

CHAPTER 5 RESULTS AND ANALYSIS

REQUEST FOR QUOTATION DOCUMENT

Department of Public Works Division of Engineering. Nassau County, New York

Transcription:

ISSN (e): 2250 3005 Volume, 07 Issue, 05 May 2017 International Journal of Computational Engineering Research (IJCER) The Influence of Price Offers for Procurement of Goods and Services on the Quality of Road Constructions Sulfadly 1, M. Wihardi Tadjaronge 2, M. Asdar 3 1 Master Degree of Transportation Planning, Hasanuddin University, 2 Professor, In the Departemen of Civil Engineering, Hasanuddin University, 3 Professor, In the Department of Economic and Business, Hasanuddin University, Makassar - Indonesia ABSTRACT The main purposes of construction service providers are to maximize profits. This is derived from the difference between the total contract value and the total cost used, so the lower the proposed price offers are feared to sacrifice and affect the quality of the work. This study aims to analyze what factors affect the value of the value of price offers for the service providers and how it affects the quality construction, using qualitative and quantitative methods with primary data in the form of questionnaires to construction and consulting service providers, committing officers and secondary data from the offer price of service providers and inspection reports on construction works. The result of this research shows that there are 16 variables that influence to the change of price offering value with the percentage of criteria range from 68% until 80%, and the highest is the difficulty of construction, the ability to estimate the offer and the overhead cost with the percentage criteria each 80%. The most influential indicator group on price offers is the electronic auction characteristics. The value of the supply has a significant effect on the quality of construction where the lower the value of price offers then the quality of construction will also be lower. Keywords: Construction Project, Price Offers, Quality Construction I. INTRODUCTION The developments of the transportation infrastructure such as roads and bridges have a very strategic role in National Development. Therefore, the process of auctioning of construction goods and services as instruments in the process of procuring infrastructure projects is expected to be implemented with the principles of efficient, open, transparent, fair and non-discriminatory as regulated in Presidential Regulation no. 4 in 2015 [1]. The main purpose of the provider of construction services and consultancy in the work is to gain profit or profits as much as possible. As stated by the Institute for Procurement of Government Goods/Services Policy (IPGGSP), that the practice of slamming the price in the procurement of goods/services procurement is still high and has the potential to decrease the quality of the work. The method of awarding contracts for construction projects submitting low price underestimate (2). One of the main disadvantages of this method is that low offers submissions are not fair. Based on the data of Construction Services Development Agency (CSDA), the possibility of competition among contractors is very high because the number of business enterprises of construction services for contractors is not proportional to the number of existing projects. So a very low offer can always be ensured in every work package that is auctioned. The indication is that in the evaluation of traditional model suppliers (the lowest offer tender method), the contractor competes solely on the price offers and this will potentially result in the low quality of the construction [3]. II. MATERIALS AND METHODS Locus of Research This research was conducted at the local government agency of North Luwu Regency specifically to the Public Works. Research Design This research is descriptive qualitative and quantitative with the intention to explain the factors that affect the value of the service provider's price offers, and its influence on the quality of construction work results. Identification of Research Variables The variables used in the factor analysis that affects the price offers can be presented as follows: www.ijceronline.com Open Access Journal Page 1

