Practical Cementing Technique to Repair Severe Casing Damage David Cirer, Erick Arze, Juan Manuel Moggia, Ruben Hector Soto, Pan American Energy.

Similar documents
Plugs and Profiles. Types Running Pulling Problems

Solid-Expandable Systems. The Key to Economical Recovery in Mature Fields

MACKERAL OIL TOOLS PVT. LTD.

Cement Plug Placement and Integrity Mechanical Cementing Service

Improving Late Life Well Integrity through Sustained Casing Pressure Remediation

Knowing Your Options When Attempting to Sidetrack in Open Hole Danny Harrell, Greg Nairn, and Rocky Seale-Smith International Inc.

MetalSkin Cased-Hole Liner System

Unconventional Resources

Isolating Potential Flow Zones During Well Construction

STAR Downhole Tubing (Aliphatic Amine Cured Epoxy - Product Data)

Dan Paul Ştefănescu*, Alexandru Nitulete** NONINVASIVE STIMULATION OPPORTUNITIES IN A MARGINAL GAS FIELD

C0 2 / Acid Gas. Conversion. Prepared for the 5 Th Well Bore Integrity Network Meeting. Calgary Alberta May 14, 2009

Seal 9 barrier verification by xlot and Communication test

CLEARMAX Wellbore Cleaning Services

Available online at Energy Procedia 1 (2009) (2008) GHGT-9

SPE Copyright 2008, Society of Petroleum Engineers

Frequently Asked Questions

STAR Downhole Casing (Aliphatic Amine Cured Epoxy - Product Data)

SPE Abstract. Introduction. Description of the ULIF Technology

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

WELL CONTROL THE RISING EAST NOVEMBER/DECEMBER INTERNATIONAL ASSOCIATION OF DRILLING CONTRACTORS Drilling

CEMENT EVALUATION ITS NOT JUST ABOUT A BOND LOG GLEN BENGE SENIOR ADVISOR CEMENTING PRESSURE PUMPING

Use of Pulsed Neutron Logs to Detect Tubing Leaks and to Identify Water Channeling behind Casing - Case Studies from Western Offshore Fields

RP 65 and other API Activities on Carbon Capture and Storage

Overview of Completions

performed during initial months of incorporation in addition to sourcing and qualifying of suppliers and sub-contractors

Shale Fracking What are the Risks? Control of Well Coverage Issues

Addressing Common Drilling Challenges Using Solid Expandable Tubular Technology By Larry Book, Enventure Global Technology, L.L.C.

A Case Study in Evaluating Technical Options for Well Abandonment in an Aging Offshore Field

Pre-Abandonment case history using inflatable solutions on Coiled Tubing John Stewart Sales Director June 2017

Well abandonment procedures and perforation with a slotted charge for cement squeeze applications

Appendix VIII. Guidelines for groundwater bores and wells

Artificial Lift Technique (VI Semester)

Railroad Commission of Texas PROPOSAL FOR DECISION PROCEDURAL HISTORY

COPYRIGHT. Sand Control Fundamentals. Virtual Instructor Led Session #2

SPE Copyright 2006, Society of Petroleum Engineers

Case Studies and Best Practices for Installation of Open Hole Multi-Stage Completions Systems in Wells Drilled Underbalanced

Swellpacker Technology Bests Zonal Isolation Challenge in High-Pressure Wells

Technical Bulletin No. MK3176. PREPARED: July, 2010

Drilling-with-Liner (DwL ) System Drill the Undrillable

Cementing Tool Supports Cement Plug in Large Diameter Geothermal Well Casing

Geoprobe SDT45 Sonic Dual Tube Sampling System

Shale Development: Understanding and Mitigating Risks Associated with Well Construction and Hydraulic Fracturing

Shale Gas Drilling Doing the Job Right! Cuadrilla Resources Limited

Case Histories (Downhole Tubing and Casing)

Appraising the Performance of Cyclic Production Scheme through Reservoir Simulation, a Case Study Tariq Al-Zahrani, Saudi Aramco

SECTION GRAVEL PACKED WATER WELL

SPECIAL SPECIFICATION 4401 Prestressed Ground Anchors

New Advancements in the Abrasion Resistance of Internal Plastic Coatings

Remotely Operated Cementing Methods for Drilling with Liner Installations. Steve Rosenberg, Global Drilling Reliability Manager

