The purpose of this procedure is to define internal audit activities of PRI s administration of the Industry Managed Accreditation Programs.

Similar documents
Audit Documentation Guidance

Code of Practice for the TL 9000 Certification Process Release 8.0

Nadcap Asia Symposium October - November, 2011

FAQ 9101:2014 / 9101E

AERO GEAR, INC. SUPPLIER QUALITY MANUAL

PRI REGISTRAR AUDITOR ADVISORY #93

Internal Auditing and Control of Nonconforming Work

Welding Performance Testing Administrators GUIDE FOR ASSESSMENT OF QUALITY CONTROL MANUALS

SUPPLIER QUALITY SYSTEM SURVEY

AUDIT CRITERIA. Superseding AC7116/3 Nadcap AUDIT CRITERIA FOR ELECTRICAL DISCHARGE MACHINING (EDM)

Table of Contents Table of Contents... 2 Introduction to Manual... 3 Scope... 3

Remedies for Supply Chain Headaches: Innovating Critical Process Manufacturing Oversight. March 23, 2016

OP-19 (9) Certification Process & Decision

For Use By Certification Bodies Performing SAAS Accredited SA8000:2014 Certification Audits

IAQG 9101:2014 (Rev. E)

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

Welding Performance Testing Administrators GUIDE FOR ASSESSMENT OF QUALITY CONTROL MANUALS

QUICK START GUIDE. SQF Implementation. for.

Management System Policy and Procedure Manual. Based on the requirements of ISO17021, AS9104 and Associated ANAB Accreditation Rules

A GLOBAL INDUSTRY-MANAGED SYSTEM FOR QUALIFYING SPECIAL PROCESS AEROSPACE PERSONNEL

Approved Supplier Guidance

AP Quality Consulting works with you to provide a custom solution

4. Quality Management System 4.1 GENERAL REQUIREMENTS

TURBO MACH A DIVISION OF VT SAA

Servicios De Control e Inspeccion S.A. NonDestructive Testing

Aerospace Scheme Auditor Guidance

CORPORATE QUALITY MANUAL

Table of Contents. Project Agreement Schedule 14

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

Replaces: Not applicable.

Quality Manual ISSUED JANUARY Approved By: January 12, 2004 (President & Chief Executive Officer)

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS

I hope you continue to find the content valuable. Joseph G. Pinto Executive Vice President & Chief Operating Officer Performance Review Institute

SCOPE OF ACCREDITATION. NonDestructive Testing. Veridiam Inc Cuyamaca St El Cajon, CA 92020

General Conditions for the Certification of Management System

Nadcap Overview. Nadcap Asia Symposium in Japan Oct31 st- Nov 1 st, 2011

CALCULATION COVER SHEET

Manufacturing Supplier Requirements Manual

Supplier Quality Clauses

Consumer Goods Requirements. Introduction & Explanation

2.1. The Seller s Quality Management System shall ensure all relevant Purchase Order requirements are flowed down to their sub-tier sellers.

To establish supplier quality requirements applicable to the type of product or service procured by Hudson MFG LLC.

Control of Documents and Records. Internal Audit. Control of Non-Conformity, Corrective and Preventive Action

Accreditation Process Requirements

IAQG Frequently Asked Questions (FAQs) 1 of 5

Rosen Aviation Supplier Quality Assurance Requirements

FSC36 SAFE FEED/SAFE FOOD GUIDANCE DOCUMENT

UPGRADE ASSESSMENT CHECKLIST

Why require the submission of documentation of the initial audit and one full audit cycle when the TSMS certificate verifies TSMS compliance?

Project Procedures 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /21/2012 PAGE 1 OF 13 BASIS OF OPERATION

25 D.L. Martin Drive Mercersburg, PA (717)

Purchasing- requirements Attachment A ALLEN AIRCRAFT PRODUCTS MINIMUM REQUIREMENTS FOR SUPPLIERS AGREEMENT

Procedure 14 Internal Audits

Mapping ISO/IEC 27001:2005 -> ISO/IEC 27001:2013

ISO 9001:2015 Gap Analysis Check Sheet

Orbel Corporation AS9100D Supplier Flow Down Requirements

Requirements for Suppliers

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action

Servicios De Control e Inspeccion S.A. NonDestructive Testing

Quality Assurance Program for the Carolina Crossroads Project

Quality Assessment Review. Agenda. The Law Says 11/16/2015. Internal Audit Management November 19-20, 2015

Vac Aero International. Heat Treating

U. S. Department of Energy. Consolidated Audit Program Treatment, Storage and Disposal Facilities. Checklist 1 Quality Assurance Management Systems

FLYSHEET 100 Rev. 14 QUALITY SYSTEM REQUIREMENTS

ISO 9001:2015. Quality Management System. Manual

I. Development, Submittal, and Acceptance of a Quality Management System

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

Internal Quality Auditing Procedure

Leveraging ISO s Quality Management System to Achieve 24/7 Inspection Readiness. Randy Querry Accreditation Manager Clinical

