Instructions for 12 and 15 IGT systems (12 pictured)

Similar documents
Instructions for 12 IGT system

PYZIQUE FRESTANDING & RETAINING WALL

Gravity Wall. A force to be reckoned with... Gravity (SRW) segmental retaining wall systems are structures

Installation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure

Premier Railroad Grade Crossing Installtion Guide PREMIER RAILROAD GRADE CROSSING INSTALLTION GUIDE GUIDE GROUNDED IN STRENGTH

EASY RIDER (MUSTANG) EASY RIDER (PONY) EASY RIDER (ZEBRA) EASY RIDER (BRONCO)

WARNING- THIS EQUIPMENT IS DESIGNED FOR ADULTS ONLY. ONLY HEALTHY PEOPLE AGES 13 AND UP SHOULD USE THE EQUIPMENT.

FITNESS PLAYGROUND ITEM NO: 8010

H 12 Heavy Duty Modern Tripod 8 Seat Swing Heavy Duty Hangers

VERsacourt LED Light System Installation Instructions

IMPORTANT. Use of safety surfacing (wood mulch) in compliance with ASTM specification F1292 is required. WARNING

Foundation Manual. Part Number: Version: Updated: July 5, S. Meadows Pkwy. A-9, #329 Reno, NV

EASY RIDER (MUSTANG) EASY RIDER (PONY) EASY RIDER (ZEBRA) EASY RIDER (BRONCO)

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

INSTALLATION GUIDE PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

RETAINING WALL SIGMA WALL 6 AND 8 SIGMA. cambridgewallsupport.com cambridgepavers.com FIND MORE DETAILS AT

MODEL # MSC-4120-BM. Spring Breeze with Me and My Toddler Metal Swing Chair OWNER S MANUAL

Aegis Heavy Capacity 20K Floor Scale. MODEL: 6200 Series. Installation Manual

You will probably need to perform this procedure in the loading dock area of the building. A fork lift or chain hoist may be needed.

GENERAL ASSEMBLY CONSIDERATIONS FOR TERRAN SACON BUILDINGS AND STRUCTURES

Cedar Flooring Rounds

Model # BARK /26/2012 Page 1 of 5

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

INSTALLATION MANUAL. All Types F Series Rev G

GUIDELINE FOR PLANTED INFILL INSTALLATIONS. Please read prior to installation, and have proper equipment and safety precautions in place.

2004 Specifications CSJ SPECIAL SPECIFICATION DIRECT FIXATION TRACK CONSTRUCTION

Installation Manual. Foundations. Version 2

ROOF MOUNT KIT OWNERS MANUAL

Rough-in frame and flush-mount panel installation instructions

GroundTrac. Installation Manual

DRIVABLE GRASS GUIDELINE FOR NON PLANTED DRY INFILL INSTALLATIONS

DRIVABLE GRASS GUIDELINE FOR DRIVABLE TURF INSTALLATION

Playground Review and Maintenance Process

ROOF MOUNT KIT OWNERS MANUAL

INSTRUCTION MANUAL.

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

Garden WallScape Installation Guide

INSTALLING A POUR-IN-PLACE DOCK LEVELER (EH & RR)

EXISTING CONDITIONS. Town of Bedford, NH Sand Volleyball Courts Existing Conditions Sheet 2 of 5 GENERAL NOTES

Conergy SolarFamulus II

ASHWELL FIRE PIT SIENNA QUARRY GRAY TAN AUTUMN BLEND. Plan Date: June 2016

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

UNIVERSITY OF MISSOURI Electrical Manholes and Handholes 2016 Q1

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

JUNGLE CONTAINED PLAY INSTALLATION INSTRUCTIONS 1

PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

Five Stone System. Trench Depth Compactible Rock. Foundation. 57 lbs 41 lbs 31 lbs 47 lbs. Patent Pending. Approximate Weight

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

44 Installation Instructions: Olde English Radius Wall Double-Sided Freestanding Wall

36" CRESTONE FIRE RING

PRODUCT INFORMATION Dero Hoop Rack

28 BELGIAN WEDGE FIRE RING

Stretch Your Dollar Theme Designs Fire Pit

1 of 1 04/09/ :41

Grizzly TM Part Number Spectrum Lane ~ Missoula MT ~

COUNTY BLOCK. Construction Guidelines on County Block Steps. Special Considerations When Building Steps. Natural Beauty Absolute Strength

STAGE MANUAL PLEASE GET APPROVAL FROM LOCAL AUTHORITY FOR USE IN YOUR AREA.

