SCHEDULING IN MANUFACTURING SYSTEMS

Similar documents
SCHEDULING AND CONTROLLING PRODUCTION ACTIVITIES

SINGLE MACHINE SEQUENCING. ISE480 Sequencing and Scheduling Fall semestre

JOB SHOP SCHEDULING TO MINIMIZE WORK-IN-PROCESS, EARLINESS AND TARDINESS COSTS ZHU ZHECHENG A THESIS SUBMITTED FOR THE DEGREE OF DOCTOR OF PHILOSOPHY

APPENDIX 1 Processing time (pij) Release date (rj) Due date (dj): Weight (wj)

INDIAN INSTITUTE OF MATERIALS MANAGEMENT Post Graduate Diploma in Materials Management PAPER 18 C OPERATIONS RESEARCH.

IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 05, 2016 ISSN (online):

OPERATIONS RESEARCH Code: MB0048. Section-A

CHAPTER II SEQUENCING MODELS

LOADING AND SEQUENCING JOBS WITH A FASTEST MACHINE AMONG OTHERS

Lecture: Scheduling. Nicole Megow

DIPLOMARBEIT. Capacitated Lot Sizing and Scheduling An alternative approach for the parallel machine case.

A Case Study of Capacitated Scheduling

A Sequencing Heuristic to Minimize Weighted Flowtime in the Open Shop

Optimizing Dynamic Flexible Job Shop Scheduling Problem Based on Genetic Algorithm

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

ON IMPROVING OPERATIONS SCHEDULING IN ELECTRONICS MANUFACTURING

SEQUENCING & SCHEDULING

Research Article Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers

Chapter 2. 2 Literature review

Learning Objectives. Scheduling. Learning Objectives

SIMULATION AND COMPARISON ANALYSIS OF DUE DATE ASSIGNMENT METHODS USING SCHEDULING RULES IN A JOB SHOP PRODUCTION SYSTEM

Stochastic Single Machine Family Scheduling To Minimize the Number of Risky Jobs

PRODUCTION ACTIVITY CONTROL (PAC)

A Queuing Approach for Energy Supply in Manufacturing Facilities

Dynamic Scheduling of Aperiodic Jobs in Project Management

CHAPTER 1. Basic Concepts on Planning and Scheduling

A Variable Capacity Parallel Machine Scheduling Problem

Flowshop Scheduling Problem for 10-Jobs, 10-Machines By Heuristics Models Using Makespan Criterion

Mass Customized Large Scale Production System with Learning Curve Consideration

Charting and Diagramming Techniques for Operations Analysis. How to Analyze the Chart or Diagram. Checklist of Questions - Example

MIT Manufacturing Systems Analysis Lecture 1: Overview

World Rural Observations 2017;9(3) Developing a New Mathematical Model for Scheduling Trucks in Cross-Docking Systems

Real-Time and Embedded Systems (M) Lecture 4

Metaheuristics. Approximate. Metaheuristics used for. Math programming LP, IP, NLP, DP. Heuristics

An Algorithm of Finite Capacity Material Requirement Planning System for Multi-stage Assembly Flow Shop

University Question Paper Two Marks

Chapter 3 Managing the Information Systems Project

SHOP SCHEDULING USING TABU SEARCH AND SIMULATION. Mark T. Traband

2 Production Planning

Contents PREFACE 1 INTRODUCTION The Role of Scheduling The Scheduling Function in an Enterprise Outline of the Book 6

CAD/CAM CHAPTER ONE INTRODUCTION. Dr. Ibrahim Naimi

Manufacturing Resource Planning

Techniques of Operations Research

Factory Operations Research Center (FORCe II)

7/8/2017 CAD/CAM. Dr. Ibrahim Al-Naimi. Chapter one. Introduction

Production Management and Scheduling

The Realities of Modern Manufacturing

ISE480 Sequencing and Scheduling

Sequencing Problem. Dr.S.S.Kulkarni

Introduction to Real-Time Systems. Note: Slides are adopted from Lui Sha and Marco Caccamo

A FLEXIBLE JOB SHOP ONLINE SCHEDULING APPROACH BASED ON PROCESS-TREE

Program Evaluation and Review Technique (PERT)

Module 7:Application of stochastic processes in queueing theory Lecture 30:Examples of application of stochastic processes in Queueing Theory

Activity Based Operation Modeling and Events Simulation

SCHEDULING PROBLEMS FOR JOBS AND DIFFERENT MACHINES WITH MAKE SPAN CRITERION AND LEFT TIME ALIGNMENT

An Agent-Based Scheduling Framework for Flexible Manufacturing Systems

Sequencing and Scheduling of Jobs and Tools in a Flexible Manufacturing System using Jaya Algorithm

Tasks or processes attempt to control or react to external events occuring in real time RT processes must be able to keep up events

UNIVERSITY OF ILLINOIS LIBRARY AT URBANA-CHAMPAIGN BOOKSTACKS

ENGR 310. Project Planning. Lecture Mar 2008

MILP Models for Scheduling of the Batch Annealing Process: The Deterministic Case

