for South East Queensland December 2013

Similar documents
Summer Water Outlook for South East Queensland. One region, one water supply

Autumn Water Outlook 2017 for South East Queensland. Getting drought ready

Water for life. South East Queensland s Water Security Program 2018 Annual Report

SEWER OVERFLOWS. Information on plumbing blockages and wet weather overflows

2017 Water Security Program Annual report. December 2017

MELBOURNE S WATER SUPPLY IS SECURE

Melbourne Water Outlook 2019

Water for life. Your say on South East Queensland s water future

Water Outlook for Melbourne

Brisbane River Catchment Flood Study overview

RESIDENTIAL CUSTOMER CHARTER

CUSTOMER CHARTER A SUMMARY OF YOUR RIGHTS AND RESPONSIBILITIES

Annual Water Outlook Western Water December 2017

2018 Water Security Program Annual report. December 2018

DRINKING WATER QUALITY MANAGEMENT PLAN REPORT

2018/19 Desalinated Water Order Advice

Integrated Catchment Modelling

Urban Rainwater Harvesting Systems: Promises and Challenges

Bulk Water Supply System Interim Operating Strategy

Lower Darling Operations Plan. September 2018

Rainwater Harvesting

South Australian Water Corporation HIGHLIGHTS

I/I Analysis & Water Balance Modelling. Presented by Paul Edwards

Essential Mathematics 2019 v1.1

Lower Darling Annual Operations Plan

Illinois in Drought. June 19, 2012, Updated June 21, 2012

A Case Study on Integrated Urban Water Modelling using Aquacycle NTUA, 2007

1 Metro Vancouver Case Study Vancouver Sewage Area Infrastructure Vulnerability to Climate Change

SMOKE TESTING SMOKING ON THE JOB

BUSINESS CUSTOMER CHARTER

Cape Town water outlook 2018

Progress Report for the Drinking Water Management Plan

South East Queensland Water Grid

Recreation Management Framework

Cape Town Water Outlook Updated 21 February 2018 Department of Water and Sanitation City of Cape Town

Desalination plant operating regime September 2010

Water Era in India. Rainwater harvesting systems. Rainwater harvesting. S.Vishwanath Twitter handle : zenrainman

Lower-Darling Operations Plan

AGENDA ITEM D6. Climate Outlook

FISHER RIVER INTEGRATED WATERSHED MANAGEMENT PLAN STATE OF THE WATERSHED REPORT CONTRIBUTION SURFACE WATER HYDROLOGY REPORT

Urban Water Security Research Alliance

At commercial metered connections, Council owns the water meter and backflow preventer and charges for actual water used.

Environment Plan Sydney Water s objectives, targets and actions to protect the environment and enhance the liveability of our communities.

Two Case Studies of Stormwater Harvesting: The Coburg and Merrifield Projects, Victoria, Australia

Water, Wastewater and Refuse

OCSD Urban Runoff Program SCAP Collection Systems in Motion

DRINKING WATER QUALITY MANAGEMENT PLAN 2015/2016 REPORT HINCHINBROOK SHIRE COUNCIL SP62

Overview. By the time we get to 2015, we will have invested around 455 million in the county. And we re set to invest even more.

Urban Water Security Research Alliance

Murrumbidgee River Operations Plan

Delaware River Basin Commission

Water Forever Whatever the weather

Stormwater design considerations

Rainwater Management. Dr. Iftikhar Ahmad. College of Earth and. University of The Punjab Lahore

Featherston Groundwater Infiltration Investigation

WATER SENSITIVE URBAN DESIGN. David Knights Shaun Leinster Phill Piper

A 25 Year Strategic Plan

o n e c i t y d i v e r s e p l a c e s

DRINKING WATER QUALITY MANAGEMENT PLAN 2016/2017 REPORT HINCHINBROOK SHIRE COUNCIL SP62

UNRESTRICTED OUTFLOWS RESTRICTED OUTFLOWS. SUMMARY WATER OUTLOOK Version 18 - updated 24 January 2018

