TUNNEL DESIGN WITH SPECIAL VIEW TO THE PORTALS

Similar documents
EUROPEAN STANDARDS FOR ROAD TUNNELS AND THEIR IMPLEMENTATION FOR AUSTRIA

Abstract. energy efficient tunnel lighting solutions 2

Workplace Transport. Introduction

UPGRADING AND REFURBISHING VENTILATION SYSTEMS IN ROAD TUNNELS - ENGINEERING WITH CONFLICTING INTERESTS

ASFINAG - A USER FINANCED SYSTEM FOR HIGHWAY CONSTRUCTION AND MAINTENANCE

ASECAP Road Safety Conference Road Safety A shared responsibility A story of success or failure?

THE EUROPEAN TUNNEL TEST IN THE SCOPE OF THE EUROTAP PROJECT

insight outlook Legal notice:

SECTION 12 - CONSTRUCTION AREA TRAFFIC CONTROL TABLE OF CONTENTS

To maximize the effectiveness and sustainability

Specific Requirements for Various Types of Signs

4 ROAD OPERATION/MAINTENANCE SERVICE TO BE PROVIDED

Rehabilitation of Prater junction

PARKING GARAGE SIGNAGE DESIGN REQUIREMENTS

Road Tunnel Ventilation

3.13 NOISE INTRODUCTION ENVIRONMENTAL POLICY TARGETS

Questions to be responded to by the firm submitting the application

Chapter 1. Introduction. 1.1 Research motivation

safety sustainability

STANDARD OPERATIONAL PROCEDURES

1.0 Background and Purpose

Light is safety Pioneering lighting solutions for modern parking facilities Light is OSRAM

Safer travel, faster arrival siemens.com/mobility

Economic and Social Council

FOLGOSO TUNNEL REFURBISHMENT WORKS: FEATURES AND CHALLENGES

GARFIELD COUNTY, COLORADO

STREET LIGHTING POLICY Draft for approval

SEMMERING BASE TUNNEL LOGISTIC CHALLENGES

Leighton Contractors. Lend Lease

Draft. Not yet Approved

EGLINTON CROSSTOWN Fairbank Oakwood CLC April 19, 2018

mageba modular expansion joints the benchmark for large movements

Development ACSF of Category B2 (SAE Level 3 & 4) Requirements

NEW AUSTRIAN GUIDELINE FOR THE TRANSPORT OF DANGEROUS GOODS THROUGH ROAD TUNNELS

GUIDELINES FOR TRAFFIC SAFETY AT INEOS O&P SITES

ASECAP. Sa f e t y, t h e Fi r s t Pr i o r i t y o f t h e Eu r o p e a n

GUIDELINES FOR FIRE SAFE DESIGN COMPARED FIRE SAFETY FEATURES FOR ROAD TUNNELS. Niels Peter Høj COWI A/S, Denmark ABSTRACT

Requirements Change Management

Easy and cost-effective

ORDINANCE ON TECHNICAL REQUIREMENTS FOR CABLE DUCTS

Exterior and Public LED Lighting Solutions

Workplace Transport Guidance

SITE ACCESSIBILITY AND PARKING

TUNNEL OPERATION : THE E40-E25 LINK (LIEGE, BELGIUM) SPECIFIC SAFETY MEASURES AND EXPERIENCE FEEDBACK

CITY OF DANA POINT SITE ACCESSIBILITY AND PARKING B103 SITE INTRODUCTION

EUROPEAN ITS-DIRECTIVE PRIORITY ACTION C SAFETY-RELATED TRAFFIC SERVICES

Section Safety Section Cleanup. None Required

Institute of Industrial Science University of Tokyo (Roppongi , Minato-ku, Tokyo 106, Japan)

MADRID CALLE 30: AN URBAN TRANSFORMATION PROJECT

Peterborough County Road Safety Audit Guideline Pilot

CROCODILE AUSTRIA INTELLIGENT TRUCK PARKING

RESEARCH FOR CIVIL SECURITY IN GERMANY: PROTECTION OF ROAD TUNNELS AND BRIDGES

THE HAZARDS OF TRYING TO IMPROVE THE SAFETY OF TUNNELS

PRO Traffic Management

ITS Architecture Workshop

Structural Design Model of Aerial Work Truss System for Tunnel Maintenance. *Dong-Kyu Lee 1)

