PRODUCTION PLANNING SYSTEM CHAPTER 2

Similar documents
MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

Introduction to Principles of Production Management WS 2012/2013 Chapter 14 Aggregate sales and Operations Planning Presented by Dr. Eng.

Aggregate Planning and S&OP

Aggregate Planning (session 1,2)

Sales and Operations Planning

Production Planning & Control BMM4823. Aggregate Planning. by Dr. Ahmad Nasser Mohd Rose

Antti Salonen KPP227 KPP227 1

Chapter 16 Sl Sales and doperations Planning

Aggregate Planning. Learning Objectives. Stages of Planning. Dr. Richard Jerz

National Institute of Technology Calicut Department of Mechanical Engineering PRODUCTION PLANNING (AGGREGATE PLANNING)

Planning and Scheduling Operations in Dynamic Supply Chain

Chapter 6 RESOURCE PLANNING SYSTEMS. Prepared by Mark A. Jacobs, PhD

The lead-time gap. Planning Demand and Supply

Supply Chain Decisions

Supply Chain Decisions

Operations Management

MPR Sample Test. CPIM(Certified In Production & Inventory Management) - 1 -

AGGREGATE PLANNING PROBLEMS

Connecting S&OP to the Shop Floor: Here s How!

Aggregate Planning. Nature of Aggregate Planning

Introduction to Production Planning

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

AGGREGATE PLANNING (SCM) Bijay Lal Pradhan, Ph.D.

9. What are the activities within the scope of production planning? 1. Aggregate production planning

LINEAR PROGRAMMING APPROACHES TO AGGREGATE PLANNING. Linear programming is suitable to determine the best aggregate plan.

Operations & Supply Planning

Aggregate Planning Exercise

Planning. Dr. Richard Jerz rjerz.com

Cost Accounting The Foundation of Management Control

Inventory & Supply Chain Management Prof. Apurva Jain

Planning. Planning Horizon. Stages of Planning. Dr. Richard Jerz

Approach to Successful S&OP October 20, 2010

Basestock Model. Chapter 13

Sales and Operations Planning Overview

FAQ: Operations and Forecasting

Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

MASTER PRODUCTION SCHEDULE (MPS)

Production planning and. Unit 3

Measure What You Manage. Michael Cowley, CPMM President CE Maintenance Solutions, LLC

Rethinking branding metrics: how to turn brand consideration into a performance metric

MANUFACTURING RESOURCE PLANNING AND ENTERPRISE RESOURCE PLANNING SYSTEMS: AN OVERVIEW

HV SHRM Member Survey

Hoffman Lab Vacation Policy

P2 Performance Management September 2012 examination

Test Bank for Supply Chain Management 5th Edition by Sunil Chopra, Peter Meindl

Level 5. Nov Senior Assessor s Report. Advanced Diploma Purchasing and Supply. Operations Management in the Supply Chain L5-12

Capacity Planning. Determinants of Effective Capacity

Chapter 02 Competitiveness, Strategy, and Productivity

Mid-Term Examination. Suggested Solution to ECLT 5940 Supply Chain Management. Time: 7:00 9:45 PM

S&OP Checklist How To Implement

Demand, Supply, and Price

Software Engineering Lecture 5 Agile Software Development

Food and Beverage Companies Become Market Leaders with Vanguard Predictive Planning

The Thinking Approach LEAN CONCEPTS , IL Holdings, LLC All rights reserved 1

Chapter 05 Strategic Capacity Planning for Products and Services

Inventory Control in Supply Chain Management: Concept and Workshop

MODULE 1: INTRODUCTION TO STRATEGIC MANAGEMENT ACCOUNTING

Best Practices in Demand and Inventory Planning

Lecture 1. Topics covered. Rapid p development and delivery is now often the most important requirement for software systems.

MgtOp 340 Professor Munson Washington State University Sample Exam for Exam 2

Forecasting Survey. How far into the future do you typically project when trying to forecast the health of your industry? less than 4 months 3%

Available online at ScienceDirect. Procedia Engineering 138 (2016 )

The Application of Survival Analysis to Customer-Centric Forecasting

Core Strategies and Pitfalls in Forecasting for Professional Services Firms

ECONOMICS 103. Topic 3: Supply, Demand & Equilibrium

Enterprise Information Systems

Getting the Most out of Statistical Forecasting!