Sewage Treatment Plant Performance Report

Energy Use and Climate Action Overview

Greater Sydney customer drought update

EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT

QUEENSLAND FLOOD COMMISSION OF INQUIRY: ENGINEERS AUSTRALIA CONTRIBUTION. W.D. Weeks Representing Engineers Australia

Infiltration and Inflow. Michael Sassaman Phone

Englishman River Program Status Update Prepared For: Drinking Water and Watershed Protection Technical Advisory Committee February 14, 2012

Trentham System. Water Supply Demand Strategy. Final Report March to 2060

2013 Annual Water Report

Investing in Sustainable cities. Water Management in urban areas: Yangon s case

Greater Sydney customer drought update

Santa Cruz Water Department: Water Resources, Conservation, and Water Shortage Contingency Plan. Santa Cruz Neighbors February 18, 2009

WaterNSW Water Operations Report. Murray-Lower Darling November 2017

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF MARCH 20, WASTEWATER COLLECTION SYSTEM AND STORMWATER MANAGEMENT REPORT

NC Water Resources Planning April 4, Tom Fransen. North Carolina Division of Water Resources 1

Town of New Castle, New Hampshire Sewer Infrastructure Evaluation

Managing Reservoirs for Atmospheric Rivers The Uneven Balance of Flood Risk and Water Supply

Maintaining Water Supply Resilience in Extreme Times

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions

South East Queensland. Report Card. hlw.org.au/reportcard

ICELANDIC RIVER / WASHOW BAY CREEK INTEGRATED WATERSHED MANAGEMENT PLAN STATE OF THE WATERSHED REPORT CONTRIBUTION SURFACE WATER HYDROLOGY REPORT

City of Dallas Water Utilities Drought Management Update. September 20, 2006

Water, Wastewater and Stormwater 2017 Budget 2018 Plan

CHAPTER 4 SYSTEM DESIGN CRITERIA

His Worship Mayor Don Darling and Members of Common Council. SUBJECT: Project Performance Update Safe, Clean Drinking Water Project

THE 14TH INTERNATIONAL RAINWATER CATCHMENT SYSTEMS CONFERENCE 2009

Climate Change Strategy. Low carbon, high water security

ORANGE WATER AND SEWER AUTHORITY

Exhibit A. Scope of Services for Flow Monitoring Program 2015 Flow Monitoring City of Lawrence, Kansas

Phil Mashoko(Pr Eng) Director: W & S City of Cape Town South Africa

Rainfall Harvesting for Indigenous Health in Australia

ewater s Mission: Build a new integrated modelling capability for Australia Dr Robert Carr, 30 May 2012

Welcome Waste Water Quality Breakout

Rainwater Harvesting in Educational Institution and Residential Area: A Case Study of University of Asia Pacific in Dhaka

Client council key performance indicators (by Wellington Water outcomes)

Design flow = PDWF + GWI + RDI

Review & Design of the Apia Pressure Sewer System

5 CONSULTANT SELECTION FOR INFLOW AND INFILTRATION AUDIT AND FLOW MONITORING PROGRAM

Gwydir Operations Plan. August 2018

Transcription:

for South East Queensland December 2013

About the Water Outlook Sunshine Coast Water gives and sustains life. We all use water every day and we rely on a safe, secure, resilient and reliable water supply. But in South East Queensland (SEQ) we live in a climate of extremes from times of drought to summer storms and we need to be ready to adjust our water use when conditions change. Somerset This Water Outlook shows how SEQ is tracking for summer 2013-14. It provides information about our dam supply levels and water consumption, together with the outlook for the summer ahead based on the latest weather forecasts. It highlights how the region s water service providers are working together to prepare for the wet season, and how you can help. It also features some of the many projects underway to improve our water supply network. Moreton Brisbane Partnering for better value SEQ s water service providers have formed a partnership to ensure a safe, secure, resilient and reliable water supply at the best value for money to customers. Lockyer Valley Ipswich Logan Redland As the region s bulk water authority, Seqwater sources, stores and supplies water from its 26 dams, 47 weirs and 14 bores and aquifers. Unitywater, Queensland Urban Utilities and the water businesses of the Redland, Logan and Gold Coast city councils deliver drinking water to households and businesses, and provide sewerage services. Scenic Rim Gold Coast As partners, we work together so that the region s water assets natural, built and organisational are planned for, delivered and managed as a single, integrated, efficient and effective system, ensuring maximum value for communities and businesses. 2 Water Outlook for South East Queensland / December 2013

