Welcome to this continuing education seminar. This is the first of three parts of the Building Enclosure Fundamentals series.

Building with Ducts in Conditioned Spaces Conditioned Attics

Reducing Air Leakage Through Envelope Retrofits: Does Your Building Suck?

Building Enclosure Detailing for Walls and Low-Sloped Roofs

Building Science. Adventures In Building Science. Build Tight - Ventilate Right

airflow in to, out of, and within buildings. These airflows are resisted by the airtightness of building elements including the exterior enclosure and

Energy Conservation & Building Envelope. Objectives. Introduction. Determine the Building Envelope of a House Calculate Heat Loss of a Building

Goals of Session. Building a Better Thermal Envelope. Thermal Envelope Priorities. Disclaimer. Insulation performance (Real World)

Building Science.com Building Science.com Building Science.com

Overview of Presentation. Airflow Control: Why. Airflow Control: what kind?

Air Leakage and Sealing

Healthy, Durable, Low Energy Buildings: Thermal: High R. Thermal bridges. Fundamentals, techniques, and pitfalls

DOE Zero Energy Ready Home Technical Training

Challenging Framing Details

Solid masonry. Healthy, Durable, More Sustainable Buildings: Five Big Changes in Buildings over the last 50 years

Insight. New Light in Crawlspaces. By Joseph W. Lstiburek, Ph.D., P.Eng., Fellow ASHRAE

Chapter 14 - Air Sealing

Heat Flow by direct contact Vibrating molecules Most important for solids 1 > t2 Heat flow

CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING (Page 1 of 8)

Flood and Hurricane Resistant Buildings by Joseph Lstiburek

10 Steps to Save Energy in Your House

Why Control Heat flow? How to Control Heat Flow? Thermal Performance. Modes of heat transfer: Thermal Control: Insulation & Thermal Bridges

Foundations. Issue. Slab-On-Grade Liquid Water Control (See Figure 2-2) Goals. Guidance

Chapter 4: Insulation

Feature Zone IECC 2009 IECC

Insight All Decked Out 1

A Rater s perspective from the field. Thomas H. Marston, February 21, 2007

2015 IECC Air Sealing Multifamily For Code Compliance Funding for Energy Code Training

Office of Design & Construction State University Plaza Albany, New York

Standards for Jackson EMC s Right Choice Program Revised: June 2011

The ECHO System The basement ventilated and drained insulation system

Insight. Uplifting Moments Roof Failures. By Joseph W. Lstiburek, Ph.D., P.Eng., Fellow ASHRAE

Throughout the balance of this paper the terms attic and roof will and can be used interchangeably.

Table Air Barrier and Insulation Inspection Component Criteria

WeatherSmart Air Barrier Installation Guide

New Construction Procurement Guidelines for the Pacific Northwest

Insight In the Deep. By Joseph W. Lstiburek, Ph.D., P.Eng., Fellow ASHRAE

Photographic Guide: Home Performance Dos and Don ts

2006 Building Science Press All rights of reproduction in any form reserved.

When R-Value Doesn t Measure Up

United States Army Corp of Engineers Requirements for Air Barrier Systems in Buildings

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING

SECTION INDOOR AIR QUALITY MANAGEMENT PLAN. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

City of High Point Airport Overlay District Noise Level Reduction Design Standards

ENERGY SAVINGS FOR LIFE

SOUTHWEST ENERGY CODES CONFERENCE. This is how we do it! Getting to 3ACH50 and

THE CITY OF FAYETTEVILLE ADOPTED THE 2009 INTERNATIONAL ENERGY CONSERVATION CODE (IECC) ON JULY 17, 2012

INSIDE WHY SPRAY POLYURETHANE FOAM INSULATION?

Using a Building s HVAC Systems and Infrared Technology to Solve Water Intrusion Problems

A Closer Look Inspection Service 2015 IECC Residential DFW area handout

The Role of Control Layers in Building Enclosure Design

Tuning up the envelope of your building

Assessing the Impact of US Housing. Retrofits. Building Carbon Emissions. Building Energy Use. buildingscience.com

Quality Insulation Installation (QII) Insulation Installation (Page 1 of 4)

FireX Fire Stopping Mastic FM

How Not to Build Roofs

A Protocol. Advanced Air Sealing

PROJECT DIRECTIVE # FOR KALISPELL PUBLIC SCHOOLS

Insulation, Fireblocking, Draftstopping and Crawl Space Requirements REVISION DATE: JANUARY 2017

A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board manufacturer's written instructions, whichever are more stringent.