6 th Well Bore Integrity Network Meeting

Project report on a deep well construction

RULE 68. DISPOSAL OF NATURALLY OCCURRING RADIOACTIVE MATERIALS (NORM) ASSOCIATED WITH THE EXPLORATION AND PRODUCTION OF OIL AND GAS

Screenless Sand Control Completions. New dimensions in sand management

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig

Capillary Injection Tubing Anchor Technologies

New Technologies for Cost Effective Abandonment Operations. Delaney Olstad, Weatherford

Coiled Tubing for Downhole Applications

CT Reverse Circulating - Basics

Optimising Cementing. Rev: /04/01. Author: Peter Aird Ref:

Heavy Oil Systems Experience and expertise to enhance productivity

COMPLETIONS WFXØ VØ-RATED OPENHOLE GRAVEL- PACK SYSTEM

An Evaluation of Well Construction/Drilling/Conversion Methodologies Associated with Gas Storage Depleted Field Operations in the United States

Key Technology for Grouting behind Wall of Single-formation Shaft Wall in the Surface Soil Segment of Waste Shaft

CHAPTER 32 - WELL ABANDONMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted September 5, Part 1 Introduction...2

Corporate Office. Innovative Well Intervention Ultra Short Radius (USR) Drilling and Completion Technologies. Effective Reservoir Development

2. THE DRILLABLE STRADDLE PACKER CONCEPT

18 DECEMBER 2013 SPE DALLAS SECTION GEORGE E. KING, P.E.

Scientific Observation Hole Program SOH-2. Drilling Permit Amendment

Why Mines is a Source of Petroleum Technology Investment Opportunities

Detailed design HON-GT-01-S2. Prepared by: Version: 1.4. Publication date: 19 May 2015

Hydraulic Fracturing Operations Well Construction and Integrity Guidelines API GUIDANCE DOCUMENT HF1 FIRST EDITION, OCTOBER 2009

Chaparral Natural Resources, Inc.

Managing Integrity Status for Large Well Stocks

HTHP Gas Production Casing Cementing Michael Davis, SPE, Drill Science Corp.

Advanced Production Technologies

Multiple Zone Geothermal Stimulation Case Study: Fluid Diversion Using Thermo-Degradable Zonal Isolation Materials

Green Well Westland SIDETRACK GEOTHERMAL WELL HON-GT-01S2 WORK PROGRAMME

Experiences in the Salt Creek Field CO2 Flood

Application of a Unique Loss Circulation Curing Cement Spacer during Cement Placement in Geothermal Wells

SABER OIL & GAS VENTURES, LLC DAILY REPORT STATE UNIVERSITY T #8 ANDREWS COUNTY, TEXAS

Andrews Shafter Lake Means 10/27/2015

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

J-W Operating Company Corporate Objectives

Steam Injection. Dr. Helmy Sayyouh Petroleum Engineering Cairo University

Well Design and Well Workover to Land Deep Production Casings in the Menengai Field

Understanding Mechanical Integrity Testing and Underground Gas Storage: The Key to Success

2015 Global Petroleum Technologies Limited.

Trican s Burst Port System (BPS)

ERCB and Groundwater Protection Water Technologies Symposium 2011 April 14, 2011

LONG REACH WELLBORES IN HARD ROCK FORMATIONS BY FLUID POWERED HIGH FREQUENCY PERCUSSION

Everything You Always Wanted to Know About Class I Injection Wells in Texas

ADVANCED FLUID SOLUTIONS FOR COMPLEX WELLBORE CHALLENGES

SESSION 23 WELL CONSTRUCTION AND COMPLETION

Environmental Management Chapter

Innovation and Integrity by Design

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:

Blowout Uncontrolled flow of gas, oil or other well fluids from a well

Draft Directive 051. Wellbore Injection Requirements. Contents. Revised edition August 14, Replaces previous edition issued March 1994.

