Span 400 Instruction Manual

Similar documents
Span 400 Series Instruction Manual

Span 500. Elite Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD

Instruction Manual. DESIGNATION SPAN 500 Double Width EN /12 XXXD SPAN 500 Single Width EN /8 XXXD

Span 300 Instruction Manual

Span 300 Manual. DESIGNATION EN1004 CEN 1298 IM - en. CEN designation of this instruction manual EN 1298 IM en

Snappy Ladder 300 Instruction Manual

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0107. Customer Service

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0106. Customer Service

EASY-SET SCAFFOLD TOWER OPERATIONAL SAFETY AND ASSEMBLY INSTRUCTIONS MODEL: AL-Q0108. Customer Service

Mobile Towers - 3T Method

This User Guide provides you with step by step instructions to ensure your system is erected easily and safely.

LADDERSPAN 3T USER GUIDE. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

ROOM-MATE. 3T - Through the Trapdoor USER GUIDE

CLIMA AGR. Mobile Aluminium Tower with Climbing Frames 1450/850 Camlock Advanced Guardrail USER GUIDE

Safety First Mobile Towers - 3T Method INTRODUCTION

CLIMA 3T. Mobile Aluminium Tower with Climbing Frame 1450/850 3T - Through the Trapdoor Method USER GUIDE

LADDERSPAN AGR. BoSS Camlock Advance Guardrail Mobile Aluminium Tower 1450/850 Frames USER GUIDE

BoSS Clima USER GUIDE. Mobile Aluminium Tower with Climbing Frame 1450/850. 3T - Through the Trapdoor Method

MiniMax USER GUIDE. Mobile Aluminium Trade Quality Access Tower System. 3T - Through The Trapdoor Method

BoSS. Mobile Aluminium Tower 1450/850 Ladderspan. 3T - Through the Trapdoor Method

Mobile Tower 3T Method (Through The Trapdoor) Please read this guide carefully. Please note that diagrams are for illustrative purposes only.

Safety First Mobile Towers - 3T Method

Safety First Mobile Towers - 3T Method

Safety First Mobile Towers - 3T Method INTRODUCTION

BoSS Room-Mate. 3T - Through the Trap Method

Safety First Mobile Towers - 3T Method INTRODUCTION. Please read this guide carefully. Please note that diagrams are for illustrative purposes only.

BoSS SOLO 700. One Man Aluminium Tower EN /4 EN1298-IM-EN 3T - Through the Trap Door USER GUIDE

SOLO 700. One Man Aluminium Tower 3T - Through the Trapdoor Method USER GUIDE

1450/850. Instruction Manual. Mobile Access Tower

8 Rung Industrial Tower

Industrial Aluminium Towers

MOBILE ACCESS TOWER INSTRUCTION MANUAL SHALLOW BRACE. Incorporating the 3T method of assembly

COMPONENT SCHEDULE SINGLE WIDTH SPAN TOWERS WITH LADDER FRAMES TO BSEN RUNG STARTER FRAMES

Industrial Aluminium Towers

SIDE CANTILEVER TOWER SCAFFOLD. 3T - Through the Trapdoor Method USER GUIDE

Industrial Aluminium Towers

Inspect components prior to erection. Inspect tower prior to use. Castors locked and legs correctly adjusted. Stabilisers fitted as specified

A SAFER WAY TO REACH NEW HEIGHTS. Instruction Manual. Mobile Access Tower. 3T - Through the trap method

Industrial Aluminium Towers

LEWIS Miniscaff Folding Tower Assembly Guide

INSTRUCTIONmanual. BoSS COMPACT SIDE CANTILEVER TOWER SCAFFOLD 3T Method - Through the Trap Door

3T - Through The Trapdoor Method

BoSS Climalite Camera and lighting tower

STAIRMAX 700. Camlock Guardrail Aluminium Tower 3T - Through the Trapdoor USER GUIDE

INSTRUCTION MANUAL MOBILE ACCESS TOWER

Single Width Tower Assembly Guide

AGR TOWER. Standard Features include. Tower Assembly Training Available

Assembly Instructions

END LINKED TOWER SCAFFOLD. 3T Method - Through The Trapdoor USER GUIDE

Thanks for viewing this information PDF. There's more products, details, speci cation etc. on our website - CLICK THE LINKS ABOVE