Best practices in demand and inventory planning

2007 Northeast Supply Chain Education Conference & Exhibition Executive S&OP

2.What factor you will keep in mind while designing a facility layout. 3 Marks Factors in determining the efficient layout & design:

THE PROFIT-DRIVEN MARKETER:

The Market Watch Monthly Desert Housing Report April CV median price per sq. ft April 2015

1. An example of a strategic operations management decision is the choice of where to locate.

Reading Essentials and Study Guide

Forecasting for Short-Lived Products

Chapter 6 Resource Planning Systems

IV/IV B.Tech (Mech. Engg.) 7th sem, Regular Exam, Nov Sub: OPERATIONS MANAGEMENT [14ME705/A] Scheme of valuation cum Solution set

Using Transportation Model for Aggregate Planning: A Case Study in Soft Drinks Industry

4 The balanced scorecard

Specialize in Value Chain Planning Solutions

A typical manufacturing plant

Rhino Report: The Top 3 Manufacturing Pain Points of 2018

Infor CloudSuite Industrial Whatever It Takes - Advanced Planning & Scheduling for Today s Manufacturer

Creation of the leading European online gaming and sports betting business. 20 October 2008

Operational Logistics Management (OLM612S)

MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.

Teaching the New Edexcel. Resources for Courses. A Level Business. The Stakeholder Game

Chapter 12 outline The shift from consumers to producers

SCM 301 (Solo) Exam 2 Practice Exam Answer Key 2. A A payment to your raw materials supplier

Manage Your Own Company Business Game LIUC Cattaneo University

Relevant Costing for Managerial Decisions QUESTIONS

Predicts 2013: Marketing Technology Investments Continue to Increase and Expand Into New Areas

Ops Mgt John T Anderson DMI Case Study

Trusted KYC Data Sharing Framework Implementation

By Eli Schragenheim Supporting TOC implementations worldwide

Lesson 1: Introduction to Production, Planning, and Control (PPC) Systems

LECTURE 8: MANAGING DEMAND

Transcription:

9 PRODUCTION PLANNING SYSTEM CHAPTER 2 ANSWERS TO PROBLEMS 2.1 Ending inventory = opening inventory + production demand = 400 + 700 900 = 200 units 2.2 Total working days = 19 + 20 + 21 = 60 Average daily production = 480 60 = 8 units 2.3 Total working days = 22 + 21 + 20 = 63 Average daily production = 25,000 63 = 396.8 units 2.4 Month 1 production = 19 8.3 = 157.7 units Month 2 production = 20 8.3 = 166 units Month 3 production = 21 8.3 = 1174.3 units 2.5 Month 1 production = 22 396.8 = 8729.6 units Month 2 production = 21 396.8 = 8332.8 units Month 3 production = 20 396.8 = 7936 units 2.6 Period 1 2 3 4 5 6 Forecast 750 800 1050 1600 1000 850 Planned production 1000 1000 1000 1000 1000 1000 Planned inventory 600 850 1050 1000 400 400 550 2.7 Period 1 2 3 4 5 6 Total Forecast demand 100 120 125 130 115 110 700 Planned production Planned inventory 125 125 125 125 125 125 750 100 125 130 130 125 135 150 Total production = 700 + 100 150 = 750 units Period production = 750 6 = 125 units

10 2.8 Period 1 2 3 4 5 6 Total Forecast demand 1300 1200 800 600 800 900 5600 Planned production Planned inventory 875 875 875 875 875 875 5250 550 125 200 125 150 225 200 Total production = Period production = 5600 + 200 550 = 5250 units 5250 6 = 875 units 2.9 Period 1 2 3 4 Total Forecast demand 9 5 9 9 32 Planned production Planned inventory 8 8 8 8 32 0 1 2 1 0 a. 8 units b. period 1, minus 1 c. 9 units, ending inventory = 4 units 2.10 a. There is a stockout of 1 unit in period one. The cost will be: Stockout cost: 1 $500 = $500 Carrying cost: 3 $50 = 150 Total cost: = $650 c. Total period inventory = 0 + 5 + 3 + 4 = 12 units The cost will be = $50 12 = $600 Since there are no stockouts this will be the total cost of the plan.

