Stage 6 & 7 Design Guidelines

Similar documents
Stage 10 Design & Building Guidelines

Stage 11 (Release 1) Design Guidelines

siting, building and design guidelines April 2017 Newgate, Tarneit Design Guidelines

Residential Building Design Approval Procedure

ANNEXURE 3. CASSIA GLADES Stage 2A DEVELOPMENT CONDITIONS AND BUILDING GUIDELINES LOT

RESIDENTIAL BUILDING PLAN APPROVAL PROCEDURE

CONTENTS 1.0 INTRODUCTION 2.0 DWELLING DESIGN - MANDATORY REQUIREMENTS AND RECOMMENDATIONS 3.0 SPECIAL DWELLING - MANDATORY REQUIREMENTS

WELCOME TO THE NEWHAVEN DESIGN ESSENTIALS

Design Guidelines. Updated 1 November 2016

Stage 6. Annexure 3. October 2015 Development Conditions and Building Guidelines

contents 1 introduction general requirements building design guidelines... 2

MARAMA NEIGHBOURHOOD

beaconsfield gardenia estate stages 1 & 2

Building Guidelines. No development is to be commenced on any lot without the plans having been approved in writing as set out above.

Benefited Land means all the lots created when the Land is subdivided in accordance with the Deposited Plan;

Salita Estate - Masterplan. Retaining wall. Stage 4. Stage 1. 2m Estate boundary wall Feature fencing by developer BAL Rating (Refer to detail)

Bella Rosa Design Guidelines

Design Essentials. Stockland Residential Communities Stage DPA 11 only

Design Essentials. Stockland Residential Communities DPA12 (Health Hub 3) only

DESIGN GUIDELINES. Mandatory Criteria and Design Recommendations encourage sustainable, high quality home design.

DESIGN GUIDELINES LANDCORP.COM.AU/THERISE

INTRODUCTION CONTENTS. 1. Approval Procedure P2. 2. Design Guideline Checklist. 1.1 Gaining Approval P Dwelling Design and Building Application

Freeling. reeling is located just 60km north f Adelaide it s an easy hour s drive o one of the most charming country owns in the state.

Applies to lots: 6, 7, 10, 17, 18, 25, 26 Applies to lots: 1, 2, 3, 4, 8, 9, 12, 13, 14, 15, 16, 20, 21, 22, 23, 27, 28, 29, 30, 31

SECTION 1 INTRODUCTION DESIGN GUIDELINES

Mirvac s approval process

Design Guidelines HALE0017 MARCH 2017 ISSUE 2

Sovereign Pocket Design Essentials

Design Guidelines October 2017

Iluka Views Design Guidelines

HOUSING DESIGN GUIDELINES DETACHED HOUSING

Overview and Project Objectives. Design Assessment and Approval. Contents. Design Guidelines

The Strand design and siting guidelines

D E S I G N G U I D E L I N E S

DESIGN GUIDELINES. (Stages 10, 11, 12 & 13)

HOUSING DESIGN GUIDELINES DETACHED HOUSING

1.0 Approval Process 2.0 Thinking about your new home 3.0 Design Requirements 4.0 Building your home 5.0 Landscaping

Design Guidelines. September 2017

URBAN DESIGN GUIDELINES

design guidelines Golden Grove Golden Grove

Building Guidelines. THE VERY BEST OF BALDIVIS

CONTENTS. the vision 3 design guidelines approval 3 submitting your application for approval 3 approval process 3-4

DESIGN GUIDELINES INTRODUCTION TABLE OF CONTENTS

Design Guidelines. November 2017

Table of Contents 1.0 Introduction Identification of Estate Covenant Use of Land Building Construction Program

DELPHIS RELEASE DESIGN & BUILDING GUIDELINES

Note: You can send approvals directly to

URBAN DESIGN GUIDELINES V2.2

Urban Design Guidelines

Design Guidelines - Amendments & Updates Stages 1, 2 & 3

Design Guidelines - Amendments & Updates Stages 4-6

This page is intentionally left blank

DESIGN GUIDELINES. 1.0 Design Assessment Panel (DAP) The submission to the Design Assessment Panel must include:

D E S I G N - G U I D E L I N E S.

Annexure A RIVERHAVEN Design Guidelines and Restrictive Covenants

Urban Design Guidelines VIRGINIA GROVE URBAN DESIGN GUIDELINES V3.2

This page is intentionally left blank

Opalia Weir Views. Design Guidelines and Review Process

RESIDENTIAL DESIGN GUIDELINES

DESIGN GUIDELINES. 1.0 Estate Vision. 2.0 Purpose of Guidelines. 3.0 Design Assessment Panel (DAP)

Annexure C. Jindowie Stages 7 & 9, Yanchep Restrictive Covenants

Design Guidelines. 1. INTRODUCTION 2. SECTION SPECIFICATIONS 3. HOUSE DESIGN RULES

