STARTUP OF ANAEROBIC MESOPHILIC DIGESTERS

Similar documents
Codigestion Case Studies Enhancing Energy Recovery From Sludge

DIGESTER FOAMING. Maintenance for Biosolids Systems. Steve Walker Senior Operations Specialist. September 13, sw510s1.pptx/1

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E.

Anaerobic Digestion- opportunities to optimize the process

ANAEROBIC SLUDGE DIGESTION PROCESS. Prepared By Michigan Department of Environmental Quality Operator Training and Certification Unit

Application of the AGF (Anoxic Gas Flotation) Process

Struvite Harvesting: Creating Value From Wastewater?

Kenosha Wastewater Treatment Plant - Energy Optimized Resource Recovery Project

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1

Advanced Aerobic Digestion. ThermAer. Autothermal Thermophilic Aerobic Digestion. Biosolids Treatment. Thermal Process Systems ThermAer Process

Thermal Hydrolysis The Next Generation

Post-Aerobic Digester with Bioaugmentation Pilot Study City of Meridian, ID WWTP PNCWA 2010

SIMPLE and FLEXIBLE ENERGY SAVINGS And PERFORMANCE ENHANCEMENT for OXIDATION DITCH UPGRADES

Harrisburg Advanced Wastewater Treatment Facility Biosolids Facilities Improvement Plan Existing Conditions Report. February 2017

Integrated Activated Sludge and Biosolids Treatment to Conserve Energy & Waste Solids Disposal

Assessment of Operating Challenges of Digester Foaming. by Ralph B. Rusty Schroedel, Jr., BCEE Brown and Caldwell

Honouliuli WWTP Start Up and Operation of the New Anaerobic Digesters

Taking the Waste out of WAS: Sludge Pretreatment for Beneficial Uses

Prepared by the Operation of Municipal Wastewater Treatment Plants Task Force of the Water Environment Federation

Anaerobic Sludge Digestion

Anaerobic Digestion The New Frontier Ohio WEA Biosolids Specialty Workshop 11 December 2014 J. Hunter Long

EVALUATION OF ENERGY RECOVERY OPTIONS FOR CONVERSION OF AEROBIC DIGESTERS TO ANAEROBIC DIGESTION

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

ANAEROBIC DIGESTION IMPROVING ENERGY EFFICIENCY WITH MIXING

Startup of Virginia's Newest Organics Co-Digestion Facility. Dennis Clough, Energy Systems Group George Bevington, Gerhardt, LLC

BENEFITS OF THERMOPHILIC DIGESTION AT CHRISTCHURCH WASTEWATER TREATMENT PLANT

ENHANCING THE PERFORMANCE OF OXIDATION DITCHES. Larry W. Moore, Ph.D., P.E., DEE Professor of Environmental Engineering The University of Memphis

Residuals, Biosolids and Sludge Processing Practice Questions

Excellence in Engineering Since 1946

Full scale and laboratory scale results from the trial of MicroSludge at the Joint Water Pollution Control Plant at Los Angeles County

Anaerobic Digester Optimization with Bio-Organic Catalyst. NYWEA 81 st Annual Meeting February 3, 2009 One Year Study November 07 - November 08

Operating Experience with Ostara Struvite Harvesting Process

Total Makeover for Biosolids Handling at DC Water s Blue Plains Advanced Wastewater Treatment Plant. February 2015

Optimizing the Performance of Anaerobic Digestion

The Biosolids Odor Reduction Roadmap (BORR): A Decision Tool to Reduce Cake Odors

Optimization of Anaerobic Digestion with Bio- Organic Catalyst Compositions (BOCs)

Anaerobic Digester Optimization with Bio-Organic Catalyst

Thermal Hydrolysis Comes to Texas!

Evaluation of Energy Recovery Options for Conversion of Aerobic Digesters to Anaerobic Digestion

EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT

CHAPTER 4 DESCRIPTION OF EXISTING FACILITIES

Sonix for Enhanced Anaerobic Digestion: Final Report (15 July 2002)

Center Sanitation District

SHAFDAN (Greater Tel Aviv Wastewater Treatment Plant) - Recent Upgrade and Expansion

ES.1 Solids Master Planning Background and Goals

DESIGN AND OPERATIONAL CONSIDERATIONS TO AVOID EXCESSIVE ANAEROBIC DIGESTER FOAMING

2017 Annual Performance Report

An Odor Odyssey: Review of Scientific Progress toward Eliminating Odorant Emissions from Philadelphia s Biosolids