Drinking water supply levels are high Right now we are enjoying a high level of water security, with the drinking water supply levels in 11 of our 12* key dams all greater than 80%. The 12 key dams in our supply network make up nearly 90% of SEQ s total water storage volume. *The water level in Cooloolabin Dam on the Sunshine Coast has been dropped to around 50% to allow the dam wall to be assessed as part of Seqwater s dam safety program. At full supply capacity, our 12 key dams can hold 2,220,161 megalitres of water That s the equivalent of almost five Sydney Harbours. We catch the rain falling across more than 1.2 million hectares of catchments and rivers flowing into our dams, aquifers and off-stream storages. % 100 98 96 94 92 90 95.3 Nov 12 93.6 Dec 12 94.4 Jan 13 97.0 Feb 13 94.4 Mar 13 94.9 Apr 13 Grid 12 / Average Monthly Volume / Nov 2012 to Nov 2013 96.4 97.6 98.9 98.5 97.4 95.6 93.9 May 13 Jun 13 Jul 13 Aug 13 Sep 13 Oct 13 Nov 13 Water Outlook for South East Queensland / December 2013 3

SEQ remains water wise While there are currently no water restrictions in SEQ, we remain a water wise region. The average daily water consumption across SEQ in November 2013 was 182 litres per person per day. Average daily consumption (Dec 2012 - Nov 2013) We live in a climate of extremes and need to be ready to adjust our water use when conditions change. Making smart water choices all year round will save you money and protect our water supply. 300 250 Before the Millennium Drought: 330 litres per person per day. At our best during the drought: 124 litres per person per day. November 2013: 182 litres per person per day. Litres per person per day 200 150 100 50 SEQ 0 Dec 12 Jan 13 Feb 13 Mar 13 Apr 13 May 13 Jun 13 Jul 13 Aug 13 Sep 13 Oct 13 Nov 13 Dec 13 4 Water Outlook for South East Queensland / December 2013

Check your bulk water quality at seqwater.com.au A 600 kilometre bulk supply pipeline network moves water around the region. Reverse-flow pipelines allow us to move bulk water from Noosa in the north to Coolangatta in the south. Water Outlook for South East Queensland / December 2013 5

Warm, dry summer ahead The Bureau of Meterology forecasts warmer days are more likely over most of eastern Queensland and warmer night-time temperatures are more likely over the state. The chances of the December to February maximum and minimum temperatures exceeding the long-term median are greater than 70% over South East Queensland. The odds suggest that for every ten summer outlooks with similar odds to these, about six or seven of them would be expected to be warmer than average, while about three or four years would be cooler. While warmer temperatures are not the only possible scenario for the region, it is the most likely. 6 Water Outlook for South East Queensland / December 2013

The Bureau of Meterology also forecasts a drier than normal season is more likely for most of north eastern Australia. Climate influences include a neutral tropical Pacific and local sea surface temperature patterns. The chances of below average rainfall during December to February are 60 to 70% over eastern Queensland (the chances of exceeding the median rainfall are 30 to 40%). This means for every ten summer outlooks with similar odds to these, about six or seven would be below the long-term median rainfall, while about three or four of them would result in above median rainfall. Near average cyclone season forecast A near average tropical cyclone season is most likely. The Bureau of Metereology forecasts a 53% chance of above average tropical cyclone activity for the Eastern region. The long-term average number of tropical cyclones during the season in Eastern Australia is four. Source: This information was sourced from the Bureau of Meteorology website following the issue of the December to February seasonal climate outlook on 27 November 2013. www.bom.gov.au/climate/ahead/temp.naus.shtml www.bom.gov.au/climate/ahead/rain.naus.shtml www.bom.gov.au/climate/ahead/tc.shtml Water Outlook for South East Queensland / December 2013 7

