Diaphragm wall Construction

Similar documents
Walls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more.

Construction Technology B (CON4313)

Civil Engineering Construction I (CBE5031)

TECHNOLOGY. Hydromill

Construction of a Semi-Buried Building A Super-sized Shopping Mall : The Festival Walk

Slurry Trench / Diaphragm Walls

BAUER. Diaphragm and Cut-off Walls

Drilled Shaft. Inspection. HQ Construction Office HQ Geotechnical Division

* The use of these areas can vary from car park space, where little waterproofing is required through to store rooms or plant rooms where a high

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

Diaphragm Walls: A Solution For Deep Excavations In Difficult Soil Conditions With Superficial Water Table

ROTARY DRILLING TECHNIQUES LARGE DIAMETER

GeoEng2000 An International Conference on Geotechnical & Geological Engineering

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

reduced groundwater inflow. Anchors can be included to provide additional lateral support, if required.

METHOD STATEMENT for INSTALLATION OF MICROPILE

Misan University - College of Engineering Civil Engineering Department

ISO INTERNATIONAL STANDARD. Building construction machinery and equipment Terms and definitions

SAFE SYSTEMS FOR PILING OPERATIONS

PILING PART-VI CONSTRUCTION AND INSTALLATION OF RCC BORED CAST IN-SITU PILES

TECHNOLOGY. Continuous Flight Auger

FURTHER TECHNICAL INFORMATION IN RELATION TO THE OPERATIONS OF OUR GROUP

USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA. Miranda Roman D. *, LaFaso Edward


ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS

The Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd.

Construction Technology B (CON4313)

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig

Soil Mechanics Lateral Earth Pressures page Lateral Earth Pressures in case of inclined ground surface or friction at wall-ground interface

SECANT PILE. Introduction:

Construction of the Manulife Tower Redevelopment of the previous Lee Gardens Hotel in Causeway Bay

Lesson 2 Substructure. Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD

Case examples for the construction of complex basement

GEOTECH YEAR Development in Geotechnical Engineering. Practical installation of stanchions for top-down construction in Bangkok subsoil

1.0 Micro Tunnelling An overview

Topic: Site Formation

The Construction of the Langham Place in Mong Kok An Introduction

Construction Planning, Equipment, and Methods PILES AND PILE-DRIVING EQUIPMENT

Ching Guan Kee ABSTRACT

Case Study. The Challenge. Deep Micropile Installation Under Existing Multistory Building

INNOVATIVE PILE EXTRACTION TECHNIQUE OF CFA PILES FOR THE NEW HARBOR BRIDGE PROJECT

Excavation. Stages. Surprises

Hydraulic Excavators

2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January

BASEMENT CONSTRUCTION PREPARED BY PN NOOR AISYAH ASYIKIN

Lesson Learned. Collapse of Diaphragm Wall Trench. Case study. Suez Canal Syphon Project

Golder Associates Innovative Applications (GAIA) Inc.

Grouting Bilfinger Spezialtiefbau GmbH

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch

COPYRIGHTED MATERIAL. Contents PART ONE: THEORY...1. Preface to the Third Edition xiii. About the Authors xv. Acknowledgements xvii

Compaction and Jet Grouting

Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:

Atlaspile. Full soil displacement bored pile, vibration free - low noise economical

Building pit District adjacent to St.Katharinenkirche Hamburg, Germany

Uplift Pressure Resistant Approach in Diaphragm Wall Excavation-case Study: Imam Hossein Holy Shrine Development -Karbala- Iraq

Supervision of Piling Works

SHAFT CONSTRUCTION SECANT PILE

Combined Pile Foundation System for a Residential Complex

Project report on a deep well construction

Topic: Site Formation

SCOPE OF WORK FOR PILING JOB

Annex V Concrete Structures Removal Plan

Martha Lake Gateway Sewer. An Introduction to Trenchless Methods and Evaluation for the Installation of New Pipelines

Assalamualaikum & Good Morning (May All Of You Gain A Better Understanding)

No-Dig Technology is the art and science of pipes, ducts and cables using techniques that minimizes / eliminates the need for excavation, i.e.