CHAPTER 13 - MECHANICALLY STABILIZED EARTH WALLS AND PATENTED EARTH RETAINING SYSTEMS

Mounting systems for solar technology

3.2 SuperTie 50K Installation Guide

INSTRUCTIONS FOR THE ASSEMBLY AND INSTALLATION OF THE VORTOX LIQUID SAMPLER

CONSULTANT PROCEDURES & DESIGN GUIDELINES Electrical Manholes and Handholes UNIVERSITY OF MISSOURI

4 EXTREME FOUNDATION PANELS

CONSTRUCTION MANUAL. T-WALL Retaining Wall System FOR RAILROAD PROJECTS. The T-WALL Solution...

G R A V I T Y / G E O G R I D

General Guidelines. Tools Required. Steel Folding Scooter & Wheelchair Carrier Instructions for Part # SC400-V2. Safety

SPECIFICATION FOR CORNERSTONE GEOGRID REINFORCED SEGMENTAL RETAINING WALL SYSTEM

Overturning Forces. 12 times 300 lbs = 3,600 lbs of shear force along top of wall. Shear Wall

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:

Bordeaux Walling. Product & Technical Information

T-WALL Retaining Wall System

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

A DIVISION OF INSTALLATION. Guide. Relax More.

SECTION 1208 CHAIN LINK FENCING DESCRIPTION

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

InstallatIon. Guidelines. Relax More. A C T G L O B A L. C O M / X T R E M E L A W N E M A I L : X T R M E L A W A C T G L O B A L.

RUSTIC FIRE PIT SIENNA QUARRY GRAY TAN AUTUMN BLEND.

Installation Manual. Foundations. Version 4.3ᵠ

GABIONS AND REVET MATTRESSES

(01) Thermo Bond Buildings Military Service Shelter: DOG KENNEL OPERATING AND SETUP MANUAL MSS-RP-1-20P

TABLE OF CONTENTS

General Brick Installation Instructions

LANDSCAPE RETAINING WALLS

Rack-in-a-BoxTM INSTALLATION MANUAL

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

at home installation guide Manufactured by:

Multicell. Vikimatic MultiCell Conduit Systems MULTICELL

TFX - Toggle Lock Installation Guide

Handling and Installation Instructions

2011 Southeast Student Conference Geotechnical Competition

Bravo Platform Unpacking Guide

VERSA-Green TM Plantable Retaining Wall System

Traffic Safety Corporation

Steps And Stairs Installation Option 1 - Steps In Wall Option 2 - Steps With Plant Space Option 3 - Steps In Front of Walls Option 4 - Steps Along

YOUR SPLASH PAD RESOURCE

installation section three: Installation

Installation Instructions

INSTALLATION INSTRUCTIONS HD MODERN TRIPOD SWING Please read the entire manual before beginning installation.

Transcription:

Instructions for 12 and 15 IGT systems (12 pictured) Step 1: IGT Site Preparation Site Location Several factors must be considered when choosing the site for your new In-Ground Trampoline (IGT) system. Since local soil and weather conditions vary greatly from region to region, it is recommended that a local landscape expert be consulted for placement of the system. A minimum of 18 feet of overhead clearance and 5 feet of clearance from the trampoline to other objects on the ground is recommended for the jumpers protection. Using impact-absorbing ground cover such as grass, sand or bark chips is recommended for 6 to 8 feet around the trampoline. Drainage Drainage is not a problem with our In-Ground Trampoline system. It is recommended to leave at least 4 inches of the trampoline above the final grade and gradually burming the soil up to the edge of the trampoline. This will keep water from flowing into the pit in the event of heavy rain. Depending on local soil conditions you may consider adding 4 to 6 inches of gravel into the bottom of the pit, creating a sump effect to prevent standing water. Extreme conditions may require additional drainage methods or the use of a sump pump. It is always a good idea to consult a local landscaper regarding local soil conditions and drainage for your area. The Pit The IGT system is designed to be installed partially or completely recessed in the ground. Either way, the pit will need to be excavated to a diameter of 13 feet for the 12 model and 16 feet for the 15 model. If the IGT system must be assembled in the pit due to size constraints of the yard, a 14 foot pit for the 12 model and 17 foot pit for the 15 model is recommended for easier access to assembly hardware. For a completely recessed system we recommend the excavation of the pit depth be 29-31 inches deep. See below for Pit Dimensions. The system is a total of 33 inches tall so this allows for the trampoline to remain at least 2-4 inches above the grade as recommended in the Drainage section. For a partially recessed system, the dirt excavated from the pit can be used to build up the area around the installation. Excavating the pit to a depth of 18 inches leaves 15 inches of the system exposed. This method eliminates the need for removing excavated soil from the property.

Details on Trampoline Installation Depth The IGT system is a total of 33 inches tall. Excavation to a depth of 29-31 inches will leave the frame 2-4 inches above the yard grade. This will keep water out of the IGT system. In order to have the trampoline appear to be flush in the yard, simply use excavated soil to create a burm up to the edge of the frame. See diagram below.