Water security expected to remain high The water inflows into our storage dams vary depending on the amount and distribution of rainfall and the catchment conditions. Drier catchments mean less runoff into the dams. Grid 12 dam inflow predictions We ve considered the impact of the Bureau of Meteorology s forecast that a warmer, drier than normal summer is more likely. 100% Starting with a combined storage level in our 12 key dams of 93.7% on 2 December 2013, the graph shows the dam storage levels that could result if the inflows into the storages over the next 12 months are either low or closer to average. 95% Average inflows With low inflows, the dams would not reach 100% by the end of summer, but average inflows would probably result in full dams by the end of summer. Above average inflows would fill the storages. Grid 12 dam storage levels 90% 85% 80% Low inflows 75% 70% Nov 13 Dec 13 Jan 14 Feb 14 Mar 14 Apr 14 May 14 Jun 14 Jul 14 Aug 14 Sep 14 Oct 14 Nov 14 8 Water Outlook for South East Queensland / December 2013

Water security summer outlook South East Queensland water security Based on the Bureau of Meterology s seasonal forecast, our own dam storage predictions and current water consumption data, South East Queensland s water security is expected to remain high at the end of the summer. Water security gauge 40% 60% High water security Medium water security Medium-low water security Low water security 80% 0% 100% Water Outlook for South East Queensland / December 2013 9

Get ready for summer 2013-14 Even with the warmer, drier weather forecast, the summer season generally brings with it higher and heavier rainfall than the rest of the year. This means there s potential for more water quality and supply issues, and flooding. Across South East Queensland, your water service providers have been working hard behind the scenes to get ready for the summer ahead. You can play your part too. Just complete our simple checklist to get ready if you do a little, we all accomplish a lot. How we re getting ready We ve increased water reservoir levels to provide more emergency storage. These storage levels are closely monitored to ensure your water supply. We ve put in place contingency plans to help critical water customers (such as hospitals). We ve conducted pre-summer risk assessments of all Seqwater assets dams, water treatment plants, reservoirs and pipelines in readiness for the storm and cyclone season. We ve updated emergency action plans for all 26 Seqwater dams across South East Queensland and revised the manual guiding flood mitigation at Wivenhoe, Somerset and North Pine dams. We ve updated and tested the water sector s Emergency Response Plan, involving all water service providers, the Department of Energy and Water Supply and Queensland Health. We ve launched weir and dam safety campaigns to educate the community to rethink their behaviour around weirs and dams. We ve readied generators for pumping stations and water boosters in case of power outages. We re conducting regular water testing to ensure the quality of supply and protect public health. We ve readied experienced crews to respond to water quality and supply emergencies around the clock. Check 10 Water Outlook for South East Queensland / December 2013

How you can get ready Have an emergency plan in place and keep at least two days supply of water in case of an interruption to your water supply. Check Know how to turn off your water supply and check your meter reading in case of leaks. Check the plumbing and gutters around your home are in good working order and contact a licensed plumber if you need to make repairs. Check your overflow relief gully is clear of obstructions, raised above ground level so stormwater does not flow into it, and the grate is loose fitting. This will help prevent sewage backing up inside your home during bad weather. If you have an illegal or inappropriate stormwater-to-sewer connection on your property (such as rainwater down pipes connected to the sewage network instead of stormwater), contact a licensed plumber to have them fix the problem. Ensure you know how to access essential service information, such as unplanned service interruptions. Check if your water retailer offers a sign up service for updates. Know how to report a water or sewerage fault or emergency. Check your water retailer s website for details. Sign up to receive alerts about dam releases or spilling dams in your area. To register, visit www.seqwater.com.au or call (07) 3035 5500. If you plan on visiting one of South East Queensland s dam recreation areas, check www.seqwater.com.au before you go and be DAMsmart: boaties and jet skiers keep your distance from swimmers and paddlers be courteous to other people whether it be on boat ramps, at campsites or on the road keep our lakes beautiful and litter-free supervise children at all times. For more tips on how to be prepared for the storm and cyclone season, visit qld.gov.au/getready Water Outlook for South East Queensland / December 2013 11