Residential Design Standards Draft 9 August 2013

Design Guidelines. Standard Lots (450m 2 <2,000m 2 )

Design Guidelines MAGPIE RELEASE (27 28) by AVID Property Group

Design Guidelines & Landscaping Packages STAGES by AVID Property Group

Annexure A - MALVERN SPRINGS - HILLSIDE Design Guidelines and Restrictive Covenants

Residential Design Guidelines. 25 February 2009

Serenity, Bundamba & Greenview releases Individual lot guidelines Protecting your investment

Guidelines. Checklist for Building Approval. 1. The Site

Annexure A - MALVERN SPRINGS Design Guidelines and Restrictive Covenants

Permitted Development for Householders: Guidance from Communities and Local Government. March 2010 Department for Communities and Local Government

belong at Jordan Springs

Annexure A - OAKEBELLA Design Guidelines and Restrictive Covenants

urban design GUIDELINES

KARAMŪ. Once you have read the guidelines and gathered your thoughts about the design of your home, you can have your plans approved by:

BUILDING COVENANTS. Section A Design Section B Procedure

KARAMŪ, RICCARTON PARK

Design Guidelines - Amendments & Updates Stage 8a, 13 & 14

PROPERTY INFORMATION

LOMBARDY ESTATE ARCHITECTURAL GUIDELINES RESIDENTIAL SECTOR

The Glades at Byford. Design Guidelines.

CALEDON ESTATE BOGMORE HOME OWNERS ASSOCIATION ARCHITECTURAL AND BUILDING CODE

Design Essentials. Call stockland.com.au/cloverton

Design and siting guidelines

URBAN, ARCHITECTURAL AND LANDSCAPE CHECKLIST

The developer / builder desires to follow the Design Guidelines and Design Features as listed below in lieu of the Basic Standards.

Encumbrance Requirements

SCHEDULE 2 TO THE COMPREHENSIVE DEVELOPMENT ZONE THE SANDS TORQUAY RESIDENTIAL LAKES AND GOLF COURSE COMPREHENSIVE DEVELOPMENT PLAN

Grandvue. Design & Siting Guidelines

RESIDENTIAL DESIGN GUIDELINES STAGES 1 TO 1 3

Design your family s future. Our vision for Akuna Vista Schofields

Part 9 Specific Land Use - Dwelling House in RU2, RU4, E2, E3 and E4 Zones

CONTENTS 02. OVERVIEW AND PROJECT OBJECTIVES 04. DESIGN ASSESSMENT AND APPROVAL 05. SITING AND SETBACKS 07. ARCHITECTURAL CHARACTER 09.

Melbourne Survey T

Practice Note FOR THE. Small Lot Housing Code

BUILDING DESIGN MANUAL BLUE MOUNTAIN RETIREMENT ESTATE GEORGE Version 6

belong at Jordan Springs

belong at Jordan Springs

Annexure A - LEXIA Design Guidelines and Restrictive Covenants

Transcription:

Stage 6 & 7 Design Guidelines

DESIRED CHARACTER/VISION The new release at Emerald Park Private Estate presents the opportunity to create a high quality and contemporary living environment. These Design Guidelines apply to all lots within the land known as Stage 7 Emerald Park Road, Emerald Park. Stage 7 is located adjacent to the Kwinana Freeway and is subject to additional building requirements designed to minimise the impact of vehicular noise to the dwelling. The objectives of the guidelines are: To produce a high quality, contemporary and aesthetically pleasant living environment; To encourage the incorporation of principles of passive solar design, energy and water conservation into the design of dwellings; SITE PLANNING Solar Access and Energy Efficiency All dwellings are required to comply with the following guidelines: Maximize the extent of windows facing North with suitable eaves and / or pergolas that allows winter sun to enter the dwelling however prevents direct sun entering in summer. Minimise the extent of windows facing east and west and provide adequate shading devices such as awnings, eaves or pergolas or the use of appropriate glazing eg smart glass. Utilise cross ventilation through the appropriate location of doors and opening windows. Make use of a hot water system that has a minimum of 5 star energy rating or is a solar HWS (either gas boosted or electric boosted with a timer). Where practical locate living areas facing north to maximize winter sun exposure. Where possible provide deciduous trees to the north of the dwelling to assist in summer thermal comfort and microclimate control. Where practical locate outdoor courtyards to face north adjacent and connected to living areas. Waste and Water Management Builders use of an on site Waste Bin during building construction. Installation of waterwise garden. These are provided by Cedar Woods to the front of the home (and side verge for corner lots) as part of the land purchase if homes are constructed within 18 months of settlement. There are a number of designs to choose from and variations to these will be considered. BUILDING DESIGN Building Appearance/Streetscape The appearance of the dwelling from the street should be articulated to provide visual interest. This can be achieved through the use of: A mixture of colour, texture and materials. Elements such as verandas, or eaves, gables, gablets, porticos and windows. Dwellings should enable eyes on the street for passive surveillance of all street frontages from habitable rooms. A defined entrance to the property. Balconies for 2 storey dwellings. All dwellings shall provide a feature to the front facade of the home. This can be either through the use of feature materials, verandahs, blade walls, porticos, roof elements etc. Materials Building materials have the potential to significantly impact upon the overall character of the area. It is important that the materials utilised reflect the desired character as outlined in Section One. A minimum of two building materials is required including: Face Brick. Rendered construction. Limestone Feature stone or brick Metal sheeting (custom or mini orb). Cedar cladding. Painted fibre cement sheeting or weatherboard. Other materials as approved by the vendor All dwellings are required to be built with the front facade comprising at least 2 of the above materials (excludes garages and glazing). No one material shall comprise more than 85% of the front facade by surface area.