PERMIT TO OPERATE SILVER CLOUD CT., MONTEREY, CA TELEPHONE (831) FAX (831)

COMMISSION MEETING. April 18, Engineering and Construction Team. Piscataway WWTP Bio-Energy Commissioners Status Briefing

WWTP Side Stream Treatment of Nutrients Considerations for City of Raleigh s Bioenergy Recovery Project. Erika L. Bailey, PE, City of Raleigh

Technical Memorandum. 201 N. Civic Drive, #115 Walnut Creek, CA Tel: Fax:

Sludge Co-Thickening and Biogas Cogeneration in the Electric City

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility

Palmer Wastewater Treatment Plant 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed

Module 22 : Sludge Management

Biosolids Monthly Report

PILOT SCALE TESTS OF A UNIQUE APPROACH FOR BNR UPGRADE OF A SHORT SRT HIGH PURITY OXYGEN SYSTEM AT PIMA COUNTY, AZ

New England s First Linear Motion Sludge Mixer A Success Story. Northeast Residuals and Biosolids Conference Cromwell, CT

LEMNA BIOLOGICAL TREATMENT PROCESS LEMTEC TM TECHNOLOGIES, INC.

1/11/2016. Types and Characteristics of Microorganisms. Topic VI: Biological Treatment Processes. Learning Objectives:

INTERESTINGLY ATAD: OPERATIONAL DATA FROM THE NEW ATADS IN ONTARIO

ANAEROBIC CO-DIGESTION OF A SINGLE SOURCE OILY WASTE AND HIGH STRENGTH PET FOOD WASTEWATER: A STUDY OF FAILURE AND REVIVAL OF A FULL SCALE DIGESTER

Anaerobic Digestion Fundamentals

HIGH PERFORMANCE ANAEROBIC DIGESTION

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic.

DELHI CHARTER TOWNSHIP

FAIRMONT WASTEWATER TREATMENT PLANT

Sludge Management EENV 5--- Chapter 4 Sludge Stabilisation

Optimization of Biogas Production and Use for Des Moines, IA

WEF Residuals and Biosolids Conference Piloting to Establish Performance Criteria at Miami s South District WWTP

Technical Memorandum No. 1

City of New Ulm Wastewater Treatment Facility Improvements Class A Bio-solids Production

Dealing with Unexpected Wastewater Treatment Plant Disruptions. February 16, 2017

AgriClean Mesophilic Digester and AgriJet Flush System

Appendix D JWPCP Background and NDN

SCUM A LIABILITY OR AN ASSET? Chad M. Simmons, P.E. Leonard Ripley, Ph.D., P.E., BCEE Freese and Nichols, Inc.

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

Mesophilic, Thermophilic And Temperature Phased Anaerobic Digestion Of Waste Activated Sludge

New high-rate plug flow anaerobic digester technology for small communities

Comprehensive Biosolids and Bioenergy Planning Authors: Cameron Clark* 1, Irina Lukicheva 1, Anna James 1, Kathy Rosinski 1, Dave Parry 1

Anaerobic Digestion and High Strength Waste Co-Digestion Panel Discussion

A Critical New Look at Nutrient Removal Processes

Anaerobic process. An introduction. Ecochemicals UAB

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation

WWTF Capacity Assessment Project

Anaerobic Digestion of Wastewater Treatment Plant Biosolids (Sludge)

CHEMICAL FREE PHOSPHOROUS ELIMINSTION P-UPTAKE PROCESS

THE DEMON ANAMMOX PROCESS: RESOURCE SAVINGS THROUGH SIDE STREAM TREATMENT, AND THE STEPS TOWARDS AN ENERGY NEUTRAL WWTP PRESENTED AT: NC AWWA-WEA 97

Table 1. Existing Anaerobic Digesters

RECYCLING DIGESTED SLUDGE TO REDUCE FAT OIL AND GREASE BUILD-UP IN PIPES

Volatile Solids Reduction (VSR): Considerations for Accurate Measurement and Reporting

Making Waste Productive. Creating Energy from Waste

Oregon Operators Conference Operator Math Workshop Module II

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

2015 HDR, Inc., all rights reserved.

Supplementary Data. Equations (S-1) and (S-2) were used to calculate dimensionless Henry s constant (K H ) at temperature T: þ 6:88 S 1