ONE MAN TOWER. Instruction/safety manual

STAIRMAX 700 MK2 USER GUIDE. Aluminium Tower 700 Climbing Rung. 3T - Through The Trapdoor Method

GENERAL SAFETY RULES DOUBLE WIDTH 232 (NARROW RUNG) 3T INSTRUCTION MANUAL DISMANTLING NOTES: The 232 Tower Approved to the requirements of BS EN 1004


Instruction Manual Span Scaffolds

Rolling Towers. Layher Rolling Towers Uni Wide. Safety Structure Instructions for Assembly and Use. Mobile working platforms to DIN EN 1004:

Rolling Towers. Layher Uni Light Tower Instructions for Assembly and Use. Mobile working platforms according to DIN EN 1004:

ASSEMBLY INSTRUCTION ROLLING TOWER RT 1400 & RT 1400XR ROLLING TOWER RT 750 & RT 750XR STAIR TOWER ST 1400 FOLDABLE TOWER FT 750 & FT 750XR

SAFE ERECTION AND USE OF ALUMINIUM TOWERS/SCAFFOLDS

Mini-Max Access Tower System Data-Sheets

Mobile Tower Scaffold. 1. INTRODUCTION 2. REGULATIONS 3. PRIOR TO ERECTION 4. MOVING A TOWER 5. INSPECTION 6. HAZARDS

Tower ASSEMBLY GUIDE

Assembly Instructions

A-0312 ASSEMBLY GUIDE

TOWER EXTENSION PACK 3 Model No. SSCL3. TOWER EXTENSION PACK 4 Model No. SSCL4 INSTRUCTIONS FOR: PLATFORM SCAFFOLD STAND. Model No. SSCL1.

3T - Through The Trapdoor Method

Low Level Access Platform

GENERAL SAFETY RULES. INSTRUCTION MANUAL (Platform Heights 1.1m, 2.1m, 3.1m & 4.1m)

1 Man Mobile Aluminium Tower System

Layher. Aluminium Rolling Towers. Layher SuperKlaxTower. Instructions for Assembly and Use

OPERATING INSTRUCTIONS

ASSEMBLY GUIDE FOR USE WITH EURO TOWERS LADDER FRAME 3T TOWER SYSTEMS ONLY

Aluminum Scaffold Safety Rules

OPERATING INSTRUCTIONS

CUSTERS FOLDY MOBILE SCAFFOLDING

User Manual. JUMBO FOLDING SCAFFOLD w/stairs & railing

PROFESSIONAL ROLLING TOWER SYSTEMS

Since it was established in 1989, with a small manufacturing base in Qwa Qwa, Uni-Span has grown to become one

USER S MANUAL HAKI PUBLIC ACCESS STAIR

WORKING AT HEIGHT. The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice.

AR SCAFFOLDING AR ALUMINUM MOBILE AR STEEL MOBILE

USER S MANUAL HAKI PUBLIC ACCESS STAIR

Assembly and Usage Instructions Z 600 S-PLUS mobile scaffold tower with stabilisers Z 600 S-PLUS folding scaffold unit COMPACT

Adjusta Minit Anti-Surf

Customer Support Manual. This booklet contains information on how to erect, dismantle and use Waco Kwikform Aluminum Scaffolding.

SAFETY SYSTEM. G-Deck Consideration. Manual Handling

COLD DEFORMATION: A STRONGER ALTERNATIVE

USER S MANUAL. HAKI Loading Tower

Rolling scaffold single/double width Safe-Quick Guardrail RS TOWER 51/52/54

Scaffold Instruction Manual

OSHA Rules for Scaffolding

Mobile Safety. EN Assembly and Use manual Rolling tower 4100 and 4200 Folding tower 4400-K C-0711.

