Similar documents
Activity Document II

REPORT OF THE REGIONAL WORKSHOP ON THE WORK OF THE TRI- NATIONAL TASK FORCE ON TRADE IN RAMIN, JAKARTA- INDONESIA 11 JANUARY 2011

Activity Document III

ACTIVITY PROPOSAL TO THE INTERNATIONAL TROPICAL TIMBER ORGANIZATION (ITTO) Submitted by the Government of Malaysia

Trees Working Group Guidelines

DIRECTORATE GENERAL OF LAND REHABILITATION AND SOCIAL FORESTRY MINISTRY OF FORESTRY REPUBLIC OF INDONESIA

NATIONAL WORKSHOP ON ENFORCEMENT COMPLIANCE FOR TRADE IN RAMIN (GONYSTYLUS SPP.)

META-EVALUATION OF PREVIOUSLY EVALUATED ITTO PROJECTS. Lessons learned & good practices towards sustainable management of tropical forests

Call for concept notes

Improving law compliance in the tropical forest sector: tracking, certification and ITTO Steven Johnson (ITTO)

St. Petersburg Declaration

Ministry of Environment and Forestry ITTO - ISWA ITTO PD 737/14 Rev. 14 (I)

Call for concept notes

Call for concept notes

MINISTRY OF FORESTRY FORESTRY RESEARCH AND DEVELOPMENT AGENCY

ITTO CITES Phase II. Completion Report

Improving law compliance in the tropical forest sector: tracking, certification and ITTO INTERNATIONAL TROPICAL TIMBER ORGANIZATION

THEMATIC PROGRAMME ON FOREST LAW ENFORCEMENT GOVERNANCE AND TRADE

COMPLETION REPORT THE ASSESSMENT OF RAMIN PLANTATION REQUIREMENT AND THE ESTABLISHMENT OF RAMIN GENETIC RESOURCES CONSERVATION GARDENS

A collaborative programme for sustainable trade in tropical timber*/ Pei Sin Tong, Steven Johnson and Milena Sosa Schmidt

Call for concept notes

FLEGT VPA Process in Lao PDR

APP Sustainability Roadmap Vision 2020

Call for concept notes

International Experts Meeting on Illegal Logging Possible Way Forward towards More Sustainable Forest Management. Chairpersons Summary

The Second Round of the International Experts Meeting on Illegal Logging. Chairpersons Summary

Multistakeholder Forestry Programme Phase 3 Technical Reports

Bigleaf mahogany (Swietenia macrophylla) in Peru, Bolivia, Brazil

I-2. Priority activities identified by your country not listed in the expanded programme of work administration, research and human resources

International cooperation on tropical forests: Governance, legality and ITTO INTERNATIONAL TROPICAL TIMBER ORGANIZATION

ITTO Project PD 397/06 Rev. 3 (I) Sustainable Development of the Wood Based Industry in South Kalimantan

Work Plan for Forest Law Enforcement and Governance (FLEG) in ASEAN,

PERIODIC REPORTING EXERCISE ON THE APPLICATION OF THE WORLD HERITAGE CONVENTION SECTION I

CONVENTION ON INTERNATIONAL TRADE IN ENDANGERED SPECIES OF WILD FAUNA AND FLORA

INTRODUCTION

Implementing Australia s illegal logging policy. Phil Townsend Manager International Forest Policy

Fifth ARKN-Forest Law Enforcement and Governance October 21, 2014, Vientiane, Lao PDR ASEAN INITIATIVES ON STRENGTHENING FLEG

COMPLETION REPORT ITTO PD.396/06 REV.2 (F) Strategy for Developing Plantation Forest: A Conflict Resolution Approach in Indonesia

Thang Hooi Chiew. [Fifth Sub-Regional Training Workshop on Timber Legality Assurance, Jakarta, Indonesia, 6-8 October 2016]

Combating illegal logging

Activity Document IV

Australia s Illegal Logging Prohibition Act 2012

Challenging Indonesia s 2020 Emission Reduction Targets in the Forestry Sector and Peatlands