Insight. Inward Drive. Outward Drying. Walter Payton 1 does Permeance. By Joseph W. Lstiburek, Ph.D., P.Eng., Fellow ASHRAE

Construction Indoor Air Quality (IAQ) Management Plan

Insight. Chubby Checker and the Fat Man Do Permeance. By Joseph W. Lstiburek, Ph.D., P.Eng., Fellow ASHRAE

Corridor Pressurization System Performance in Multi-Unit Residential Buildings

2009 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata)

Mark Lawton, P.Eng., FEC. Airtightness in Buildings A Canadian History June 2017

National Master Specification (NMS) Section Publisher: Spex.ca Page 1. Approved: RELATED REQUIREMENTS.1 Section [ ].

SECTION GYPSUM BOARD

SIP Homes: Built for a Lifetime of Comfort and Value

GYPSUM BOARD

Healthier Home Environments Benefit Everyone

Insight. Joseph Haydn Does The Perfect Wall. By Joseph W. Lstiburek, Ph.D., P.Eng., Fellow ASHRAE

FIREBLOCK/DRAFTSTOPPING INFORMATION CODE INFORMATION FOR 1 & 2-FAMILY DWELLINGS FOR WOOD-FRAMED CONSTRUCTION FIREBLOCK

Rebates for Improvements Home Efficiency Program Fort Collins Utilities

Insight. Decks: Roofs You Can Walk On. By Joseph W. Lstiburek, Ph.D., P.Eng., Fellow ASHRAE

2013 COMMERCIAL PRODUCTS

2009 IECC Chapter 1 Additions, alterations, renovations or repairs.

Inside Why Spray polyurethane Foam insulation? All About Spray polyurethane Foam Book 1

Chevy Chase Club June 30, 2008 Bowie Gridley Architects

SECTION GYPSUM BOARD

SECTION THERMAL INSULATION

Index. STP779-EB/Jul. 1982

New Approaches to Energy Efficiency & Green Building. Who is Icynene Inc.? World-Wide Distribution. The Icynene Insulation System

Air Sealing, Infiltration & Ventilation

Continuous Insulation Systems for Exterior Walls

Cavity fire barriers. Cavity fire barriers. Fire separation within concealed spaces. C06 Floors and ceilings

Impact Resistance of Advanced Framed Wall Systems with Insulating Sheathing as the Primary Sheathing

PREP + INSULATION. DISCLAIMER: These tools are for illustrative purposes only and

Energy Provisions of the Kentucky Residential Code. Guide for Homeowners

Building Enclosure Design Fundamentals, Components, and Assemblies

2. Heat Transfer is quantified in British Thermal Units (BTU s)

Success with 2009 IECC in Georgia: Tech Tips for Builders. Insulation. Copyright 2014 Advanced Energy. All Rights Reserved

Questar ThermWise Duct Technical Specifications

LEED And Your Indoor Environment

COOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No.

INSULATION BATT (1) (2) Code Reference: 2016 Title 24, Reference Appendices RA3.5. Pressure or Friction Fit

Transcription:

Insight The Hollow Building An edited version of this Insight first appeared in the ASHRAE Journal. By Joseph W. Lstiburek, Ph.D., P.Eng., Fellow ASHRAE Buildings today are hollow and multilayered with numerous air gaps or void spaces. Chases, shafts, soffits and drops abound. Everything is connected to everything else, typically unintentionally. Buildings are complex three dimensional airflow networks (1). This is not good. Buildings once were solid and compartmentalized. They were heavy and massive and expensive because they were heavy and massive. Heavy and massive also constrained us in other ways we couldn t go tall. To save money we made walls light; to go tall we made walls light. To make walls light, we made them hollow. What is so bad about hollow? The voids allow air to flow through the fabric of modern buildings, resulting in airflow networks that can carry moisture that impacts a materials long-term performance (serviceability) and structural integrity (durability). They also affect building behavior in a fire (spread of smoke and other toxic gases, supply of oxygen), indoor air quality (distribution of pollutants and location of microbial reservoirs) and thermal energy use. The airflow networks do not become networks until we get pressures to drive the flows. Hollow gives us paths but paths by themselves do not lead to flows. However, when we add air-based HVAC life gets interesting. We tend to accidentally couple mechanical systems to building enclosures resulting in pressures within the building hollows. Within the building, walls are hollow and filled with air. The studs are steel and perforated. When covered by gypsum board they can be considered flat, rectangular ducts. When they are insulated with fiberglass batts, the wall ducts have a poor filter that does next to nothing to retard airflow. The wall ducts are also perforated by electrical outlet boxes and other services. These hollow exterior and interior perforated walls are connected to each other creating hollow cubes that have tops that are also hollow by virtue of dropped ceiling and bulk head construction. Most dropped ceilings are typically return air plenums that now suck on the sides of the cube - the interior and exterior walls (Figure 1). When we add horizontal and vertical chase ways, soffits and shafts we have the typical modern office building, hotel or school a classic indeterminate system that folks insist on trying to model. Even more useless are the attempts to understand microbial contamination in these buildings by doing air sampling for mold. A futile exercise if the airflow pathways and flows are not determined and quantified. Something that is typically impractical to do and may in fact be impossible in many buildings. If I were in charge I would ban dropped ceiling return air plenums (Photograph 1). You just know that the interior gypsum board lining does not extend to the underside of the floor or roof system of the majority of buildings (Photograph 2). And even if it does it is rarely sealed. As a result exterior air is sucked through the air porous insulation right into the return plenum. It the outside air is humid, and if the space is air conditioned we loose control of the relative humidity in the dropped ceiling and the ceiling tile begin to smell like vomit (really - the butyric acid found in ceiling tile does smell like vomit as the relative humidity goes up) or the space smells like dirty socks (really - bacteria growing on coils from a moisture load the designer did not anticipate does smell like dirty socks). What are the odds? I can t tell you the number of buildings we have had to go into and retrofit a closure at the plenum to exterior wall connection (Photograph 3). This is another example of problems that result from the widespread failure to provide a continuous air barrier system in a building. May 2008 www.buildingscience.com 1

Figure 1: Dropped Ceiling Return Plenum Negative pressure field in the dropped ceiling return plenum extends to exterior accidentally coupling the HVAC system to the building enclosure. Photograph 2: Lack of Closure The gypsum board does not extend to the underside of the floor assembly above. Note the discolored insulation due to the filtration effect of dust being retained as exterior air is pulled through insulation into the return plenum. Photograph 1: The Ubiquitous Dropped Ceiling Return Plenum Who knows what evil lurks hidden above the ceiling tile? The Building Scientist knows Photograph 3: Retrofit of Closure Gypsum board extended to underside of floor assembly and sealed creating closure. So what to do? Install a return duct on each air-handling unit in a dropped ceiling and pull air from the space below. Get rid of every 20 th ceiling tile and install a grate to equalize the pressure between the occupied space and the dropped ceiling (Figure 2). The return system does not have to be extensive and fully ducted. Use transfer grilles and transoms to bleed the pressure from rooms with doors (Figure 3). And create a closure seal the exterior wall to the floor above and the floor below creating a continuous air barrier. Note: mineral wool meets the fire requirements but does not stop airflow, so don t shove mineral wool into a gap that leads between floors and think you have done a good deed - fire-rated foam, mastic or sealant needs to be used. May 2008 www.buildingscience.com 2

