SITE VISIT REPORT DATE: JOB: NO. OF VISIT: PAGE OF : PURPOSE OF VISIT: CONTRACTOR: Items to be checked Observations Actions SETTING OUT

Similar documents
PRELIMINARY INSPECTION FRAMEWORK

Typical detail: New roof with breathable underlay

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.

Construction Technology Revision Guide

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 protecting Membranes 90 System Components.

SECTION CAST-IN-PLACE CONCRETE

Section 02 SUBSTRUCTURE

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total

Residential Building Inspections

VISQUEEN RADON MEMBRANE SYSTEM

Wall lining Inner leaf blockwork. K106 Cavity Board. Flexible sealant STANDARD DETAILS FOR 115 MM INSULATION BOARD IN A 125 MM CAVITY

SECTION UNIT MASONRY

Description Unit Quantity Rate Kshs. Amount Kshs.

Part 5 Substructure and ground floors. Chapter 5.2. Suspended ground floors

Garage Conversion - Between and Under Joist Applications

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

Construction details:

TW50. Insulation STANDARD DETAILS FOR 50 MM INSULATION BOARD IN A 100 MM CAVITY. Low Energy Low Carbon Buildings. Wall lining. Inner leaf blockwork

2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS

REINFORCED CONCRETE MASONRY SECTION

Interiors Sources Decor LLC. Method Statement BLOCK WORK. Civil Works 6/26/2016

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.

Jabfloor is also available in higher grades up to Jabfloor 250 which may be required in certain specialist industrial and commercial applications.

Concrete Slab-on-Ground

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR

New Zealand Concrete Masonry Manual

TECHNICAL GUIDANCE XXXX 2015 EXXON QUESTION ANSWER. page 1 of 9

A Handbook of thermal bridging details incorporating aircrete blocks

Bi-Folding Door Installation Guide

Leaving Certificate Revision Notes. Airtightness. Potential air leakage paths (the numbered points in section 2.1 give a description for

Mr. A Sample Foxes Cottage Bolton Road Bury St Edmunds IP32 2DB 6th January 2014

11/09/2018 LBP licence classes

Building Design Data

INSTALLATION CHECKLIST 2 ND EDITION. Fox Blocks Abbott Drive Omaha, NE

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

CONCRETE BLOCK MASONRY

Civil Engineering Construction Chapter 5

SPECIAL INSPECTION AGREEMENT

2003 International Residential Building Code

High Performance DPM. Installation. Technical Support: LAST UPDATED: Page 1 CE Mark to EN 13967

SECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents.

PIR Insulation. XT/UF Insulation for Ground Supported and Suspended Floors. Floors 08/ /0183

BRICKWORK 3.5 BRICKWORK 1 GENERAL

0331 Brick and block construction

Stone and Masonry Veneer

Superior Performance Phenolic Insulation SR/UF. Insulation for Ground Supported and Suspended Floors. Floors AS LOW AS 10/4803

ASSOCIATION OF CONSULTING STRUCTURAL ENGINEERS VICTORIA

STATEMENT OF SPECIAL INSPECTION FORM

Xtratherm Thin-R Partial Fill Cavity Wall Board (XT/CW Grade)

Lonsdale Building Inspections Department 415 Central Street W. PO Box 357 Lonsdale, MN (507) fax (507)

CONCRETE FORMWORK CHECKLIST AT SITE

Product & Installation Guide for New Build & Refurbishment Projects. exceeding the performance criteria of all current Building Regulations

Sheetseal 226 RIW. Sheetseal 226

Construction and the Built Environment. Unit 1: The Construction Industry for the 21st Century [GCB11] MONDAY 14 MAY, AFTERNOON

3.3 Wall Construction

1. Section , Concrete Reinforcement and Embedded Assemblies. B. ACI 530/ASCE 5 - Building Code Requirements for Masonry Structures

PAGE 415. Part 9. External works. 9.1 Garages. 9.2 Drives, paths and landscaping

CHAPTER 8: Superstructure (Internal)

All floors must have sufficient strength and stability in order to support various loads. Such as? People Furniture Equipment Machinery Partitions

Visqueen High Performance Radon

CHECKING MANUAL FOR THE EXAMINATION OF RESIDENTIAL PLANS AND INSPECTION OF RESIDENTIAL CONSTRUCTION IN GRENADA

Cavity Tray Application

26 Visqueen 100% Recycled Ecomembrane 28 Visqueen DPM To Pifa Standard PROOF. membranes

SECTION MORTAR

METALS Commissioning of Metals Structural Steel Framing Steel Studs... 2

Requirements for Measuring and Pricing of Structural Concrete

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

Miller Collective Safety at Height Solutions EPIC ULTRA Barrier System EPIC Post-N-Barrier System EPIC Basic Barrier System

ORDINANCE NO BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BOULDER, COLORADO: CHAPTER 98 - Baled Straw Structures SECTION PURPOSE

Project Solutions Design & Build

Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION

206 Basic Construction Management

Unit 4 Brick Masonry. Part Ⅰ Illustrated Words and Concepts. Figure 4-1 Basic Vocabulary of Bricklaying

SECTION COLD-FORMED METAL FRAMING

SECTION METAL STAIRS

Designation of a Notified Body pursuant to the Construction Products Regulation

SECTION METAL STAIRS

Xtratherm Thin-R Partial Fill Cavity Wall Board (XT/CW Grade)

KEEP YOUR FAMILY SAFER FROM EARTHQUAKES AND TYPHOONS BY MAKING SURE YOUR HOUSE FOLLOWS THESE 6 BASIC PRINCIPLES

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

PROJECT: TULSA COMMUNITY COLLEGE BOOKSTORE RENOVATION PROJECT NUMBER: ISSUE: CONSULTANT: SEAL: SHEET NUMBER: GENERAL NOTES

