ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis AE 481W Thesis Proposal Dr. Ali Memari January 13 th, 2012

Similar documents
ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis AE 481W Thesis Proposal Dr. Ali Memari December 12 th, 2011

ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis AE 481W Technical Report 3 Dr. Ali Memari November 16 th, 2011

ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis AE 481W Technical Report 2 Dr. Ali Memari October 19 th, 2011

ECMC Skilled Nursing Facility

ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis AE 482 Final Report Dr. Ali Memari April 4, 2012

SENIOR THESIS PROPOSAL STRUCTURAL REDESIGN USING STEEL FRAMING

Thesis Proposal. CHRIS VANDELOGT Structural Option

Best Buy Corporate Building D (4) Richfield, MN

Thesis Proposal 12/13/06

Kaleida Health Global Heart and Vascular Institute University at Buffalo CTRC/Incubator. Buffalo, New York. Revised Thesis Proposal

MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS

Technical Report #2. Matthew R Peyton

REVISED PROPOSAL. University Academic Center. Eastern USA. Alexander Altemose. Structural Option. Advisor: Thomas E. Boothby

Jonathan R. Torch Thesis Proposal Columbia University. Thesis Proposal. Columbia University Northwest Science Building

TECHNICAL REPORT III. University Academic Center. Eastern USA. Alexander Altemose. Structural Option. Advisor: Thomas E. Boothby

Dead Loads (psf): Concrete Floor Slab on Metal Deck 45 psf Mechanical and Ceiling 7 psf Miscellaneous 5 psf Exterior Wall 80 psf

Global Village Rochester Institute of Technology Rochester, New York

Stephan Northrop Structural Option Dr. Linda Hanagan. North Shore Equitable Building Pittsburgh, PA Senior Thesis Proposal

Thesis Proposal. Matthew R Peyton

Thesis Proposal. CHRIS VANDELOGT Structural Option

Technical Report #1. Matthew R Peyton

Technical Report #1. Indiana Regional Medical Center Indiana, PA. Cody A. Scheller. Structural Concepts & Existing Conditions Report

January 14, 2006 Structural Thesis Proposal: Structural and Breadth Redesign Options

FAIRFIELD INN & SUITES, MARRIOT PITTSBURGH, PA

Proposal. Revised The Residences Anne Arundel County, Maryland. 1/14/2011 Faculty Advisor - Dr. Richard A. Behr Ryan English - Structural Option

Franklin Square Hospital Center Patient Tower

FDA OC/ORA Office Building

William W. Wilkins Professional Building Columbus, Ohio

Table of Contents 2. Structural Systems.4 Foundations.4 Floor System...4 Columns..5 Lateral System...5

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

TECHNICAL REPORT 1. Structural Concepts / Structural Existing Conditions. Penn State Hershey Medical Center Children s Hospital. Hershey, Pennsylvania

Johns Hopkins Graduate Student Housing. Thesis Proposal. 929 North Wolfe Street Baltimore, Maryland Brad Oliver Structural Advisor: Professor Memari

Temecula Medical Center Temecula, CA

Thesis Proposal. University Hospitals Case Medical Center Cancer Hospital. Daniel C. Myers. December 12, 2009

THESIS PROPOSAL. Aubert Ndjolba Structural Option PENN COLLEGE OF TECHNOLOGY. Faculty advisor: Dr. Boothby. Date: 12/09/11

[TECHNICAL REPORT 3] Lateral System Analysis

MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8

TEMECULA MEDICAL CENTER PRESENTATION OUTLINE

MEMORIAL SLOAN-KETTERING CANCER CENTER

CORPORATE HEADQUARTERS

Office Building-G. Thesis Proposal. Carl Hubben. Structural Option. Advisor: Dr. Ali Memari

Thesis Proposal. Student Health Center Penn State University. Prepared By: Jacob Brambley (Structural Option) Prepared For: Dr.

Structural Redesign Gravity System

Traci Peterson Option: Structural Faculty Consultant: Memari. Executive Summary

THESIS PROPOSAL. Aubert Ndjolba Structural Option PENN COLLEGE OF TECHNOLOGY. Faculty advisor: Dr. Boothby. Date: 01/13/12

Christopher McCune Structural Option 2006 Senior Thesis Penn State Architectural Engineering. Eight Tower Bridge Conshohocken, Pennsylvania

MITRE 3 Building McLean VA

CORPORATE HEADQUARTERS

Thesis Proposal Structural Redesign / Cost, Schedule and Coordination Analysis / Architectural Impact

Simplified Building Schematic for Typical Floor (Levels 9 through 22):

