Double covered. ODOT tests enhanced chip seal on S.R. 20. chip seal constructed on an. existing flushed roadway has the

Similar documents
1. Chip Seal Preservation/Funding 2. BST Summits (2006, 2007, 2009, 2010) 3. Double Seal Experiments (2008 and 2010)

Overview. Preventive Maintenance Concepts. What are thin and ultra thin mixes. Experience in Michigan with ultra thin

THINLAY ASPHALT FOR PAVEMENT PRESERVATION

Specifying Asphalt Pavement the ODOT Way

Micro-Surface Premature Distress SH 19 Hopkins County, Paris District

2016 County Engineer s Workshop

Section 505. CHIP SEALS

Using Chip Seals & Fog Seals in Pavement Maintenance. Thomas J. Wood Research Project Supervisor MnDOT s Office of Materials & Road Research

Chip Sealing The Nuts and Bolts. Thomas J. Wood Research Project Supervisor MN/DOT

TENNESSEE DEPARTMENT OF TRANSPORTATION

Thinlay Asphalt for Pavement Preservation

Asphalt Pavement Mix Types

Efforts to Improve Micro Surfacing Performance

Kevin King TXI 2002 Current, TXI Highway Sales/Marketing Manager; Lightweight i Aggregate Division TxAPA Seal Coat Committee Chairman 2003-C

Thinlay Asphalt for Pavement Preservation

Pavement Preservation: Theory and Treatments. APWA Norcal Conference Presented by: Telfer Pavement Technologies,LLC Cesar Lara

Thick Microsurfacing. Terry Asphalt Materials Inc. AEMA Meeting February 21, Terry Asphalt Materials Inc. All Rights Reserved

550 Surface Treatments

Hot Applied Chip Seal Design and Construction. NWPMA Vancouver, WA 2017

NJDOT STATE REPORT NORTHEAST PAVEMENT PRESERVATION PARTNERSHIP ANNUAL MEETING APRIL 29 MAY 1, 2015 NEWARK, DELAWARE

Prevention of Transverse Bumps Over Crack Sealant During Asphalt Overlay Construction

HPTO High Performance Thin Overlay Rocky Mountain Asphalt Conf. Denver, CO Feb. 20, 2009 Frank Fee NuStar Asphalt Refining

ODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN

WSDOT Pavement Preservation Performance

Origin. Characterization of Stone Matrix Asphalt Mixtures and Comparisons to Hot Mix Asphalt Mixtures. Acknowledgements. SMA in the United States

VDOT S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS

Maintenance & Rehabilitation. Treatments. Crack Sealing. Sealant Types. Asphalt Pavement Preservation: Identification of Alternative Treatments

SAND SEAL SPECIFICATIONS. The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority.

Technical Memorandum: Causes of Failure of District 11 Asphalt Rubber Chip Seal 11-Imp-86-PM 37.3/43.3 (EA )

Nova Scotia 2009 Pavement Preservation. Jim Chisholm Highway Construction Services

Guidelines for Maintaining Adequate Pavement Friction in Surface Pavements

Surface Requirements for Bituminous-Aggregate Combinations

Chip Seals. State of the Practice Rocky Mountain Pavement Preservation Partnership Conference. 29 October John O Doherty, P.E.

Sandwich Chip Seal: Usage and Performance. Presented By: Chris Dechkoff, EIT C-TEP January 31 st 2012, Edmonton

ADOT s Use of RAP in Asphaltic Concrete

SUPERPAVE FACT SHEET

Arizona AGC Pavement Preservation Series Micro Surface and Slurry Seal Guide for Application and Construction

Chip Seal Best Practices Chip Seal Introduction AT-TC3PP T1-JA01. Glossary of Terms and Acronyms

UNIQUE PAVING MATERIALS. Cleveland, Ohio. Started in 1959 Unique is the oldest continuous cold mix producer in the USA.

