Ongoing and Future Project Work. Construction Management

Similar documents
Courthouse Update August 19, 2014

BOARD OF TRUSTEES OCTOBER 13, 2014

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality

Administration Building Needs Assessment

Civil District Court Parish of New Orleans. Image Courtesy of EDR MA. Renovation & Utilization Feasibility

MTA CAPITAL CONSTRUCTION NEW YORK BUILDING CONGRESS NOVEMBER 7, MTA Capital Construction 0

Stevens & Associates, Inc. Building Construction Projects. Fact Sheets

Construction Look Ahead February 2018

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201

STILLWATER COUNTY COURTHOUSE ALTERNATE 1

ARLINGTON COUNTY, VIRGINIA

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 18, 2016

A Building Area: (sf) 80,000 SF + Sky Bridge. Cost per Square Foot: $340 ± Construction Cost $27,422,000. Date of Completion: January 2014

New Main Hospital, Site Park, and Underground Garage Construction Progress Update #16

BBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1

A Building Area: (sf) 80,000 SF + Sky Bridge. Cost per Square Foot: $340 ± Construction Cost $27,422,000. Date of Completion: January 2014

West Construction, Inc.

BBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1

CITY COUNCIL MEETING INTRODUCTION

Second Avenue Subway

City of Roanoke. Commercial Permit Submittal Guidelines

Phase 2 Exposition Metro Line Project

Draft Feasibility Study for the Expansion of Southeast Library

Abington Memorial Hospital Abington, PA. Project Description

Construction Project Briefing. June 14, 2017

ARTICLE 987. PD 987. PD 987 was established by Ordinance No , passed by the Dallas City Council on June 14, (Ord.

Exhibit A: Detailed Scope Summary

MCER Study for Little Powder K-8

Project Parameters. Project Timeline. APS Strategic Plan - Design Principles. Adjourn

RE: Jackson Row - truck route

CITY OF TROY, MISSOURI Building Permit Application. Type of Permit: Residential Commercial. Company: Contact person: Address # Street Name:

Delaware Street

Stevens High School Pre Bond Presentation Claremont, NH

Progress update (November to March) 03/23/2009 2

Phase 2 Exposition Metro Line Project

LAKE + FOREST CONSTRUCTION TIMELINE

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING

Application. Village of Morton Grove Department of Buildings 6101 Capulina, Morton Grove, IL Phone: 847/ Fax: 847/

Constructability Guidelines

CITY OF LAKE FOREST PARK BUILDING CHECKLIST FOR NEW CONSTRUCTION, ADDITION, AND REMODEL BUILDING PERMIT

Auburn University Construction Project April

Transformer Vault Placement and Space Requirements

IMMC SCHOOL OF NURSING BUILDING IMPLOSION

REQUEST FOR INFORMATION

Site Selection Process

Installing sidewalk pavers along Race Street.

Building Architecture

DEVELOPMENT PERMIT ITEM NO: 11 DP NO:

Questions and Answers Construction of New Amenities At Folly Beach County Park

BARRY S CORNER. Draft Construction Management Plan

Dulles Corridor Metrorail Project

STATE UNIVERSITY CONSTRUCTION FUND

Hale Allen Jones The Institution of Structural Engineers East Anglian Branch Award for Structural Excellence Submission

COMMERCIAL PLAN SUBMITTAL GUIDELINES JAN 2018

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey

DESIGN GUIDELINES FOR MULTI FAMILY AND ATTACHED SINGLE FAMILY INFILL HOUSING

Kaiser Permanente Largo Medical Office Building Largo, MD

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

Indirect and Cumulative Effects

COMMUNITY BOARD EIGHT

Village of Orland Hills COMMERCIAL Building Permit Application S. 94th Avenue, Orland Hills, IL

Photos by Susie Fitzhugh. BEX IV Projects Update: Arbor Heights, Genesee Hill, Pinehurst, Thornton Creek

RECOMMENDED CONCEPT COLLEGE COMMUNITY CAMPUS IMPROVEMENTS INTERNAL ROADWAY COST ANALYSIS MAY 9, 2014

Voigt 1. Russell Voigt Construction Option Advisor Ed Gannon Louis at 14 th Washington, D.C. 16 September 2013 Technical Report #1.

Construction Project Briefing. November 19, 2014

RATIONALE AND REASONING The following information is provided in response to the issues raised by the Board of Regents at the September 2012 meeting:

A/E Design Deliverable Checklist

TOWN OF BRUNSWICK, MAINE

Application for Building Permit St. Charles Township 1003 N. Saginaw St St. Charles, MI Phone (989) Fax (989)

Planned Procurement Opportunities Report. November 2017

Planned Procurement Opportunities Report. December 2017

Briefing Session: A406 STRATEGIC PROJECTS PROGRAM MANAGEMENT. January 24, 2019


El Dorado Avenue

PREPARED TESTIMONY OF LEE LISECKI. Q. Please state your name, professional position, and business address.

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

P.C. RESOLUTION NO

Jackson Miracle Building Plan Outreach Roundtable. February 14, 2017

ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING. Kansas City Terminal Railway Company

MANHATTAN COLLEGE STUDENT COMMONS

5/15/2013. Approved Course Title 2010 Existing Building Code Chapters Florida Building Code, Existing Building. Chapters

ENTRY FORM. DVASE 2014 Excellence in Structural Engineering Awards Program

NEW MIDDLE SCHOOL PROJECT

Jobsite Layout Considerations

# 11 ) UN MEDICAL MARIJUANA - CULTIVATION SPECIAL USE PERMIT PUBLIC HEARING

Katie Sennett. Dec. 18, Baltimore, Maryland. Proposal. Page 2. Page 1

ENTRY FORM. DVASE 2018 Excellence in Structural Engineering Awards Program

Robinson Landing: Townhouse Pre-Construction Presentation January 9, 2018

Woodbridge Redevelopment Update. CLC Meeting #6 Wednesday, December 13, 2017

The courthouse exterior. Courtesy of NLA/HLM Architects. United States. Courthouse Sacramento, Robert D. McCartney, S.E.