The Effect of Temperature on Methane Productivity of Municipal Solid Waste in Anaerobic Digester

Why THP Made Sense for TRA

NITROGEN REMOVAL GUIDE FOR WASTEWATER OPERATORS THE WATER PLANET COMPANY FORMS OF NITROGEN OF INTEREST TO WASTEWATER OPERATORS

Transcription:

STARTUP OF ANAEROBIC MESOPHILIC DIGESTERS Marialena Hatzigeorgiou P.E./CH2M HILL Brian Owsenek P.E./Upper Occoquan Sewage Authority Tom Alkema/CH2M HILL Ronald Sieger P.E. BCEE/CH2M HILL and Karen Pallansch P.E./Alexandria Sanitation Authority *Ron Sieger passed away on May 3 26 ABSTRACT Many operators have started up mesophilic digesters but everyone has differing stories and experiences. This paper is a combination of the startup of several mesophilic anaerobic digesters with very low seeding to fully seeded conditions. Upper Occoquan Sewage Authority (UOSA) operates the Millard H. Robbins Water Reclamation Plant. UOSA started three anaerobic digesters between August 2 and March 21 as part of a major expansion which brought the permitted capacity of the facility from 32 to 54 million gallons per day (mgd). Alexandria Sanitation Authority (ASA) operates the ASA Advanced Wastewater Treatment Plant with an average plant influent flow of 54 mgd. ASA started four anaerobic digesters between May and October 25 as part of a solids upgrade that added pre-pasteurization and two new anaerobic digesters. This paper will provide a useful roadmap for digester startups for all operators. KEYWORDS Mesophilic anaerobic digestion biosolids solids startup. INTRODUCTION Case Studies. The plant expansion for UOSA involved conversion of one unheated unmixed secondary digester (8/1) to a primary digester by installation of mixing cannons heating equipment digester gas system and foam separation equipment. In addition the floating cover was fixed in place and new gas purifier systems and other miscellaneous instrumentation and automation equipment were installed. Digester 8/1 along with the retrofitted digesters 7/1 and 7/2 were startup as primary digesters between August 2 and March 21. The plant upgrade for ASA involved addition of a pre-pasteurization system two new anaerobic digesters and the retrofit of the two existing anaerobic digesters. For all four anaerobic digesters the work included installation of mixing cannons heating equipment digester gas collection and utilization system foam separation equipment and instrumentation and automation equipment. In addition the floating cover of the one existing digester was fixed and the two new mesophilic anaerobic digesters were built with structural thermophilic capability. The startup discussions for the pasteurization system and the anaerobic digesters were initiated in early fall of 24. The pasteurization system was performance tested on water and then operated on water during winter of 24-25. By early spring of 25 a detailed startup plan 415

was provided for the startup of the anaerobic digesters with pasteurized solids (PSLDG) in order to achieve Class A biosolids pathogen density levels. The four digesters were started up as primary digesters between May and October 25. Tables 1 and 2 below provides the digesters information for UOSA and ASA respectively. Table 1 UOSA Anaerobic Digesters Parameter Dig. # 8/1 Dig. # 7/1 & 7/2 Maximum Capacity (gal) 138 1128 Diameter (ft) 8 8 Heat Exchangers (MBtu/hr) Spiral 2. Spiral 2. Sludge Recirculation (gpm) 43 25 Type of Cover Fixed Metal Fixed Concrete Mixing System IDI Gas Cannons IDI Gas Cannons Mixing Capacity (gpm) 35 35 Target Temperature (C) 36 36 Table 2 ASA Anaerobic Digesters Parameter Dig. # 1 2 3 4 Maximum Capacity (gal) 15 Diameter (ft) 95 Heat Exchangers MBtu/hr Sludge Recirculation (gpm) Type of Cover Mixing System Mixing Capacity Concentric tube counter flow 2. 38 gpm Fixed Concrete IDI Gas Cannons 564 gpm Target Temperature (C) 35 Paper Objectives. Mesophilic anaerobic digestion is a biological process which during startup requires time and careful management. Good planning continuous monitoring and slow changes are the three key factors for a successful startup. This paper provides a comparison in terms of 416