Table 1. Factor variables that influence the price offers No. Variables No. Variables A Project Characteristics X1 D Conditions of Business Competition X4 1 Great value project/epa [4] X1.1 1 Estimated number of competitors [4] X4.1 2 Project location [4] X1.2 2 Previous auction competitions [4] X4.2 3 Road access project location [4] X1.3 3 Concurrent auction announcement X4.3 4 Implementation during the rainy season X1.4 4 Strict supervision X4.4 5 Degree of construction difficulties X1.5 5 Culture deposit to officer X4.5 6 Material Resources to place liquor X1.6 E Economic Conditions X5 7 Population Characteristics Population Characteristics at Locations X1.7 1 Project availability [4] X5.1 B Tender documents X2 2 Material price fluctuations [4] X5.2 1 The number and capacity of the tool X2.1 3 Foreign currency fluctuations (Dollars) X5.3 2 Specific Material type requirements X2.2 4 Inflation rate X5.4 C Company Characteristics X3 F Electronic Auction Condition X6 1 Availability of start-up capital [4] X3.1 1 Registration of the auction is easier [6] X6.1 2 Availability of staff with Certificates of The cost of participating in the auction X3.2 2 Expertise/Certificate of Skills [4] is more efficient [6] X6.2 3 Worker availability [4] X3.3 3 Secured data security [6] X6.3 4 Availability of equipment [4] X3.4 4 No face to face [6] X6.4 5 Support sub contractor [4] X3.5 5 Opportunities to get the project [6] X6.5 6 Abilities to estimate the offer [4] X3.6 6 No project location limits [6] X6.6 7 Project load worked [4] X3.7 7 The ability of staff in IT [6] X6.7 8 Experience similar projects X3.8 8 Understanding of auction rules X6.8 9 Overhead Cost X3.9 9 Socialization of electronic auctions X6.9 10 New or Old Company X3.10 10 The auction process is more transparent X6.10 Take an auction with your own company 11 or loan X3.11 11 Action participants can not intervene Based on the Regulation of the Minister of Public Works No. 06/PRT/M/2008 [7] on guidelines on supervision of construction implementations inspections by the Departments of Public Works, the variables used in construction inspection especially construction quality measurements (see in Table 2) Table 2. Quality Measurement Research Variables No. Variables No. Variables A Aspects of personnel C Material Aspects X6.11 1 Certificate of Experts / Certificate of Skills X1 1 Raw Material Requirements X11 2 Availability of Manpower X2 2 Availability of Raw Materials X12 3 Schedule of Personnel Supply X3 D Product Quality (Laboratory Test) X13 4 Worker Effectiveness X4 E Volume Aspects (Quantity) B Aspects of Equipment 1 Examination Procedure (MC) X14 1 Type of Tools X5 2 Volume Measurement Methods X15 2 Number of Tools X6 3 Time Measurement Volumes X16 3 Tool Capacities X7 F Aspects of Administration 4 Condition of Tools X8 1 Back Up Data X17 5 Schedule of Tool Supplies X9 2 Reports X18 6 Effectiveness of the Tool Utilizing X10 www.ijceronline.com Open Access Journal Page 2