11 2.11 a. Total production = 530 + 130 100 = 560 b. Daily production = 560/70 = 8 units c. The monthly production for May = 168 units d. The ending inventory for May = 153 units Month May Jun Jul Aug Total Working days 21 19 20 10 70 Forecast demand 115 125 140 150 530 Planned production Planned inventory 168 152 160 80 560 100 153 180 200 130 2.12 Month Jan Feb Mar Apr May Jun Total Working days 20 22 20 20 18 19 119 Forecast demand 1300 1200 800 700 700 900 5600 Planned production Planned inventory 899 989 899 899 810 854 5350 500 99 112-13 186 296 250 Total production = 5600 + 250 500 = 5350 Daily production = 5350 119 = 44.95 units per day There will be a stockout of 112 units in February and 13 units in March.

12 2.13 Total production = 300 + 1080 200 = 1180 units Number of weeks available for production = 5.5 Average weekly level production = 1180 = 214.5 units 5.5 The nearest quantity that can be produced is 200 units on two shifts. In the second week there is a shutdown so production in that week that will be only 100 units. Total production so far = 5 200 + 100 = 1100 units The balance of 80 units can be made in week four when extra help is available. Opening inventory = 200 units Week 1 2 3 4 5 6 Total Forecast demand 120 160 240 240 160 160 1080 Planned production Planned inventory 200 100 200 280 200 200 1180 200 280 220 180 220 260 300 2.14 Ending backlog = demand + opening backlog production = 700 + 450 800 = 350 units 2.15 Total production = demand + opening backlog ending backlog = 3800 + 900 200 = 4500 units Weekly production = 4500 6 = 750 units Week 1 2 3 4 5 6 Total Forecast demand 750 700 550 700 600 500 3800 Planned production 750 750 750 750 750 750 4500 Planned backlog 800 800 750 550 500 350 100

13 2.16 Desired ending backlog = 1200 Note: All weekly production amounts determined using standard rounding rules. Total production = demand + opening backlog ending backlog = 6800 + 1100 1200 = 6700 units Weekly production = 6700 6 = 1117 units Week 1 2 3 4 5 6 Total Forecast demand 1200 1100 1200 1200 1100 1000 7300 Planned production 1117 1117 1117 1117 1117 1117 7200 Planned backlog 1100 1183 1166 1249 1332 1315 1198 2.17 Total production = 112,500 + 9000 11,250 = 110,250 units Daily production = 110,000 75 = 1470 units Number of workers required = 1470/15 = 98 Actual daily production = 98 15 = 1470 units Month 1 2 3 4 Total Working days 20 24 12 19 75 Forecast demand 28000 27500 28500 28500 112500 Planned production Planned inventory 29400 35280 17640 27930 110250 11250 12650 20430 9750 9180

14 2.18 Total production = 17900 + 800 1000 = 17700 Daily production = 17700/117 = 151.28 units Number of workers required = 151.28/9 = 16.81 17 workers Actual daily production = 17 9 = 153 units Month 1 2 3 4 5 6 Total Working days 20 24 12 22 20 19 117 Forecast demand 2800 3000 2700 3300 2900 3200 17900 Planned production Planned inventory 3060 3672 1836 3366 3060 2907 17901 1000 1260 1932 1068 1134 1294 1001 It is not possible to meet the ending inventory target because of the extra fraction of a worker needed. The only way to do it would be to reduce the number of workers to 16 at some point.

15 MULTIPLE CHOICE QUESTIONS 1. The ability of manufacturing to produce goods and services is called: a. scheduling b. production planning c. capacity d. routing e. none of the above 2. Priority in production planning relates to: a. routing b. how much of what is needed and when c. capacity d. an objective of the firm e. none of the above 3. Which of the following is an input to the production plan? a. strategic business plan b. financial plan c. market plan d. engineering plan e. all of the above are inputs 4. Which of the following plans has the longest planning horizon and the least level of detail? a. strategic business plan b. production plan c. master production schedule d. all of the above have the same level of detail e. none of the above 5. In terms of INCREASING level of detail, which is the best sequence of activities? I. Material requirements planning. II. Master production scheduling. III. Production planning. a. I, II and III b. I, III, and II c. II, III, and I d. II, I, and III e. III, II, and I