Drexel University Race Street Dormitory REVISED THESIS PROPOSAL Doug Tower Structural Advisor: Kevin Parfitt 2/7/07

Handley McDonald. Handley McDonald. Technical Report 1. Claude Moore Medical Education Building Faculty Advisor: Richard Behr

Thesis Proposal. La Jolla Commons Phase II Office Tower San Diego, California. December 13, 2013

Rutgers University Law School Building Addition and Renovation Camden, NJ

Thesis Proposal. Aquablue at the Golden Mile. Hato Rey, Puerto Rico

4/14/2010. Columbia University Northwest Science Building. New York, NY

Fairfield Inn and Suites Pittsburgh, PA

Kaleida Health Global Heart and Vascular Institute University at Buffalo CTRC/Incubator. Buffalo, New York. Technical Report #2

Technical Report 1 Bed Tower Addition at Appleton Medical Center Appleton, WI

Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report

Park Potomac Office Building E

LIFE SCIENCES BUILDING STRUCTURAL CONCEPTS AND EXISTING CONDITIONS

Thesis Proposal. Nasser Marafi. Center & Facility Service Building. St. Joseph Hospital of Orange Patient Care. Proposal

OF THREE NEW BUILDINGS BEING CONSTRUCTED TO REPLACE THE EXISTING COMPLEX. THE FLOOR SYSTEM OF GEORGE READ HALL IS A HAMBRO COMPOSITE SYSTEM

Pennsylvania College Of Technology Dauphin Hall Williamsport, Pennsylvania

THESIS PROPOSAL. Dominick Lovallo Dr. Hanagan Advisor The Pennsylvania State University. Embassy Suites Hotel, Springfield Virginia

THESIS PROPOSAL. Dominick Lovallo Dr. Hanagan Advisor The Pennsylvania State University. Embassy Suites Hotel, Springfield Virginia

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Thesis Proposal. Piez Hall Extension. Oswego, NY

Traci Peterson Option: Structural Faculty Consultant: Memari. Executive Summary

STRUCTURAL DESIGN & PROGRESSIVE COLLAPSE

Crossroads at Westfields Building II

The Harry and Jeanette Weinberg Center Mercy Hospital Medical Office Building Baltimore, MD. Thesis Proposal

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

The Towers at the City College of New York. Robin Scaramastro - Structural Option - Advisor: Dr. Memari

Project. San Jose City College Physical Education Building. Prepared For. Prepared By PLACE IMAGE HERE. Ken Bauer, AIA Principal

STRUCTURAL TECHNICAL REPORT 1

William W. Wilkins Professional Building

State Street New Haven CT Structural Sabrina Duk T. Boothby

John Jay College Expansion Project

Letter of Transmittal

Weill Cornell Medical Research Building 413 E. 69 th Street New York, NY

Hyatt Place North Shore. Pittsburgh, PA T. Technical Assignment #1. Kyle Tennant. Kyle Tenn. Structural (IP) [Type the document subtitle]

Technical Report 1. Hakuna Resort Swift Water, Pennsylvania. Image Courtesy of LMN Development LLC

Taking It to the Limit BY JOHN ROACH, PE, AND JOHN BOEKELMAN, SE, PE, RA CannonDesign

North Shore at Canton Baltimore, MD Beau Menard Technical Report 1

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity

Table of Contents Executive Summary 2 Introduction 3 Structural Systems Problem Statement 9 Proposed Solution 10 Breadth Topics 11 Tasks and Tools

Point Pleasant Apartments Point Pleasant, NJ Ryan P. Flynn Structural Option Faculty Consultant: Dr. Hanagan

St. Elizabeth Boardman Hospital Renovation. Inpatient Facility

Technical Report 1. Kingstowne Section 36A 5680 King Center Drive Kingstowne, VA James Chavanic. Structural Option. Advisor: Dr.

Angela Mincemoyer Structural Option Advisor: Dr. Boothby Peggy Ryan Wil iams Center Ithaca, New York 3 March 2014 Peggy Ryan Williams Center Proposal

Proposal. PricewaterhouseCoopers Oslo, Norway

Executive Summary...2 Introduction...3 Structural System Overview Buffalo,...4 Foundation...4 Floor System...4 Gravity System...4 Lateral System...

