Hydrologic Engineering Center. Training Course on. Hydrologic Modeling with HEC-HMS. Davis, CA. Course Description

Similar documents
Hydrologic Engineering Center. Training Course on. Hydrologic Modeling with HEC-HMS April 2018 Davis, CA. Course Description

Autumn semester of Prof. Kim, Joong Hoon

ADVANCED APPLICATIONS OF HEC-HMS

Hydrologic Calibration:

Hydrologic Engineering Center Hydrologic Modeling System (HEC-HMS) Sunil KUMAR Director, National Water Academy

2

Chapter 4 "Hydrology"

Hydrologic Modeling System HEC-HMS

Example 3. Elementary HEC-HMS Model. Purpose. Illustrate the steps to create a functioning precipitation-runoff model in HEC-HMS.

Creating a Flood Forecasting System for the San Diego River Watershed

Hydrologic Modeling Overview

DEVELOPMENT OF FLOOD INUNDATION MAP FOR BAGO RIVER BASIN USING DIFFERENT MODELS. Presented by. Dr.Win Win Zin Professor YTU

The Texas A&M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory (HMI) Questionnaire

Hydrologic Modeling System (HEC-HMS) Adaptions for Ontario

Impacts of Climate Changes on Peak Flow of Upper Meghna River Basin. *Md. Mostafa Ali, **Afiya Narzis and ***Shammi Haque

HEC-HMS Modeling Summary: Cherry Creek Basin Tributary to Cherry Creek Dam

Hydrology and Water Resources Engineering

CONTINUOUS RAINFALL-RUN OFF SIMULATION USING SMA ALGORITHM

Hypothetical Flood Computation for a Stream System

Introduction to HEC HMS. Daene C. McKinney

A HYDROLOGIC MODEL FOR ASSESSING THE INFLUENCE OF WETLANDS ON FLOOD HYDROGRAPHS IN THE RED RIVER BASIN DEVELOPMENT AND APPLICATION

SECTION IV WATERSHED TECHNICAL ANALYSIS

CFCAS project: Assessment of Water Resources Risk and Vulnerability to Changing Climatic Conditions. Project Report IV.

Estimating the 100-year Peak Flow for Ungagged Middle Creek Watershed in Northern California, USA

SECTION III: WATERSHED TECHNICAL ANALYSIS

Pilot Study for Storage Requirements for Low Flow Augmentation

Suspended Sediment Discharges in Streams

The Hydrologic Engineering Center's Activities in Watershed Modeling

Simulation of Daily Streamflow

Hydrostatistics Principles of Application

Integrating HEC HMS generated flow hydrographs with FLO-2D. Nanda Meduri, PE, PMP, CFM Seth Lawler Venkata Dinakar Nimmala, CFM

Computer Determination of Flow Through Bridges

Event and Continuous Hydrological Modeling with HEC- HMS: A Review Study

San Luis Obispo Creek Watershed Hydrologic Model Inputs

Module 3. Lecture 6: Synthetic unit hydrograph

Feasibility Engineering Study

Alternative Approaches to Water Resource System Simulation

1 THE USGS MODULAR MODELING SYSTEM MODEL OF THE UPPER COSUMNES RIVER

Reservoir on the Rio Boba

Hydrologic Modeling System HEC-HMS

HEC-HMS Development in Support of Russian River Watershed Assessment

Estimation of Infiltration Parameter for Tehri Garhwal Catchment

SOUTHEAST TEXAS CONTINUING EDUCATION

Training Course Brochure Building Capacity in Rural & Urban Water Management

A&M WATERSHED MODEL USERS MANUAL WATER RESOURCES ENGINEERING

GISHYDRO: Developing Discharges and Watershed Parameters

APPENDIX 4 ARROYO MODELING

RAINFALL-RUNOFF STUDY FOR SINGAPORE RIVER CATCHMENT

URBAN FLOODING: HEC-HMS

Estimation of Hydrological Outputs using HEC-HMS and GIS

Application of HEC-HMS for the event and continuous simulation in highaltitude scarcely-gauged catchment under changing climate