Data collection Factors data affecting the price offers are obtained through a questionnaire to the construction and consulting service providers. Construction quality is obtained through haunted to the Committing Officer or Technical Activity Officer (CO/TAO) of Public Works Department of North Utara Regency, physical job report, data backup of measurement results, physical and financial realization report, procurement plan, contract document and procurement document. Data analysis This study uses a questionnaire instrument to the parties involved in the procurement process. The data obtained i.e.: 1) Respondent profile data, 2) Offer value in auction of goods and services procurement, 3) Variables that affect the contractual offer value in following the auction, and 3) Variables that affect the quality of construction results. The criteria scores determined in this paper are as follows: 84,0% - 100% = Very Influential/Excellent 67,9% - 83,9% = Influence/Good 51,8% - 67,8% = Less Influence/Fair 35,7% - 51,7% = Not Impact/Poor 19,6% - 35,6% = Not Influential/Very Poor Furthermore, a statistical analysis of each variable is performed. Validity test and reliability test of factor instrument affecting price offers, multiple linear regression analysis of partial indicators, interpretation of the model followed by statistical test of the regression model consisting of F-test, t-test, and Coefficient of Determination (R 2 ) [8], tested regression models with normality and Multi co- linearity tests. The effect of price offers on construction quality is tested by simple linear of the regression methods, and re-interpretation of the regression model that is formed. III. RESULTS An Analysis of the Factors Affecting the Price Offers of Values 1. Test Validity Validity test is done by testing 30 results of questionnaires from respondents with a significance level of 5%. The test criterion is, if R arithmetic > R table, then the instrument or item question correlated significantly to total score or declared valid, if R arithmetic <R table then instrument or item statement not correlated significantly to total score or declared invalid. The result of the validity test shows that from 40 variables studied, for the factors that influence the value of the price offers, yielding the smallest correlation of 0.053 and the largest correlation is 0.758. R table sought at significance 0.05 with the amount of data (n) counted 30, then got R table equal to 0,361. Table 3. Test results of validity of research instruments No. Variable R tabelr arithmetic R hitung Explanation No. Variable R tabel R hitung note 1 X1.1 0,361 0,647 Valid 21 X4.1 0,361 0,613 Valid 2 X1.2 0,361 0,758 Valid 22 X4.2 0,361 0,619 Valid 3 X1.3 0,361 0,501 Valid 23 X4.3 0,361 0,394 Valid 4 X1.4 0,361 0,647 Valid 24 X4.4 0,361 0,671 Valid 5 X1.5 0,361 0,457 Valid 25 X4.5 0,361 0,622 Valid 6 X1.6 0,361 0,555 Valid 26 X5.1 0,361 0,426 Valid 7 X1.7 0,361 0,758 Valid 27 X5.2 0,361 0,657 Valid 8 X2.1 0,361 0,647 Valid 28 X5.3 0,361 0,662 Valid 9 X2.2 0,361 0,418 Valid 29 X5.4 0,361 0,567 Valid 10 X3.1 0,361 0,555 Valid 30 X6.1 0,361 0,593 Valid 11 X3.2 0,361 0,511 Valid 31 X6.2 0,361 0,053 Invalid 12 X3.3 0,361 0,663 Valid 32 X6.3 0,361 0,471 Valid 13 X3.4 0,361 0,402 Valid 33 X6.4 0,361 0,319 Invalid 14 X3.5 0,361 0,647 Valid 34 X6.5 0,361 0,62 Valid 15 X3.6 0,361 0,457 Valid 35 X6.6 0,361 0,656 Valid 16 X3.7 0,361 0,758 Valid 36 X6.7 0,361 0,641 Valid 17 X3.8 0,361 0,248 Invalid 37 X6.8 0,361 0,578 Valid 18 X3.9 0,361 0,095 Invalid 38 X6.9 0,361 0,697 Valid 19 X3.10 0,361 0,647 Valid 39 X6.10 0,361 0,108 Invalid 20 X3.11 0,361 0,457 Valid 40 X6.11 0,361 0,531 Valid www.ijceronline.com Open Access Journal Page 3

2. Test Reliability Reliability test is to measure the reliability of an instrument by using Alpha Cronbach coefficients, stating that the value of an instrument is said to be reliably if the value of Alpha Cronbach > R table. The results obtained are Alpha Cronbach coefficient of 0.750 while R table values for respondent is 30 and 5% significance level is 0.361, thus R arithmetic> R table (0,750> 0,361). This indicates that the measuring tool in this study is reliable or in other words the measurement can give consistent results if the re-measurement of the same subject. An Analysis of the Factors Affecting the Value of Price Offers Based on the description of the results of data processing of each variable to measure what factors affect the value of price offers, it appears that the influence of each variable varies according to the results of the criteria obtained. The variables that enter the category "no effect" on the change of the offer value of the procurement price of goods and services is the deposit cultural variables to the official (X4.5) with the criterion percentage of 43.74% and the material price fluctuation variable (X5.2) with the percentage of criterion of 50.32%. Variables that are categorized as "influential" to the value of the price offers, there are 16 variables with percentage range criteria from 68% to 80%. The most influential variables of the value of offerings are the difficulty level of construction (X1.5), the ability variables in the estimation of offering (X3.6) and the overhead variable (X3.11) with the percentage criteria respectively 80%. No. Table 4. Factors Criterion that affects the offer value Variable Percentage Criteria Criteria 5 4 3 2 1 1 Great values of the project/ EPA X1.1 62,74% 2 Project location X1.2 61,89% 3 Condition of road access X1.3 75,16% 4 Implementation during the rainy season X1.4 62,11% 5 Degree of construction difficulty X1.5 80,00% 6 Material Source Distance X1.6 70,11% 7 Characteristics of Population X1.7 61,89% 8 Number, capacities and type of tools X2.1 62,74% 9 Material Type Requirements X2.2 72,21% 10 Availability of start-up capital X3.1 70,11% 11 Availability of staff with Certificate of Experts X3.2 72,63% and Certificate of Skills 12 Worker availability X3.3 72,00% 13 Availability of equipment X3.4 76,63% 14 Support subcontractor X3.5 62,74% 15 The abilities to estimate the offering X3.6 80,00% 16 The need for work X3.7 61,89% 17 Experience similar projects X3.10 62,74% 18 Overhead Cost X3.11 80,00% 19 Estimated number of competitors X4.1 68,84% 20 The level of the previous auction competition X4.2 58,11% 21 Similar auction announcements X4.3 72,84% 22 Strict supervision X4.4 60,21% 23 Culture of deposit to officials X4.5 43,79% 24 Project availability X5.1 53,68% 25 Material price fluctuations X5.2 50,32% 26 Fluctuations in foreign exchange rates (Dollars) X5.3 55,79% 27 Inflation rate X5.4 54,11% 28 The auction registration process is easier X6.1 68,84% 29 Secured data security X6.3 75,79% 30 The opportunities to get bigger project X6.5 68,00% 31 No project location limits X6.6 65,47% 32 The ability of staff in the field of IT X6.7 67,16% 33 Understanding of electronic auction X6.8 75,16% 34 Training and socialization of electronic auctions X6.9 64,42% 35 Participants of the auction can not intervene X6.11 67,58% www.ijceronline.com Open Access Journal Page 4

