INSTALLATION PROCEDURE

Similar documents
INSTALLATION PROCEDURE

INSTALLATION PROCEDURE

INSTALLATION PROCEDURE

Effective This guide supersedes all previous versions

Global Water Instrumentation, Inc.

Quick-Start Operating Guide Document No Process Gas Cooler Copyright 2010 Terra Universal Inc. All rights reserved. Revised October 2010

New Advanced Environmental Air Treatment System

Installation, Operating and Maintenance Instructions Incognito Series Air Curtain

CFL Series User Manual

Installation Guide Document No Transaction Windows Copyright 2017 Terra Universal Inc. All rights reserved. Revised October 2017

1.0 STS-WiFi Operations Manual Outline

NOVALYNX CORPORATION MODEL B & M-B EVAPORATION GAUGE TESTER INSTRUCTION MANUAL

DUST FREE ACTIVE Total Home Air Purification

New Advanced Environmental Air Treatment System

V 2.0 ASSEMBLY GUIDE. TS Platform Scale Series 2

INSTALLATION MANUAL SURFACE-MOUNTED HEADWALL

TL-600 MOBILE PHASE HEATER

FORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual

Stretch Wire. P/N Rev. 2. IOM Stretched wire festoon manual

H-1/SS-1 Changer Operational Manual

Thermoelectric Coolers. All Models INSTRUCTION MANUAL. Rev. G 2016 Pentair Equipment Protection P/N

Wash Down Duty Non-Contact Sensor

FORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual

3601 E. 34th St. Tucson, AZ USA Tel Fax Web:

MODELS MB1K-1, MB1K-2 MB2K-1, MB2K-2 MB3K-1, MB3K-2

Thermoelectric Cooler

Locking Systems International Inc.

Model PVIV-PROBE-KIT. Electrical Contact Probe. User's Manual

END TRUCKS WHEEL SIZES: 9", 12", 15" & 18"

92831 TEL: (714) FAX:

Mechanical Post Lift. Owner s Manual

DESIGNERS AND BUILDERS OF CURRENCY CHANGERS AND ALLIED SYSTEMS SINCE 1921 FOR RLC-2 / RLC-3. Manual Part No Revision No.

Dancer Duty Potentiometer

RNS, DRS, & ER-60 M-Line Operational Manual

Dandy Leveler UDLV-150 & UDLV-500 (New Style)

Global Water Instrumentation, Inc.

APC Step-Down Transformer. Models: AP9626, AP9627, and AP9628

92831 TEL: (714) FAX:

OptoLum MegaLine RGBW Luminaire

Festoon Manual Heavy Duty C-Track

AM1643 Full Immersion Platinum Resistance Thermometer User s Guide

Distribution Box INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS UGC

HATCHSAFE Installation Instructions/Operation and Maintenance Manual Models: All Models

OM-CP-QUADPROCESS 4-Channel Low Level DC Current Data Logger. OM-CP-OCTPROCESS 8-Channel Low Level DC Current Data Logger INSTRUCTION SHEET

Rack Power Distribution Unit AP7562, AP7563, AP7564 General Information

Miniglaze/2. Owner & Operator's Manual PORCELAIN STAINING AND GLAZING FURNACE. Model No: Voltage: V 50/60Hz V 50/60Hz

INSTALLATION & OPERATION INSTRUCTIONS ICW-3 WINDOW INTERCOM

User Manual. PAT-Stand-16 Docking Station. Release 1.3. November EL-CELL GmbH

TERMS AND CONDITIONS May 15, 2017

Instructions and E00 Series Sampling Module Extenders

ISIMET. E Series Enclosure. Custom Assemblies Installation, Maintenance, and Operation Instructions

Series 5500 Bellows Pump Connectors Catalog 474E

Installation Guide Document No BioSafe Cleanroom Windows Copyright 2017 Terra Universal Inc. All rights reserved. Revised December 2017

INSTALLATION MANUAL RECTANGULAR COLUMN

KNHE20 SERIES WATER-TO-AIR HEAT EXCHANGER

Drag Chain Conveyor Installation and Operation Manual

DMX-BRANCH/4. user manual. ELATION DMX-BRANCH/4 user manual

HDI 2200 Choke Position Indicator

4300 WINDFERN RD #100 HOUSTON TX VOICE (713) FAX (713) web: twrlighting.com IMPORTANT!!!

Global Water globalw.com. Global Water. Instrumentation, Inc.