Workshop on Watershed Modeling with GSSHA April 11-13, 2017 Artic Hydrology in GSSHA April 14, 2017 Hydrologic Engineering Center Davis, California

5/11/2007. WinTR-55 for Plan Reviews Small Watershed Hydrology Overview

Module 3. Lecture 4: Introduction to unit hydrograph

Application of HEC-HMS for Flood Forecasting in Kabkian Basin and Delibajak Subbasin in Iran

A Hydrologic Study of the. Ryerson Creek Watershed

UPDATE OF ARC TP108 RUN-OFF CALCULATION GUIDELINE

Risk. Management Center

THE BIGGER THE BETTER? HOW SPATIAL RESOLUTION AFFECT RUNOFF MODELING AND WATERSHED DELINEATION INTRODUCTION

5/25/2017. Overview. Flood Risk Study Components HYDROLOGIC MODEL (HEC-HMS) CALIBRATION FOR FLOOD RISK STUDIES. Hydraulics. Outcome or Impacts

HYDROLOGICAL MODELING OF AN AGRICULTURAL WATERSHED USING HEC-HMS HYDROLOGICAL MODEL, REMOTE SENSING AND GEOGRAPHICAL INFORMATION SYSTEM

DEVELOPMENT OF A HYDRO-GEOMORPHIC MODEL FOR THE LAGUNA CREEK WATERSHED

A Finite Difference Method for Analyzing Liquid Flow in Variably Saturated Porous Media

CEIWR-HEC Engineering Assistance. Summary of Recent Activities and FY 2017 Outlook

Simulation of Event Based Runoff Using HEC-HMS Model for an Experimental Watershed

HYDROLOGY WORKSHEET 1 PRECIPITATION

EVALUATION OF THE HEC-1 MODEL FOR FLOOD FORECASTING AND SIMULATION IN THE HORMOZGAN PROVINCE, IRAN

CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL

Douglas County 2008 PFIS Appeal, 2010 Effective FIS Restudies ( ), and Alpine View Estates Flood Study

Flood Modelling For Peri Urban Areas in Adyar River

Engineering Hydrology

Evaluation of the effects of underlying surface change on catchment hydrological response using the HEC-HMS model

HEC-WAT Hydrologic Sampler

GreenPlan Modeling Tool User Guidance

Software Applications for Runoff Hydrological Assessment

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

Impact Study of a check dam on Ground Water Recharge

STUDY OF RAINFALL-RUNOFF RESPONSE OF A CATCHMENT USING SCS CURVE NUMBER COMBINED WITH MUSKINGUM ROUTING TECHNIQUES

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Table of Contents Precipitation Hyetograph Historical Storms Synthetic Storms Snowfall and Snowmelt...

Development of a GIS Tool for Rainfall-Runoff Estimation

Impacts of Rainfall Event Pattern and Land-Use Change on River Basin Hydrological Response: a Case in Malaysia

HEC Models for Urban Hydrologie Analysis

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis

Simulation in Hydraulics and Hydrology

Introduction. Keywords: Oil Palm, hydrology, HEC-HMS, HEC-RAS. a * b*

CE 2031 WATER RESOURCES ENGINEERING L T P C

LIST OF TABLES.II LIST OF FIGURES.II LIST OF ATTACHMENTS.II I. INTRODUCTION.1 II. STUDY AREA.3 III

COMPARISON OF ESTIMATED FLOOD HYDROGRAPHS USING LUMPED AND DISTRIBUTED MODELS

Hydrologic Engineering Center Models for Urban Hydrologic Analysis

1 n. Flow direction Raster DEM. Spatial analyst slope DEM (%) slope DEM / 100 (actual slope) Flow accumulation

Amina Reservoir Project Report

Norman Maclean Snowmelt Flow rate Storm flows fs (c flow m a tre S

Hydromodification Management Plan. Draft Report Chapters 4-6. Lower Silver - Thompson Creek Subwatershed. April 7, 2003