MANUFACTURING SYSTEM BETP 3814 INTRODUCTION TO MANUFACTURING SYSTEM

SimBa: A Simulation and Balancing System for Manual Production Lines

A Genetic Algorithm to Generate a Pro-Active Scheduler for

Production planning and. Unit 3

FACTORY ORGANIZATION AND MANAGEMENT WORK STUDY

Simulation Using. ProModel. Dr. Charles Harrell. Professor, Brigham Young University, Provo, Utah. Dr. Biman K. Ghosh, Project Leader

Simultaneous Perspective-Based Mixed-Model Assembly Line Balancing Problem

International Journal of Engineering, Business and Enterprise Applications (IJEBEA)

5.3 Supply Management within the MES

OPERATING SYSTEMS. Systems and Models. CS 3502 Spring Chapter 03

Performance Improvement of the Flexible Manufacturing System (FMS) with a Proper Dispatching Rules Planning

MINIMIZING MEAN COMPLETION TIME IN FLOWSHOPS WITH RANDOM PROCESSING TIMES

PLANNING OF ORDER PICKING PROCESSES USING SIMULATION AND A GENETIC ALGORITHM IN MULTI-CRITERIA SCHEDULING OPTIMIZATION

PLANNING AND CONTROL FOR JOB SHOP PRODUCTION 11.1 INTRODUCTION Objectives

THE IDEA OF EVALUATION SYSTEM OF WORK-PLACE LAYOUT PLANNING ESLP FOR CONCURRENT PRODUCTION

INTEGRATING COMBINATORIAL SCHEDULING WITH INVENTORY. Daria Terekhov

A Diagnostic Approach to Scheduling

Using Demand Solutions APS for Effective Scheduling in the Food Process Industry

Lecture Note #4: Task Scheduling (1) EECS 571 Principles of Real-Time Embedded Systems. Kang G. Shin EECS Department University of Michigan

Proceedings of the 2010 Winter Simulation Conference B. Johansson, S. Jain, J. Montoya-Torres, J. Hugan, and E. Yücesan, eds.

Graph Optimization Algorithms for Sun Grid Engine. Lev Markov

A term used to embrace the techniques of method study and work measurement, which are employed to ensure the best possible use of human and material

CHAPTER 1 INTRODUCTION

Chapter 12. The Material Flow Cycle. The Material Flow Cycle ٠٣/٠٥/١٤٣٠. Inventory System Defined. Inventory Basics. Purposes of Inventory

Minimizing Makespan for Machine Scheduling and Worker Assignment Problem in Identical Parallel Machine Models Using GA

Analysis and Modelling of Flexible Manufacturing System

International Journal of Advanced Engineering Technology E-ISSN

MODULE 1 LECTURE NOTES 2 MODELING OF WATER RESOURCES SYSTEMS

6 PROJECT TIME MANAGEMENT

Integrated Production and Distribution Problem with Single Perishable Product

Copyright is owned by the Author of the thesis. Permission is given for a copy to be downloaded by an individual for the purpose of research and

A COMPARISON OF JOHNSON S RULE AND TOC BASED SCHEDULING METHODOLOGIES

Operations Research QM 350. Chapter 1 Introduction. Operations Research. University of Bahrain

CHAPTER 6: DISCRETE-EVENT SIMULATION MODEL

Production and Operations Management

General-purpose SPWA with the Class-type Skill by Genetic Algorithm

OPERATİONS & LOGİSTİCS MANAGEMENT İN AİR TRANSPORTATİON

A HYBRID GENETIC ALGORITHM FOR JOB SHOP SCHEUDULING

Production and Operations Management

Transcription:

In process planning, the major issue is how to utilize the manufacturing system s resources to produce a part: how to operate the different manufacturing processes. In scheduling. The issue is when and in what sequence the different jobs should pass through the production facilities. A schedule must be compatible with the technological constraints established during process planning and should be optimal with respect to the performance criteria.

There is a wealth of literature related to scheduling problems, addressing both issues specific to manufacturing systems and aspects of scheduling in other areas. In manufacturing, the theoretical treatment of the scheduling problem makes assumptions related to the production facilities (the behavior of the different resources) and the job configuration (how the different jobs are structured, how flexible the technological constraints are, etc.).

There are two major categories of scheduling problems: Static Dynamic or stochastic

In the case of static scheduling problems, the arrival and processing times for the different jobs are deterministic and known in advance. In the case of a dynamic/stochastic scheduling problem, the arrival times follow some distribution and the processing times vary and are often uncertain. In the case of a static problem, there is usually no resource breakdown during the period of time one is scheduling, all of the resources can be either idle or working. In the case of a dynamic/stochastic problem, resource failures are allowed. In the case of a static job shop, moreover, there is no preemption once a job has started working on a resource, it will be finished on that resource and the resource will be available for the next job.