DEFORESTATION NDONESIA S COMMITMENT IN ACHIEVING MINISTRY OF ENVIRONMENT AND FORESTRY OF REPUBLIC OF INDONESIA ZEROI

Original language: English SC65 Doc. 36 CONVENTION ON INTERNATIONAL TRADE IN ENDANGERED SPECIES OF WILD FAUNA AND FLORA

Terms of Reference (TOR)

Liberia Development Forestry Sector Management Project

CHINA Evaluation of the nfp Process

Indonesia s Report. Presented by Head of Indonesia Delegation. The Second ASFN Meeting August 2008, Bangkok

Basic information on the MSS proposal

Strategic Plan of Action

Terms of Reference for WWF-UK Study

Policies and Systems toward Sustainable Management of Production Forests in Indonesia and Malaysia

NDF Guidelines for making NDFs for trees in the European Union

REPORT ON THE IMPLEMENTATION OF ACTIVITIES. A2.1, A2.2, A2.3, and A2.4

CONDITIONS FOR IBSAP IMPLEMENTATION

Comments on National Renewable Energy Action Plan (NREAP) of Georgia

JOINT WORKSHOP BRUSSELS

FLEGT Monitoring IM and IMM. Melissa Othman Tim Dawson

EU approaches against wildlife trafficking, illegal logging and illegal fishing an introduction

INDONESIAN INITIATIVES ON REDD+

China policy to combat illegal logging, illegal logs and illegal timber products

AIDE MEMOIRE FOURTH MISSION OF THE JOINT MONITORING AND REVIEW MECHANISM. Accra, 13th 16th March, 2012

THE ROLE OF PUBLIC-PRIVATE COOPERATION FOR THE CONSERVATION AND RESTORATION OF FOREST ECOSYSTEM

* Tomoyuki NAITO. Article ha 2020 ODA ITTO ODA CITES NGO ODA

DIRECTORATE OF FOREST TREE SEED

6/15/2017. UN-REDD Programme Việt Nam Phase II. Sub-regional Collaboration on Transboundary Displacement

FORESTRY POLICY FOR ADDRESSING CLIMATE CHANGE

CONVENTION ON INTERNATIONAL TRADE IN ENDANGERED SPECIES OF WILD FAUNA AND FLORA

2007/40 Non-legally binding instrument on all types of forests

Legality verification on the internal European (EU) market

6 th Sub-Regional Training Workshop on Timber Legality Assurance

ADDRESSING CONSERVATION COMMUNITY CONCERNS IN FOREST MANAGEMENT IN WEST& CENTRAL AFRICA

ITTO Policy Development Series No. 18. ITTO Action Plan International Tropical Timber Organization

The Process - achievements, weaknesses and the future

National Forest Plan

What future for forest concessions and alternative allocation models for managing public forests?

BRIK Endorsement System: Securing Timber from Legal Sources

PROJECT LIFE04 TCY/CRO/029. CAPACITY BUILDING FOR IMPLEMENTATION OF THE UNFCCC AND THE KYOTO PROTOCOL IN THE REPUBLIC OF CROATIA (CRO Climate Cap)

NATURAL FOREST DEPLETION (Q&Q) = FOREST & BIODIVERSITY LOSSESS OR DECREASE

ROLES OF FOREST AND FORESTRY IN INDONESIA

OUTLINE FOR A CLIENT SURVEY STUDY

Prepared for the Project by: Dr. Hiras Sidabutar, Project National Expert and Mr. Jimmy Chandra, Project Coordinator

CO-SPONSORING COUNTRIES AND ORGANIZATIONS

Emerging governance mechanisms in ASEAN: Supporting improved quality infrastructure for forest sector legality and sustainability initiatives

PRESS RELEASE. (For immediate release)

March 2012, Version 1.9

Cambodia Readiness Preparation Proposal to FCPF PC8. Omaliss Keo 25 March 2011, Dalat, Vietnam