% TS increase stability and performance of anaerobic digesters started up from very low to fully seeded. It can be used as a guide for starting digesters at any plant. METHODS AND MATERIALS General. Anaerobic digestion seed includes raw sludge (primary sludge or scum) digested solids and pasteurized solids. Digested solids are preferred but raw sludge can be used when there is no other operating digester on site or close by from a nearby wastewater treatment plant. Pasteurized solids have not been used either in the United States or in Europe. Theoretically pasteurized solids will work for digesters seed but the startup time is expected to be far more lengthy and operational intensive. Upper Occoquan Sewage Authority (UOSA) VA. Solids processing at UOSA consists of feeding waste activated (WAS) and primary sludge (PSD) to the digesters. The stabilized solids are then get dewatered and dried. Alternatively WAS can be mechanically thickened dewatered dried and disposed after lime addition. The project was phased such that the secondary digester (8/1) was taken out of service first retrofitted and returned to service as a primary digester. Once the biological processes had stabilized an existing primary digester (7/1) was taken out of service retrofitted and returned to service. Finally the remaining primary digester (7/2) was retrofitted and returned to service. Startup conditions for the two operations differed substantially. In startup of digester 8/1 the digester was filled with plant water heated to 36C seeded from another digester and then fed with primary sludge. For the second startup that of digester 7/1 the digester was filled with primary sludge and seed. Unfortunately there are no data available on the exact amount of seed used for this startup. All that is available is the monitoring data during the startup that indicate that the amount of seed used was not adequate for the feed rates to that digester. Alexandria Sanitation Authority (ASA) VA. The normal operation solids processing at ASA consists of: Primary (PSD) and tertiary (TSD) sludge to gravity thickeners Waste activated sludge (WAS) to mechanical thickeners Gravity and mechanically thickened sludges blended and pasteurized Pasteurized solids (PSLDG) to anaerobic digesters Digested solids (DS) to dewatering At the time of the start up of the four high rate mesophilic digesters of 1.5 mgd capacity each ASA had no operating digesters to seed the new digesters and the plant was in operation at all times so there could be minimum interruption to the daily solids process. In addition the volume of seed hauled in from a nearby plant had to be minimum in order not to contaminate the volume of the newly built digesters with other than Class A pathogen levels. The digesters were started one at a time. The very first digester required the most attention and took the longest. It was filled to the top of the canon mixers with plant effluent that was then 417

heated to mesophilic digestion temperature. At the same time the headspace was purged with nitrogen gas as was the associated digester gas piping. Once purged and heated the digester was seeded with digested biosolids from the Upper Occoquan Sewage Authority (UOSA) plant. The volume of the seed solids was equal to 4.5% of the total volume of one digester. Once the digester was seeded PSLDG was added at a very slow rate. The digester had to be carefully managed in order for the slow-growing methane formers to populate the digester and to balance the acid formers. The digester parameters (temperature total solids volatile solids volatile acids alkalinity ph VSR) along with the feed parameters (total and volatile solids) were monitored and evaluated based on the ranges provided below: Temperature between 34.5 and 35.5 C with 35 C target value. Ratio of volatile acids/alkalinity less than.35 ph between 6.5 and 8. with target value of 7.1 VSR higher than 4% Ratio of TS feed/ts in digester between.5 to.1 Ratio of VS feed/vs in digester between.3 to.1 Digester gas methane concentration higher than 55% by volume concentration Every time the digester feed rate was modified a new period of the startup began. Each period was based upon an average week. There were specific goals for feed loading and digester results. Decisions on whether to proceed to the next period or not were made based on the monitored parameters. It took a couple of periods longer to start the first digester than anticipated because the desirable solids concentration of the feed PSLDG was not achieved until later in the startup. Table 3 is the planned table for the first digester to start up (Digester 4) provided with the startup plan in March of 25. The digested solids in (lb/day) calculated in the digester at the end of the period includes the volatile solids reduction plus the solids lost from the digester through the transfer. Table 3 - Feed Rates and Time from Startup to Achieve Solids Concentration in Digester Period Vol in Dig @ start (gal) Feed Vol/day (gal/day) Feed Rate (gal/hr) Vol in Dig after 7 days DS in Dig @ start (lbs) DS added per day (lbs) DS in Dig after 7 days (lbs) DS in Dig after 7 days with VSR + Transfer (lbs) % TS in DS after 7 days Adjustable Values Seed - - 1596274-1512 9945.7 Volume fed 1 1596274 8 33 161874 1512 3 17114 11338.8 16832 Digester volum 2 161874 114 48 169854 17114 428 219 13322.1 2.5% Solids in seed 3 169854 158 66 162914 219 593 24259 1672.12 15. Digester deten 4 162914 232 97 1637154 24259 871 3354 211.15 75% Volatile solids 5 1637154 333 139 166464 3354 125 3913 2595.19 45% Volatile solids 6 166464 48 2 16832 3913 181 51713 3426.24 7 full 16832 71 296 16832 51713 2665 69353 45947.33 4.5% Solids in PSLD 8 1638 1 417 1638 69353 3753 93714 6285.46 9 1638 137 571 1638 93714 5142 125992 8347.62 1 1638 19 792 1638 125992 7131 168985 111953.84 11 1638 256 167 1638 168985 968 22373 148221 1.11 12 1638 338 148 1638 22373 12685 2966 192562 1.44 13 1638 43 1792 1638 2966 16138 367485 243459 1.82 14 1638 53 228 1638 367485 19891 4543 298392 2.23 15 1638 53 228 1638 4543 19891 52614 34497 2.58 16 1638 53 228 1638 52614 19891 5864 384293 2.87 Once the first digester reached the overflow level digested solids were then transferred to the next dormant digester for startup. Solids were transferred every day from the first digester to the 418