Chipseal Design and Materials. Stephen Van De Bogert Western States Asphalt

LRRB Local Operational Research Assistance Program (OPERA) for Local Transportation Groups Field Report

404-LVT (Low Volume Traffic) A new 404 specification for your lightly traveled roads

Pennsylvania s Experience with Thin Asphalt Overlays

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

SPECIAL PROVISIONS - SP2005BOOK Page 237 JUNE 30, 2006 Last Revision 4/16/08

Thin Asphalt Overlays for Pavement Preservation

SPECIFICATIONS FOR SAND SEAL

Comparative Analysis of Emulsion and Hot Asphalt Cement Chip Seal Performance. Douglas D. Gransberg, P.E., C.C.E. University of Oklahoma

ROCKY MOUNTAIN PAVEMENT PRESERVATION PARTNERSHIP MICRO SURFACING

Pavement Management Systems

SURFACINGS AND PAVEMENTS SECTION 37: BITUMINOUS SEALS 37-1 SEAL COATS

SPECIFICATIONS FOR NEW WORK CHIP SEAL

Full Depth Pavement Reclamation

Combining Preservation Treatments

SPECIFICATIONS FOR FOG SEAL WITH COVER AGGREGATE

Successful Chip Seal Construction with Marginal Aggregates on Low Traffic Volume Roadways

Thin Asphalt Overlay Considerations. Danny Gierhart, P.E. Regional Engineer Asphalt Institute Tuttle, OK

Evaluation of New Patching Material for Open-Graded Asphalt Concrete (OGAC) Wearing Courses

Slurry Seal Quality Construction State-of-the-Practice

Section 506 SLURRY SEAL Description. Prepare the surface and apply a properly proportioned slurry seal mixture.

Section 506. SLURRY SEAL

Modified Warranty Chip Seal - What is it?

FEATURE CORE INNOVATION AREA (CIA) TEAM PRESENTATION:

Development of Improved Procedures for Removing Temporary Pavement Markings during Highway Construction

ALABAMA DEPARTMENT OF TRANSPORTATION

SPECIAL SPECIFICATION 3402 Reflective Crack Relief Interlayer (RCRI)

Section 508. CHIP SEALS Description. Prepare the surface and apply the specified single chip seal, double chip seal or shoulder chip seal.

Chip Seal Specification Revisions

Advances and Challenges in Asphalt Paving

Pavement Preservation-ODOT Leading the Way

6.3mm Thin Asphalt Overlay (Thin Hot Mix Asphalt Overlay or Thinlay)

Pay Schedule for Ride Quality

OGFC Meets CRM : Where the Rubber meets the Rubber

Performance Evaluation of Asphalt Pavement Preservation Activities

ASPHALT MIX DESIGNER

ITEM 404LVT (Low Volume Traffic) ASPHALT CONCRETE Revised June 5, 2015

Minnesota Road Research Project Cell 26 Installation Report: Thermoplastic Inlay on an Asphalt Pavement Surface

Ohio Asphalt Paving Conference

Pavement Maintenance Best Practices. Thomas J. Wood

SOM August 2009 Alaska

SPECIAL PROVISION TO SPECIAL SPECIFICATION Quality Control/Quality Assurance of Hot Mix Asphalt

ROUTE 3 NORTH PAVEMENT PRESERVATION SHRP2 SHOWCASE PROJECT

What s MnDOT s Working. Thomas Wood MnDOT Office of Materials & Road Research

Verification of Gyration Levels in the Superpave

INTRODUCTION TO ASPHALT MATERIALS FOR MANAGERS AND OWNERS ASPHALT PAVEMENT ASSOCIATION OF OREGON

1825 W. Adams, Phoenix, AZ Phone (602) / Fax (602)

What s New in Pavement Preservation? Tom Wood Pavement Specialist

Chip Seals Theory and Best Practices Leading To A Successful Project. Edward J. Denehy, P.E.

FIBER REINFORCED BITUMINOUS MEMBRANE SURFACE TREATMENT SPECIFICATIONS

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING

Using Pavement Management Data to Determine Asphalt Pavement Performance Cycles

Chip Seal Slurry Seal Cape Seal

Special Provision for Hot-Mix Asphalt Prime Coat

Timothy R. Murphy, P.E. Murphy Pavement Technology, Inc.

By Rebecca McDaniel, NCSC, Purdue Rocky Mountain Asphalt Conference February 21, 2008

Importance of identifying trends. Help identify erroneous test results. Quality of pavement Encourage paying attention to test results.