Description: 5. Very influential 2. Not Affect 4. Influential 1. Not effect at all 3. Less Influential The calculation method used to determine the factors that influence the value of price offering partially on the level of indicators are Multiple Linear Regression Analysis with the help of the program SPSS version 22. The steps in this method are to create multiple regression equation models, then done the interpretation of the model Followed by statistical tests consisting of F-Test, t-test, and coefficient of determination (R 2 ) (see in Table 5. Models Table 5. Multiple Linear Regression Analysis against Y Unstandardized Standardized Coefficients Coefficients B Std. Error Beta www.ijceronline.com Open Access Journal Page 5 T Sig. Zeroorder Correlations Partial (Constant) 7,333 0,900 8,146 0,000 Condition_Project 0,453 0,070 0,215 6,458 0,000 0,860 0,567 0,091 Document _ auction 0,317 0,185 0,048 1,717 0,089 0,745 0,180 0,024 Condition_Enterprise 0,504 0,056 0,328 9,010 0,000 0,876 0,693 0,128 Condition_Competitio 0,423 0,075 0,154 5,616 0,000 0,798 0,514 0,080 n_business Condition_Economy 0,427 0,077 0,149 5,541 0,000 0,657 0,509 0,078 Condition_Auction 0,577 0,063 0,285 9,136 0,000 0,889 0,698 0,129 Based on the regression test results, with constant and coefficient of each variable, and then obtained models of regression equations as follows; Y = 7,333+0,453X1+0,317X2+0,504X3+0,423X4+0,427X5+0,577X6 Notes: Y = Value of the offerings X1 = Project Characteristic Variables X2 = Variable Document Auction X3 = Variable Characteristics of the Company X4 = Variable of Business Competition Condition X5 = Variable Economic Condition X6 = Electronic Auction Conditioning Variable Interpretation of the obtained regression model is: 1. The effect of the Project Characteristic (X1) on the Value of Price offers (Y) is positive where the improvement of the characteristic aspect of the project by 1 unit will increase the value of the supply price by 0.457 with the assumption that other independent variables in this regression model are fixed. 2. The influence of Auction Document aspect (X2) on the Value of Price offers (Y) is positive which increases the aspect of the auction document by 1 unit will increase the value of offers by 0.317 assuming the other free variable in this regression model is fixed. 3. The Influence of Company Characteristic (X3) to the value of the price offers (Y) value is positive, where the aspect improvement of company characteristics by 1 unit will increase the offering value by 0,504 assuming other independent variable in this regression model are permanent. 4. Influence aspect of Business Competition Condition (X4) to the value of the price offers (Y) is positive values, where aspect improvement of business competition conditions equal to 1 unit will increase offer value equal to 0,423 with other free variable assumptions in this regression model is fixed. 5. The influence of the aspect of Economic Condition (X5) on the Value of Price Offers (Y) is positive which increases the aspect of the economic condition by 1 unit will increase the offer value by 0.427 with the assumption that the other independent variable in this regression model remains. 6. The effect of the Electronic Auction (X6) condition on the Value of Price Offers (Y) is positive where the increase of the electronic auction condition by 1 unit will increase the offer value by 0,577 with the assumption that the other free variable in this regression model is fixed. Since the effect of this aspect is highest, if there is a decline in the value of the procurement price of goods and services far from the EPA, this variable should be attention. Test statistics on the results of data processing i.e.: Part