MTTC User Manual. Innovative Technology for a Connected World. General Description. Specifications and features

Mechanical Medic-Aid 6 Selection Vending Machine Operator s Manual

KPHE20 SERIES WATER-TO-AIR HEAT EXCHANGER

HD Firewall Mount 850 all, S/V , C ipd #

92831 TEL: (714) FAX:

Festoon Manual Stretch Wire

Aero Tec Models 700 & 750 (115 vac)

Quick-Start Operating Guide Document No Exhaust Fume Hood Copyright 2010 Terra Universal Inc. All rights reserved. Revised September 2010

RL4050LS. Electronic Load Shackle. Installation Guide

OPERATION AND INSTALLATION MANUAL

Fall Protection Catalogue CANADIAN

L505 VISUAL LEVEL INDICATOR. Dip-Tape Visual Level Indicator INSTALLATION AND OPERATIONS MANUAL

OMNICON Antibiotic Potency Testing

Q45WQ. Water Quality Monitoring System. 6 Iron Bridge Drive Unit 1 & 2 Gatehead Business Park

Switch-Tek. LV41 & LV42 Series Manual. Sump Float Level Switches

Dynatronics Parallel Bars

OPTO BRANCH 6 RJ45. user manual. ELATION OPTO BRANCH 6 RJ45 user manual

ION Fresh & Clean Ventilation System Part # Basement Unit Part # Crawlspace Unit

4 rotary milling table

Ion Fresh & Clean Ventilation System

FORM FOOTWALL. FORM FOOTWALL (floating) (floating) Installation Manual

Xxxxx Xxxxxx OM-CP-TEMP101A. Temperature Data Logger with 10 year battery life INSTRUCTION SHEET MQS5026/0117

General Information. Southwest Office Edwards Road, Suite B105 Cerritos, CA (Main Phone)

OPERATOR S MANUAL Model 27G Rotary Collet Magnet Wire Stripper

TEST & MEASUREMENT TOOL LIMITED WARRANTY Every Test & Measurement Tool is warranted for five (5) years from the date of purchase *.

INSTALLATION MANUAL. FOOTWALL/SINKWALL (floor mount)

User s Guide OM240. Linear & Polynomial Conversion. Shop online at omega.com SM

STAINLESS STEEL PEG BOARDS

SWM4-W Wall Mount. Indoor Only C2223M-A (2/06)

Global Water Instrumentation, Inc.

10810 W. LITTLE YORK RD. #130 - HOUSTON, TX VOICE (713) FAX (713) web: IMPORTANT!!!

M LIM Line Leak Interface Module Procedure Guide (only for the Integra 500)

PRESTO GEORUNNER FLOW PROTECTION SYSTEM INSTALLATION GUIDELINE. GRFP-V2 1 NOV Presto Products Co. All Rights Reserved.

PAGODA SERIES OPERATOR'S MANUAL

UNI BAR. user manual. ELATION UNI BAR user manual

10810 W. LITTLE YORK RD. #130 - HOUSTON, TX VOICE (713) FAX (713) web: IMPORTANT!!!

INSTALLATION AND OPERATION MANUAL

FCT FCT [UB] [UB] FCT [UB] Signal Converter/Isolator. Signal Converter/Isolator. Page 1. April B. The Interface Solution Experts

Model Number: 1300 Series

TRACK LED SCOREBOARD INSTRUCTION MANUAL REVISION DATE: PART#:

Transcription:

INSTALLATION PROCEDURE ELECTRA-flo/FI INSPECTION & HANDLING. The ELECTRA-flo/FI should be carefully inspected for damage prior to installation. Report damage to your Freight Department, or contact delivery carrier. These units may be handled while in any position. However, it is important not to drop or mishandle the units such that damage is done to sensing holes, connection fittings, or the swivel mounting brackets on the ends of each mounting strut. WARRANTY Air Monitor Corporation (hereinafter referred to as "Seller") warrants that at the time of shipment, products sold pursuant to this contract will be free from defects in materials and workmanship, and will conform to the specifications furnished or approved in writing by Seller. No warranty is given that delivered products will conform to catalog sheets, data sheets, and the like, which are subject to change without notice. Seller will repair or replace, at its option, any products listed under this warranty which is returned freight prepaid to Seller and within the earlier of three (3) years after start-up or thirty-nine (39) months after shipment, prove upon test and examination by Seller to be defective within the terms of this warranty. The warranty period for any item repaired or replaced shall be for the time remaining on the warranty period for the original components. Purchaser shall notify Seller in writing of such defect within sixty (60) days of discovery of the defect. This warranty does not extend to any product sold by Seller which has been the subject of misuse, neglect, accident, damage or malfunction caused by interconnection with equipment manufactured by others, improper installation or storage, or used in violation of instructions furnished by Seller, nor does it extend to any product which has been repaired or altered by persons not expressly approved by Seller. Seller shall not be liable for any special or consequential damages or for loss of damage directly or indirectly arising from the use of the products. The warranty set forth above is in lieu of all other warranties either express or implied and constitutes the full extent of Air Monitor Corporation's liability to the customer, or any other party for breach of warranty. THERE ARE NO EXPRESS WARRANTIES EXCEPT AS SET FORTH HEREIN. THERE ARE NO IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE, WHICH ARE PARTICULARLY DISCLAIMED.