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Climate Simulation Irrigation Winter Processes Surface Hydrology Water Balance & Percolation Subsurface Hydrology Soil Component Plant Growth Residue

Dulcepamba River Hydrologic and Hydraulic Analysis *

Development of Flood Inundation Map for Bago River Basin

Transcription:

Hydrologic Engineering Center Training Course on Hydrologic Modeling with HEC-HMS Davis, CA Course Description The course provides an introduction to HEC-HMS for new users, focusing both on using the program and performing watershed studies. The course starts with a summary and overview of the program and the mechanics of constructing watershed models. Each component of the model is then studied in detail. Major modules include historic and synthetic precipitation approaches, and computing infiltration and excess surface runoff. Unit hydrograph procedures are explained. Channel and reservoir routing methods are also included. Parameter estimation techniques are taught throughout with supplemental use of the optimization tool for refining estimates using observed data. A multiple-subbasin model is finalized and used to compute flow frequency curves. Theoretical material is supported with workshops that illustrate the basic steps of building a model to support "without project" and "with project" alternative analysis for a watershed study. 1

Monday 8:00-9:00 a.m. Introduction 9:00-9:15 a.m. Break 9:15-10:00 a.m. 1.1 Lecture: Overview of Hydrologic Modeling for Project Studies Purpose and applications of rainfall-runoff modeling to accomplish study goals, overview of rainfall-runoff processes, and description of how each technical subject relates to the overall task of model development with consideration given to the intended us of the model. 10:00-11:00 a.m. 1.2 Lecture: Introduction to HEC-HMS Introduction to modeling capabilities, the user interface, data entry and editing, simulation runs, and viewing results. 11:00-12:00 noon 1.3 Workshop: Getting Started with HEC-HMS Mechanics of the program including creating data sets, computing simulation runs, and viewing results. 12:00-1:00 p.m. Icebreaker Lunch 1:00-1:15 p.m. Review 1:15-2:15 p.m. 1.4 Lecture Introduction to HEC-GeoHMS Introduction to the HEC-GeoHMS ArcGIS extension. Demonstrate how HEC-GeoHMS can be used to generate input files for an HEC-HMS model. 2:15-4:45 p.m. 1.5 Workshop: Applying HEC-GeoHMS 4:45-5:00 p.m. Review The workshop will show students how to use HEC-GeoHMS to build a watershed network and generate input files for an HEC-HMS model. 2

Tuesday 8:00-9:00 a.m. 2.1 Lecture: Meteorologic Models - Historic Precipitation Overview of the types of rainfall used in runoff computations and introduction to precipitation methods available in HEC-HMS for reproducing historic storms: user-specified gage weights, inverse distance, specified hyetograph, and gridded precipitation. 9:00-9:15 a.m. Break 9:15-10:00 a.m. 2.2 Lecture: Introduction to Loss Rate Methods Definition of "loss rates" and the processes involved. Introduction to loss rate methods for event simulations: initial constant, deficit constant, SCS curve number, Green Ampt. Discussion on the choice of a loss rate method and how to estimate model parameters. 10:00-11:45 a.m. 2.3 Workshop: Rainfall and Loss Rate Computation 11:45-12:00 noon Review 12:00-1:00 p.m. Lunch Examination of different approaches to historic precipitation. Time will also be spent comparing different approaches to computing loss rates. 1:00-1:45 p.m. 2.4 Lecture: Meteorologic Models - Hypothetical Storms 1:45-2:00 p.m. Break Description of hypothetical storms and their use. Introduction to the methods available in HEC-HMS: specified hyetograph, standard project storm, SCS storm, and frequency storm. 2:00-3:00 p.m. 2.5 Lecture: Unit Hydrograph Approach to Rainfall-Runoff Modeling Development of the unit hydrograph theory and its application. Definition of synthetic methods and discussion of several methods: Clark, SCS, and Snyder. Discussion of the choice of a unit hydrograph method and how to estimate parameters. 3:00-4:45 p.m. 2.6 Workshop Computing Synthetic Unit Hydrographs 4:45-5:00 p.m. Review Students will develop unit hydrograph parameters using standard methods with comparison to observed data. Time will also be given to comparing hydrographs generated using different watershed delineations. 3