Southwest Petroleum Branch,SINOPEC. The Challenges of Stimulation In Sichuan Western Tight Sand Formation

Transcription:

SPE 154241 Practical Cementing Technique to Repair Severe Casing Damage David Cirer, Erick Arze, Juan Manuel Moggia, Ruben Hector Soto, Pan American Energy. Copyright 2012, Society of Petroleum Engineers This paper was prepared for presentation at the SPE/ICoTA Coiled Tubing & Well Intervention Conference & Exhibition held in The Woodlands, Texas, USA, 27 28 March 2012. This paper was selected for presentation by an SPE program committee following review of information contained in an abstract submitted by the author(s). Contents of the paper have not been reviewed by the Society of Petroleum Engineers and are subject to correction by the author(s). The material does not necessarily reflect any position of the Society of Petroleum Engineers, its officers, or members. Electronic reproduction, distribution, or storage of any part of this paper without the written consent of the Society of Petroleum Engineers is prohibited. Permission to reproduce in print is restricted to an abstract of not more than 300 words; illustrations may not be copied. The abstract must contain conspicuous acknowledgment of SPE copyright. Abstract We introduce a new way to repair the casing affected by severe damage, even long rupture casing. These techniques consist to pump cement through a special design of cement retainer and fiber pipes call ERFV (Epoxy Reinforced Fiber Glass), to fill the annular space between the casing and ERFV pipes. The ERFV are used as a guide for a special pilot mill (a mill with a nose of smaller diameter). Thus, achieve the integrity, the passage and the continuity of the well. This paper will explain the method to repair severe casing damage and show the results of wells repaired. Introduction When we operate in mature fields such as the San Jorge Gulf Basin, where most of the wells has 40 to 50 years of antiquity in production. Some were converted to water treated injection wells. Maintaining the integrity of the wells creates a great challenge for Workover Engineering. These oilfields maintain their production based on drilling new wells and to keeping as low as possible the declination of all existing wells. To reach these objectives, the water flooding patterns are continuously being modified to maintain production levels; these changes generate much of corrosion damage on the casings, leaving many wells without possibility to keep active. The production casing, as we know, is submerged, both inside and outside, in fluids of different combination of salinity and temperature, that helps to generate material loss ending of ruptures and pitting in the casing. The greatest damage is generating between the surface casing shoe and the top of cement. These damages and ruptures could generate environmental contamination and creates difficulties to keep the well on production. The solution that we found to repair that damage is easy and cheap, using simple materials. Like ERFV tubes, cement retainer and special drill mills. This technique involves pumping cement through a special cement retainer. This retainer is located above the ERFV tubes. The cement will fill the annulus between the casing and the fiber tubes, helping to increase the pressure allowing put cement behind the casing to repair the damage. In some wellbores, these damages came to be up to 240 m (787 ft) long. Theory By analyzing in detail the sequence of operation to remedy the severe damage to the casing, that means, all the maneuvers that were performing in the traditional cementation process, we realize that we are using a large volume of cement. These large volumes of cement are placed within the casing as a balanced plug. Mostly of this cement stays within the casing and not behind it and within the rupture zone. The pressure applied to this process is only the hydrostatic of the cement. This is to avoid increasing the damage to the casing by applying extra pressure on the damage zone. Resuming the traditional Operation: Once defined the extent to the severe damage, we make the admission test and proceed to make the cementation as follows:

2 SPE 154241 RIH and set Plug and Packer, with the corresponding plug-pressure test. Decant sand on plug. POOH Packer and RIH tubing string Cement is pump and balanced in front of the breakage This technique has three main difficulties: The volume of injected cement behind the casing is relatively low due it is not possible to apply enough pressure to the cement slurry. In larger damage zones, often it is not easy to achieve total hermeticity in only one cementing operation. It needs to repeat the procedure. After that, end the cementing operation and POOH the tubing string. RIH a drill mill and drill the cement remaining within the casing. Many times the cement itself presents a higher resistance than the corroded casing. Therefore, it is highly likely that the drill mill start to increase the damage on the casing walls, with the risk to open a window and to go out of the wellbore. This situation would imply to lose the access to the bottom of the wellbore, thus loosing the well production. The cleaning of the wellbore generates a high cost of special services (motor mud, cutters, drills, etc), This generate a large amount of remaining cement cuts and high consumption of water to make up such waste to surface. All these maneuvers to drill the cement are time consuming of equipment. Then we have to test that the cementation has been successful. These are pressure tests up to 300 psi. So, if this test is positive, clean the well and put it in production. Resuming new methodology Analyzing the local suppliers market, one local company was select to seek the possibility to modify tools for this project. They fabricated a cement retainer with a 3 1/2" threaded pin at the bottom, which is used to hang the fiber tube. This string is run in the hole and the retainer is set above the breakage, leaving the fiber tubes in front of the breakage. These retainers are easy to set up, because the tools for this purpose are often used. These aluminum retainers present no difficulty to be drilled out. Once defined the extent of the casing damage. We make the admission test and proceed to make the cementation as follows: Set up a drillable plug below the base of the casing damage. That serves as a seal in the area of interest. Make pressure test to drillable plug. In some cases, we left a conventional bridge plug on the top cement zone and make balanced cement plug below the damage zone. Then the ERFV tubes are running in to the well bore. Those are running hanging from the aluminum cement retainer with a special thread connection to the fiber pipes. Set up the retainer over the damage zone and ERFV pipes facing the area to be repair. The procedure is to pump cement through a stinger into the aluminum cement retainer, filled the annulus between the casing and ERFV pipes guide. The cement is pumped under pressure from the top to the bottom and behind de casing trough the whole length of the breakage, thus achieving the sealing of the entire damage zone. These pressures depend of how big is the damage. During the process of clean up the wellbore with special drill mill, the first pressure test is at midway of the repaired zone. It let us know if the first part of repaired zone it is hermetic. After clean up the wellbore completely and just in front of the repaired casing damage, make a complete hermetic test. Like show in the schematics. We can see how the theory works. Most of the pumped cement fills the annulus between casing and ERFV. Now when we drill it, the internal ERFV space is empty, allowing to use this space as a

SPE 154241 3 guide for a special pilot mill (a mill with a nose of smaller diameter). This is to avoid generate more damage on the casing wall, drill and clean the wellbore faster and safe. The tools are kept inside the wellbore. With all these features, the first well was select to perform the first pilot. First pilot well With all this theory the first well was selected to perform the first experimental evidence. SAG-4 Injector well 1) Background: Field: Anticlinal Grande. Antique: 54 years old. Objective: put the well in injection. Production: 14 m3opd associated Risk: high. The well has not a cement profile. The first 20 mts below the wellhead is 7 ", then is 5 ½" diameter. The guide shoe of 9 5 / 8 ".Is 90 meters. The casing has a problem under the guide shoe (and with solids contributions already detected in + / - 90 m). EWI shows red condition. 2) Workover intervention: Pulled out of hole the existing injection system was successful with good results. All the production assembly were recovery completely. 1) Halliburton recorded the CAST-F mode Cement, Neutron log, CCL, CBL, VDL logs to understand the status of casing. 2) WEATHERFORD recorded a CIT log (Corrosion Integrity Tool) and get data from how corroded is the casing. It was RIH the bridge plug and packer to locate the damage zone. It was detect from 91 meters to 217 meters. It was performed admission test to the damage zone. We were determining the base and the top of damage. Left we to proceeds to set a bridge plug "N" type hydraulically in 660 meters. Set a second bridge plug "N" type at 230 meters. This was set as the basis of the damage zone. The bridge plug was test with 800 PSI. The complete string of the casing aligner was armed with fiber pipe 3 1/2 inches diameter composed of 14 tubes (127 m long), all them hanging from aluminum cement retainer (Blinded at the bottom), with lower thread of 3 ½ " EUE. This was set at 88.95 meters. The cementing company proceeded to pump 220 sacks of special cemented. All the cement filled the annular space between casing and the fiber tubes. After 12 hour WOC, it assembled and RIH the BHA. This BHA was composing by high-speed deep motor with a concave pilot mill of 120 millimeter. The objective was to drill the cement retainer aluminum plug. After proving tightness with negative results underwent second balanced-type cement, failing to obtain the desired result. Then we finish drilled the fiber pipe completely. The hermetic test performed. In this test did not achieve total tightness. The second operation to finish the reparation was performing with traditional method. After the casing damage was fixed. The injection system was recovered, changed and lowered a new one. In addition, we keep this well in production. All this experience gives us a good background to establish a methodology to Repair Severe Casing Damage and good Practical Cementing Techniques.

