Bioenergia Los Pinos Project Americas Clean Energy Fund II (AEF II): Proposed Investment. January 2017 Prepared by SCLEA

Similar documents
Bioenergia Las Pampas Project Americas Clean Energy Fund II (AEF II): Proposed Investment. January 2017 Prepared by SCLEA

Santuario PV Power Plant Project Americas Clean Energy Fund II (AEF II): Proposed Investment. May 2017 Prepared by SCLEA

Environmental and Social Review Summary

Annex 1: Project Tropicalia Sustainable Tourism, Dominican Republic

ENVIRONMENTAL AND SOCIAL ACTION PLAN

Environmental and Social Policy

Principles for environmental and social responsibility

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT

IFC s Policy and Performance Standards on Social and Environmental Sustainability. November 10, 2006 Rachel Kyte

Review Indicators Alignment Review Evaluation / Recommendations

1 Project description

Managing E&S risks through the Equator Principles: Intesa Sanpaolo s view IAIA Florence, April 2015

UNRAVELING THE MYRAID OF STANDARDS AND TOOLS

IPIECA, API and OGP Guidance cross-referenced to the GRI OGSS

CAO Audit of IFC Investment in Coastal Gujarat Power Limited, India August 22, 2013 (Published on October 23, 2013)

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Mezitli Wastewater Treatment Plant

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Review & Update of World Bank s Environmental & Social Safeguard Policies Phase 3 Consultation Meetings. Turkey Municipal Services Project

Second opinion on Export Development Canada (EDC) s framework for Green bonds

CONDUCTING E&S DUE DILIGENCE ALIGNED WITH IFC PERFORMANCE STANDARDS A FOCUS ON FINANCIAL INTERMEDIARIES

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Global Reporting Initiative Index

GOLD STANDARD PASSPORT

Setting Standards for Sustainable Development. Update and Review of the World Bank s Safeguard Policies

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Level of Reporting on GRI Indicators, 'in accordance' Core. Fully Significant Changes during 2016

Indicator Description Relevant Section Expanded Version Digest Version GENERAL STANDARD DISCLOSURES

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Review and Update of the World Bank s Environmental and Social Safeguard Policies Phase 3 Feedback Summary

Environmental and Social Review Summary. China Wastewater

Requirement (legislative, lender requirement (e.g. EBRD PR), Best Practice)

BEYOND THE BALANCE SHEET

DRAFT FOR PUBLIC COMMENT Guidance Note for ESS10 Stakeholder Engagement and Information Disclosure

GATSUURT GOLD MINE : ENVIRONMENTAL AND SOCIAL ACTION PLAN

Guidance Note 1 Social and Environmental Assessment and Management Systems

IFC SUSTAINABILITY FRAMEWORK

Global Reporting Initiative (GRI) G4 Content Index

UNRAVELING THE MYRAID OF STANDARDS AND TOOLS

Syvash Wind Farm Environmental and Social Action Plan (ESAP)

Environmental, Social and Governance (ESG) management

Gold Standard Passport CONTENTS

Total employees by employment contract and gender

220 KV TRANSMISSION LINE AKHALTSIKHE-BATUMI

GLOBAL COMPACT COMMUNICATION ON PROGRESS

1 Environmental and Social Action Plan

GENERAL STANDARD DISCLOSURES

ISO 9001:2015 ISO 14001:2015 ISO 45001:2018

PROJECT PREPARATORY TECHNICAL ASSISTANCE

Statoil, Sustainability Report 2016

Assessment and Management of the Environmental and Social Impacts of Activities, Products and Services

Case of MIGA s Guarantee Linked to the Engineering and Feasibility Phase of Developing the PT Weda Bay Nickel Project. Summary

Environmental and Social Review Summary. Airport City Belgrade

DRAFT FOR CONSULTATION OCTOBER 7, 2014

Promoting sustainable bioenergy production and consumption policy recommendations

GRI content index Core - Gemalto 2017

Stakeholder Input Final World Bank Group Framework and IFC Strategy in Palm Oil References

SUSTAINABILITY REPORT

Revised Independent review of the Ethiopian Railway Project against environmental and social performance standards

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

1 Project description

Jbel-Sendouq Khalladi Wind Farm and 225kV Power Line Project Tangier, Morocco. Environmental and Social Action Plan

Social and Environmental Principles and Criteria. Barney Dickson UNEP-WCMC 1 st May 2012

Respect for Human Rights. Environmental Management G4-17 P3 P10 P82 G4-18 G4-19 G4-20 G4-21 G4-22 G4-23 G4-24 P57 P95 G4-25 G4-27 P15 P24 P82 P9 P13

Global Reporting Initiative Finder

SPECIFIC STANDARD DISCLOSURES

Uzbekenergo: Talimarjan Thermal Power Plant 2, Uzbekistan Environmental and Social Action Plan (ESAP)