16 6. Over the time span of the production plan, which of the following can usually be varied to change capacity? a. work force b. inventories c. plant and equipment d. all of the above e. a and b above 7. Which of the following is a characteristic of a production plan? a. time horizons are five years b. the production plan is for individual items c. the only objective is to have an efficient plant d. all of the above are characteristics of a production plan e. none of the above is characteristic of a production plan 8. Determining the need for labor, machines, physical resources to meet the production objectives of the firm is called: a. production control b. production planning c. capacity planning d. all of the above e. none of the above 9. The function of setting the limits or levels of manufacturing operations based on the market plan and resource availability is called: a. production planning b. production activity level c. capacity planning d. all of the above e. none of the above 10. A statement of a schedule of requirements for individual end items is called: a. a master production schedule b. a material requirements plan c. a production plan d. a capacity plan e. none of the above 11. Which of the following statements is most appropriate regarding production planning? a. a high level of detail is not needed b. a translation must be made from product demand to capacity demand c. product groups based on similarity of manufacturing process should be used in planning d. all of the above are true e. none of the above is true 12. Which of the following statements is best about sales and operations planning? a. it provides an means of updating the material requirements plan b. it includes only the marketing and production plans c. it is usually updated on a monthly basis d. it has no effect on inventory levels

17 13. Which of the following are characteristics of an MRPII system? I. It incorporates the plans of marketing, production and finance. II. It is a fully integrated planning and control system. III. It has feedback from the bottom up. a. I only b. II only c. III only d. I, II and III 14. For the purposes of production planning, product groups should be established on the basis of: a. market segments b. similarity of manufacturing process c. the availability of materials d. the availability of machinery e. all of the above 15. Which of the following is a basic strategy in developing a production plan? a. hybrid strategy b. production leveling c. chase strategy d. a and b above e. b and c above 16. A production planning strategy which turns away extra demand is called: a. production leveling b. demand matching c. hybrid strategy d. all of the above e. none of the above 17. Which basic production planning strategy will build inventory and avoid the costs of excess capacity? a. demand matching (chase) b. production leveling c. subcontracting d. all the above e. none of the above 18. Which basic production planning strategy avoids hiring and layoff costs and the costs of excess capacity? a. demand matching b. operation smoothing c. subcontracting d. all the above e. none of the above 19. If the opening inventory is 100 units, the sales are 500 units and the ending inventory is 200 units, then manufacturing must produce: a. 300 units

18 b. 400 units c. 500 units d. 600 units e. none of the above 20. Over a 10-week period the cumulative sales are forecast at 10,000 units, the opening inventory is 200 units and the closing inventory is to be 100 units. What should be the weekly planned production for level production? a. 990 b. 1000 c. 1010 d. 1030 e. none of the above 21. Firms will generally make-to-stock when: a. demand is unpredictable b. there are many product options c. delivery lead times are long d. all of the above e. none of the above 22. Firms will generally make-to-order when: a. products are produced to customer specifications b. there are many product options c. product is expensive to make and store d. all of the above e. none of the above 23. Which of the following information is needed to develop a make-to-stock production plan? I. Forecast by time period for the production plan. II. Opening inventory. III. Opening backlog of customer orders. IV. Desired ending inventory. a. I, II and III b. I, II and IV c. 1, III and IV d. II, III and IV e. none of the above 24. If the old backlog was 200 units, the forecast for the next period is 500 units, and production for the next period is 600 units, what will be the backlog at the end of the next period? a. 100 units b. 200 units c. 300 units d. 700 units e. 800 units

19 25. Which of the following is concerned with long-term planning of manufacturing activity? a. Sales and operations planning b. Master production scheduling c. MRP d. Production activity control e. Master planning 26. Which of the following is NOT a rule of Sales and Operations Planning? a. Product Groups need not be decided b. Planning units of measure need to be decided c. A planning horizon must include new product development time d. Performance review periods to be compared should be decided 27. Which of the following is a complete closed loop planning system that develops plans for all materials and operations? a. Capacity requirements planning b. Enterprise resource planning c. Supply chain management d. Material requirements planning 28. Which of the following represents the major reason for developing the production plan as part of Sales and Operations Planning? a. To decide how to best produce exactly what is in the sales plan b. To plan for resources required to produce to the agreed plan c. To plan a schedule for the production of individual products d. To plan the acquisition of new manufacturing facilities 29. Which of the following is true? I The strategic plan is stated in product terms II The strategic business plan is stated in financial terms III The strategic business plan is developed from the strategic plan a. I and II only b. I and III only c. II and III only d. I, II, and III e. None are correct 30. Which following best represents the concept of sustainability? a. The ability to make long production runs b. The ability to train labor effectively c. The ability to maintain the supplier base d. The ability to continue operation in the long term 31. When a company establishes a program to recycle or reuse products discarded or returned from customers it is typically called which of the following? a. Product return contract b. Reverse supply chain