4 SPE 154241 Methodology resumes 1) Calibrate to ensure passage thru the wellbore (if necessary). It is important to rectify the area of interest as below it. 2) Record a corrosion log in order to select the depth of the k aluminum retainer and length of the fiber tubes. 3) Depend of kind of casing damage. Water admissions, solids contributions, fishing below the rupture zone or loss of passage thru the wellbore. We will choose the most appropriate bull plug. Among them are: drilled bull plug, recovery bridge plug or balanced cement plug. 4) The bull plug must be set it 15 meter under the base of casing damage. 5) RIH the bridge Plug and Packer to test the depth where the k aluminum retainer will set up. Verify the pipe tally to be in depth. Moreover, if necessary we must record a CCL log. 6) Make admission test for the zone to be cementing. 7) RIH the ERFV aligners with the aluminum cement retainer. Set up at determined deep with the fiber tubes in face a casing damage. 8) Pump the cement; WOC. Depend what kind of cement was pump. 9) Drill the cement, the aluminum cement retainer, with motor deep and drill pipes. 10) Use concave pilot drill mill. 11) Perform pressure tests with 300 psi (with the motor deep in to the wellbore). The first test must be doing in the middle of the zone to be repair and the second at the end of rotating fiber pipes. 12) If both tests are positive, clean all the wellbore and continue with the objective of intervention. Results Having used the last example as pilot to establish the working methodology. We proceeded to repair a eighteen wells, achieving successful repairs in almost all of them. Some of the wells repaired, with different length of damage, at different depths and different kinds of wellbores, are shown below. DAMAGE ZONE RETAINERS DEPTH. WELL TOPE BASE UPPER LOWER (MTS) (MTS) (MTS) (MTS) CEMENT VOLUME RESULTS TYPE WELL SAG-4 91 217 88.9 230 220 BLS RECORDED CBL OK INJECTOR PLM-816 194 415 185 1330 30 BLS + 75 BLS RECORDED CBL OK PRODUCTOR DE WF PLM-814 231 286 230 1130 70 BLS DE CEMENTO RECORDED CBL OK PRODUCTOR DE WF PZ-822 475 550 461 596 25 BLS + 60 BLS RECORDED CBL OK INJECTOR PMC-71 488 600 465 677 50 BLS + 100 BLS RECORDED CBL OK INJECTOR PZ-96 241 472 233 568 40 BLS + 250 BLS RECORDED CBL OK INJECTOR PMC-21 117 279 116 323 100 BLS + 60 BLS RECORDED CBL OK INJECTOR PMC-4 226 246 204 291 199 BLS RECORDED CBL OK INJECTOR PCD-135 50 149 46 183 260 BLS RECORDED CBL OK PRODUCTOR PCG-128 263 481 220 505 50/100BLS + 15/30 BLS RECORDED CBL OK PRODUCTOR DE WF PMC-11 120 300 105 343 50 BLS no record PRODUCTOR DE WF PMC-11 525 625 510 652 180 BLS no record PRODUCTOR DE WF Pz-893 220 260 215 310 150 BLS RECORDED CBL OK PRODUCTOR PMC-20 109 207 124 241 300 BLS + 110 BLS RECORDED CBL OK INJECTOR PMC-36 258 343 249 392 50 BLS + 50 BLS RECORDED CBL OK INJECTOR PZ-871 430 505 425 529 225 BLS no record PRODUCTOR PCD-4 145 318 126 422 50 BLS + 220 BLS RECORDED CBL OK INJECTOR PC-1048 240 587 242-415 587 200 BLS RECORDED CBL OK PRODUCTOR DE WF Costs and benefits First: Getting a barrier to maintain the integrity of the wellbore, avoiding contamination of freshwater aquifers (Patagonian formation) in cases where the casing shoe does not cover that area. Second: Comply with company policies relating to wellbore control, maintaining proper control of the sub-surface facilities. Third: Extend the life of the wellbore, avoiding having it to abandon the wellbore for integrity problems. Fourth: do not have to drill a replacement well. Fifth: could be the most important, it has to maintain inside the well. Avoiding go out of the well. The operating costs are relatively low, because the tools that we are operating are daily used.

SPE 154241 5 Logs The Corrosion logs recorded before and CBL-VDL logs recorded after repaired well are show below PZ-822 PLM-816 PMC-71 PLM-814 Conclusions When we think in repairing a wellbore with a large breakage, the first thing to do is to think in the difficulties to achieve the target. With this technique, we managed to overcome this difficulty. This technique is reliable to repair casing damages in a simple and low cost way.