LAYHER ACCESS TECHNOLOGY CATALOGUE

Assembly and usage instructions. Z600 brace-free mobile scaffold

Assembly and usage instructions REACHMASTER

Chairman's Message. Shadab Ahsan

WARNING. *All Tele-Tower manuals are available free from Telpro Inc. Call Customer Service at or if you need a copy.

ALUMINUM SCAFFOLDING

USER S MANUAL HAKI COMPACT STAIR TOWER

Transcription:

Span 400 Instruction Manual DESIGNATION SPAN 400 Double Width EN 004 3 8/2 XXCD SPAN 400 Single Width EN 004 3 8/8 XXCD CEN designation of this instruction manual EN 298 IM en Rev-00

WARNING NEVER STAND ON AN UNGUARDED PLATFORM SAFE WORKING LOADS AND WORKING HEIGHTS The safe working load at each level of platform is 360kg evenly distributed, regardless of whether one or two platforms are installed. Therefore, even if two platforms are installed side by side, total cumulative load shall not exceed 360kg distributed. The total loading on the tower structure should not exceed 720kg. Normal maximum platform height for indoor use is 2m for Double Width, and 8m for Single Width. For outdoor use, the maximum height is 8m for Single and Double Widths. ASSEMBLY PROCESS 0cm. Preparation Locate the tower level adjusters on each leg at 0cm (4 inches) from the bottom of the leg. Unlock the interlock clips on all frames. When installed, always move the interlock clip to the locked position. Sort the braces into horizontal and diagonal braces - the diagonals are slightly longer. Unlock the brace locks. Unlocked Locked Unlocked Locked 2. Base Step : Install castor into adjustable leg. Step 2: Ensure interlock clips are released from the base frames (bottom frames). Step 3: Install castor / leg assembly to frame by pushing the leg into the frame tube. This should be done with manual force only, no tools. Step 4: Lock castors before ascending any part of the tower. Note the locking and unlocking position for the castors as shown here. Unlocked Locked 3. Locking down the platform (Windlock) A windlock clip is installed on the platform at the hook. This is locked as shown here. Unlocked Locked 0

USAGE ADVICE We recommend a minimum of two people to assemble, dismantle and move the platform tower. Check that all components are on site and in good working order. Ensure that the assembly location is checked to prevent hazards during assembly, dismantling or moving and while working on the tower. Particular attention should be given to the ground condition, whether level or sloping, obstructions and wind conditions. The ground condition must be capable of supporting the tower structure. Towers must always be climbed from the inside of the assembly using the ladder. Adjustable legs must only be used to level the tower. If the adjustable legs are to be extended by more than 50 mm; a risk assessment needs first to be undertaken by a competent person. Lifting of components must be done inside the effective base area of the tower; components are normally hoisted using a rope. Moving the tower must only be done by manual effect from the base of the tower. When moving tower be aware of overhead hazards (e.g. electric cables). No personnel or material to be on the platform whilst the tower is being moved. Beware of horizontal loads which can lead to instability of the tower. The maximum side force is 20kg. When tying-in the tower, attach a tie to each upright at 4m height intervals. Ensure that couplers are suitable for 50mm diameter aluminum tube. Do not use boxes or steps to gain additional height. If extra height required, contact your distributor to get extra components. Do not lift or suspend an assembled mobile tower. Damaged components or components from other tower systems must never be used. Stabilisers should always be fitted when specified. Use the stabiliser shown on the component list according to the tower height. When wind exceeds Beaufort force 4, cease using the tower. If wind is expected to reach Beaufort force 6, tie tower to a rigid structure. If winds of Force 8 are forecast, dismantle the tower or remove to shelter. Wind speeds Force Peak mph Peak km/h Peak m/s Guidance 4 8 29 8. Moderate breeze - raises dust & loose paper 6 3 50 3.9 Strong breeze - difficult to use umbrella 8 48 74 20.8 Gale force - walking is difficult CARE AND MAINTENANCE Keep all equipment clean, especially spigots and sockets where frames join. Spigots should fit easily into sockets. Lubricate with light oil. Remove dirt or paint from adjustable legs with a light brush, lightly oil the leg locks. Do not strike or hammer components. Do not throw or drop onto hard surfaces. Lightly oil spring mechanism of the hooks. For transport and storage, components are best stored vertically. Damaged parts must be repaired or replaced; refer to the Instant Upright website for further advice or contact your equipment supplier for advice. 02