F-test F-test is a test to determine the magnitude of the effect of independent variables on the dependent variable simultaneously. The value of F-arithmetic is obtained at 816,400 and F-table for N (1) = 6 and N (2) = 94 of 2.20. Based on these results, it is found that the value of F-arithmetic is greater than F-table values (816,400> 2.20), with probability values for F-statistic of significance is 0,000 <α = 0,05. So the decision taken is rejected H 0 and H 1 are received. This means that all independent variables, i.e. Project Characteristics, Auction Documents, Company Characteristics, Business Competition Conditions, Economic Conditions and Electronic Auction Conditions simultaneously significantly affect the dependent variables i.e. price offerings with significance level α = 5%. T-Test T-test is an individual test of all regression coefficients that aims to determine the magnitude of the influence of each independent variable to the dependent variable. Where t table with a significant level of 0.05 testing two sides with degrees of freedom (df) = (n - k) = (94-6) = 88 then obtained t-table = 1.6623. Based on t-test results obtained t-arithmetic of each variable is greater than t-table, thus all independent variables significantly influence partially on the dependent variable that is the price offers. Coefficient of Determination (R 2 ) The coefficient of determination is used to find out what percentage of the change in the independent variable can explain the change of the dependent variable. From the test, the value of R 2 adjusted is 0.981 so that it can be said that 98.1% of the dependent variable variation (in this case the supply value) can be explained by the independent variables Project Characteristics, Auction Documents, Company Characteristics, Competition Conditions, Economic Conditions and Electronic Auction Condition. While the rest of 2.9% explained by other variables outside the models. An Analysis of the Influence of Price Offers on the Quality of Construction The calculation method used to determine the effect of price offers on the quality of construction results partially is the method of Simple Linear Regression Analysis with the help of SPSS version 22 program. Model of simple linear regression equations which formed as follows: Y = 18,621 + 0,575X Notes: Y = Quality Construction X = Value of the Price Offers Interpretation of the regression model obtained is the value variables of the price offers give a positive influence on the quality of road construction. An increase in the value of the price offers of 1 unit will increase the construction quality by 0.575 units. Test statistics on the results of data processing i.e.: F-Test F-test is a test to determine the magnitude of the effect of independent variables on the dependent variable simultaneously. The value of F-arithmetic is 77,296, and F-table with 5% significance for N (1) = 1 and N (2) = 57 is obtained by 4.01. Based on the results of the calculation, then the value of F-arithmetic is greater than the value of F-table (77.296> 4.01), with probability values for F-statistic of significance is 0,000 <α = 0.05. So the decision taken is H 0 rejected and H 1 received. This means that the independent variable that is the price offer values significantly affects the dependent variable of Construction Quality with significance level α = 5%. The coefficient of determination (R 2 ) The coefficient of determination is used to find out what percentage of the change in the independent variable can explain the change of the dependent variable. From the tests performed, the value of R 2 adjusted by 0.572 so that it can be said that 57.2% of the variable is bound (in this case the quality of construction) can be explained by the independent variable i.e., the values of the price offers. While the rest of 42.8% explained by other variables outside the model. IV. DISCUSSION Based on the research results, the most influential variables of the value of offerings are the difficulty level of construction (X1.5), the variable of capability in the offer estimate (X3.6) and the overhead cost variable (X3.11) with the percentage of each criterion by 80%. The higher the difficulty level of construction (complexity) of a project, the greater the level of risk is guaranteed by the construction project, because the items must be done by the service provider, using equipment and materials with certain specifications. Such type of project necessarily www.ijceronline.com Open Access Journal Page 6