EU Energy Winter Package (RED Recast) and Future of Forest Biomass Piotr Borkowski, EUSTAFOR s Executive Director

Governance G4-34 G4-35 G4-36 G4-37 The governance structure of the organization Any committees responsible for decision-making on economic, environmen

Environmental and Social Action Plan. Draft Report. The business of sustainability

Performance Requirements

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

Multilateral Investment Guarantee Agency. Performance Standards on Environmental and Social Sustainability

2017 GRI CONTENT INDEX

Environmental and Social Action Plan Adjaristskali Hydropower Plants

Code of Conduct Fleggaard GmbH

Page 1 of 6 THE ANTAMINA PROJECT THE CHALLENGE OF SUSTAINABLE DEVELOPMENT IN PERU

ECONOMIC TRANSFORMATION AND INSTITUTIONAL CAPACITY BUILDING ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK

Miro Forestry Company Policies & Procedures

Lithuanian Energy Institute, PP9

EBRD Environmental and Social Action Plan

International Finance Corporation s. Performance Standards on Social & Environmental Sustainability

2015 GRI G4 CONTENT INDEX

Sustainable Crop Biofuels in Africa EIA or ESIA process

6. Environmental and Social Action Plan. Indicator of Completion. Completion Date

Sustainable Palm Oil Sourcing Policy

JCM Power. The Environmental and Social Governance (ESG) Policy

PT INDONESIA INFRASTRUCTURE FINANCE (SEMS) Printed from llf website on 16 November 2016.

SNTGN TRANSGAZ SA MEDIAS. ESAP BRUA Version 3 1

FOREST INVESTMENT PROGRAM DESIGN DOCUMENT. (Prepared by the Forest Investment Program Working Group)

Africa Agriculture and Trade Investment Fund (AATIF, the Fund) Preface to the Social & Environmental Safeguard Guidelines

Summary - Agri-Commodities Policy

ENVIRONMENTAL AND SOCIAL ACTION PLAN ÖKSÜT GOLD MINE, TURKEY (THE 'PROJECT')

Sustainability Plan Colombia

Global Reporting Initiative (G4) Content Index

Call for concept notes

GRI Index. 1. Strategy and Analysis. 2. Organizational Profile. GRI Indicator Description Page(s)

Ecosystem Services Identification, Valuation & Integration (ESIVI) Strategic Sustainability and Climate Change Team, London

UN Global Compact - Communication on Progress, 2016

Transcription:

Bioenergia Los Pinos Project Americas Clean Energy Fund II (AEF II): Proposed Investment January 2017 Prepared by SCLEA 1 INTRODUCTION As required by the guidelines for investing of Americas Energy Fund II Clean Energy ( AEF II CE ), the investments categorized by the General Partner within guidelines categories 1 through 7 the General Partner may determine to make the Investment in accordance with the Partnership Agreement and such Investment will be deemed an Eligible Clean Energy Investment. The following information is presented to the Committee to analyze and provide a recommendation regarding the eligibility of the Proposed Investment as Eligible Clean Energy Investment. The Proposed Investment described in this report is: TABLE 1: PROPOSED INVESTMENTS Proposed Investment Category Type Los Pinos Bioenergy Plant 2 Electricity generation from biomass residues 2 RISK CLASSIFICATION AND RATIONALE The proposed investment is classified as Category B (Medium risk Projects) because it has potencial limited adverse environmental or social risks and its impacts are few in number, site specific and most likely reversible and easily addressed through mitigation measures. The proposed investment is a project located into a landfill in Penco, Concepcion province, VIII region of Chile (see Figure 1 below). The Centro de Manejo de Residuos de Concepcion (CEMARC landfill) has its own Environmental License granted on 2004 (RCA N 183/2004) where was approved an incineration biogas plant. The project was presented on 2014 through a Letter of project pertinence wanting to optimize the current biogas burning process implementing a more efficient and sustainable process using the biogas to produce electric energy. This process will install and operate 2 power generators with 2,9MW total installed capacity. The energy produced will be injected to the distribution system. From the information reviewed and analyzed, CEMARC is in compliance with the Environmental License granted to operate the landfill.