dormant digester equal to the daily feed to the first digester. The dormant digester headspace was isolated from the rest of the digester gas piping and did not require purging. Once the dormant digester level reached the cannon mixers temperature was confirmed mixing started and raw solids were fed to the digester at much higher feed rates. Once the second digester reached the overflow level the same concept as above was applied to the third dormant digester by transferring from the first two digesters that were now in service. Finally the dormant digester concept was applied to the last digester by transferring digested solids from the other three digesters in service. Table 4 is one of the tables created during startup to assess the current period based on the parameters monitored and calculate the next period s feed rate (this is the table created during periods 17 and 18 for the first digester). The actual test analysis results for the % TS and % VS are used for both the digesters feed and the digesters contents in order to plan the next period s feed rate and calculate the expected % TS by the end of that period. Similar tables were created for the other three digesters as well. Table 4 - Actual Feed Rates and Time from Startup to Achieve Desired Solids Concentration in Digester Period Days in Period @ start of Period Vol in Dig @ start (gal) Feed Vol/day (gal/day) DS in Dig @ Vol in Dig @ start of end of period period (lbs) TS in seed/feed per period (%) VS in seed/feed per period (%) TS added per day (lbs) Actual DS Actual % TS in Dig @ Adjustable in DS @ end end of Values of period period (lbs) Seed 3 - - 156327 3.44% 6.2% - 11712.9% 1 11 156327 83 156916 11712 3.34% 75.7% 224 11778.9% 16833 2 7 156916 1145 1577175 11778 3.11% 74.1% 297 11838.9% Dig vol. gal 3 3 1577175 1833 1582674 11838 3.69% 73.9% 564 1188.9% 4 7 1582674 2411 1599551 1188 3.38% 73.9% 68 1334.1% 5 7 1613436 3987 1641345 1334 3.43% 72.9% 1141 1558.11% 6 full 4 1641345 5547 1663533 1558 3.59% 71.5% 1661 16649.12% 7 ovflow 8 165457 7975 165457 16649 3.28% 71.3% 2182 24777.18% 8 ovflow 6 165457 1376 165457 24777 3.45% 73.9% 2985 35789.26% 9 trsfr 7 165457 1556 1577292 35789 3.72% 75.5% 4827 4641.35% 1 3 1577292 22742 1577292 4641 3.94% 75.4% 7473 56565.43% 11 5 1577292 38693 1577292 56565 3.62% 74.9% 11682 69719.53% 12 6 1577292 56956 1577292 69719 3.63% 74.6% 17243 97344.74% 13 9 8/16/25 1582593 71598 1582593 97344 4.27% 75.4% 25497 183464 1.39% 14 8 8/25/25 1582593 56217 1582593 183464 4.22% 75.9% 19785 233619 1.77% 15 4 9/2/25 1582593 59622 1582593 233619 3.68% 75.7% 18299 249458 1.89% 16 7 9/6/25 1582593 56483 1582593 249458 4.4% 76.8% 1931 253417 1.92% 17 11 9/13/25 1582593 43895 1582593 253417 4.48% 78.6% 1641 316772 2.4% Planning Feedrates and Time from Startup to Achieve Desired % Solids in Digester (With VSR) Period Days in Period Vol in Dig @ start (gal) Feed Vol/day (gal/day) Actual DS in Vol in Dig @ Dig @ start end of period of period (lbs) DS added per day (lbs) DS in Dig @end of period (lbs) Calculated DS in Dig @ end of period with VSR + Transfer (lbs) Calculated % TS in DS @ end of period Adjustable Values 14 trsfer 8 1582593 56 1582593 183464 19943 2917 22846 1.67% 15. Dig SRT day 15 trsfer 4 9/2/25 1582593 59 1582593 233619 2765 281841 245282 1.86% 78.6% VS in feed 16 trsfer 7 9/6/25 1582593 56 1582593 249458 2923 334132 269665 2.4% 61.6% VS in digeste 17 trsfer 1 9/13/25 1582593 56 1582593 253417 2923 264799 255589 1.94% 56% VSR 17 trsfer 1 9/14/25 1582593 54 1582593 255589 2176 3714 281333 2.13% 18 prg/dwtr 7 9/24/25 1582593 45 1582593 316772 16813 371415 319611 2.42% 4.48% TS in feed 19 dwtr 7 1/1/25 1582593 54 1582593 319611 2176 38455 32234 2.44% 2 dwtr 7 1/8/25 1582593 54 1582593 32234 2176 386583 324418 2.46% There was a series of items or obstacles that had to be considered or overcome respectively. In reference to the digester gas (DG) system the purging of the digester headspace with nitrogen had to be scheduled and coordinated so that the required amount of nitrogen was pressurized in the digester in a timely manner. A leaking gasket of the liquid relief port was not detected during the tank air test and was addressed during startup. As a result the liquid relief port for the first digester that was started up had to be clamped down and was no longer an effective means 419