City, Country Date, 2013

CONVENTION ON INTERNATIONAL TRADE IN ENDANGERED SPECIES OF WILD FAUNA AND FLORA

Københavns Universitet. A guide to seed quality Moestrup, Søren; Schmidt, Lars Holger. Publication date: 2008

COMPLETION REPORT. Host Government: Indonesia

DARWIN INITIATIVE LOGICAL FRAMEWORK See:

«ROLES OF CAMEROON IN TIMBER TRADE FLOWS» : Terms of Reference

INTERNATIONAL TROPICAL TIMBER ORGANIZATION

The VLTP 1. Purpose of Discussion Paper 1. Current wood flows and the future harvest level under VLTP 2

Sustainable Forest Management in Myanmar and Its Role in Supporting the SDGs

Public Forestry Institutions

Strategic Program API

Illegal Logging : Overview and Possible Issues in the UNECE Region

Transcription:

COMPLETION REPORT Review on Ramin Harvest and Trade: CITES Compliance, Tri-National Task Force on Trade in Ramin, Trade Control and Monitoring ITTO-CITES PROJECT INDONESIA S WORK PROGRAMME FOR 2010 Ensuring International Trade in CITES-listed timber Species is Consistent with their Sustainable Management and Conservation EXECUTING AGENCY Directorate of Biodiversity Conservation Directorate General of Forest Protection and Nature Conservation, MoF Manggala Wanabakti Building, Block VII, 7 th. Floor Jl. Jend. Gatot Subroto, Senayan Jakarta 10270, Indonesia Telefax : +62 21 5720227

THEMATIC PROGRAM ON ITTO-CITES ENSURING INTERNATIONAL TRADE IN CITES-LISTED TIMBER SPECIES IS CONSISTENT WITH THEIR SUSTAINABLE MANAGEMENT AND CONSERVATION STARTING DATE May 2010 April 2011 DURATION OF THE ACTIVITY 8 months, extended to 12 months ACTIVITY COST (US$) ITTO US$ 55,000.00 Additional budget (ITTO) US$ 3,060.00 GOI (in-kind) US$ 17,450.45 Total US$ 75,510.45 ACTIVITY COMPLETION REPORT ACTIVITY TECHNICAL AND SCIENTIFIC STAFF Activity Coordinator Agus SB. Sutito Activity Secretary Badiah Febriany Iskandar National Expert and Team Leader Tajudin Edy Komar Tukirin Partomihardjo Faustina Ida Hardjanti Trio Santoso Nunu Anugrah Puja Utama IMPLEMENTING AGENCY Directorate of Biodiversity Conservation Directorate of Forest Protection and Nature Conservation Manggala Wanabakti Building Block VII, 7 th Floor Jalan Gatot Subroto, Senayan, Jakarta Telefax: +62 21 5720227 Jakarta, April 2011

TABLE OF CONTENTS EXECUTIVE SUMMARY 1 1. ACTIVITY IDENTIFICATION 1.1. Context 1.2. Origin and main problem to be addressed 2 2 2 2. ACTIVITY OBJECTIVES AND IMPLEMENTATION STRATEGY 3 3. ACTIVITY PERFORMANCE (Activity elements planned and implemented) 3 4. ACTIVITY OUTCOME, TARGET BENEFICIARIES INVOLVEMENT 4 5. ASSESSMENT AND ANALYSIS 5 6. LESSONS LEARNED 5 7. CONCLUSIONS AND RECOMMENDATIONS 5 Annex 1. Activity Financial Statement (ITTO Contribution) 6 Annex 2. Activity Cash Flow Statement (ITTO Contribution) 7 Annex 3. Activity Financial Statement (GoI in-kind Contribution) 8 Annex 4. Activity Cash Flow Statement (GoI in-kind Contribution) 9