Metal Web Floor System

tra-load Damp Proof Courses Product and Systems Overview

Introduction. Contents

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Summit tm Modular Railing System

BEAM & BLOCK SYSTEM. 108mm. 175mm Deep (160mm) Wide Beam. 160mm

Installation Standard For TILE-LINED ROMAN BATH TUBS IAPMO IS (10) Wall Finish. (3) Test Required. (2) Waterproof. Tile. (8) Concrete Shell

CONTENTS. Introduction 04

Visqueen Gas Barrier STRUCTURAL WATERPROOFING AND GAS PROTECTION SYSTEMS. CE Mark to EN 13967

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10

BELMURO WALL SYSTEM INSTALLATION GUIDE

Residential Deck Safety, Construction and Repair. Juneau Permit Center, 4 th Floor Marine View Center,(907) February 2016

SECTION ARCHITECTURAL ORNAMENTAL HANDRAILS AND RAILINGS Monaco tm Modular Railing System

SPECIFICATION FOR REINFORCED SOIL WALL

TYPICAL SCHEDULE OF COMPONENTS

Sheetseal GR RIW. Sheetseal GR

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated:

Zenon Panel Assembly Guideline - Page 1

Transcription:

SETTING OUT Correct to boundaries Correct to building lines? Diagonals accurate? Levels correct? EXCAVATIONS Adjoining structures OK? Centres of foundations line with walls? Bottoms of trenches uniform, firm, level & free from lumps, foreign matter, mud & water? Steel pegs fixed for levels? Structural engineer inspection HARDCORE Not frozen? Free from timber products, plasterboard, metals big lumps of concrete, rubbish etc... Correctly compacted, engineer happy? Correct thickness? Blinded?

RADON BARRIER Correct to make boundaries & guage Any joints lapped correctly Radon tape used REINFORCEMENT Adequately stored to avoid deformation No crude bends Correct bars, spacers & laps, check with str. eng. Adequate cover, check with str. eng Free from loose rust/scale/mud/mould/grease FORMWORK Boards are not reused too much Is set correctly, right levels & accurate Strong? Movement joints? Free of sawdust, chippings, nails, wire, water & rubbish Clean and coated with release agent.

CONCRETE Correct Temperaturebetween to boundaries 5-30 deg Check mix/strength Poured within 30mins of delivery Compacted? bubbles stop rising &aggregate not separated from grout Radon, formwork etc... not displaced Boards removed within 24 hours Cover with polythene? Insulated if cold? Time to strike concrete - check with engineer Concrete protected from site traffic for 4 days Concrete protected from weather, dirt, damage, shock etc...

MASONRY Correct to setting boundaries out? (including lintel height to take account of floors) Openings correct? Mortar mix correct? Blocks kept dry? Damp proof course correct? Vertical? Joints into existing OK? Lintels correct way up? Cavity work: Correct thickness? Cavity trays correct? DPC doesn't project (other than opes) Wall ties correct? Lifting battens in cavity? Correct insulation at opes? - Insulation correct? Cavities below doors protected to prevent rubble/rubbish

STRUCTURAL STEEL Correct to fabrication boundaries Coated in red oxide? Straight, untwisted, smooth ends? Quality of welds Friction grip areas are left unpainted Stored to avoid distortion Concrete bases at correct level? Correct setting out? Correctly orientated Correct sizes? Plum & level with bob? Holding down bolts at right angles? Full turn of thread above nut? Certified by structural engineer? Fire protection applied?

TIMBER STRUCTURE Correct Free from to large boundaries dead knots, wanes, shakes & is straight/square? Kept dry? Treated with preservatiove on cut ends? Joists at correct levels? Double joists in correct positions, bolted with washers? trimming done correctly? Joists bear min 90mm on masonry, 45mm on steel Wall plates level? Joists mortared & taped correctly? Correct wall hangers? or timber built in adequately End joists 50mm from walls Struts are correct? Notching or drilling as specified? Insulation applied correctly?

DAMP PROOF MEMBRANES & INSULATION ABOVE FLOORS Correct Floor surface to boundaries flat & clear of mortar 1200 guage dpm? Laid with joints lapped 150mm & sealed? Not punctured? Lapped & sealed at penetrations Properly fitted into corners & upstands Enough slack? Enough lap to dpc? Clean & treated with respect? No gaps in insulation? Supported at edges? Cut tight around penetrations? Protected with boards to prevent damage by wheel barrows/boots when screeding?

TIMBER STRUCTURE Correct Restratints to boundaries straps as specified? Boards are as specified? Holes around services penetrations sealed? Boards are protected? TIMBER STUDWORK As specified? Stacked to keep dry? Panels are vertical?

ROOFS Correct Wall plates to boundaries centred on inner leaf? Wall plate dead level & parallel? Rafters are parallel Holding down straps as specified? No timbers with 200mm of flue or within 40mm of chimney? STAIRS Correct specification, material etc... Correct rise/going (take into account floor finishes) Correct thicknesses? Glued top/bottom of each riser? Newels, balusters, handrail as specified?

SCREEDS Correct Sub level to correct boundaries Gas pipes properly protected? Coarse sharp sand? Laid dry? Check depth Cured with polythene? Good finish? No hollow areas? WINDOWS & DOORS Correct specification Correct drips & thresholds DPC and insulation fixed prior to fitting at reveals, lintels & cills Plumb & square & can open correctly AIR TIGHTNESS Correct specification Correctly installed Airtightness test conducted & results