Refurbishment of the Amsterdam IJtunnel

Preliminary Planning Study. New Railway Line Dresden Prague. Task 2 Route Optimization

Management of Dynamic Traffic Data and Connectivity into Vehicles. Peter Hrassnig ASFINAG Maut Service GmbH A3PS Conference,

OKLAHOMA TURNPIKE AUTHORITY SPECIAL PROVISION FOR SECTION 880 CONSTRUCTION SIGNING AND TRAFFIC CONTROL

Legal Summary SHE-037 Handbook of Business Operation in Thailand s Industrial Estate Version 2

NOISE MAPPING AND NOISE ACTION PLANS IN LARGE URBAN AREAS

Ministry of Land, Infrastructure, Transport and Tourism

Curb Ramps [ 4.7.3] [ 4.7.2; 4.8.2; 4.1.6(3)(a)] [ 4.3.7] ADA Accessibility Survey Instructions Curb Ramps Page 1 of 6

I335. Western Springs Stadium Precinct

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

MESSAGE STANDARDIZATION ON VARIABLE MESSAGE SIGNS (VMS) Simon Trépanier, Eng. Ministère des Transports du Québec

ATTACHMENT B THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CA RESOLUTION NO._6022_

Field Guide on. Safe Maintenance and. Work Zone Operations

Triflex DMS. Triflex DMS. System Benefits. System Data Sheet. Model Specification. Test Data

Appendix A: Equipment Packages for St. Louis Regional ITS Architecture

E23 Signs. E23. Signs

TRADITION. Master Sign Program

Home Office Type Approval Process

Mobile Work Zones. Traffic Control in Short Duration / Guidelines for M0WING ZONE AHEAD WORK ROAD SHOULDER WORK RIGHT LANE CLOSED AHEAD SIGNAL AHEAD

Traffic Management Procedure

Claremont City Center Project Focus Group Summary

Quality assurance in road operations and maintenance in Lithuania

Total commitment to our customers every day

CHAPTER 18 TEMPORARY ROADS AND BRIDGES

BMV Customer Choices Initiative

Facts that provide correct decision-making input

Portable Changeable Message signs have a wide variety of

Response to a Bridge Strike over the Railway

4.4 Policy Development

G4S ACADEMY ANTI-RAM AND TERRORISM PROTECTION

Choose NDC for Quality, Reliability and Unrivalled Experience

Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood

ITS World Congress, Detroit

Ports & Rail. Lighting & Controls Solutions

LED LOW BEAM LIGHT WITH 77 % ENERGY REDUCTION

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

Response of the Road Haulage Association to National Infrastructure Commission. Congestion, Capacity, Carbon: Priorities for national infrastructure.

Night Work Specification

NEED FOR INTELLIGENT TRANSPORTATION SYSTEMS IN AMARAVATI

CITY OF FORTUNA, CALIFORNIA

Occupational Health and Safety Requirements for Workplaces 1

NRA Alpha-Numeric Index to the Design Manual for Roads and Bridges

26 th INTERNATIONAL EXHIBITION of Construction

Metro Purple Line Extension

Transcription:

- 69 - TUNNEL DESIGN WITH SPECIAL VIEW TO THE PORTALS G. Eberl and W. Riffnaller Österreichische Autobahnen- und Schnellstraßen Ges.m.b.H. After the disasters which in 1999 occurred in several European tunnels it has been realized that the behaviour of drivers has a great influence on tunnel safety. Therefore an appropriate method to analyse the behaviour of drivers in tunnels has been searched for. In spring 2001 the ÖSAG has charged the KfV (Austrian Board of Trustees for road safety) with a study on the behaviour of drivers in motorway tunnels. The research has been finished in autumn 2001 and its results were presented on the 1 st symposium in April 2002. The results of this research have been considered in the planning of the ÖSAG-projects Semmering pass consisting of a tunnel chain with a total tunnel length of 16 km and Tunnel chain Klaus on the A9 Pyhrn Motorway which consists of 6 tunnels constructed by mining method and 4 short tunnels constructed by cut-and-cover method. Most part of the long tunnels constructed by mining method are divided only by valley crossings. Additionally, these results have been considered in the guidelines for the design of portal areas and in the revised guidelines for operating and safety equipment in tunnels. 1. GUIDELINE FOR THE DESIGN OF PORTAL AREAS: In summer 2002 within the ASFINAG group there has been established a working group charged with the working out of guidelines which in autumn 2003 have been finished. In collaboration with a traffic psychologist (author of the above mentioned study) the members of this working group have tried to find strategic principles for designing the portal area and to draw up model plans for the portal area. In detail the following regulations have been worked out: A) Main principles of these guidelines - The design of the portal area has to keep the drivers free of optic impressions, so that he can concentrate on the driving into the tunnel. The driver shall have as few disturbing impressions and information as possible approaching and entering the tunnel. The definition of the portal area is a distance, which you can pass in 5 seconds using the allowed speed. Driving with 80 or 100 km/h this is a distance of about 110 to 140 m before the portal. - If a driver error occurs in the portal area and there is a collision, the consequences of the collision have to be minimized; primarily the design has to protect other road users but also the driver himself. - An architectural design of the portal also has to fulfil these principles. - If topographical situations do not allow to obey the specific regulation, as a minimum the mentioned principles have to be fulfilled.

- 70 - B) Special regulations - Definition of the placement of traffic lights (directly at the portal and 250 m before the portal), it is preferred that they are overhead and they shall be in LED-technique. - The markings before the portal in a length of about 250 m shall be made with a short distance of the lines. - Rumble strips have to be made at the edge line and at the continuous traffic line at bi-directional tunnels for about 100 m before the tunnel portal to give an acoustic sign when a car looses its way (s.pic 1). pic.2 pic.1 - Dampers have to be installed on the right side of tunnel portals of bi-directional tunnels (s.pic.2). - The situation of the signalization of the speed limits and the speed limits themselves before the tunnel portal are defined in the draft of the new regulation as follows (s.tab.1): Kind of traffic Speed on open road State of operation Distance [m] Distance [m] Distance [m] bi-directional 130 Normal 100 300-500 80 300-500 -- 100 80 Works in the tunnel 100 300-500 80 300-500 50 100 30 Jam - closure 100 300-500 80 300-500 Stau 100 tab.1 General prohibition of driving < 100 Normal 80 300-500 -- 100 80 Works in the tunnel 80 300-500 50 100 30 Jam - closure 80 300-500 Stau 100 General prohibition of driving unidirectional 130 Normal 100 500-800 100 500-800 100 Works in the tunnel 100 500-800 80 500-800 30 General prohibition of Jam - closure 100 500-800 Stau 500-800 driving

- 71 - - The signalisation of the name and the length of the tunnel together with the tunnel symbol will be situated not in the mentioned portal area, but some hundred meters before the tunnel. The board with radio frequencies will also be situated not in the portal area. (s.pic.3) pic.3 - There will be installed information boards about 1,5 km before the tunnel entrance and directly at the entrance of the tunnel, to make it possible to inform drivers in case of emergency or road works inside the tunnel (s.pic.4). 2. TUNNEL CHAIN AT KLAUS: The fact that the motorway section between Schön and Lainberg Nord runs through a deep valley required the building of many tunnels. As a result about 10 km or 70 per cent of this 16 km long motorway section run underground in tunnels. The planning of this project was very challenging especially because of the direct succession of so many tunnels which partly are divided only by valley crossings. pic.4

- 72-2.1. Operating and safety equipment The arrangement of construction elements such as lay-by niches, cross passages for pedestrians and cross passages for vehicles as well as the installation of operating and safety equipment have been carried out according to the RVS 9.281 and RVS 9.282 and according to the latest technical standards. On the motorway section between Schön and Lainberg Nord among others the following safety facilities have been installed - Emergency phones - Fire alarm devices - Video monitoring system with digital recording of video images - Surveillance of air quality in the tunnel - Ventilation during operation and in case of fire - Fire extinguishing facilities - Tunnel radio system - Height control facility - Tunnel lighting - Information boards for additional traffic information All facilities are controlled by the control centre situated in Ardning (s.pic.6). pic.6 Considerable emphasis has been laid on the quality of the lighting system in the tunnel. In the interior zone of the tunnel 150W Sodium high pressure lamps have been installed in distances of 17,85 m which leads to an average luminance of 5 cd/m2 during operation. At the lay-by niches in the interior zone there are installed 250W HMI-lamps in order to reach halation-effects. Additionally, the emergency phone niches are lighted up by 250W HMIlamps installed in the lighting axis and rotated through an angle of 90.