Step 2: Lay Out Parts Parts list Quantity 12 Foot 15 Foot Description 12 15 Top Frame Segments (10 hole) 12 15 Bottom Frame Segments (4 hole) 24 30 Side Panels 24 30 Rubber Edge Protector Strips 1 1 Pad Set 1 1 Jumping Surface 96 120 Springs 48 60 Bolts 48 60 Nuts 96 120 Washers 1 1 Tool Kit Lay Out Parts for Easy Installation Lay out parts as shown to simplify assembly of the frame. Use one of the shipping boxes to separate all the hardware.

Step 3: Frame Assembly Tips - Use the assembled lower frame ring as a template to help locate and mark for pit excavation. - Assembly should occur next to the excavated pit. If there is no room for assembly close to the pit, it can be assembled in the pit however it is recommended to excavate the diameter of the pit to 14 feet for the 12 model and 17 for the 15 model for easier access to the hardware. - Be sure the spring holes on the top frame segments are facing up. - Leave all bolts loose to allow movement of the components during assembly for easier bolt hole alignment. - Unless you are on a perfectly level surface for assembly, some holes may be difficult to line up. Use a long screwdriver to help locate and align holes Step A: Assemble lower frame ring section. Assemble lower ring using the 12/15 lower frame segments.

Step B: Join 3 wall panels with one top frame segment. Lay 3 panels on the ground overlapping each other so the holes are aligned. Attach the top holes of the panel (holes closest to the edge with the protector strip) to the upper frame segment using a bolt and washer on the panel side and a nut and washer on the frame side as shown in the photo below right. Make sure the spring holes are facing up on the top frame segment. Do not tighten the bolts at this time. Step C: Join the 3 wall panels and upper segment to the lower frame ring. To make assembly easier, use the shipping boxes to support the lower frame ring about 6 inches off the ground while attaching the wall panels. Attach the assembly from step 2 to any place on the lower frame ring using a bolt and washer on the panel side and a nut and washer on the frame side. Do not tighten bolts at this time.

Step D: continue adding wall panels and upper frame segments. Attach 1 wall and 1 upper frame segment at a time always starting with upper bolts first. Use the Allen wrench to help push the bolts through the holes. Step E: Complete the frame assembly. The final wall panel and upper segment installation may require lifting and/or shifting the frame. This is why the bolts should be left loose until the frame is completed. Be sure all edge protectors are properly seated prior to tightening the hardware. When all components and hardware are in place, tighten all bolts. The frame/wall panel bolt should protrude about ¼ inch past the nut when tightened. Do not over tighten and crush the wall panel.

The Frame is now complete Step 4: Position Frame Assembly into Pit Install The frame can now be placed into the excavated hole. The completed frame weighs 235 lbs. (12 ) 255 lbs (15 ) and will require 3 to 4 adults to position the frame into the pit.

Level Frame A level frame is important for safe trampoline use. Use a string level or similar device to make sure the frame is completely level before continuing. Backfill Backfill the frame assembly using the excavated soil. Try to use loose dirt free of large clumps. The final landscape can be finished at this point if desired or later. It is important to have the final surface, whether it is grass or mulch etc, at the same level as the top of the frame. For a good flush look, you may need to start the backfill up to the edge of the frame from 2-3 feet away from the trampoline gradually sloping up from the existing yard grade up to the top of the frame.

Step 5: Install Jumping Surface Attach Every 4 th Spring Using the provided spring tool, start at any point attaching every 4 th spring from the frame to the rings on the jump mat, skipping 3 holes on the frame and 3 rings on the mat. Although it is hard to see, the spring has a large hook and a small hook. (See photo) Make sure the small hook is attached to the jump mat first and then using the spring tool, pull the larger hook and attached to the frame. It is very important to attach springs in the correct pattern. Be sure the D ring on the jump mat is oriented properly. NO!

Attach middle springs Attach the springs in the middle of the first round of springs Attach all remaining springs Make sure the springs already attached are correct. There will be a frame hole and mat ring for each spring. After the pattern is confirmed correct, attach the rest of the springs to the frame and mat.

Step 7: Attach pad Edge protector Before installing pads, make sure the Edge Protector is properly in place Install pad Lay the pad out on the perimeter of the trampoline. At this point you must lie down on top of trampoline jump surface and lift up the edge of the pad to gain access to the tie straps located on the bottom side of the pad. Secure the pad by slipping the strap down between the frame tube and wall panel on either side of one of the frame/wall panel bolts. Pass the end of the strap though the buckle pull tightly so the pads will not slide around. The ties will line up with every other frame assembly bolt.

You are now finished with the IGT installation!