MOVING TOWERS To Move the tower to a new position, first prepare the tower. Check that the wind speed does not exceed 29km/h (8.m/s). Ensure the tower is empty (material and personnel). Check for overhead obstructions including electrical cables. Raise the stabiliser feet (only enough to clear obstructions). Taking care to ensure tower stability is maintained, insert any extended adjustable legs completely into the frame. Release the castor brakes. Carefully move the tower by manually applying force at the base. Do not use mechanical means to move the tower. Once positioned prepare the tower for use. Check and adjust as necessary to ensure all castors and stabilisers are in firm contact with the ground. Check that the tower is vertical using a spirit level. Reapply the castor brakes. EXPLODED VIEW Span 400 - double width Span 400 - single width 0. Castor 06. 5 Rung Frame. Frame clip 02. Adjustable Leg 07. Trapdoor Platform 2. Stabiliser 03. Horizontal Brace 08. Toe-board set 04. 3 Rung Frame 09. Guard-rail bracing frame 05. Diagonal Brace 0. 5 Rung Ladder Frame 03

STABILISERS Stabilisers are to be used, when specified, to guarantee the structural stability of the tower. In addition, the ballast table is to be observed. Fig 2 Fig 3 Fig 4 2m single platform 2.5m single platform 3m single platform Telescopic Stabiliser x = 3730mm x = 3929m x = 4078mm Large Stabiliser x = 4440mm x = 4660mm x = 484mm 2m double platform 2.5m double platform 3m double platform Telescopic Stabiliser x = 4095mm x = 4333mm x = 4523mm Large Stabiliser x = 4792mm x = 5042mm x = 5252mm ALWAYS ENSURE STABILISER SIZE IS CORRECT AND ABLE TO SUPPORT TOWER Lightly tighten the upper clamps above the sixth rung on each corner post. Position the lower clamp above the bottom rung. Ensure the lower arm is as horizontal as possible. Position the stabilisers so that the footpads are approximately equidistant from each other, as shown in Fig.2. Adjust the outrigger and reposition the clamps as required to make firm contact with the ground. Ensure the clips with locking pin are in place. When in the correct position, tighten the clamps firmly. To position the tower against a wall, do not remove the stabiliser; move parallel with the wall. (Fig.3) To position the tower in a corner, remove the inside stabiliser and place the outside two parallel with the wall. (Fig.4) 04

ALTERNATIVE CONFIGURATIONS This manual details the sequence for the building of towers with ladder frames and a single platforms up to the working level. Alternative builds may be adopted as follows: 2 platforms at every level A second platform can be added (trapdoor not required) to each intermediate access platform level. (Double width towers only) Fig 4 Inclined ladder access Inclined ladders can be fitted for access to each platform level. If inclined ladders are used then ladder frames can be replaced by standard frames in the build tables. (Suitable for both single and double width towers) Fig 5 BUILD TABLE ADJUSTMENTS If inclined ladders are used then ladder frames can be replaced by standard frames in the following build tables If double width platforms are required at all levels, the number of standard platforms in the double width build table should be increased to match the number of trapdoor platforms Fig 6 Fig 7 Single Width tower with inclined ladder access Double Width tower with 2 platforms at all levels and inclined ladder access National regulations may determine variations to the standard build sequence. Instant Upright national distributors will be able to advise of variations to the standard build which are applicable. 05