of digester s roof structural safety device. This liquid relief port gasket was changed to the appropriate one at a later date when the digester was taken out of service for maintenance. The enclosed flares operating parameters had to be modified in order to burn the initial low flow DG produced. Safety was the first priority for all actions and especially for when handling digester gas (DG) equipment. In reference to the solids operation all activities had to be coordinated based on continuous plant operation. The operation of the pasteurization facility was coordinated such that to efficiently and effectively ensure the production of the required daily digester feed. The ASA digesters temperature is controlled with the daily PSLDG feed temperature. The digester heat exchangers are not in service under normal operation. Upstream solids processes were operated such that PSLDG feed to the digesters was high in % TS (between 4.5 and 5.5 %TS). Purging and cleaning of equipment downstream of the digestion process were conducted in order to achieve Class A biosolids pathogen levels throughout. The moderate foaming that was developed after high filament activity in the biological reactors and high digester feed rate (see period 13 under Table 4) made it necessary to decrease the digester feed rate relative to the initial planned feed rate. RESULTS Alexandria Sanitation Authority (ASA) VA. For all four digesters volatile acids and alkalinity have remained well within appropriate ranges demonstrating that the digesters had no signs of difficulty such as foaming or low ph. The first digester was put in service (started feeding PSLDG) on June 3rd 25 and reached 2.3% total solids (TS) by the time we started transferring digested solids (DS) to dewatering which was the last week of September from all four digesters. The second digester was put in service on August 3th 25 and reached 2.2% total solids (TS) by the time we started transferring DS to dewatering. The third digester was put in service on September 14th 25 and reached 1.9% total solids (TS) by the time we started transferring DS to dewatering. The fourth digester was put in service on September 24th 25 and reached 1.8% total solids (TS) by the time we started transferring DS to dewatering. The success of the ASA digesters startup was a result of detailed preparation thorough equipment testing and operation of equipment with plant effluent water before start up training and working as a team with the operators often monitoring and evaluating the digesters in service and patience. DISCUSSION The charts below provide a comparison and information on anaerobic digesters start up based on the case studies seed and feed total solids concentration summarized in Table 5. 42

Table 5 UOSA/ASA Digesters Startup Seed Summary Parameter by Digester ASA UOSA Dig. 4 Dig. 3 1 Dig. 8/1 Dig. 7/1 Seed DS (% digester volume) 4.5 95 4 n/a Feed (type) PSLDG PSLDG PSD PSD 75 2.5 7 65 2.25 6 2. Feed (gal/day) 55 5 45 4 35 3 25 2 Feed % TS 1.75 1.5 1.25 1..75 % TS in digester 15.5 1 5.25 6/3/5 6/18/5 7/3/5 7/18/5 8/2/5 8/17/5 9/1/5 9/16/5. Feed % TS Feed: 7 day avg % TS: 7 day avg Figure 1 ASA digester 4 startup feed rates and % TS 75 3. 7 65 2.75 6 55 5 % TS 2.5 2.25 Feed (gal/day) 45 4 35 3 25 2 Feed 2. 1.75 1.5 1.25 % TS in digester 15 1. 1 5.75.5 9/24/5 1/9/5 1/24/5 11/8/5 11/23/5 12/8/5 12/23/5 Feed % TS Feed: 7 day avg % TS: 7 day avg Figure 2 ASA digester 1 startup feed rates and % TS 421