requires the planning and special calculation when preparing the price bidding document in order to be implemented properly. These risks have a major impact on the success of a construction project [9]. The capability of project financing estimation is very important to support the success of a project. The input elements in the construction project include labor, cost, methods, equipment and materials, all of which need to be arranged in such a way that the proportion of need in the project is appropriate for its use and the project can work effectively and efficiently. The accuracy of the calculation of these needs is needed in planning. Improper calculations will lead to cost swelling so that project efficiency is difficult to achieve [10]. Overhead costs are costs that are categorized as product costs in addition to raw material costs and direct labor costs [11]. Overhead costs are sometimes defined as rescue costs, indirect labor costs, and all other production costs that may not be identified or charged directly to an order And certain products. Overhead costs in the preparation of the EPA are usually combined with profit calculations for service providers whose level of reasonableness is a maximum of 15% of total costs excluding the National Income Tax (NIT). For service providers who bid at a low price, surely taking into account the high or low overhead costs incurred by the Committing Officer (CO) into the EPA submitted at the time of the auction. The influence of offering value on the construction quality is positively correlated with 0,575 units, which means that the smaller the offering price of the service offering price, the quality of the resulting construction will also be low. Similarly the contrary, the higher the value of the offering to the EPA then the quality of construction will also be better. V. CONCLUSION The most influential factors on the value of the price offers of construction service providers as well as consultancy in North Luwu Regency are the difficulty level of construction, the ability to estimate supply and overhead cost, with the influence level of 80%. Indicators that most influence the value of the offering price of construction service providers and consultancy in North Luwu Regency are electronic auction conditions. The level of achievement of the quality of work package construction carried out by service providers in good categories when measured from the type of construction equipment used, and also from the aspect of the material requirements of raw materials used, with the percentage criteria of 86%. The influence of offering value on the quality construction, especially road and bridge in North Luwu Regence is positively correlated by 0,575 units, which means that the smaller the value of price offering the service provider, the quality of the construction will be smaller. REFERENCES [1]. Anonymous. (2015), Presidential Regulation No. 04 of 2015 on Procurement of Goods/ services owned by the Government. Bappenas, Jakarta [2]. Wei Chih Wanga, Han Hsiang Wang, YuTing Lai, & John Chien Chung Li, (2006) Unit-price-based model for evaluating competitive bids, InternationalJournal of Project Management, 24(2) [3]. Hatush. Z and Skitmore. M. (1998). Contractor selection using multi-criteria utility theory: an additive model. Build Environ, 33 [4]. Yuniawaty, S. and Yessy, (2005), Factors Influencing Contractors to Follow Tender, Surabaya, Christian University of Petra. Respawan, Made. (2015). Factor analysis that influences the participation and value of Electronic Offers (E-Procurement) Offering for construction services in Buleleng Regence. Thesis. Essay. Study Program Civil Engineering. Udayana University Bali [6]. Suciptapura I, Made. I.G.A. Adnyana Putera. Mayun Nadiasa (2013). Participation of Contractor in Denpasar City in Government Electronic Goods Procurement Auction. Spectra Journal. Vol. 2 No. 2 July 2013. Denpasar: Master's Degree Program in Civil Engineering. Udayana University. [7]. Anonymous. (2008), Regulation of the Minister of Public Works No. 06/PRT/M/2008 concerning Guidelines on the Supervision of the Implementation and Construction Inspection of the Ministry of Public Works [8]. Santoso, S. (2012). SPSS Application of the Multivariate Statistics. PT. Elex Komputindo, Jakarta [9]. Priscillia S and Patrick T, (2014), "Risk Factor Causes Model of Successful Construction Project" Civil Engineering Program Universitas Kristen Petra Surabaya [10]. Hermiaty, Dessy, (2007), "Modeling and Analysis of Proportion of Wages of Labor on Construction Projects", Thesis Master of Construction Management, UII, 2007 [11]. Anonymous. (2007), Regulation of the Minister of Public Works No. 43/PRT/M/2007 on Standards and Guidelines of Procurement of Construction Services, Ministry of Public Works, Jakarta. www.ijceronline.com Open Access Journal Page 7