EXECUTIVE SUMMARY Among others, existing discrepancies among international trade under CITES rules and regulations and domestic harvest and trade practices/rules are not supporting overall compliance system for Ramin management and contribute to poor trade monitoring and control. Variation and inconsistency of harvest and trade data base and quota may cause detrimental effect on Ramin population. Effectiveness of a regional mechanism, the Tri National Task Force to combat illegal trade in Ramin (Malaysia, Singapore and Indonesia), temporary suspended since 2007, is needed to be reviewed. To ensure that harvest and trade of Ramin in Indonesia is consistent with sustainable forest management and conservation of CITES-listed timber species, the project is aimed to develop guidance of CITES compliance system and implementation, to enhance regional cooperation and to improve trade data collection, monitoring and trade control. All the Project outputs are carried out as planned, although the duration of the Project was reduced from 12 months to 7 months. At the end, the project has extended one more month to put further effort in the follow-up of recommendations for more concrete results. After Activity Completion, current practices of Ramin harvest and trade and CITES compliance system for Ramin sustainable management have been reviewed and their gaps have been identified. Strategic guidelines towards sustainable management and conservation of Ramin have been formulated. Related authorities and stakeholders on Ramin trade at local level, national level and regional level have had a closer look and shared common view on the problems, of which required actions and further steps have been recommended. Strengthening cooperation at all levels in the practices of Ramin harvest and trade are keys to the post-activity sustainability. The CITES Management authority has taken up the Tri-national Task Force issues and proposed some follow-up approaches to strengthen regional cooperation. Synchronization of rules and regulations as well as data collection, monitoring and control system are highlighted. Some rules and regulations even among related authorities under the same Ministry of Forestry are not harmonized in harvest and trade in Ramin. Stakeholders at local and field levels are not well aware of some incompliance practices that affect the overall data collection, monitoring and control system, which consequently influence the harvest quota and international trade. Capacity building and dissemination of CITES rules and compliance system to wider scope of stakeholders and field officers help ease implementation synchronization and improvement of database and control system which will contribute to better SFM Practices in Ramin harvest and trade. Formal adoption of the findings and recommendations is vital to effective execution of future actions. Similar activities could be carried out for other timber and plant species listed in Appendix II such as Agarwood for enabling their sustainable management and conservation. 1

1. ACTIVITY IDENTIFICATION 1.1. Context The Project location is Indonesia. The Activity addressed issues on Ramin harvest and trade. Logging moratorium and the inclusion of Ramin into CITES Appendix is expected to contribute to the SFM and conservation of the species by determining harvest quota. Since 2001,Ramin as a genus was listed into CITES Appendix III to assist in the trade control by both exporting and importing countries. In 2004, Ramin was up-listed into Appendix II of CITES. Indonesia has imposed a logging moratorium of Ramin since 2001 and only one Concession Company is allowed to harvest Ramin which is located in Sumatra. Other concession areas which have Ramin potentials are not allowed to harvest and trade Ramin before they achieve sustainable forest management (SFM) and certified by recognized certification company. Indonesia, Malaysia and Singapore has established a regional forum since 2003/2004, called the Tri-National Task Force in Trade on Ramin to enhance data exchange to reduce illegal trade to the neighbouring countries. 1.2. Origin and problem The harvest quota is determined based on field assessment on population, habitat and potential regeneration, including the performance of concessionaire. There are discrepancies in practices and compliance to the national rules and international regulations for Ramin trade. The elaboration and description (manual and guideline on the CITES compliance system) is yet to be established and well disseminated to the relevant parties in the field, causing insufficient human resources and capacity to support such field assessment. Monitoring on harvest and trade is still weak resulting in poor statistical data presentation and accuracy resulting in data variation and inconsistency thus it is difficult to control national, international trade both legal and illegal practices. Poor trade monitoring and tracking system has caused impacts to taxes and revenue. The National Workshop held on 24 July 2007 on the evaluation of CITES implementation has also questioned the pricing of Ramin for both domestic and international trade. This Workshop recommended that a closer look on data collection mechanism, monitoring and export control of forest products, including Ramin, needed to be carried out. The Task Force scheduled to have annual meeting in the member countries. In 2006/2007, the meeting of the Task Force has been temporarily suspended until there is a new insight to demonstrate that the Task Force will be contributing significantly to combat illegal logging and illegal trade of Ramin. 2. ACTIVITY OBJECTIVES AND IMPLEMENTATION STRATEGY The proposed activity is expected to contribute to improved management on Ramin through the formulation of roadmap toward the SFM and conservation, improved implementation on CITES, more effective mechanism in tackling illegal trade and improved trade control and monitoring. Inclusion of Ramin into CITES Appendix II requires assessment to ensure that the harvest will not cause detrimental effect to the survival of the species population and habitat. NDF on Ramin has not been well elaborated and introduced to the field officers and staff, especially to the relevant parties in Sumatra and Kalimantan. This activity is therefore expected to contribute to the improvement of the NDF assessment 2