16 2.5 15 14 2.25 13 2. 12 11 1.75 Feed (gal/day) 1 9 8 7 6 % TS Feed 1.5 1.25 1. % TS in digester 5.75 4 3.5 2 1.25. 8/1/ 8/16/ 8/31/ 9/15/ 9/3/ 1/15/ 1/3/ 11/14/ 11/29/ Feed % TS Feed: 7 day avg % TS: 7 day avg Figure 3 UOSA digester 8/1 startup feed rates and % TS The feed rate increase through the start up of ASA digester 4 is considerable less than the ones indicated for ASA digester 1 and UOSA digester 8/1 because of the small amount of seed solids that this digester received (only 4.5% of total volume). In addition the feed rate in UOSA digester 8/1 is higher than the feed rate of ASA digester 1. UOSA feed solids had an over 1% less concentration than the ASA feed solids therefore higher feed rates were acceptable. UOSA generally tends to be more aggressive in reference to the digesters startup feed rates. 36 8. 33 3 7.75 27 7.5 Alkalinity (mg/l) 24 21 18 15 12 9 ph Alaklinity 7.25 7. 6.75 6.5 ph 6 3 VAs 6/3/5 6/18/5 7/3/5 7/18/5 8/2/5 8/17/5 9/1/5 9/16/5 6.25 6. Figure 4 ASA digester 4 startup stability Alkalinity VAs ph ph: 7 day avg Alkalinity: 7 day avg VAs: 7 day avg. 422

45 42 39 36 33 Alaklinity 8. 7.75 7.5 Alkalinity (mg/l) 3 27 24 21 18 15 ph 7.25 7. 6.75 ph 12 6.5 9 6 3 VAs 6.25 6. 9/24/5 1/9/5 1/24/5 11/8/5 11/23/5 12/8/5 12/23/5 Alkalinity VAs ph Alkalinity: 7 day avg VAs: 7 day avg. ph: 7 day avg Figure 5 ASA digester 1 startup stability 36 8. 33 3 Alkalinity 7.75 27 7.5 Alkalinity (mgl/l) 24 21 18 15 12 ph 7.25 7. 6.75 ph 9 6.5 6 3 VAs 6.25 6. 8/1/ 8/16/ 8/31/ 9/15/ 9/3/ 1/15/ 1/3/ 11/14/ 11/29/ Alkalinity TOAs ph ph: 7 day avg Alkalinity: 7 day avg TOAs: 7 day avg Figure 6 UOSA digester 8/1 startup stability The slow increase in alkalinity for ASA digester 4 along with the ph stabilizing is indicated on figure 4. ASA digester 1 and UOSA digester 8/1 indicate a more stable operation from the beginning of startup. ASA tests their samples for volatile acids versus the total organic acids that UOSA perform analysis for. Both perform the analysis based on the recent standard methods. The total organic acids include the volatile acids along with crotonic adipic pyruvic phthalic fumaric lactic succinic malonic gallic aconitic and oxalic acids. For both plants the indicated acids do not raise any concerns. For UOSA digester 8/1 ph actually reached a minimum of 6.56 S.U. while TOA was decreasing from its peak. A ph at this level is normally 423

considered undesirable and potentially inhibitory of methanogens but no obvious ill effects were observed. 4 8 35 75 DG Produced x 1 ft3/day 3 25 2 15 1 %VSR DG 7 65 6 55 5 % VSR 5 45 6/3/5 6/18/5 7/3/5 7/18/5 8/2/5 8/17/5 9/1/5 9/16/5 4 DG Produced %VSR % VSR: 7 day avg DG produced: 7 day avg Figure 7 ASA digester 4 startup performance 45 8 4 75 DG Produced x 1 ft3/day 35 3 25 2 15 1 %VSR DG 7 65 6 55 5 % VSR 5 45 4 9/24/5 1/9/5 1/24/5 11/8/5 11/23/5 12/8/5 12/23/5 DG Produced %VSR % VSR: 7 day avg DG produced: 7 day avg Figure 8 ASA digester 1 startup performance 424