Construction of diaphragm wall using grab system and sealing the executive joint by CWS method in Ahvaz Subway

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA)

Student s Guide Lesson 3- Installation Process Version 1-1/

Silent Vibrationless. Technology. teel Sheet Piles. Vinyl Piling. etaining Walls. Piles. tory Piling. oundations. ite Piles. n Free Piling.

UNDERPINNING A CRANE FOUNDATION

Sabah Shawkat Cabinet of Structural Engineering 2017

Contents. Glossary 9. Foreword 10

Concrete Cutter Helps Prepare for World Trade Center Memorial Site

CVO/169897A OCTOBER 30, PLASTIC CONCRETE CUTOFF WALL

Risk Management of the Restoration of Shanghai Metro Line 4

MODERN CONCRETE TECHNOLOGY AND PLACEMENT METHODS AND THEIR INFLUENCE ON WATERPROOFING PERFORMANCE OF DIAPHRAGM WALLS M.D.

Water Well Decommissioning Guidelines

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL

Water for the World. Methods of Developing Sources

Lightweight Recoverable Foundations on Suitable Ground

SECTION DRILLED CONCRETE PIERS AND SHAFTS

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA)

Steven Dapp, Ph.D., P.E. Steven Dapp, Ph.D., P.E. Dan Brown and Associates

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

Construction Technology B (CON4313)

twenty four foundations and retaining walls Foundation Structural vs. Foundation Design Structural vs. Foundation Design

JET GROUTING Implenia Spezialtiefbau GmbH

Site Investigation MUHAMMAD AZRIL HEZMI

Deep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project

Pipe Jacking. Japan Sewage Works Association

SITE INVESTIGATION. Foundation Engineering

Presented By: Brenden Tippets, Project Executive

Analysis of Application of Pile Foundation Technology in Construction Engineering

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

How we would build the proposed storm relief sewer

Transcription:

Diaphragm wall Construction Diaphragm wall is a continuous wall constructed in ground in to facilitate certain construction activities, such as: a) As a retaining wall b) As a cut-off provision to support deep excavation c) As the final wall for basement or other underground structure (e.g. tunnel and shaft) c) As a separating structure between major underground facilities d) As a form of foundation (barrette pile rectangular pile)

Diaphragm wall Diaphragm wall is a reinforced concrete structure constructed in-situ panel by panel. The wall is usually designed to reach very great depth, sometimes up to 50m, mechanical excavating method is thus employed. Typical sequence of work includes: a) Construct the guide wall b) Excavation to form the diaphragm wall trench c) Support the trench cutting using bentonite slurry d) Inert reinforcement and placing of concrete to form the wall panel

Further explanation on the work sequences Guide wall guide wall is two parallel concrete beams constructed along the side of the wall as a guide to the clamshell which is used for the excavation of the diaphragm wall trenches. Bentenite slurry to counter balance the pressure from soil Trench excavation In normal soil condition excavation is done using a clamshell or grab suspended by cables to a crane. The grab can easily cut through soft ground. In case of encountering boulders, a gravity hammer (chisel) will be used to break the rock and then take the spoil out using the grab. RC guide wall to protect and control of the wall alignment Trench to be excavated downward using grab or clamshell until reaching the required level

Excavation support the sides inside the trench cut can collapse easily. Bentonite slurry is used to protect the sides of soil. Bontonite is a specially selected fine clay, when added to water, forms an impervious cakelike slurry with very large viscosity. The slurry will produce a great lateral pressure sufficient enough to retain the vertical soil. Reinforcement reinforcement is inserted in the form of a steel cage, but may be required to lap a few sections in order to reach the required length. Concreting placing of oncrete is done using tremie pipes to avoid the segregation of concrete. As Concrete being poured down, bontonite will be displaced due to its lower density than concrete. Bontonite is then collected and reused.