20 c. Customer servicing d. Resupply planning 32. Which of the following is most true about Sales and Operations Planning a. It usually is produced only once a year b. It usually includes only sales and manufacturing people c. It is typically done in financial terms d. It usually includes all functions at the executive level Answers. 1 c 2 b 3 e 4 a 5 e 6 e 7 e 8 c 9 a 10 a 11 d 12 c 13 d 14 b 15 e 16 e 17 b 18 c 19 d 20 a 21 e 22 d 23 b 24 a 25 a 26 a 27 b 28 b 29 c 31 b 32 d

Introduction to MATERIALS MANAGEMENT CHAPTER 2 Production Planning System Introduction to to Materials Management, 8e 8e Chapman, Arnold, Gatewood, and and Clive

Planning System Questions What are we going to make? What does it take to make it? What do we already have? What do we need to get?

Key is to Match Priority What is needed, when, and how much Capacity Capability to produce what is needed and when Priority (Demand) Capacity (Resources)

Major Levels of Planning and Control In order of time span (long to short) and detail (general to detailed) Strategic plans Strategic business plans Sales and Operations Plans (Production Plans and Marketing Plans) Master Production Schedules Material Requirements Plans Purchasing and Production Activity Control

At Each Level, Need to Decide What are the priorities What to produce? How much? When? What is the available capacity? How can the differences between priorities and capacities best be resolved?

The Strategic Plan Broad direction of the firm Product lines Markets Growth Senior management from all functions responsible for input Some companies use Hoshin planning Vision Goals

Sustainability The capability to continue (sustain) operations into the future Pollution and waste control Social responsibility Remanufacturing and the reverse supply chain Recycling

Risk Management Negative risks Evaluate sources and possible results of failures Develop plans to minimize impacts Positive risks (opportunities) Evaluate sources Develop plans to exploit

The Strategic Business Plan Developed from the overall strategic plan Focuses on the financial implications Pro forma income statements Pro forma balance sheets

Planning Hierarchy Strategic Business Plan Production Plan Master Plan Master Production Schedule Planning Material Requirements Plan Production Activity Control and Purchasing Implementation

Production Plan Quantities of each product group to be produced each period Projected/desired inventory levels Resources needed Equipment Labor Material Availability of needed resources Sometimes called the aggregate production plan

Product Groups (Families) Established on the basis of similar resources and processes used Makes long-term forecasting easier Effective for planning the major focus of the production plan - resources

Master Production Schedule Shows, for each period, the quantity of each end item to be made. Level of detail is higher than the Production Plan End items vs. groups of items Time periods usually shorter (e.g., weeks versus months)

More Detailed Planning and Control Material Requirements Plan End item requirements broken down into specific components what to make or buy, and when Production Activity Control Execution plan, detailing specific orders to produce items from the Material Requirements Plan Purchasing Similar to Production Activity Control Includes items to be purchased rather than produced

Capacity Management At each level of the planning and control system, reconciliation with resources must be made Must obtain the right resources or change the plan Inadequate resources = missed production schedules Resources significantly exceed planned production = idle resources and extra cost

Sales and Operations Plan Strategic Business Plan Annually Marketing Plan SALES AND OPERATIONS PLAN Production Plan Monthly Detailed Sales Plan Master Production Schedule Weekly or Daily

Sales and Operations Planning Can be used to update the strategic plan Provides a tool to manage change Enforces functional plans to be realistic and coordinated Represents a plan to achieve company objectives Provides management visibility of production, inventory, and backlogs

Developing the Production Plan Some key questions that must be answered to develop an effective planning strategy How flexible are the resources, both in quantity and timing? Are outside resources available (subcontracting)? Can we utilize inventory to meet demand?

Basic Production Plan Strategies Chase vary production rates to meet changes in demand Often used when inventory cannot be used or when resources are flexible and inexpensive to change Level establish average demand level and set production rate to that level Often used when resources are difficult or very expensive to change Hybrid use a combination of some chase and some level

Demand Pattern No. of Units Demand Time

Chase Production Chase Production No. of Units Chase Production Demand Time

Level Production Level Production No. of Units Level Production Demand Time

Level Production Plan Production Rate = Sales - Open Inv + End Inv # of Production Periods

Level Production Plan Practice Problem Charlie s Chairs has a forecast (in 000) of 50, 60, 70, 30 chairs for the next four quarters. His opening inventory is 40 chairs but he would like to reduce this to 30 by the end of the year. How many chairs should he make each quarter and what will be his ending inventory?