EXPERIENCE WITH STONE MATRIX ASPHALT IN THE UNITED STATES

INTERSTATE 40 FREEWAY

Add as Section 37-6: 37-6 HIGH FRICTION SURFACE TREATMENT

DEPARTMENT OF LAND USE AND TRANSPORTATION OPERATIONS AND MAINTENANCE DIVISION

Transcription:

PAVEMENT MAINTENANCE By Mark Russell, P.E., Kevin Littleton, P.E., and Jeff Uhlmeyer, P.E. Contributing Authors Double covered ODOT tests enhanced chip seal on S.R. 20 A chip seal constructed on an existing flushed roadway has the potential to result in bleeding or flushing of the new chip seal. The excess binder, if not properly accounted for during design and construction, will migrate to the surface of the chip seal and fill the aggregate void spaces, leaving a flushed surface. Limited information is available regarding construction of a new chip seal on a flushed existing surface. A review of the literature indicated that both an inverted double chip seal and a sandwich seal are capable of correcting a flushed existing pavement, but construction details or performance data for these types of chip seals were not included. Although the chip seals reported in the literature are not conventional double chip seals, they both involve two applications of aggregate and one or two applications of binder. This led to the proposal to construct a double chip seal as a method to address a severely flushing pavement on S.R. 20 north of Spokane in Washington state. A single chip seal consists of one application of aggregate over one application of asphalt binder. A double chip seal is essentially two single chip seals, one placed on top of the other. The aggregate on top is usually a finer gradation than that placed on the bottom in a standard double chip seal. An inverted double chip seal is the opposite of a conventional double chip seal with the finer aggregate gradation placed on the bottom during the first application of aggregate and binder. Double chip seals are more durable and seal the roadway against water better than a single chip seal, leading to their use in locations where there is high truck traffic or on steep grades. The disadvantage of a double chip seal is higher cost due to two applications of binder and aggregate. A double chip seal is a departure from the normal practice used by the Washington State Department of Transportation (WSDOT). WSDOT uses single chip seals almost 24 April 2012 ROADS&BRIDGES

exclusively to preserve low-volume highways. If it can successfully address the flushing pavement on S.R. 20, a double chip seal will provide an economical method of addressing flushing on chip seal roadways in the future. This article documents the design and construction of the double chip seal on S.R. 20. WSDOT will monitor the double chip seal for a period of five years at which time a final report will be prepared documenting its performance. Fixing the flushing The goal of the pavement design on S.R. 20 was to find an economical solution to the flushing pavement. In 2000, WSDOT placed hot-mix asphalt (HMA) on this section of S.R. 20 to improve the structure, but this is a low-trafficvolume highway, and it is WSDOT s intent to maintain it as a chip seal route in the future. Milling and replacing the flushing HMA would provide a reliable method of eliminating the flushing pavement but would be much more costly than using a chip seal to correct the flushing. The successful use of a double chip seal to correct a flushing pavement in Thurston County, Wash., influenced WSDOT s design. The double chip seal used in Thurston County consisted of two applications of binder and two applications of 1 2 in. to No. 4 aggregate with a reduced application rate of the for the first application. To simplify design and use available materials, WSDOT selected a double chip seal similar to the Thurston County design consisting of two applications of binder and two applications of 8 in. to No. 4 aggregate (Table 1). An application of No. 4 to 0 choke (Table 1) placed after the second application of aggregate would fill surface voids and lock in the second application of 8 in. to No. 4 aggregate. The double chip seal on S.R. 20 was part of a larger project to place over 00 lane-miles of single chip seal. The double chip seal used the same 8 in. to No. 4 gradation as the single chip seal, which eliminated the need to produce a relatively small quantity of aggregate of a different gradation. The design called for reducing the first application of binder to account for the flushing pavement and not placing a fog seal over the finished surface. WSDOT s Eastern Region s standard practice is to place choke stone and a fog seal on chip seals, but the fog seal was eliminated to reduce the possibility of flushing. WSDOT constructed test sections in 2008 to evaluate the double chip seal s effectiveness at correcting the flushing and to assist in developing application rates for the and the aggregate. The lower, the better Construction of the test sections occurred in July 2008 in both lanes of a 1 2-mile section of flushing pavement on S.R. 20. WSDOT selected the location because of its relatively high rate of flushing and because its geometry was representative of most of the remainder of the flushed roadway. The plan was to use four different application rates of aggregate and for the test sections. Actual application rates varied from the planned application rates, resulting in the first application for Test Section 1 having application rates very similar to Test Section 2 and the first application for Test Sections and 4 having the same application rates. Table 2 shows the actual application rates for the first and second application of binder and aggregate. Checking embedment after the first applications of aggregate gave an indication of the effect the flushing pavement would have on the chip seal (Table ). Binder application rates Table 1. Double Chip Seal Gradations Sieve 8-in. U.S. No. 4 U.S. No. 4 0 1 2-in. Square 100 --- 8-in. Square 70 90 100 U.S. No. 4 0 5 76 100 U.S. No. 8 0 --- U.S. No. 10 --- 0 60 U.S. No. 200 0 1.5 0 10 % Fracture 90 90 After three months in service the double chip seal appeared to be performing well with only a few areas in the wheel path where the embedment appears to be near 100%. WSDOT will monitor the pavement condition, rutting and ride during annual surveys. ROADSBRIDGES.com 25