SPECIFIC PRODUCT INFORMATION Table of parts and quantities Span 400 Double Width Towers - 2m, 2.5m and 3m lengths to EN004 Platform Height (m) 2m 3m 4m 5m 6m 7m 8m 9m 0m m 2m Work Height (m) 4 5 6 7 8 9 0 2 3 4 Tower Height (m) 3 4 5 6 7 8 9 0 2 3 Tower Weight in kg (2m in length) 0 50 74 200 226 253 285 3 337 363 389 Tower Weight in kg (2.5m in length) 4 68 94 225 253 285 39 350 378 409 437 Tower Weight in kg (3m in length) 25 82 20 244 275 309 345 379 40 444 474 Note: Quoted platform heights included 50mm (6 inches) leg adjustment for leveling that can be increased or reduced Description Weight (kg) 5 Rung Frame 9.3 2 2 3 3 4 4 5 5 6 6 3 Rung Frame 5.8 5 Rung Ladder Frame 2.6 2 2 3 3 4 4 5 5 6 6 3 Rung Ladder Frame 7.2 Trapdoor Platform (2m, 2.5m, 3m) 4 8 20 2 2 3 3 4 4 5 5 6 6 Fixed Platform (2m, 2.5m, 3m) 4 7 20 Horizontal Brace (2m, 2.5m, 3m).7 2 2.4 4 4 7 7 0 0 3 3 6 Diagonal Brace (2m, 2.5m, 3m).8 2.2 2.5 4 6 8 0 2 4 6 8 20 22 24 Guard-rail bracing frame (2m, 2.5m, 3m) 3.8 4.4 5.2 2 2 3 3 4 4 5 5 6 6 7 Telescopic Stabiliser 5.2 4 4 4 4 4 Large Stabiliser 6.8 4 4 4 4 4 Adjustable Leg. 4 4 4 4 4 4 4 4 4 4 4 Castor / Baseplate 2.2 4 4 4 4 4 4 4 4 4 4 4 Toe-board set (2m, 2.5m, 3m) 8.7.5 4.4 06

DOUBLE-WIDTH TOWER 6m 2 3 4 5 6 7 8 07

9 DOUBLE-WIDTH TOWER 6m 0 2 3 4 5 6 08

DOUBLE-WIDTH TOWER 6m 7 8 9 20 09

DOUBLE-WIDTH TOWER 5m 2 3 4 5 6 7 8 0

9 DOUBLE-WIDTH TOWER 5m 0 2 3 4 5 6

DOUBLE-WIDTH TOWER 5m 7 8 9 2

SPECIFIC PRODUCT INFORMATION Table of parts and quantities Span 400 Single Width Towers - 2m, 2.5m and 3m lengths to EN004 Platform Height (m) 2m 3m 4m 5m 6m 7m 8m Work Height (m) 4 5 6 7 8 9 0 Tower Height (m) 3 4 5 6 7 8 9 Tower Weight in kg (2m in length) 78 25 48 75 98 23 255 Tower Weight in kg (2.5m in length) 86 3 63 88 22 25 284 Tower Weight in kg (3m in length) 92 40 75 203 238 272 307 Note: Quoted platform heights included 50mm (6 inches) leg adjustment for leveling that can be increased or reduced Description Weight (kg) 5 Rung Frame 7.3 2 2 3 3 4 4 3 Rung Frame 4.5 5 Rung Ladder Frame 0.6 2 2 3 3 4 4 3 Rung Ladder Frame 5.9 Trapdoor Platform (2m, 2.5m, 3m) 4 8 20 2 2 3 3 4 4 Horizontal Brace (2m, 2.5m, 3m).7 2 2.4 Diagonal Brace (2m, 2.5m, 3m).8 2.2 2.5 2 3 4 5 6 7 8 Guard-rail bracing frame (2m, 2.5m, 3m) 3.8 4.4 5.2 2 2 4 4 6 6 8 Telescopic Stabiliser 5.2 4 4 4 4 Large Stabiliser 6.8 4 4 Adjustable Leg. 4 4 4 4 4 4 4 Castor / Baseplate 2.8 4 4 4 4 4 4 4 Toe-board set (2m, 2.5m, 3m) 6.8 8.4 9.8 3

SINGLE-WIDTH TOWER 6m 2 3 4 5 6 7 8 4

9 SINGLE-WIDTH TOWER 6m 0 2 3 4 5 6 5

SINGLE-WIDTH TOWER 6m 7 8 6

SINGLE-WIDTH TOWER 5m 2 3 4 5 6 7 8 7

9 SINGLE-WIDTH TOWER 5m 0 2 3 4 5 6 8

SINGLE-WIDTH TOWER 5m 7 8 9