Charlie s Chairs - Solution Sales = 210 chairs Opening inventory = 40 Desired closing inventory = 30 Production rate = 210 40 + 30 4 = 50 chairs/ quarter

Level Production Level Production No. of Units USE Inventory Level Production CREATE Inventory Demand Time

Hybrid Strategy Hybrid Strategy No. of Units Demand Hybrid Time

Numerical Example Suppose the forecasted demand for a product family looks like the table below. Assume the product family is a Make-to-Stock family with a starting inventory of 100. Period 1 2 3 4 5 6 Total Forecast (Demand) 150 160 180 175 155 140 960

Production Plan Using a Level Strategy Period 1 2 3 4 5 6 Total Forecast (Demand) 150 160 180 175 155 140 960 Planned Production 160 160 160 160 160 160 960 Planned Inventory 110 110 90 75 80 100

Production Plan using a Chase Strategy Period 1 2 3 4 5 6 Total Forecast (Demand) 150 160 180 175 155 140 960 Planned Production 150 160 180 175 155 140 960 Planned Inventory 100 100 100 100 100 100

Production Plan using a Hybrid Strategy Period 1 2 3 4 5 6 Total Forecast (Demand) 150 160 180 175 155 140 960 Planned Production 140 140 140 175 175 175 945 Planned Inventory 90 70 30 30 50 85

Practice Problem Shawn s Chimney Cleaning has new orders for the next week of 4, 6, 2, 7 & 5 houses. He has 4 orders left over from last week and he would like to start next week with only 3 customers waiting for work. How many should he clean each day? Use a level plan. Why use a level plan?

Make-to-Order Production Plans Products made to customer specifications The customer is willing to wait for completion Generally products more expensive to make and/or store Often several options offered Company often uses a backlog of unfilled customer orders rather than inventory

Meridian Water Pumps Teaching Notes for Introduction to Materials Management, 7e 5 Chapter 2 Case Study Teaching Notes This case is a fairly simple case to work on analytically, yet can provide the basis for a good discussion about the trade-offs involved with making a good production plan or Sales and operations plan. While there are clearly differences in the financial results of the possible plans, there are clearly nonfinancial issues that can and should be discussed in order to give students a better overall perspective involved with this important planning process. Here are sample solutions to the assignment questions: 1. Developing a level production plan is fairly easy. The total demand for the six months is 4650 units. Since the current inventory is 50 and the target inventory for the end of the six month is 25, we reduce the required production for the six months to 4625 (4650 25). Dividing the 4625 by the six months, we would be required to make 771 pumps per month. Dividing the 771 by 25 (the number of pumps one worker can make in one month), we would need 30.8 workers. Rounding that to 31 workers, we have the following result: We need to hire 11 workers (there are currently 20, and we need 31) There is an upfront cost of $1100 ($100 hiring cost for each worker) The monthly production will be 775 (31 workers 25 pumps per worker) The inventory at the end of month 1 will be 225 (production of 775 plus existing inventory of 50 = 825, then subtract the production of 600) Month 1 2 3 4 5 6 Demand 600 750 1000 850 750 700 Production 775 775 775 775 775 775 Inventory 225 250 25 50 25 50 Inventory cost $1125 $1250 $125 $0 $0 $250 The total inventory cost is $2750 The total hiring cost is $1100 The total extra cost of the level plan is $2750 + $1100 = $3850 There are several qualitative issues that can and should be discussed here. Three of the more important ones may be as follows: There are two months when shortages appear. There is no indication how customers will react. For example, if the customers are willing to wait for one to two months, then certainly there will at least be some loss of goodwill. There is a high probability that customers would not be willing to wait if they could obtain the product from a competitor (given that water pumps are a common product, this is highly likely). In that case a real financial cost is the loss of profit from those lost sales, and potentially some permanent loss of those dis appointed customers. At a minimum, there is likely to be some cost in filling the backorders. As indicated in the case, such shortages also require sales people to make additional visits to customers to calm their anger. Such visits might cost some real dollars and also create some anger and discouragement within the sales staff. There is an assumption that the newly hired 11 people will be able to produce a full production (25 pumps per month) immediately. Most production jobs entail a learning curve, implying that the production of 775 total pumps in month 1 may be overly optimistic. 2. The chase plan is also fairly easy to develop. To create it, the assumption is made that the target inventory of 25 can be accomplished in the first month. To obtain the number of people needed each month, the demand for that month is divided by 25 (the number of pumps one worker can make in one month). The only exception is the first month, when we assume that 25 units of demand can be taken from inventory to get to the target level immediately. Z03_CHAP6323_08_SE_CASE_WEB.indd 5 12/1/15 4:00 PM