and quota determination. In addition to NDF, the activity is expected to contribute to the improvement on the accuracy of statistical data presentation by improving data collection mechanism on the resource base, harvest and trade control and monitoring. The Workshop recommended that a closer look on data collection mechanism, monitoring and export control of forest products, including Ramin, needed to be carried out. This activity is therefore proposed to address the above issues, with specific on Ramin. Understanding the basis for the inclusion of species into CITES Appendix, determination of harvest quota and Non-Detriment Finding (NDF) are still limited for most field officers of the CITES Management Authority and other relevant stakeholders such as plant quarantine, customs officers and the officers of Customs and Excise offices. This proposed activity is intended to improve capacity of both institutional and human resources in order to enhance the SFM and conservation of Ramin through the establishment of Ramin roadmap for sustainable management, and compliance to the implementation of CITES rules and regulations. Mechanism in regional cooperation through the Tri-national task Force is not well established and might not respond well to the changing situation. However, roles of regional support for international trade are still considered important. There are needs for review of the ToR, and enhancement of the regional cooperation. In addition, improved managament of Ramin also requires accurate data on resources, harvest and trade. Methods of collection and presentation of trade control and monitoring, including the accuracy and up-dating of data are still poor, especially those on Ramin. Ramin, for which only one concession is allowed to harvest in Indonesia, still has the least accuracy in its statistical data, especially on its harvest and trade due to various factors and barriers. This activity is therefore proposed to identify the barriers and improve data collection, including the accuracy and consistency of trade data. Specific objectives are 1. To establish a roadmap towards sustainable management and conservation of Ramin and to support CITES compliance practices 2. To review and enhance the regional cooperation, and 3. To improve data collection, trade control and monitoring system The strategic approaches of inputs are mainly on workshop, training and review on the issues related to the harvest and trade on Ramin. The potential risk may be in the insufficiency of participants willing to participate. 3. ACTIVITY PERFORMANCE (Activity elements planned and implemented) There are no changes/adjustment on Specific objectives. At the beginning, the duration of the Project January-December 2010 has been reduced to May-December 2010 due to the late contract signed and urges from ITTO to finish all EU funded activities by 2010. All projects elements were implemented as planned (May-December 2010), except for the regional workshop on the work of the Tri National Task Force on Trade in Ramin which was extended to mid January to accommodate adequate time for inputs from other Parties. During the wrapping up results in February, the Project has added an additional activity (March-April) to follow up the recommendations of the regional by approaching 3