External Provider Quality Requirements QCS-001 Processing Sources

1050 Day Hill Road Windsor, Connecticut Telephone (860) Fax (860) SUPPLIER SURVEY DATE OF SURVEY TYPE OF SURVEY

Certified Welding Fabricator (CWF) Program Information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Frequently Asked Questions (FAQ) Log Revision: 20 Nov 2017

MSC-SE-0007 SUPPLIER QUALITY MANUAL

ISO 22000:2018 Transition Workshop (Auditors)

Introduction to Nadcap/PRI. formally: Nadcap Customer Support Initiative (NCSI)

Nadcap A Regulator s View. Dr E H Blacklay 21 March 2017

To support organizations in making a successful transition to IATF Quality Partner has developed several documents to help:

IBERIA LINEAS AEREAS DE ESPAÑA SOCIEDAD ANONIMA OPERADORA Dirección Técnica. NonDestructive Testing

SUPPLIER QUALITY SYSTEM SURVEY

ISO/TS Pitfalls By Robert Wallace, SRI Senior Lead Assessor

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.

AS9101 Revision E Understanding the Changes

Internal Audit Procedure:

Audit Report No: QE /12 - S. Hooks Industrial, Inc. Contact Person: Mr. John Valentine Phone: « »

GKN Aerospace - St. Louis Supplier Quality Assurance Manual

Sensor Scientific, Inc.

Possible Noncompliance Review Processing

ADVANCED INTERNAL AUDIT WORKSHOP

U.S. Technical Advisory Group to ISO/Technical Committee 207 Clarification of Intent of ISO 14001

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Procedures: QP 4 through QP 8, QP 16, QP 17, and QP 19

Supplier Quality Clauses

Complaints, Feedback, Corrective and Preventive Action

Nadcap Customer Support Initiative (NCSI) for Newcomers

The National Heavy Vehicle Accreditation Scheme (NHVAS)

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing

Pikes Peak Test Labs, Inc Edison Avenue Colorado Springs, Colorado QUALITY ASSURANCE MANUAL

Transcription:

INTERNAL AUDIT Page 1 of 5 1.0 PURPOSE 2.0 SCOPE The purpose of this procedure is to define internal audit activities of PRI s administration of the Industry Managed Accreditation Programs. This procedure is applicable to oversight of the Nadcap Aerospace Industry Managed Accreditation Program. 3.0 DEFINITIONS Finding: a general term referring collectively to Nonconformances and Observations. Internal Audit Review Team: Nadcap Program Director and Program Managers. Nonconformance (NCR): a violation of an Industry Managed Accreditation Program requirement. Observation: an opportunity for improvement. 4.0 PROCEDURE 4.1 The Nadcap Leadership Team, as defined in IMAPP 06 Continuous Improvement, shall determine the procedures to be audited during the year by utilizing a risk analysis tool. 4.1.1 Each procedure shall be audited, at a minimum, every three (3) years. 4.2 The Quality Manager shall develop an annual Internal Audit schedule using i- frm-50 Internal Audit Schedule. 4.2.1 The schedule shall be posted and maintained on SharePoint. 4.2.2 The schedule and changes to scheduled timing shall be approved by the Director, Nadcap Program and Aerospace Operations. 4.3 The Quality Manager shall ensure that the audit is conducted per the approved schedule. 4.4 The audit shall be conducted by qualified auditors per 4.13 using the appropriate checklists. 4.5 Checklist responses, nonconformances, and observations shall be recorded in eauditnet.

INTERNAL AUDIT Page 2 of 5 4.6 Findings shall be classified as Major nonconformance, Minor nonconformance, or Observation. 4.6.1 A nonconformance shall be classified as Major for any of the following circumstances: Evaluate impact- identified issue calls into question the reliability of the Nadcap work product (Advisories, Audit Reports, Accreditation Process, QML, etc.) A systemic breakdown Nonsustaining corrective action a situation where agreed corrective action was not implemented or failed to prevent recurrence of an NCR. 4.6.2 A nonconformance shall be classified as Minor when there is any single system failure or lapse in conformance that did not call into question the reliability of the Nadcap work product. 4.6.3 An observation identifies an item that is compliant with the requirement but may be an opportunity for improvement. 4.7 The condition found shall include the following at a minimum: Auditor who identified the finding Responsible Party - the person responsible for developing the response to the finding Immediate Supervisor of the responsible party Document Owner of the procedure that the finding is written against Other Associated Individuals other persons affiliated with a finding as applicable. These persons contribute to developing the response to the finding. Written description of the finding 4.8 The Quality Manager shall review the audit report for completeness, and ensure the condition found contains all required elements. 4.9 The Quality Manager shall submit the audit to Responsible Parties by selecting Send for Supplier Review. 4.10 Responding to Findings 4.10.1 Responses to findings shall be posted in eauditnet within twenty-one (21) calendar days of the audit results being submitted for Supplier Review. 4.10.2 The Responsible Party shall develop the response, and coordinate the response with other associated individuals when applicable. Evidence of coordination shall be included in the response.