6 Case study Month 1 2 3 4 5 6 Demand 600 750 1000 850 750 700 People Needed 23 30 40 34 30 28 People +/ 3 7 10 6 4 2 Inventory 25 25 25 25 25 25 Hire/Layoff Cost $300 $700 $1000 $600 $400 $200 The total hire/layoff cost for the six months is $3200. The inventory cost for each month is 25($5) = $125. For the full six months the cost for inventory is $750. The total cost for the chase strategy, then, is $3950. That is only slightly higher than the level strategy ($100). As with the level strategy, however, there are qualitative issues that should be discussed. Included should be the following: From a customer perspective, this approach is clearly better than the level plan that represents at least two months of inventory shortages. One might argue (and in a real situation even calculate) that this approach is financially better, in that the potential cost of lost profitability was not included in the level schedule analysis. The largest qualitative cost in this chase plan is the constant movement of people in and out of production. This ignores several potential hidden costs, including the following: The learning curve impact of the new people. The analysis assumes that a new person can produce at the same rate as an experienced one. This is seldom the case. The issue of employee loyalty. The production people will likely get the impression (rightly so) that the company has little or no loyalty to the feelings and needs of the workers. In that case, it would be likely that the employees will also have little feeling of loyalty. That can impact not only morale, but also productivity improvement efforts. A little recognized issue is the impact of employee guilt. In some cases employees who escape a layoff will feel guilty. While often relieved that they kept their job, they will sometimes express the feeling of why did I survive I feel guilty that I have my job while some of my friends on the production line lost their jobs. 3. The following represents a hybrid plan. It has a level schedule for the first three months (until the demand grows to the point where shortages would occur), then has a level schedule for the next two months, then starts to reduce employees as the lower demand part of the cycle again starts. Month 1 2 3 4 5 6 Demand 600 750 1000 850 750 700 People Needed 23 30 40 34 30 28 People +/ 12 0 0 2 0 1 Production 800 800 800 750 750 725 Inventory 250 300 100 0 0 25 Hire/Layoff Cost $1200 $0 $0 $200 $0 $100 Inventory Cost $1250 $1500 $500 $0 $0 $125 The total cost of this plan (inventory plus hire/layoff costs) is $4875. From this purely financial analysis of these two extra costs, this plan would not be preferable. If, however, all the qualitative costs discussed above (and their potential associated financial implications) are to be considered, this approach may be preferable and selected. Specifically, it has a reasonably small impact on layoffs and also prevents shortages that could impact customers. Z03_CHAP6323_08_SE_CASE_WEB.indd 6 12/1/15 4:00 PM

Williams 3D Printers Teaching Notes for Introduction to Materials Management, 7e 7 4. There is only one hybrid approach presented. This question presents a great opportunity for students to present their own plans and discuss the pros and cons of each. A good discussion here can leave students with a much stronger perspective of the issues and advantages of developing good production plans. Chapter 2 Case Study Teaching Notes This case has an advantage in that it can be used for discussing the strategic issues often surrounding the development of longer term S&OP planning, where additional capacity is possibly needed. But if students are not at a level where that is appropriate, then the case can be more simply used as a discussion of some of the options available for a company in this situation to use, and some of the pros and cons of each. You may find that even for students not familiar with strategic thinking that some may move in that direction based on their experience and basic logic. The environment described and the issues facing the company are fairly common for a start-up organization in a rapidly growing market typical of the introduction phase of a product life cycle. You may wish to point out that often in such a market many small companies trying to enter the market is typical, but over time most will fail, either because of an inferior design, a lack of flexibility to understand the market, or the inability to find ways to grow in the market. As successful companies in the market grow, they are able to gain from the advantages of growth, including economies of scale. You may wish to point out that since the entire market is growing at this point, individual companies may experience growth without experiencing a lot of competitive pressure. This is because growth can occur without actually growing market share (assuming the company grows at the same rate at which the market grows). Later on in the life cycle when the market growth slows considerably, the competition between survivors will tend to increase as the only way they can obtain growth is through taking market share from another company. How much of a discussion of this you feel appropriate should be based on the background of the students. You can also refer them to the first few pages of Chapter 14 where the product life cycle is briefly discussed. The case can be discussed without this life cycle discussion, focusing primarily on the key issue of dealing with longer range sales and operations planning (S&OP) in this kind of environment. It certainly can bring out many of the trade-offs inherent with the development of any S&OP process that almost any company has to go through, although in this case inventory does not seem to be a major problem (again somewhat typical in what appears to be a make-to-order environment). The key trade-offs here appear to lie within the concepts of how to best manage rapidly growing sales forecasts. Specifically, they need to plan for longer range resources and how to pay for them. Certainly, one alternative is for them to maintain their current size and only take orders that they can produce within their existing facility and staffing. Some students may wish to take that option, and could justify it by stating that it would allow the facility to only take orders with the highest possible profit margin. Given that the design for each order is apparently not standard, the price is likely not standard either. If they do negotiate price, it gives them the option of taking or not taking a particular order. Some companies in this type of market will elect to take this approach, and it can work as the market matures if the company can successfully identify and defend a specific niche where they can provide good products and services. It is not clear that this would be the preferred approach here, and certainly it would appear that the sales and marketing manager, at least, would need to be convinced. Also, if they stay small as the market matures, they may face other problems the design of a product tends to become more standard as the market matures, and also price becomes more sensitive. This type of discussion may be too advanced for your students, but asking them to consider what has happened in recent years to the product with which they may be familiar with may help consider smart televisions, cell phones, and almost any other electronic device. If the growth option is taken, then Pamela s concerns need to be addressed. The decision to grow the business needs to include a good plan as to how. As Pamela points out, Z03_CHAP6323_08_SE_CASE_WEB.indd 7 12/1/15 4:00 PM