At the lower application rates for the first application of, a double chip seal reduced the flushing and could produce an acceptable pavement. The double chip seal on S.R. 20 was part of a larger project to place over 00 lane-miles of single chip seal. The double chip seal used the same 8 in. to No. 4 gradation as the single chip seal, which eliminated the need to produce an aggregate of a different gradation. should be adjusted so that embedment is between 50% and 70%. Higher embedment rates indicate too much binder and could result in flushing. As expected, the embedment measurements for the first application were higher than they would be if the existing pavement surface was not flushing. There also were some indications of bleeding during construction especially in the sections with higher binder application rates. Monitoring the test sections for two years after construction revealed wheel-path flushing had occurred in many locations. Test Sections 1 and 2, which had higher binder application rates during the first application than Test Sections and 4, appeared to have the more severe flushing. Despite the overall lower flushing severity, Test Sections and 4 still had many severely flushed areas presumably where the flushing of the underlying pavement was more severe. By 2009 the embedment was 100% in the flushed areas of lanes 1 and 2 but was reported to be in the 70% range in Test Sections and 4, which had the lower binder application rates for the first application. The test sections showed that at the lower application rates for the first application of a double chip seal reduced the flushing and could produce an acceptable pavement. The test sections also showed that the application rates for the first application of would need to be varied depending on the flushing present on the existing surface. Getting a good rate The application rates used for Test Sections and 4 were the basis for the final design included in the contract documents (Table 4). The goal was to achieve an initial embedment of about 50%. The application rate for the first application of 0.20 gal/sq yd was about one half of the application rate typically used by WSDOT on a single chip seal. The remaining application rates for the and aggregate for both applications were within the normal range for WSDOT s typical single chip seal. The first application of aggregate and binder for the double chip seal occurred on July 27, 2010, and the 26 April 2012 ROADS&BRIDGES

second application for the double chip seal and placement of the areas to receive the single chip seal occurred the next day. The weather for the most part was ideal for chip seal placement, with clear skies and high temperatures in the upper 90s. The maximum surface temperature measured during placement was 116 F. The contractor, Central Washington Asphalt (CWA) used conventional chip seal equipment and placement procedures. Overall the construction of the double chip seal went well. Two issues that may affect performance were that the aggregate gradations were outside of specification limits and that the application rates Table 2. Double Chip Seal Test Section Binder and Aggregate Application Rates Test Section Location (milepost) Table 4. Application Rates From Contract Documents Application of the No. 4 to 0 choke were inconsistent and lower than specified. The intent was that the application rates in the contract documents would be a starting point and field personnel would adjust the application rates during chip seal placement to account for field conditions. Prior to placing the double chip seal, WSDOT field personnel gave each section of the roadway a 1 to 4 rating based on the extent of flushing visible with 1 being no flushing and 4 being severe flushing (Table 5). Adjustments to the first application of and aggregate were based on the rating for each section being chip sealed. Sections with a rating First Application Second Application 1 (gal/sq 8 in. U.S. No 4 (lb/sq (gal/sq Table. Embedment Measured on First Application of Double Chip Seal Test Section Test Section Location (milepost) Percent Embedment 1 66.7 to 66.98 WB 80 2 66.98 to 67.2 WB 50 66.7 to 66.98 EB 70 4 66.99 to 67.2 EB 70 8 in. U.S. No 4 (lb/sq 1 66.7 to 66.98 WB 0.27 20 0.5 22 2 66.98 to 67.2 WB 0.28 20 0.6 20 66.7 to 66.98 EB 0.20 20 0.40 20 4 66.99 to 67.2 EB 0.20 20 0.40 20 1 The second application also included 4 lb/sq yd of U.S. No 4 0 choke on all sections. Asphalt () gal/sq yd Gradation Aggregate lb/sq yd First Application 0.20 8 in. U.S. No. 4 20 8 in. U.S. No. 4 20 0 Second Application 0.5 0.40 U.S. No. 4 0 4-6 Table 5. Roadway Flushing Rating System Visual Rating Roadway Condition 1 No flushing 2 Intermittent flushing in the wheel path Consistent flushing in the wheel path and intermittent flushing in the remaining portion of the travel lane 4 Severe flushing in the entire travel lane of 1 did not have significant flushing and did not receive an application of binder or aggregate during the first application. Instead these areas received a single chip seal using the same application rates as the second application of binder and aggregate for the double chip seal. Changes in application rate for the first application of were marked with lath placed at the beginning of each section. The application rate written on the lath was entered into the computerized application rate-control system on the distributor truck to ensure the proper application of. WSDOT field personnel verified application rates by computing the yield based on the area chip sealed and the gallons of used. Tables 6 and 7 show the actual application rates for each section along with the percent embedment. The embedment of most sections was around 50% but some were as low as 0%. The low embedment in some sections may have been due to minimal traffic allowed on the sections prior to checking the embedment. Placement of the second application of the double chip seal and the single chip seal areas occurred at the same time as a continuous operation. The second application of the double chip seal consisted of 0.4-0.9 gal/sq yd of and 24 lb/sq yd of 8 in. to No. 4 aggregate with 2. lb/sq yd of No. 4 to 0 choke on all areas regardless of the condition rating. Application rates for the single chip seal areas were the same as the application rates for the second application of the double seal. Testing of samples from the stockpiles revealed that the gradation of the 8 in. to No. 4 aggregate was outside specification requirements for the percentage passing the No. 4 sieve and that the gradation of the No. 4 to 0 choke was outside the specification for the percentage passing the No. 200 sieve. WSDOT used a specification for statistical acceptance of aggregates on this project. Although the aggregate gradations were outside specification requirements for individual sieves, the overall quality level was such that the specification allowed the aggregate to 28 April 2012 ROADS&BRIDGES