for endorsement of Indonesia CITES Management Authority and further communication to other parties. And it is implemented as planned. The total amount of expenditure is US$ 56,378 From the ITTO contribution, the Project budget was originally at US$ 55,000 and there was an additional fund for US$ 3,060 for the regional Workshop (see Annex 1 and 2). The rest of the expenditure, US$ 17,450.45 was accounted from in-kind Government contribution (see Annex 3 and 4). Overall Project budget were spent as planned. Adjustment for the use of fund were conducted twice, at the beginning when the project duration was reduced to seven months and at the end of the Project to use remaining fund for additional activity stated above. 4. ACTIVITY OUTCOME, TARGET BENEFICIARIES INVOLVEMENT Major achievement/impacts of the specific objectives are elaborated below: 1. A roadmap toward sustainable management and conservation of Ramin (Gonystylus spp) is published to be distributed to stakeholders for its application. 2. A review on trade data collection, monitoring and trade control and its workshop proceeding are published to be used as references for responsible authorities and stakeholders. Recommendations are to be followed-up. 3. The paper on Aturan dan Ketentuan CITES Terkait Ramin (Gonystylus spp) dan Jenis Tanaman Lainnya (CITES rules and regulation on the listing of Ramin and other plant species) is published to be used as references and training materials. Recommendations are to be followed-up. 4. A training Workshop Proceeding on CITES rules and regulation on the listing of Ramin and other plant species is published for references. 5. Responsible officers, related stakeholders and field officers gain more understanding on the CITES rules and regulation and plan to adopt/adjust their practices for CITES compliance implementation and to improve Ramin harvest and trade monitoring and control. 6. A review of TOR of Tri National Task Force and its regional workshop proceeding are published for references. 7. Recommendations from the regional workshop are taken up by the CITES Authority of Indonesia and the Authority has proposed Malaysia Authority to call for next annual meeting to discuss on the matter. The primary beneficiaries of the Activity(the Ministry of Forestry, Indonesia (MoF), CITES MA/CITES SA, research institutions, universities and forest concession companies) have been actively involved in various discussions during the implementation of the Activity. As for regional cooperation parties, representatives from Malaysia, and Singapore have supported by review the draft ToR, attended the regional workshop and actively provided inputs and information. Through active sharing opinions and discussion, the discrepancies of CITES compliance practices among related stakeholders on harvest and trade are in clearer picture, the weak points and corrective measures are shared. Many emerging creative initiatives and efforts to adopt/adjust and improve their practices are responded positively. For the Project sustainability, many results are needed to be endorsed for legal/formal basis in future actions/measures, such as the roadmap toward sustainable 4

management and conservation of Ramin (Gonystylus spp), recommendations on trade data collection, monitoring and control, recommendations on CITES compliance practices. The Authorities could then take follow-up actions. Related authorities within the Ministry of forestry have already agreed to arrange internal meetings on some relevant recommendations to synchronize related regulations. Co-ordination and regular communications among responsible authorities and stakeholders are vital to the continuity of the impacts. Capacity building to provide more understanding to related stakeholders is not less important. Future discussions in the next annual meeting of tri-national task force proposed by Indonesia also enhance regional cooperation. 5 ASSESSMENT AND ANALYSIS From the realized Project performance and outcome it can be seen that the Project Activity has been adequately designed through identification, strategies, plan and resources and is able to create impacts to the right targeted beneficiaries. Institutions involved are actively responsible in their roles and contribute support to the Project when necessary. Time and project inputs are also quite adequate, although a little bit tight at the end of the year when most offices have long holidays. Overall, the Project has not faced significant problems in management, monitoring and control, effectively meets the targets and efficiently spending the expenditure. 6. LESSONS LEARNED Keys of success of the Activity lie on the active roles of field operators that yield enormous insights on the problems and existing discrepancies in practices. Also, elements on the adoption/endorsement of the findings should be included in the future Project design. It should be noted that role of ITTO Regional representative is important to the success of the Project. The activity have gained many inputs in adjusting the budget and upgrade the planned national workshop on ToR of Tri-national Task Force into Regional Workshop and supports in the provision of additional budget as needed in the adjustment. 7. CONCLUSION AND RECOMMENDATIONS The activity is conducted successfully as planned and contributes important findings and recommendations through effective and efficient Project design and inputs. Supports from ITTO Regional Representative are credited on the matter. Some recommendations for future similar projects are: Involve roles of field offices/operators in the design Avoid important activity at the yearend Include elements of adoption/endorsement in the design Similar projects for other timber/plant species are recommended, such as agarwood and merbau. 5

Responsible for the Report Name: Agus SB Sutito, Date: 30 April 2011 Position held: Project Leader 6