The production facilities of a manufacturing scheduling problem are usually assumed to be a job shop (see Chapter 5). To be more specific about the problems addressed in a static job shop, we will discuss some additional assumptions about the static job shop to help you understand the major scheduling issues. A job is an entity: it cannot be split and processed by two different resources simultaneously. This means that assembly operations are not addressed under this type of assumption.

Each job has m distinct operations, one on each resource/machine: there is no repetition on the same machine from the same job. For example, if one does a turning operation on a lathe, the part will not go back to the same lathe for a second operation. No cancellation: once a job has arrived, it cannot be cancelled.

Processing times are independent of the schedule: irrespective of which jobs are put on which machines, the processing times remain the same. In static jobs, an in-process inventory is allowed. Machines may be idle, and no machine may process more than one operation at a time. There is only one of each type of machine and they never break down, as discussed above.

The general job shop problem is usually formulated as a problem in which one has n jobs, m machines, and an operation o ij denotes the operation of job i by machine j. The technological constraints are represented in the order the jobs must follow while they are processed by the different machines. There are some further simplified variations of the problem when one refers, for example, to flow shop where all jobs share the same order.

A representation of the sequence the jobs must follow through a job shop is the Gantt diagram. r i is the arrival/ready time of job J, O ij is the operation of the i th job by the j th machine, p ij is the processing time of the operation o ij, di is the due date, ai is the allowance of that particular job, W ik is the waiting time, W i is the total waiting time for particular job, C i is the completion time, F i is the flow time, L i is the lateness, T i is the tardiness, and E i is the earliness.

example of scheduling four machines to process four different jobs. The machines are M1, M2, M3, M4, and the jobs are indicated by A, B,C,D. Table 8.1 shows the technological constraints as well as when the jobs are released in the particular job shop with the four machines.

Table 8.1: Data for the Scheduling Examble Job Released at Machining Order/Times (min.) A 8:30 M1(60) M2(30) M3(2) M4(5) B 8:45 M2(75) M3(3) M1(25) M4(10) C 8:45 M3(5) M2(15) M1(10) M4(30) D 9:30 M4(90) M1(1) M2(1) M3(1)

A schedule is a sequence of jobs on each machine as indicated in Table 8.2. This same sequence is represented in the Gantt chart of Figure 8.2. One can see that all the jobs will be done by 11:51.

Table 8.2: An examble schedule 1st 2nd 3rd 4th M1 A D C B M2 B C A D M3 C B A D M4 D A C B

Table 8.3 presents an infeasible schedule, where the sequence suggested contradicts the technological constraints as stated in table 8.1. The infeasibility of this schedule can easily be documented by drawing a Gantt chart for this sequence and seeing that the technological constraints are violated.

Table 8.3: Infeasible Schedule 1st 2nd 3rd 4th M1 D B A C M2 D C B A M3 D B C A M4 A D C B

Table 8.4 presents a feasible schedule similar to that in Table 8.2. It is not only feasible, but it is better in that all the jobs are done by 11:45. In this table and corresponding Figure 8.3, one can see an even better improvement as far as the maximum completion time of all the jobs.

Table 8.4: A Feasible Schedule 1st 2nd 3rd 4th M1 A B C D M2 B C A D M3 C B A D M4 D A C B

A general formulation of the scheduling problem can be stated as n/m/a/b, where n is the number of jobs that will be scheduled on m machines, with A signifying the type of shop (F for flow shop or G for general job shop) and B indicating the performance measure to be optimized. A schedule for the general job shop problem consists of m permutations of the n jobs with each permutation giving a particular sequence of the jobs ion one machine. Since there are n! permutations of n objects and there are m different machines the number of all possible schedules is (n!)m.

In the previous example, where n=4 and m=4, the total number of schedules is 4331,776. The purpose of the scheduling techniques and algorithms is to find a schedule, which optimizes a particular performance measure with no full enumeration of all possible schedules. An important aspect of this process is which performance measures must be optimized. They can be grouped according to three different categories:

Based on completion times o F max : maximum flow time o C max : maximum completion time o F av : average flow time o C av : average completion time

Based on due dates o L av : average lateness o L max : maximum lateness o T av : average tardiness o T max : maximum tardiness

Based on inventory and utilization costs o Nw av : average number of jobs waiting for machines o Nu av : average number of unfinished jobs o Nnc av : average number of completed jobs o Np av : average number of jobs in process at any time o I av : average machine idle time o I max : maximum machine idle time

These performance measures are often complex, conflicting, and sometimes overlapping. Performance measures based on completion times, are important in cases in which a set of jobs are to be worked through the manufacturing system, and the time the jobs will remain on the factory floor is important. The second category, performance measures based on due dates, is related more to made-to-=order production where particular deadlines must be met and penalties may be associated with the deadlines. The third category, criteria based on inventory and utilization costs, is particularly important in case sin which expensive materials are processed or capitalintensive facilities are used.

Figure 8.1: Gantt Diagram

Figure 8.2: Gantt Diagram for the Schedule in Table 8.2

Figure 8.3: Gantt Diagram for the Schedule in Table 8.4