Table 6. Flushing Rating and Application Rates for First Application of the Double Chip Seal on Westbound S.R. 20 Beginning Ending Total Distance (miles) Visual Rating (gal/sq 8 in. to U.S. No. 4 (lb/sq Percent Embedment 6.610 64.195 0.585 1 na na na 64.195 65.204 1.009 0.18 21 45 65.204 66.74 1.50 4 0.17 21 5 66.74 67.2 0.499 2 0.16 21 50 67.2 67.849 0.616 4 0.15 21 0 67.849 67.91 0.082 1 1 0.15 21 50 67.91 70.202 2.271 4 0.15 21 50 70.202 71.05 1.10 2 0.22 20 50 71.05 72.06 0.758 1 na na na 72.06 72.00 0.27 2 0.2 22 50 72.00 72.840 0.540 1 na na na 1 This section was treated with a double chip seal as if it had a rating of 2. Table 7. Flushing Rating and Application Rates for First Application of the Double Chip Seal on Eastbound S.R. 20 Beginning Ending Total Distance (miles) Visual Rating (gal/sq 8 in. to U.S. No. 4 (lb/sq Percent Embedment 6.610 65.204 1.594 0.15 21 50 65.204 66.74 1.50 4 0.16 21 5 66.74 67.2 0.499 1 na na na 67.2 67.594 0.61 4 0.14 21 50 67.594 71.40.746 0.18 21 50 71.40 72.06 0.72 2 0.21 20 50 72.06 72.00 0.27 0.19 22 40 72.00 72.840 0.540 2 0.2 22 50 remain in place with a price reduction. The percentages passing the remaining sieves were all within specification, and the higher percentages passing the two sieves should not affect the performance of the double chip seal. Double the effect After three months in service the double chip seal appeared to be performing well with only a few areas in the wheel path where the embedment appears to be near 100%. WSDOT tested the friction of the double chip seal after construction with a ribbed tire using a locked-wheel friction tester meeting ASTM E-274 requirements. As would be expected for a chip seal, the friction numbers were good with an average friction number of 62.1 and ranging between 57.5 and 68. WSDOT will monitor the pavement condition, rutting and ride of the double chip seal during annual pavement surveys and report the results in the final report. WSDOT designed and constructed a double chip seal to correct the flushing of an existing HMA pavement on S.R. 20. Design of the double chip seal was straightforward, and construction was accomplished using conventional chip seal equipment and methods. Initial indications are that the double chip seal was able to correct the flushing and improve friction. R&B Russell is state pavement design engineer in the State Materials Lab of WSDOT. Littleton is eastern region materials engineer in the Eastern Region Materials Lab of WSDOT. Uhlmeyer is state pavement engineer in the State Materials Lab of WSDOT. Write in 767 ROADSBRIDGES.com 29