INTERNAL AUDIT Page 3 of 5 4.10.3 Before posting, responses shall be approved by the immediate supervisor of the Responsible Party. Evidence of approval shall be included in the response. Note, only the first cycle response needs to be approved. 4.10.4 The response to nonconformances shall include the following elements: Immediate Corrective Action Root Cause of the Nonconformance Impact of All Identified Causes and the Root Cause Potential Systemic Nature Action Taken to Prevent Recurrence Effective Date Objective Evidence 4.10.5 Observations require a response by the Responsible Party. The response may indicate that no action was taken provided that investigation deemed that any further action was unnecessary. 4.10.5.1 Actions proposed to resolve an Observation shall not be implemented prior to the Observation being dispositioned by the Internal Audit Review Team. 4.10.6 Once all responses are posted, the Quality Manager shall submit the audit for Quality Manager Review by selecting Send for SE Review. 4.10.7 The Quality Manager shall review responses and disposition all findings within seven (7) calendar days. 4.10.7.1 Any finding assigned to the Quality Department shall be reviewed and dispositioned by a minimum of two (2) members of the Internal Audit Review Team. 4.10.7.2 Findings are dispositioned by requiring additional information from the Responsible Party, voiding the finding, or accepting the response. 4.10.8 If subsequent response cycles are required, the applicable Responsible Parties will have seven (7) calendar days to respond. 4.10.9 The Quality Manager shall have 7 days to review subsequent responses and disposition the findings. 4.10.10 Once all findings have been designated Void or Accept, the Quality Manager shall submit the audit for Internal Audit Team Review by selecting Send for TG Review. 4.10.11 The Internal Audit Review Team shall review responses and disposition all findings.

INTERNAL AUDIT Page 4 of 5 4.10.11.1 Findings are dispositioned by one of the following: requiring additional information from the Responsible Party, voiding the finding, or closing the response. 4.10.12 Once all findings have been designated Void or Close by the Internal Audit Review Team, the Quality Manager shall move the audit to Withheld. 4.10.13 Extensions for response submittal shall not be granted. 4.10.13.1 Responses not submitted by the due date shall accrue delinquency days. 4.10.14 Delinquency days shall result in actions being taken as deemed appropriate by the supervisor and/or the Nadcap Leadership Team. 4.11 Appeals of NCRs 4.11.1 The validity of an NCR may be challenged. Appeals shall be submitted in lieu of a response in eauditnet. Justification, and any supporting evidence, shall be provided. 4.11.1.1 When appealing an NCR, it is not required to include all elements of the nonconformance response. 4.11.2 The appeal shall be resolved by the Quality Manager or the Internal Audit Review Team. 4.11.3 If an NCR is determined to be invalid, the status of the NCR in eauditnet shall be revised to Void. A note shall be included explaining why the nonconformance is no longer valid. 4.12 Verification of Corrective Action 4.12.1 The status of the audit shall be changed to Completed after the Quality Manager has verified that all proposed corrective actions have been implemented. 4.12.2 The effectiveness of corrective actions implemented as a result of an internal audit NCR will be evaluated by an internal auditor(s) during the subsequent internal audit. 4.13 Selection and Training of Auditors 4.13.1 Internal Auditors are selected from PRI Staff and Nadcap Auditors. 4.13.2 PRI staff who are not Nadcap-qualified auditors must complete one of the auditor training courses listed below: ANAB recognized Lead Assessor Course (e.g. Stat-a-Matrix), ASQ sponsored Auditor Training (e.g. CQA), or

INTERNAL AUDIT Page 5 of 5 Internal training administered by the Quality Department. 4.13.3 Internal Auditors shall be trained to this procedure. 5.0 DOCUMENT REVISION HISTORY Effective Date 19-Apr-2015 1-Feb-2016 1-Apr-2016 05-Oct-2016 15-Sep-2017 Summary New Document transitioned from NIP 8-01 02-Dec-14 Significant re-write. Removed the following- quarterly audits, audit all procedures every year, internal audit manager, internal audit manager qualifications, response extensions. Added risk analysis tool used to determine procedures to be audited, each procedure audited at a minimum every 3 years, internal audit review team, schedule is a controlled form, 7-day review time for Quality Manager, response delinquency, training requirements for non-nadcap auditors 4.6.1 clarified the definition of impact; 4.6.2 revised to align with clarified impact language in 4.6.1; 4.7 changed finding description to condition found, and added written description of finding; added new 4.9 Send to Supplier Review 3.0 revised Finding definition, added NCR and Observation definitions; 4.4 - added reference to 4.13; 4.6.3 changed conformance to compliant and procedure to requirement ; 4.10.11.1 and 4.11 - changed finding to NCR ; Removed Referenced Documents section 5.0 and added document titles to documents referenced in the body of the procedure; 4.10.5.1 new; 4.10.11 replaced nonconformance with finding; 4.10.11.1 replaced Nonconformances with Findings, and NCR with finding; 4.10.12 replace nonconformances with findings