7 65 6 55 5 % VSR 45 4 %VSR 35 3 25 2 8/1/ 8/16/ 8/31/ 9/15/ 9/3/ 1/15/ 1/3/ % VSR % VSR: 7 day avg Figure 9 UOSA digester 8/1 startup performance The performance for the digesters start up was evaluated based on the percent volatile solids reductions (% VSR) and the DG production. Once the digester reached its loading capacity the % VSR stabilized between a range of high 4s and low 6s. For UOSA digester 8/1 there is an indication of some low % VSR values at the end of September 2 that are not supported by the available data. The DG production indicated for ASA digester 4 actually commenced before August 25. DG was produced as early as the third day of startup but actual data were not available before August 25. The amount of DG produced represent the total amount produced daily by all digesters in service. Data in reference to DG produced from the UOSA digesters during startup are not available. 425

16 15 14 13 12 11 % TS 2.5 2.25 2. 1.75 Feed (gal/day) 1 9 8 7 6 Feed 1.5 1.25 1. % TS in digester 5.75 4 3.5 2 1.25 3/6/1 3/21/1 4/5/1 4/2/1 5/5/1 5/2/1 6/4/1 6/19/1. Feed % TS Feed: 7 day avg % TS: 7 day avg Figure 1 UOSA digester 7/1 startup feed rate and % TS 45 42 39 36 33 ph 8. 7. 6. Alkalinity (mgl/l) 3 27 24 21 18 Alkalinity 5. 4. 3. 15 12 2. 9 6 VAs 1. 3 3/6/1 3/21/1 4/5/1 4/2/1 5/5/1 5/2/1 6/4/1 6/19/1. Alkalinity TOAs ph ph: 7 day avg Alkalinity: 7 day avg TOAs: 7 day avg Figure 11 UOSA digester 7/1 startup stability 426

7 65 6 55 %VSR 5 % VSR 45 4 35 3 25 2 15 3/5/ 3/2/ 4/4/ 4/19/ 5/4/ 5/19/ 6/3/ % VSR % VSR: 7 day avg Figure 12 UOSA digester 7/1 startup performance Figures 1 through 12 provide information on the startup of UOSA digester 7/1. The exact quantity of seed provided for the startup of digester 7/1 back in Spring of 21 is not available. Based on the steep slope of the % TS along with the high amounts of total organic acids as shown in Figure 11 and the low %VSR it is seen that digester 7/1 was overloaded at the beginning of April 21. Digester 7/1 was started under emergence conditions; there was not sufficient time for planning and monitoring the results were the overloaded digester. A total of 33 lbs of sodium bicarbonate were added between April 4 th and April 6 th 21. The sodium bicarbonate provided the required buffering for the digester to establish stable conditions (total organic acids decreased and VSR % increased). CONCLUSIONS Whether a digester is being put in service for first time or back in service after maintenance planning monitoring and patience are the key factors for its startup. A digester can be started up with minimum seed (less than 5% of total volume) or a lot of seed (over 5% of total volume) the less the seed the longer it takes and the more careful management it requires. If multiple digesters are to be started up the best practice is to start up one at a time and to use the dormant digester concept. Per the dormant digester concept when the starting up digester reaches the normal operating level then digesting solids equal to the daily feed of the seed digester are transferred to the next digester to start up. During filling the dormant digester is not being mixed neither fed. Anaerobic digesters react slowly to any adverse changes but also require time in order to correct any missteps. Chemicals like sodium bicarbonate are available in order to add buffering 427

capacity but they should be applied only when really needed and not as means to speed up the start up. ACKNOWLEDGMENTS Credits. The authors thank the operators and lab personnel of the two wastewater treatment plants who performed the start up and collected the data that formed the basis of this document. Authors. A big thank you to Ron Sieger for his assistance with the ASA startup. He is greatly missed. REFERENCES U.S. Environmental Protection Agency (23) Environmental Regulations and Technology Control of Pathogens and Vector Attraction in Sewage Sludge; EPA-625/R-92-13 Water Environment Federation (1998) Design of Municipal Wastewater Treatment Plants 4th ed.; Manual of Practice No. 8; Alexandria Virginia. Standard Methods Committee (1996) 556 Organic and Volatile Acids 428