8 Case study growth in the production area may need to appear something like a step function, where large chunks of production capacity are added. Smoothing out added production capacity would seem to be difficult here, although it should be pointed out (and some students may suggest) that sometimes smoothed addition of capacity can be obtained by subcontracting the work. If the discussion goes in this direction, student should be aware that in those cases, it is more difficult for the company to control the work, especially in terms of quality, but also cost and delivery. Still this may be a very attractive alternative for some students. If they decide to grow internally with the chunks of capacity, they need to address that likely at first they would have an excess of capacity since the sales are less likely to grow in matching chunks of orders. Options possibly exist, however. One would be to offer other companies some of the added capacity for short-term subcontracting work. Another would be to build some inventory of more standard parts of the printers. The inventory option would mean even more added cost up front, but could allow them to postpone the next needed chunk of capacity assuming the market continues to grow. If the students are at a level where discussion of this option evolves some strategic points, you may wish to point out that addition of capacity in this early life cycle market often should lead the growth of demand. While that option tends to cost more in the short term, products in this type of market tend to be much more sensitive to delivery than they are to price, and the excess capacity (especially in a product with lots of design options) can help make delivery reliable, and they also tend to provide good margins (not being particularly price sensitive). On the other hand, facilities producing products in a more mature market tend to allow the addition of capacity to lag demand growth, preferring to use techniques such as working overtime and subcontracting as much as possible before turning to acquiring more capacity. The main point against adding a chunk of capacity is cost and the impact on profitability. Certainly, the concerns of the financial manager need to be considered, and it would be an important decision if the company wishes to forgo a profitability position for some time in the future to pay for the added capacity. Some students may point out that this may make them much more profitable in the future as they can serve more of the market. While that can be true, you need to point out that if growth continues, the company is likely to face a similar issue about adding even more capacity sometime in the future. Students should be made aware that these kinds of decisions must be made considering the overall strategy of the firm. They should be able to understand that even if you elect to forgo any detailed discussion around the life cycle and its characteristics. Acme Water Pumps Chapter 3 Case Study Teaching Notes The following is a master schedule using the case data. It is important to note that the projected balance ignores the forecast data for the first three weeks (because the demand time fence is 3 weeks), and from that point on the balance is computed from the larger of customer orders or forecast. Period 1 2 3 4 5 6 7 8 9 10 11 12 Forecast 90 120 110 80 85 95 100 110 90 90 100 110 Cust. orders 105 97 93 72 98 72 53 21 17 6 2 5 Proj. Balance (25) 220 123 30 250 152 57 257 147 57 267 167 57 MPS 300 300 300 300 ATP 30 58 209 287 The order request for week 5 of 45 units should be no problem, as the ATP of 58 for week 4 covers it nicely. At this point it might be helpful to teach students about ATP by challenging them with additional questions about future orders. For example, Z03_CHAP6323_08_SE_CASE_WEB.indd 8 12/1/15 4:00 PM