Entrance The front door shall present and be visible to the primary street (unless otherwise approved by the vendor). Front doors shall include either glazing within the door or a sidelight adjacent to the door. Windows The placement, proportion and detail of windows and openings can assist in articulating the facade and are an important element within the design. To create an elegant design, windows facing the street shall be well considered as features within the elevation design. Sliding windows are discouraged on the street elevations In these locations, opening lights should be awning type. Setbacks Setbacks are generally controlled by Town of Kwinana with reference to the Residential Design Codes. The upper floor of a 2 storey dwelling should be setback from the ground floor building line to reduce the impact on adjoining properties and avoid a boxy appearance Height Unless otherwise approved by Cedar Woods, the level of the site is not to be varied by more than 300 mm from the finished level of the site (ie at the time development works are completed and title has issued). Unless otherwise stated, a building height of 2 storeys is permitted. Where a 2 storey dwelling is proposed, consideration should be given to the overshadowing and overlooking of the adjoining property. Roof Form, Materials and Colour The design of your roof makes a major contribution to the character of the area and your home. Roofs which are visible from the street or public areas shall be pitched with a minimum angle of 25 degrees. However, Cedar Woods may, at its discretion, permit a skillion or curved roof of a lower pitch where the applicant can satisfactorily demonstrate that the roof is an integral part of a passive solar design and has the required overhang according to such principles with respect to north facing windows. Minor roof elements such as verandas and window awnings may be reduced to a pitch of 15 degrees. The use of gables, gablets, raised porches, porticos and dormer windows are encouraged to provide greater interest and character to the front of your home. Dark coloured roofs are discouraged and zincalume is permitted. Light coloured and light weight roof material is encouraged to reduce the temperature of your home in summer. Corner Sites Corner sites tend to be the most prominent in the neighbourhood. Those dwellings located on corner sites should: Address both street frontages where practical. Incorporate at least one window from a habitable room addressing the secondary street. Incorporate verandas, roof gablets and gables, recessed panels or other features to provide visual interest to both street frontages. Provide feature landscaping. Fencing Where fencing of the front boundary is constructed it shall be: Constructed from painted timber or metal and/ or masonry that matches the front façade of the dwelling. A maximum height of 900 mm to all east/west orientated lots. A maximum height of 1,200 mm to all north/ south orientated lots and be at least 50% visually permeable. Fencing to corner sites is to be provided by Cedar Woods and must maintain an interactive street frontage for at least the first 4 m from the minimum front building setback line. Side boundary fences between properties are to be timber lap fencing with a height of 1.8 metres. Cedar Woods will provide these fences if homes are completed within 18 months of settlement. Garaging and Access All dwellings must as a minimum include a double carport with sectional door This shall be designed as follows: Carports must accommodate at least 2 vehicles (minimum area of 30 m2) and be incorporated under the main roof of the dwelling (unless a secondary road frontage is available) and must be enclosed with a roller door.

Carports must be constructed out of the same materials as the dwelling. No open carports are permitted. Roof pitch to be the same as the main dwelling. Colour All colours to the external front façade of the home are subject to approval by Cedar Woods at its complete discretion. Neutral colours are preferred as the dominant colour with highlight colours to be used for trims etc. OTHER CONSIDERATIONS Site Services Bin storage areas, clothes drying areas and sheds must not be visible from the street. All piped and wired services are to be concealed from view from the street. Meter boxes must not be placed on the front façade of the dwelling. Air conditioning units, solar hot water systems are to be of a similar colour to the roof or building material and are not to be located above the peak ridge of the roof of the main building. They should be located so they are not visible from the street or public areas and if possible adjoining properties. Split solar hot water heaters are encouraged with the storage unit located in the roof space or on the ground and concealed from view from the street. TV Antennae, Satellite Dishes & Radio Masts TV antennae, satellite dishes and radio masts should either: Be built within the roof space. Be located towards the rear of the building out of view from the street. Be located with due consideration for neighbours. Avoid unnecessary extensions of height. Landscaping All garden areas within public view are to be completely landscaped within 3 months of occupation of the residence and shall be maintained thereafter by the purchaser in a neat and tidy

For further information please call 9480 1500 or visit emeraldpark.com.au