Figure 1. Project Location The bioenergy project will not use any space beyond those evaluated and environmentally approved by the RCA N 138/2004. Because of this, the bioenergy project does not require to apply to the Environmental

Impact Assessment System, since it does not constitute a change of consideration and is not listed in article 3 of the D.S. N 40/2012, Regulation of the Environmental Impact Assessment System (SEIA). Considering that the project is a facility located into a small area at CEMARC landfill, it does not require land acquisition or involuntary resettlement nor does affect the surrounding communities and their health, safety and security. There is no indigenous community identified and no cultural heritage could be affected, nor affected the biodiversity conservation and natural resources. 3 PROJECT DESCRIPTION Los Pinos is a 2.9 MW landfill biogas fuelled power plant. The plant is located in Penco, Bío Bío Region, Chile, next to one of the biggest municipal waste landfills in the area, called Centro de Manejo de Residuos Concepción ( CEMARC ). Los Pinos power plant is currently on final commissioning process. The landfill started operation in 2006 and has been receiving approximately 700-800 metric tons per day since its opening. The landfill was design considering biogas and lixiviation management. The current biogas production, approximately 2500 Nm3/h, is burned in a flare. Los Pinos battery limit starts at gas reception, and the plant consists in a gas reception system, a gas cleaning system, two 1.45 MW engines and the electrical connection to the public distribution grid. The generation sets make and model are GE Jenbacher 420. During the takeover and after the start up, Los Pinos will fulfil all the social and environmental compliance for an operating project. Due to the current gas production and the landfill capacity it is technically feasible an expansion project. The project design and the engineering already include an expansion. Once the total expansion capacity would be defined it is considered to present a social and environmental study for the full expansion capacity. FIGURE 1: CEMARC LANDFILL

4 LOS PINOS CORRECTIVE ACTION PLAN Considering the SEDD results/conclusions and the corrective action plan suggested by the consultant GHD, the Project considers the following actions for implement:

Applicable Performance Standards 1, 3 There is no evidence of environmental, social and safety regulations compliance 1, 3 Missing identification, verification and evaluation of risks and environmental and social impacts for the project, including possible emergency situations, and that the measures for the management of such risks and situations are appropriate, based on the IFC standards and requirements within the framework of the Chilean environmental legislation. Gap / Risk Recommendations Priority Respons ible Identify all environmental, social and safety regulations applicable to the project and manage for their compliance An SEMS must be established according to characteristics of the company, incorporating the following elements: (i) policy; (ii) risks and impacts identification; (iii) management programs; (iv) organizational capacity and competence; (v) preparedness and response to emergencies; (vi) participation of social actors, and (vii) monitoring and evaluation. Develop a policy on social, environmental and risk management, which should be part of SEMS. Occupational Health and Safety management system as well as incident tracking and follow up, among others, will be included in the SEMS. Project cycle phase / Deadline Completion Indicator May 31, 2017 Document with environmental, social and safety regulations applicable to the project and their compliance. Sept 30, 2017 Established SEMS with defined structure and related documents for its implementation. 1, 3 The absence of an organizational scheme for monitoring to the environmental and social aspects of the operation represents risks to the proper implementation and monitoring of environmental management measures. It can lead to further sanctions by the A staff structure for manage the E&S risks and impacts, and SEMS must be defined as soon as possible. April 30, 2017 Defined and implemented an organizational structure for managing the E&S impacts and risks of the project, and within the SEMS

competent institutions. and the Policy of Human Resources for the operation. 2 Not having policies and human resources procedures can become an obstacle to build and maintain long-term good relationships between workers and the company. 1, 3, 4 Not having a definition of dialogue mechanisms and communication with stakeholders identified for the project, jeopardize the company s image and therefore the acceptance of the project and relations with the communities. 1 It is feasible an expansion of the current project due the gas production and landfill capacity, up to 2.9MW an Environmental Impact Study must to be presented to the environmental authorities. Formulate the guidelines for implement a human resources policy with procedures to define aspects such as selection criteria, recruitment mechanisms and procedures, induction, manual of functions, training, safety practices and occupational health, etc. Also, within the human resources procedures and requirements, considering the labour conditions and terms of employment according to PS2 of the IFC, as well as the structure of personnel required by the company with the description of job profiles, requirements and hiring records. Additionally, the policy should explicitly describe the guidelines pointing out to non-discrimination, no forced labour, no child labour, and no hinder or prevent the associations and labour organizations. The project must have a policy and explicit information procedures and dialogue mechanisms through which stakeholders may be informed of the project and can present concerns, questions, complaints or claims (Grievance Mechanism). In case of further expansion of the Los Pinos project (capacity > 2,9 MW), a comprehensive Environmental Impact Assessment (EIA) in line with IFC PS and applicable local regulations will be undertaken by a competent E&S third party. Medium Medium June 30, 2017 May 31, 2017 Before beginning of next expansion construction. Formulated Human Resources Policy Procedures and related documents to implementation of the Policy Policy, procedures, defined dialogue and dissemination mechanisms. Communications An Environmental Impact Study presented to the Environmental Impact Assessment System (SEA) in other to get the

3 It is required to record and calculate the GHG emissions on Annual Report to the Fund. Develop an annually calculation of greenhouse gas (GHG) for direct and indirect emissions of GHG. Medium Annually reported during first quarter Environmental License as approval of the expansion capacity of the project. GHG emissions included on Annual Report to the Fund. Eduardo Vicuña B. S&E Officer Americas Energy Fund II Clean Energy L.P.