Figure 2: Uncoupling Dropped Ceilings from Building Enclosures Create a closure by extending the interior gypsum board to the underside of the floor deck, add a return air duct to the air handling units and equalize the air pressure between the dropped ceiling and the occupied space by adding ceiling grates. Photograph 4: Hotel Room Flow Path Part I Dropped ceiling connected to interior wall connected to demising wall connected to exterior. Figure 3: Transfer Grille Transfer grille provides a path for return air into a common area that contains a ducted return. What can be baffling at times is that the hollow wall ducts can operate under air pressure regimes (fields) that are largely independent of the air pressures on either side of them. Consider a hotel room with a bathroom exhaust duct located in a dropped ceiling above the bathroom. It is not practical to seal this duct airtight although attempts are made. When this duct leaks it draws air from the dropped ceiling depressurizing it. This dropped ceiling is connected to the demising wall that separates units and this demising wall extends to the exterior (Photograph 4). This demising wall is now a duct that pulls air from the exterior and supplies it to the dropped ceiling (Figure 4). It the outside air is humid, and if the space is air conditioned, and if the walls are covered with vinyl wallpaper we get mold (Photograph 5). What are the odds? May 2008 www.buildingscience.com 3

Figure 4: Wall Ducts Interior wall with negative pressure field created by accidental coupling of HVAC system or exhaust fans to wall cavity creates a pathway for exterior air to enter building interstitial cavities. Photograph 5: Hotel Room Flow Path Part II Mold on interior wall resulting from exterior humid air being pulled into demising wall as a result of negative pressure field created by leakage of exhaust fan in bathroom dropped ceiling. Figure 5: Fan Coil Return Plenum Filter grille not connected to fan coil unit with a return sleeve leading to increasing negative pressures within dropped ceiling as filter gets progressively dirty. May 2008 www.buildingscience.com 4

So what to do in this case? Provide a continuous air barrier at the exterior wall. Add a grille in an interior wall that bounds the dropped ceiling near the ceiling where this interior wall connects to the demising wall to bleed the pressure so that a negative pressure field is not set up in the demising wall. Do not add a grille to bleed the pressure in the demising wall as this will cause the fire protection engineers head to explode as well as violate the smoke and fire rating of the assembly. And oh yes, don t install vinyl wall coverings. We re not done with hotels yet. Fan coils and air handlers suspended from ceilings in gypsum board enclosures give me heartburn. These units have a supply duct (really a short sleeve extending from the unit that blows air into the room). But these units rarely have a ducted return. They use the gypsum board to create a return plenum and a filter grille is installed in the underside of the gypsum board creating the unit closure. As the filter gets dirty the negative pressure in the gypsum board enclosure increases (Figure 5). This gypsum board enclosure connects to the demising wall and the demising wall connects to the exterior (Figure 6) creating a wall duct that draws in exterior air leading to mold (Photograph 6). Figure 6: Accidental Flow Paths Interior walls connecting to dropped ceiling return plenum of fan coil unit become ducts that can connect to neighboring spaces and the exterior. How do we fix this? Add a return sleeve to match the supply sleeve thereby connecting the filter grille directly to the unit. Now add an additional grille to bleed the pressure created by leakage in the air handler itself. This grille can be small (4 inches by 8 inches) and can be in the ceiling of the enclosure around the unit (right beside the return filter grille). Don t install it in the demising wall (remember the exploding heads.). And oh yes, don t install vinyl wall coverings. Let me also tell you what does not work extending the exterior gypsum board past the demising wall where it intersects the exterior wall to provide an air barrier. In theory such an air barrier should work but in practice it does not as we can not get the gypsum board to be sufficiently airtight. The negative pressure field needs to be eliminated as well. Getting rid of the interior to exterior wall connection is a really good idea, but by itself it is not enough. So where are we now? We have to live with being hollow we are not going to go back to heavy May 2008 www.buildingscience.com 5

expensive massive resource intensive unsustainable buildings. We have to learn to compartmentalize in order to break up the three dimensional airflow networks. This includes a complete continuous air barrier system on the exterior. We must not accidentally couple HVAC systems to building enclosures and we must equalize pressures between the hollow spaces and the conditioned space. And we should learn to love fully ducted returns and be very wary of return plenums. References (1) Lstiburek, J.W.; The Pressure Response of Buildings, Thermal VII ASHRAE/DOE/BTECC, December 1998. Photograph 6: Demising Wall Mold Mold on demising wall due to coupling of fan coil unit return plenum to demising wall creating flow path between exterior and interior. May 2008 www.buildingscience.com 6