LOCATION OF PROBES. The ELECTRA-flo/FI probe assembly must be located within the smallest diameter portion of the fan inlet bell. Contact Air Monitor's Applications Engineering Department for guidance when the intended installation location is not accessible or is obstructed. The levels of air filtration and cleanliness associated with commercial HVAC systems are satisfactory for the ELECTRA-flo/FI. Applications containing airborne contaminants or condensing moisture may impair measurement accuracy and functionality. - 2 -

PROBE ASSEMBLY INSTALLATION. The probes and support struts for a fan inlet are pre-assembled at the Factory. The probe assembly and the associated transmitter for a particular fan inlet can be identified by means of the ESID # on the end of each probe, the transmitter package, and transmitter itself. See Figure A below for probe assembly detail. The ESID # on the Transmitter and on the Probe(s) must match. DO NOT MIX AND MATCH Confirm the number of Probes needed for each Transmitter by referring to the provided Factory Set-Up Sheet. Figure A Each probe has an airflow arrow to assist in correct installation relative to the direction of air flow in the duct. If the fan has a shaft at the inlet area where the ELECTRA-flo/FI probe assembly will be mounted, it will be necessary to separate the probe assembly into two sections and then re-assemble it around the shaft. Position the probe assembly in the smallest diameter portion of the fan inlet bell, being sure that the assembly is kept vertical (not leaning in/out relative to the inlet). Mark the locations of the eight mounting holes. It is recommended that the probe assembly be secured to the inlet using 8-32 or 10-32 machine screws and lock nuts, not sheetmetal screws. (Note: Fasteners are not provided.) See Figure B below for mounting detail. Figure B Position the two sensor nodes and secure them in place by means of the set screw on each end. Each node should be positioned so that there is y inches between the centerline of the node and the inside of the fan inlet, where: y = 20% of the inlet diameter If the fan has a dual inlet, repeat the above steps for the other fan inlet. -3-

CABLE CONNECTIONS. Each probe has an integral cable terminated with a positive locking plug-in connector. The standard cable length is 10', unless the optional 50' or 100' long cables were ordered. Secure the cables to the sensor support struts with wire ties, then out the inlet housing with the cables secured to the inlet surface. If the fan has a single inlet, then the two connection cables (one per sensor) will plug into the provided junction box which needs to be mounted in a location reachable by all four connection cables. See Figure C below. Figure C -4-

TRANSMITTER INSTALLATION. The transmitter must be located so that the single cable from the probe array will reach the receptacle in the bottom of the transmitter. Standard cable length is 10', with optional 50' and 100' cables available. Mount the transmitter to a vertical surface in an upright position. Avoid locations subject to excessive amounts of vibration. The transmitter's enclosure has a NEMA 1 rating, requiring that it be mounted in a moderately clean indoor environment with temperature ranges between 20ºF and 140ºF. Consult the ELECTRA-flo Transmitter O&M manual for details related to power and signal wire connections, configuration options, and start-up. See Figure D for transmitter dimensions and installation clearances. ELECTRA-flo Thermal Air Flow Transmitter M AIR ONITOR CORPORATION Figure D -5-

CUSTOMER SERVICE. Air Monitor Corporation provides in-house technical support for all our products: Monday through Friday, 7 am to 5 pm (pst) Phone: 707-544-2706 or 1-800-AIRFLOW / Fax: 707-526-2825 If after contacting the Customer Service Department it is determined that equipment will require return to Air Monitor Corporation for further repair, a Return Authorization number will be issued. A Confirmation of Return Authorization with shipping instructions will be sent via facsimile or e-mail. Equipment to be returned to Air Monitor should be returned in its original shipping container if possible. If this is not possible, ensure equipment is packaged sufficiently to protect it during shipment. Caution: All damage occurring during transit is the Customer s responsibility. List the Return Authorization (R/A) number on the packing list and clearly mark this number on the outside of each shipping container. Costs associated with the return of equipment to Air Monitor Corporation are the customer s responsibility regardless whether the repair/return is under warranty. Once the Customer Service Department determines that the equipment repair is under warranty, the item will be repaired and returned to the customer at no charge. If the equipment is not under warranty, customer will need to approve a repair quote which will be invoiced along with return shipping charges. 1050 Hopper Avenue Santa Rosa, CA 95403 707-544-2706 www.airmonitor.com INSTALL36A (11/12)