Improving South East Queensland s water and sewerage systems We re continually working to improve the region s water supply network and sewerage systems. Here are just some of the projects recently completed or underway. Seqwater Flood-damaged Mt Crosby Weir ready for wet season Essential repairs to Mt Crosby Weir have been completed ahead of summer. The weir and associated infrastructure was significantly damaged by the huge volume of water and debris that flowed down the Brisbane River as a result of Ex-Tropical Cyclone Oswald in January 2013. Mt Crosby Weir is one of the most important assets in South East Queensland s bulk water supply system. Water from the weir is pumped to the region s largest water treatment plants, which supply most of Brisbane and Ipswich s drinking water. Reservoirs upgraded to improve water quality Reservoirs at Chapel Hill, Stafford and North Pine were drained and upgraded to improve drinking water quality. These reservoirs store water for tens of thousands of households across South East Queensland. Caring for our catchments This financial year Seqwater is investing more than $5 million in revegetation work to improve catchment health. Seqwater works in partnership with landholders, local catchment groups, councils and organisations such as Healthy Waterways and SEQ Catchments to ensure a whole-of-catchment approach to managing our natural resources. State-of-the-art water treatment plant for Kilcoy After more than three years of planning and construction, Kilcoy s new water treatment plant will be officially opened in December 2013. The state-of-the-art plant uses the latest water treatment processes, including UV and dissolved air filtration, to produce high quality water with a reduced need for chemical treatment. More than 1700 residents and local businesses will benefit from the plant s improved reliability. Unitywater Three new water supply reservoirs for the Sunshine Coast Unitywater has commissioned three new water supply reservoirs at Harbour Hill, Craig s Hill and Albatross Avenue. The reservoirs provide greater water storage capacity and improved water service security and efficiency in periods of peak use, disruption to supply and emergency situations, such as extreme weather events and fire fighting. Water main for greater Maroochydore A new 6.5 km trunk water main is delivering increased water security and has the ability to provide coastal Maroochy with two water supplies in a ring main configuration instead of just one supply main into the area. This will also increase fire fighting capacity in the network. Control system upgraded The Supervisory Control and Data Acquisition (SCADA) system is critical to Unitywater s ability to provide reliable and efficient water supply and sewage treatment services across an area of more than 5200 square kilometres. The system enables Unitywater to monitor and control the entire network from one location, saving time and resources and minimising risk of human error. Recent upgrades support improved reporting with historical data and optimised pump and network control. Reducing sewage overflow Unitywater s Sewage Overflow Abatement Program (SOAP) is reducing the frequency and impact of sewage overflows in the community during wet weather. The SOAP includes an ongoing program to find the causes of inflow and infiltration on private property and in the Unitywater network. Inflow is the rainwater that enters the sewerage network via defective or inappropriate plumbing of stormwater to the sewer. Infiltration occurs when groundwater enters sewer pipes through cracks and faulty joints. Unitywater works with customers to identify and fix defective plumbing connections, which then reduces the amount of stormwater into the sewer network and reduces sewage overflows. 12 Water Outlook for South East Queensland / December 2013