- 73 - LED-arrows indicating escape routes in case of emergency and stroboscopic flashes represent important safety criteria (s.pic.7). pic.7 The working out of a traffic control plan was a very challenging task. The main problem consists in the fact that before the tunnels traffic cannot be diverted and there is not enough space in case of jams because the open road sections between the tunnels forming the tunnel chain are very short (often with bridge constructions) Considering these facts traffic control plans for two cases have been defined: - Short term obstructions - Long term obstructions Normally, short term obstructions have no impact on neighbouring tunnels so that traffic control measures have to be taken only for the tunnel concerned. For example: emergency information in unidirectional tunnels Long term obstructions inevitably impact on neighbouring tunnels (on tunnels lying before the tunnel concerned). Depending on the kind of obstruction general danger alarms (eg. yellow flashing traffic lights) or traffic diversion at the junction lying before the tunnel chain are put into effect. For example: fire alarm 3. PSYCHOLOGICAL INVESTIGATIONS On 26 September 2003 the tunnel chain has been opened to traffic. In order to check over the efficiency of the measures which have been taken the KfV (Austrian Board of Trustees for road safety) has been charged with a new psychological research. Like the research carried out in 2001 in this new research varied data have been collected from 67 test subjects. In both researches the test subjects had to drive with cars provided with

- 74 - instruments through several tunnels of the Pyhrn Motorway. Then they were interviewed in a detailed way about their impressions and about other aspects. In the latest research the test subjects had additionally to undergo high-frequency ECGs which allow to collect objective data about the stress the test subject is under. The test section of the recent research was about 90 km long and ran on the A9 between Ardning and Schön. On this section older tunnels such as the Bosrucktunnel and the Lainbergtunnel had to be passed as well as the tunnels of the tunnel chain at Klaus which - as mentioned above - have been constructed according to the latest standards. But also the older tunnels meet the latest standards under many aspects because they have been renovated in the last years. Comparisons with former standards could be made on the basis of the data collected in 2001 partly on the same motorway sections. The latest analysis has been carried out under the aspect of traffic signs, tunnel entrances, tunnel lighting, design of the tunnel walls, road markings, safety equipment and design of transition areas (transition from one or more lanes to one lane, rapid succession of tunnels and open road sections). The results of the study carried out in 2001 have already shown that differences in the above mentioned designs have impact on the behaviour and the subjective feeling of the driver. The results of the recent research show that the new tunnel designs have been accepted positively by the drivers. In the area before the tunnel information have been structured in a new way and have been reduced to the essential. As a result drivers now record more easily the important traffic signs which call for actual action. The new designs of tunnel portals show also elements of art. The comparison between portals of different designs shows that every design is accepted. In 2001 as well as in 2003 the test subjects were asked about suggestions for improvement under all aspects. The study of 2003 virtually brought no actual new idea which has not been realised in the meantime. The test subjects are very satisfied with tunnel lighting, the design of tunnel walls, marking signs and reflectors. The drivers also know more about safety equipment and the right behaviour in case of emergency. Nevertheless the latest research show that there are also some points - specific of this section - which potentially could be improved. Several test subjects felt uncomfortable about the rapid succession of tunnels and open road sections. Some drivers felt also irritated by traffic signs and guidance systems lit by LED-technique which generally have been accepted positively but at night-time make a sharp contrast with the background. To solve this problem it has been suggested to dim the lights. Like the former research also the recent study compares the statements of the test subjects with their behaviour in order to compare the subjective feeling about safety with objective safety indicators. As higher levels of planning standards should lead to a reduction of driving errors and this indicator sometimes may be not exact enough, variability of heart beat frequency has been analysed, too. On the basis of this physiological indicator the stress of the test subject can be measured objectively and details which did not come out during the interview can be found out. Using this method above all the stress of anxious people can be measured more exactly. The latest research is now being analysed and evaluated, the results will be available in time when the symposium takes place.