4

Wednesday 8:00-9:00 a.m. 3.1 Lecture: Introduction to HEC-DSS and HEC-DSSVue 9:00-9:15 a.m. Break Introduction to the HEC-DSS data files and its role in HEC-HMS. Introduction the the HEC-DSSVue program for creating and managing data in support of hydrology studies. 9:15-11:00 a.m. 3.2 Workshop: Using HEC-DSSVue 11:00-11:15 a.m. Review Use HEC-DSSVue to plot and tabulate data. Manually enter time-series and paired data in a HEC-DSS file and use the automatic import tool to import precipitation data. Overview and use of the HEC-DSSVue graphical editor. 11:15-12:00 noon 3.3 Lecture: Automatic Optimization Tools in HEC-HMS 12:00-1:00 p.m. Lunch Use of the optimization tool to estimate unit hydrograph and loss rate model parameters using observed rainfall and flow data. 1:00-2:30 p.m. 3.4 Workshop Parameter Estimation with Optimization 2:30-2:45 p.m. Review Use of the optimization tool to estimate unit hydrograph and loss parameters using rainfall and flow data developed in an earlier workshop. Comparison of the results by analyzing multiple storm events. 2:45-3:30 p.m. 3.5 Lecture Reservoir Modeling Capabilities 3:30-3:45 p.m. Break Description of the reservoir element and the three methods for routing water through the reservoir pool. Representation of outflow structures of the dam. Discussion of data requirements. 3:45-5:00 p.m. 3.6 Lecture Overview of Channel Routing Techniques Concepts of flood wave routing and discussion of the channel routing methods available in HEC-HMS: lag, Muskingum, kinematic wave, Muskingum-Cunge, and modified Puls. 5

Thursday 8:00-8:30 a.m. 4.1 Lecture: Selecting the Appropriate Routing Technique Discussion on the choice of a routing method and how to estimate model parameters. 8:30-10:00 a.m. 4.2 Workshop: Stream Flow Routing 10:00-10:15 a.m. Review 10:15-10:30 a.m. Break Development of routing parameters using Muskingum-Cunge and modified Puls methods, with comparison of results between methods and to observed flow data. 10:30-11:30 a.m. 4.3 Lecture: Model Calibration Strategies Discussion of the model calibration process. Methods for selecting initial parameter values, calibration versus validation, and metrics for determining model adequacy. Requirements for report documentation. 11:30 12:00 noon 4.4 Workshop: Multiple Subbasin Modeling 12:00-1:00 p.m. Lunch Finalize the multiple-subbasin model using parameters developed during previous workshops. Verify the completed model using observed storm events. Make final adjustments and calibrate loss rates to a computed frequency flow curve. 1:00-2:30 p.m. 4.4 Workshop - continued 2:30-2:45 p.m. Review 2:45-3:45 p.m. 4.5 Lecture: Advanced Capabilities 3:45-4:00 p.m. Break Introduction to advanced modeling tools in HEC-HMS including: gridded precipitation and loss rates, snowmelt, evapo-transpiration, erosion and sediment transport, and water quality. 4:00-5:00 p.m. 4.6 Lecture: Frequency Curve Determination for Planning Studies Watershed modeling for planning studies with emphasis on frequency curve determination for "with project" and "without project" conditions. 6

Friday 8:00-10:30 a.m. 5.1 Workshop: Frequency Curve Determination 10:30-10:45 a.m. Review Determination of frequency curves for "without project" and multiple "with project" alternatives, considering current and future conditions in the watershed. 10:45-12:00 noon Conclusion and Closing Activities 7

8