Queensland Urban Utilities Water main for Ipswich CBD Queensland Urban Utilities has completed a $2.9 million water main along Brisbane Street and is building a new 700 metre section of water main along Brisbane Street between Burnett and Ellenborough Streets. The upgrade will ensure Queensland Urban Utilities continues to provide a reliable water supply to the Ipswich CBD. Urban growth prompts sewer upgrades The capacity of a 62 km sewerage network in Brisbane s southeast suburbs at Bulimba Creek has been increased to cater for growth in the area. The $51.7 million project was completed earlier this year. Queensland Urban Utilities is investing a further $80 million to increase the capacity of Woolloongabba s sewerage system, again to meet the demands of a growing population. The project involves the installation of 5.2 km of trunk sewer mains in Woolloongabba and Stones Corner and will take around two years to complete. Canungra water main renewal project Queensland Urban Utilities is investing $1.2 million to install new water mains along several streets, including Pine Street, within the township of Canungra. This work will ensure sufficient water supply during a fire event and increase the reliability of the water supply. Work commenced in August 2013 and will progress in stages until April 2014. Redland City Council Sewer system readied for wet season Work is underway to reduce inflow to the existing sewer system on the mainland and in Dunwich to minimise the impact of water entering the system. This includes relining sewers and replacing sewer maintenance holes to reduce the demand on pumping and treatment systems during heavy rain. Improving waterways A total of $850,000 has been invested in new screens on the inlet to Cleveland sewage treatment plant to cope with heavy rainfall and to ensure the receiving waterway is cleaner. Logan City Council Water supply infrastructure upgrades Design work is underway to improve water supply infrastructure in the city s south. Works will involve the installation of new pressure reducing valves or flow meters, and water pipelines at more than 40 locations to more efficiently manage the water supply. Construction is expected to commence in early 2014. City s largest wastewater catchment gets an upgrade Logan City Council is upgrading the Loganholme sewerage catchment to enhance its operability and facilitate future growth. The upgrade involves two major projects with a combined value of $72 million, including installation of a 6.4 km pipeline from Slacks Creek to the Loganholme sewage treatment plant and modifications to a pump station. At the same time, a new inlet works and odour control facility is being constructed at the Loganholme treatment plant. These works are scheduled to be completed in mid-2015. City of Gold Coast Improvements to Maudsland water supply The City of Gold Coast is installing multiple new potable water mains, a new pump station and three pressure reducing valves to cater for future growth and fire fighting demand in the Maudsland area. Some $2m will be invested in upgrading this essential infrastructure. At risk water mains to be replaced The Gold Coast s water supply reticulation network consists of more than 3,000 km of water pipes. Despite the relatively young age of much of the city s water network, there are water mains which experience frequent failures or are at risk of failure. A $2.4 million program will see these water mains replaced. This will minimise the number of water outages and minimise water loss from water main failures. $5 million pressure and leakage system upgrade Gold Coast s pressure and leakage management system has been upgraded to improve the reliability of the equipment and enable remote monitoring and control. The pressure and leakage management system comprises 63 district metered areas, which cover about 50% of customers. The process limits water losses due to leakage as well as reducing pipeline and service connection breakages. Water Outlook for South East Queensland / December 2013 13

Contact us (07) 3035 5500 (Monday to Friday, 8.30am to 5.00pm) 1800 771 497 (After hours and on weekends) Dam release hotline 1800 613 122 1300 0 UNITY (1300 086 489) ask.us@unitywater.com www.unitywater.com 13 26 57 (7am - 7pm weekdays) Faults and emergencies 13 23 64 (24/7) customerservice@urbanutilities.com.au communications@seqwater.com.au www.facebook.com/unitywater www.urbanutilities.com.au www.seqwater.com.au www.facebook.com/seqwater @_seqwater www.facebook.com/ QueenslandUrbanUtilities @urbanutilities 14 Water Outlook for South East Queensland / December 2013

(07) 3829 8999 (Monday to Friday, 8am-5pm - answering service after hours for emergencies) rcc@redland.qld.gov.au (not 24 hours) www.redland.qld.gov.au www.facebook.com/redlandcouncil @redlandcouncil 07) 3412 5494 (to report a water leak or fault - 24 hours) (07) 3412 3412 (all other enquiries - 24 hours) council@logan.qld.gov.au www.logan.qld.gov.au www.facebook.com/logancitycouncil @logancc 1300 GOLDCOAST (1300 465 326) 1300 WATER (1300 000 928) mail@goldcoast.qld.gov.au www.cityofgoldcoast.com.au www.facebook.com/cityofgoldcoast @cityofgoldcoast Water Outlook for South East Queensland / December 2013 15