Revised Thesis Proposal AE Senior Thesis 1/11/2012 Justin Kovach Structural Option Dr. Boothby Advisor

GEN*NY*SIS CENTER FOR EXCELLENCE IN CANCER GENOMICS Rensselaer, NY

FDA CDRH Laboratory Silver Spring, Maryland. Executive Summary: Timothy Mueller Structural Option Walter Schneider

Jonathan R. Torch Technical Report 2 Columbia University. Technical Report 2. Pro-Con Structural Study of Alternate Floor Systems

Danielle Shetler - Structural option Courtyard by Marriott Lancaster, PA

Transcription:

ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis 2011 Class: Subject: Faculty Consultant: Submitted: AE 481W Thesis Proposal Dr. Ali Memari January 13 th, 2012

Table of Contents Executive Summary... 3 Introduction... 4 Architectural Overview... 5 Structural Systems Overview... 6 Foundation System... 6 Floor System... 7 Framing System... 7 Lateral System... 8 Proposal... 9 Proposed Structural Depth... 9 Breadth Options...10 Breadth Study One: Analysis / Re-design of Mechanical System...10 Breadth Study Two: In-Depth Cost and Schedule Analysis of Depth...10 Breadth Study Alternative: Re-design of Building Facade...10 Required Tasks...11 For the Proposal...11 For the Breadths...12 Schedule...13 Conclusion...14 Page 2 of 14

Executive Summary This proposal will present a challenge involving ECMC Skilled Nursing Facility, propose a solution to this challenge, and provide a detailed analysis as well as a broad study of the impact of these changes throughout multiple disciplines. This building is a new 296,000 square foot long-term nursing facility found at the ECMC campus in the heart of Buffalo, NY. The project cost is roughly $95 million, and only steps away from the ECMC, residents can receive the highest level of care. The buildings main framing system consists of composite steel deck on steel framing. The lateral system consists of concentrically braced frames specifically located throughout the building. Upon review of previous technical reports, it was found that the building holds few structural flaws and challenges to address. Therefore, it was assumed that an identical building was being designed in downtown Los Angeles, where a building within this area is subject to high seismic activity. In the proposed solution, three areas will be studied and analyzed for adequacy: the foundation, the floor system, and the lateral system. Using ASCE 7-10 to obtain design loads, the existing structure will be analyzed to confirm or deny its adequacy in this large seismic zone. The incorporation and design of lead rubber base isolators will be used in the foundation as well to reduce damage caused by earthquakes. Since the building will be located in the more semi-arid environment of Los Angeles, CA, an in-depth study will be conducted on the mechanical system to test its performance in this new location. If deemed ineffective, specification changes will be made to ensure proper moisture and temperature control. Additionally, any changes to these specifications must also consider cost and schedule. An impact study on the cost and schedule of the project will be performed to help determine the feasibility of specific systems and ultimately influence the design. Page 3 of 14

Introduction The new ECMC Skilled Nursing Facility serves as a long term medical care center for citizens found throughout the region. The building is located on the ECMC campus found at 462 Grider Street in Buffalo, NY. This site was chosen to bring residents closer to their families living in the heart of Buffalo. As you can see here in Figure 1, the site sits right off the Kensington Expressway, providing ease of access to commuters visiting the ECMC Skilled Nursing Facility. Since the Erie County Medical Center is found within close proximity of the new building, residents can receive fast and effective care in an event of emergency. The new facility is the largest of four new structures being built on the ECMC campus located in central Buffalo, NY. Figure 1: Aerial view of ECMC Skilled Nursing Facility site shown in white. Photo courtesy of Bing Maps. The new campus will also contain a new Renal Dialysis Center, Bone Center, and parking garage. Each of the three new facilities will be connected to the main medical center via an axial corridor, which provides enclosed access to emergency rooms, operation rooms, and other facilities found within the Erie County Medical Center. Page 4 of 14

Architectural Overview The new Erie County Medical Center Skilled Nursing Facility is a five-story 296,489 square-foot building offering long-term medical care for citizens in the region. The facility consists of an eight-wing design with a central core. The main entrance to the building is located to the east and is sheltered from the elements by a large portecochere. There is a penthouse level that contains the facility s mechanical and HVAC units. Each floor features one garden terrace, providing an outdoor space accessible to both residents and staff. The exterior of the building is clad in brick, stone veneers, composite metal panels, and spandrel glass curtain wall system. Figure 2: Exterior view of stacked garden terraces, green wall, and the building s vertical and horizontal shading panels. Rendering courtesy of Cannon Design. The facility also incorporates green building into many of its elegant features. The composite metal panels that run vertically and horizontally across each wing of the building, visible in Figure 2, provide solar shading along with architectural accent. A green wall is featured on each outdoor garden terrace, providing residence with a sense of nature and greenery. The ECMC Skilled Nursing Facility provides an eclectic, modern atmosphere and quality care for long-term care patients found within the Buffalo area. Page 5 of 14