Schuylkill Avenue Phase I Community Briefing Summary and Notes December 2, 2013

706 Mission Street The Mexican Museum Dock Levelers, Roll-Up Doors, Gates and Fencing, and Metal Panels Pre-Bid Meeting

Public Works Department

VERSION 2.0. FOR COMMERCIAL PROJECTS New Construction and Additions

ROOSEVELT ISLAND OPERATING CORPORATION OF THE STATE OF NEW YORK DESIGN OF TWO NEW ELEVATORS FOR MANHATTAN TRAM STATION

FOR LEASE 801 N. FEDERAL HWY FORT LAUDERDALE, FL RETAIL/OFFICE FLAGLER VILLAGE FREESTANDING BUILDING

City Commission Workshop

CONSTRUCTION PROPOSAL Vision General Contracting LLC

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

Oregon University System OHSU Collaborative Life Sciences Building. Portland, OR

Transcription:

Ongoing and Future Project Work

New Broward County Courthouse Tower 1,000 Car Courthouse Garage Midrise Building Renovations

714,000 square foot, 20-story Civil/Family Courthouse replacing 1950 s era space Project Cost: $213 Million CBE Participation: 29% 77 courtrooms with 42,000 square feet of shelled floor space for future expansion Construction of courthouse tower scheduled for completion in 2015 500-car secure parking garage with solar panels and plaza scheduled for 2017 completion Improved security features

Separate circulation corridors and elevators for judges, prisoners and the public Additional screening stations at building entrances Secure parking garage for judges & constitutional officers Cameras to monitor building circulation including stairs Bullet proof Judge s benches in courtrooms Holding cells for prisoners Bullet proof glass at public information and service desks Emergency generator power for security and life safety systems in case of a power outage

Includes New Courthouse Tower, connecting bridge, East Wing façade & elevator, and demolition of West and Central Wings October 15, 2012 Construction Notice to Proceed issued to James A. Cummings, Inc. Completion of tower scheduled for 2015

Includes new plaza and secure 500-car garage with solar panels Separate construction solicitation will be required Completion scheduled for 2017

Pile Installation Approach is to minimize noise, disruption and vibration

Walkway Column Numerous utility conflicts affecting major ductbanks and smaller lines Concrete Pile Cap Piles (6-8 piles per column is typical)

Installing infrastructure & piles among multiple underground utilities. Excavation around additional electrical ductbank and sewer Revised location of drainage structure Interfering electrical ductbank avoided Designed location of drainage structure

Mix of heavy courthouse traffic, pedestrian access ways and the volume of construction traffic is problematic Contractors maintenance of traffic (MOT) measures are working and effective Additional measures are being considered and implemented to alleviate potential liabilities

Supplement the already numerous signs and barricades Provide police enforcement in addition to Contractor s safety guards Limit or eliminate on-street parking Create cell phone waiting area Look at potentially closing SE 6 th Street to traffic or further restricting lanes

Public Works Director approvals for critical path change orders - each individually valued at less than $500,000. Change orders have been coordinated with County Attorney and County Auditor. Estimated Change Order Item Amount* Civil Work $63,000 Architectural $232,000 Structural Concrete $487,000 Structural Steel $354,000 Fire Protection $195,000 Plumbing $298,000 Subtotal: $1.6 million *Staff is finalizing the change order value related to re-design by Spillis Candela & Partners/Heery/Cartaya Joint Venture

Board approval is required for the remainder of the change orders, which include the primary mechanical, electrical and time impacts. Change Order Item Mechanical Electrical Time Impact Subtotal: Estimated Amount* $6.4 million $2.4 million $1.0 million $9.8 million *Staff is finalizing the change order value related to re-design by Spillis Candela & Partners/Heery/Cartaya Joint Venture

Total Mechanical Redesign Impact Change Order Item Immediate Need Items Mechanical, Electrical & Time Impacts Total: Estimated Amount* $1.6 million $9.8 million $11.4 million *Staff is finalizing the change order value related to re-design by Spillis Candela & Partners/Heery/Cartaya Joint Venture

Project Cost: $29.5 million CBE Participation: 25% New 1,000 space parking garage and approximately 12,000 square feet of office space in support of the new Civil/Family Courthouse Scheduled Completion: November 2013

Cleared 1,000-car garage site New sewer lines under construction on Andrews Avenue Master Building Permit from City of Fort Lauderdale expected in December 2012

Four previously unidentified underground fuel storage tanks discovered The tanks and contaminated soils removed & groundwater remediation is in progress Elevator pit configuration is possibly impacted Staff does not anticipate major project delays or additional contract costs

Project Cost: $8.5 million CBE Participation: TBD Internal reconfiguration of all four floors to consolidate Public Defender, State Attorney, BSO and Clerk of Courts occupancies and provide a fire sprinkler system for life-safety Reduction in rental space Scheduled Completion: Late 2015 Project is not fully funded. Available budget: $6.8 million. Additional $1.7 million required to complete the project.

Website link: www.broward.org/newcourthouse Twitter: @courtnewsflash