Joining for the diaphragm wall panel Diaphragm wall cannot be constructed continually for a very long section due to limitation and size of the mechanical plant. The wall is usually constructed in alternative section. Two stop end tubes will be placed at the ends of the excavated trench before concreting. The tubes are withdrawn at the same time of concreting so that a semi-circular end section is formed. Wall sections are formed alternatively leaving an intermediate section in between. The in-between sections are built similarly afterward but without the end tube. At the end a continual diaphragm wall is constructed with the panel sections tightly joined by the semi-circular groove. 1 st panel 3 rd panel 2 nd panel Excavation onward Stop-end tube Semi circular groove

Excavation using grab or clamshell to form trench for the diaphragm wall panel. Bentonite slurry is filled inside the trench to stabilize the side of cut Placing in of reinforcement bars and stop-end into trench Steel tube used as Stop-end to form the joining key Placing concrete into the trench using tremie pipe and take-out the stop-end at the same pace Construction process for a diaphragm wall panel

Forming the guide wall and using it in the trenching operation

Clamshell use to excavate the trench to form a diaphragm wall panel

Fixing and placing of reinforcing cage

Using hydrofraise (reverse circulation trench cutter) to form diaphragm wall panel Bored piles of square section can be installed using the Hydrofraise or similar drilling techniques. The bore hole is stabilised by drilling mud. The "Hydrofraise" is a drilling machine powered by three down-the-hole motors, operating with reverse circulation. A heavy metal frame, serving as a guide, is fitted at its base with two cutter drums carrying tungsten carbide tipped cutters. These rotate in opposite directions and break up the soil. A pump is placed just above the drums and evacuates the loosened soil, which is carried up to the surface by the drilling mud. The mud with cuttings is continuously filtered (desander unit) and then poured back into the trench.

A heavy crawler crane supports and manipulates the machine. It carries the power pack supplying the hydraulic power, which is conveyed through hoses to the three down-the-hole motors, two of them driving the cutter drums and the third driving the pump. The hydraulic cutting device is designed to give the cutter drums a high torque at low speed of rotation. The guide frame is suspended from the cable-operated crane. A hydraulic feed cylinder is used to achieve a constant rate of advance or to maintain a constant weight on the cutter drums. Another important advantage is that the drilling mud is constantly screened and desanded during excavation. Thus the reinforcement can be placed and concreting carried out as soon as the required depth has been reached. This excavation system makes it possible to drill piles panels or diaphragm wall elements in a very wide range of soils, from cohesionless soils to hard rock.

Flow diagram showing the excavation using trench cutter and soil removal by de-sanding equipment through circulation of slurry

Construction sequences of a Hydrofraise panel 1. Excavation of the pretrench 2. Start of drilling of a primary panel, 1st element 3. Continuation of drilling of a primary panel, 2nd element 4. End of drilling of primary panel, 3rd element 5. Pouring the concrete of a primary panel 6. Construction of the next primary panel 7. Drilling of an intermediate secondary panel 8. Pouring the concrete of the secondary panel 9. Continuation of the excavation of the pretrench

Common hydrofraise equipment with the guiding frame and the cutting drum at the bottom for cutting into various kind of subsoil ranging from clay to hard rock

Guiding frame Cutting drum

Using hydrofraise (reverse circulation trench cutter) to form the diaphragm wall panel Festival Walk

Using hydrofraise (reverse circulation trench cutter) to form the diaphragm wall panel KCRC project

Bentenite slurry to balance the soil pressure to protect the trench from collapse Guide wall Trench excavation working in bentonite slurry with grab alignment control by guide wall

de-sanding equipment Debris (sand and gravel) being filtered from the bontonite slurry and deposite to the storage tank Debris storage tank De-sanding equipment the bontonite slurry carrying the soil and gravel re-circulate to this equipment with the bontonite slurry and the debris being removed. The debris will be collected in the storage tank for disposal later

Concrete placing using hopper and tremie pipe Tongue and groove type stopend to form the joining for two adjacent diaphragm wall panel

Application of diaphragm wall in construction

Diaphragm wall Diaphragm wall as cut-off for basement excavation Diaphragm wall

Diaphragm wall as cut-off for basement excavation Connecting the basement floor onto the diaphragm wall. The diaphragm wall will become the permanent basement wall afterward

Diaphragm wall As side support for trenching cutting (constructing an underground subway for Central-Wanchai Bypass)

Diaphragm wall Diaphragm wall Diaphragm wall Diaphragm wall to form large cofferdam for building foundation

Construction of the ICC Tower from a cofferdam formed using diaphragm wall

End of presentation