Structural Systems Overview The ECMC Skilled Nursing Facility consists of 8 wings and a central core, with an overall building footprint of about 50,000 square feet. The building sits at a maximum height of 90 above grade with a common floor to floor height of 13-4. The ECMC Skilled Nursing Facility mainly consists of steel framing with a 5 concrete slab on grade on the ground floor. The Penthouse level contains 6.5 thick normal weight concrete slab on metal deck. All other floors have a 5.25 thick lightweight concrete on metal deck floor system. All concrete is cast-in-place. The geotechnical report was conducted by Empire Geo Services, Inc. The study classified the soils using the Unified Soil Classification System, and found that the indigenous soils consisted mainly of reddish brown and brown sandy silt, sandy clayey silt, and silty sand. The ECMC Skilled Nursing Facility foundations sit primarily on limestone bedrock, although in some areas the foundation does sit on structural fill. Depths of Foundation System Figure 3: Footing bearing conditions. On bedrock (left detail), and on Structural Fill (right detail). Detail courtesy of Cannon Design. limestone bedrock range from 2ft to 12ft. The building foundations of the ECMC Skilled Nursing Facility are comprised of spread footings and concrete piers with a maximum bearing capacity of 5,000 psf for footings on structural fill and 16,000 psf for footings on limestone bedrock. Concrete piers range in size from 22 to 40 square. Page 6 of 14

Floor System The floor system on all floors except at the penthouse level consists of a 5.25 thick lightweight concrete floor slab on 2-20 gage metal decking, creating a one-way composite floor slab system. The concrete topping contains 24 pounds per cubic yard of blended fiber reinforcement. Steel decking is placed continuous over three or more spans except where framing does not permit. Shear studs are welded to the steel framing system in accordance to required specification. Refer to Figures 4 and 5 for composite system details. Figure 4: Composite deck system (parallel edge condition). Detail courtesy of Cannon Design. Figure 5: Composite deck system (perpendicular edge condition). Detail courtesy of Cannon Design. Figure 6: Typical bay layout for building wing. Detail courtesy of Cannon Design. Framing System The structural framing system is primarily composed of W10 columns and W12 and W16 beams; however the girders vary in sizes ranging from W14 to W24, mainly depending on the size of the span and applied loads on the girder. Typical beam spacing varies from 6-8 o.c. to 8-8 o.c. Figure 6 shows a typical grid layout for a building wing. Columns are spliced at 4 above the 2nd and 4th floor levels, and typically span between 26-8 and 33-4. Page 7 of 14

Lateral System The lateral resisting system consists of a concentrically brace frame system composed of shear connections with HSS cross bracing. Lateral HSS bracing is predominantly located at the end of each wing, and also found surrounding the central building core. Because of the radial shape of the building and symmetrical layout of the structure, the brace framing can oppose seismic and wind forces from any angle. The HSS bracing size is mainly HSS 6x6x3/8, but can increase in size up to HSS 7x7x1/2 in some ground floor areas for additional lateral strength. Figure 7 contains multiple details and an elevation of a typical brace frame for the ECMC Skilled Nursing Facility. Figure 7: Typical lateral HSS brace frame (left). Typical HSS steel brace connection at intersection (upper right). Typical HSS steel brace connection at column (lower right). Details courtesy of Cannon Design. Page 8 of 14

Proposal Proposed Structural Depth The original structural system for the ECMC Skilled Nursing Facility consists of composite steel framing tied into metal decking using shear studs and concentrically braced frames used to resist lateral forces. After analysis of the building's lateral system and structural framework, it was found that the ECMC Skilled Nursing Facility met all code requirements and industry standards. Furthermore, wind loading was the predominant case for lateral loading on the building. For this thesis, the design for the ECMC Skilled Nursing Facility will be evaluated in a different location, specifically in Los Angeles, CA where seismic activity will predominate lateral loads. The buildings existing structural system and foundations will be redesigned to meet code requirements in this new location. The specific systems that are a target for re-design will include the building's soil and foundation system, floor system, and lateral system. Soils found in Los Angeles, CA will be classified and checked for adequate strength or other possible failure modes such as soil liquefaction. Additionally, the existing foundation system will be analyzed for its adequacy in this new location. Also, some research has been done on the use of lead rubber base isolators between the foundation and the structural framework and will be specified in the new foundation design as well. The use of these base isolators will prove essential in reducing damage caused by earthquakes. A floor system with the least amount of mass and weight would benefit greatly in a high seismic zone and would be chosen for re-design at this location since it will help reduce the story shear forces produced during an earthquake. With this in mind, a composite steel deck and frame floor system was chosen for design. With its ease of constructability and lightweight frame, it seemed to be the best choice for re-design in this location. It was concluded that the use of pendulums and large mass dampers would be inadequate for the new structure since it is only 5 stories high. These types of dampers are more useful in high-rise structures and skyscrapers in seismic areas. Because of the efficiency and economic benefits of a concentrically braced lateral system found in the analysis of the existing structure, it will be used for redesign of the lateral system at this new location. The lateral system's new design will focus toward resisting frequent seismic events in this new location. Locations of these braced frames may change in the new design. Page 9 of 14

Breadth Options Breadth Study One: Analysis / Re-design of Mechanical System Upon changing the location of the ECMC Skilled Nursing Facility, the thermal impact on the building will change greatly since the climate is significantly different. At its current location in Buffalo, NY, the building experiences lake effect snow in the winter months and a moderate climate in the summer. Los Angeles, CA rarely experiences any snowfall and its average temperatures are significantly higher than in Buffalo, NY throughout the year. Considering these effects, the existing mechanical system will be evaluated and checked against figures for this new location. If the existing system is proven inadequate, a change in the specifications for the mechanical system will be made to meet industry standards. Breadth Study Two: In-Depth Cost and Schedule Analysis of Depth This breadth analysis will be made in connection with the structural depth. Any proposed changes to the foundation system, floor system, or lateral system will have an impact on the project's cost and schedule. In addition, availability of materials and possible labor costs are also important factors to consider. Once the analysis of the cost and schedule changes are considered, these proposed changes to the ECMC Skilled Nursing Facility will be evaluated for feasibility. Breadth Study Alternative: Re-design of Building Facade The existing facade for the ECMC Skilled Nursing Facility consists mainly of a brick cavity wall with some architectural stone detailing. Since masonry may not perform well in a high seismic zone, another alternative facade system will be investigated and chosen for re-design of the facade system. This change in the facade system will be based on its structural performance, architectural consideration, cost, installation, and thermal properties for this new location. Page 10 of 14

Required Tasks Listed below are multiple tasks that must be completed during the research and development of my proposal as well as the tools associated to complete these tasks. For the Proposal Task 1 Analyze and classify soils for Los Angeles, CA. Design new foundation system at this location. Task 2 Design/specify lead rubber base isolators for building dampening. Task 3 Determine both gravity and lateral loading at each story. Determine base shear and analyze its effects on the re-designed foundation. Design new floor system for this location. Task 4 Using new story and base shears, determine controlling load cases for lateral design. Design new concentrically braced frame lateral system at this location. Page 11 of 14

For the Breadths Breadth #1 Task 1 Determine thermal load on the building at this new location. Task 2 Analyze the existing mechanical system and determine its adequacy. If inadequate, change the specifications for the mechanical system to meet industry standards. Breadth #2 Task 1 Task 2 Use RS Means to obtain a preliminary cost and schedule for the redesign involved in the depth. Consult with general contractor for a detailed cost and schedule of the existing design. Compare / contrast re-design against existing cost and schedule. Breadth #2 (Alternative) Task 1 Research masonry performance against seismic activity. Research alternative facade systems. Task 2 Design an alternative facade system for the building. Perform cost estimate and schedule for this system. Task 3 Perform cost estimate and schedule for existing facade system. Compare and contrast the two different facade systems. Page 12 of 14

Schedule Page 13 of 14

Conclusion In conclusion, the proposed redesign of the ECMC Skilled Nursing Facility will mainly focus the seismic response regarding the adequacy and performance of the structural system in this new location. In addition, other aspects of design such as impacts on the mechanical system, construction costs, and project schedule will be studied and specified. After proper verification that the original design possesses minor flaws as well as the control of wind loads on the structure, it was assumed that an identical building was proposed to be designed in the Los Angeles, CA area where it will mainly be subject to high seismic activity and loading. The proposal will focus on three main aspects: the foundation, the floor system, and the lateral system. An in-depth breadth study of the mechanical system at this new location will be made to verify the systems adequacy. Los Angeles, CA presents a warmer climate, which will produce a significantly different effect on the design and components incorporated in the mechanical system. If the system is found to be inadequate, specifications will be made for the building at this new location. Additionally, with any changes on the building at this new location, a detailed cost and schedule analysis will need to be performed. This construction breadth will investigate the adequacy of current systems when considering material availability and shipment costs. This study will also help compare and contrast the existing building versus the new design at this separate location when considering the impacts on the project cost or schedule. Page 14 of 14