Walls generally range from 600 to 1500 mm thickness, in wide between 2000 and 3500 mm and can be excavated to depths of 60m or more.

This method significantly reduces the over-consumption of concrete and eliminates any risk of over-augering.

TECHNOLOGY. Hydromill

Lesson 2 Substructure. Dr S.Sreenath BSc Engg, MSc Engg, MSc (ICM), MBA, PhD

Diaphragm wall Construction

ISO INTERNATIONAL STANDARD. Building construction machinery and equipment Terms and definitions

Case Study. The Challenge. Deep Micropile Installation Under Existing Multistory Building

ROTARY DRILLING TECHNIQUES LARGE DIAMETER

Wet Speed-Mixing WSM - Soil Mixing Procedure in Twinmix Design

* The use of these areas can vary from car park space, where little waterproofing is required through to store rooms or plant rooms where a high

VERTICAL BARRIERS SLURRY TRENCH BARRIERS: excavation equipment. prof. E. Fratalocchi Environmental Geotechnics Waste and polluted sites containment

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:

Construction Technology B (CON4313)

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA)

Misan University - College of Engineering Civil Engineering Department

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch

METHOD STATEMENT for INSTALLATION OF MICROPILE

PILING PART-VI CONSTRUCTION AND INSTALLATION OF RCC BORED CAST IN-SITU PILES

The Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd.

INNOVATIVE PILE EXTRACTION TECHNIQUE OF CFA PILES FOR THE NEW HARBOR BRIDGE PROJECT

Construction Technology B (CON4313)

1. Introduction Selection of Pile Type Soil Report / Boreholes Obstructions Design and Installation of Piling Mat 3

Civil Engineering Construction I (CBE5031)

HORIZONTAL BORING HORIZONTAL BORING. Underground Electric Distribution Standards I. GENERAL

Advantages / Disadvantages of Piling Methods. Continuous Flight Auger (CFA)

SECANT PILE. Introduction:

Drilled Shaft. Inspection. HQ Construction Office HQ Geotechnical Division

Combined Pile Foundation System for a Residential Complex

FURTHER TECHNICAL INFORMATION IN RELATION TO THE OPERATIONS OF OUR GROUP

STANDARD SPECIFICATION Section Auger-Grout Injected Piles Civil Engineering Group Revised: August, 2000

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE

CONTACTS LUCOP Sp. z o.o. Ul. Sejmu Czteroletniego 2 m Warszawa Tel

A.Zh.Zhussupbekov Department of Civil Engineering and Engineering Mechanics, Columbia University, New York, USA

Ground Improvement Piling Piled Retaining Walls Enlarged Head Piles Innovations.

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts

SCOPE OF WORK FOR PILING JOB

Assalamualaikum & Good Morning (May All Of You Gain A Better Understanding)

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

Diaphragm Walls: A Solution For Deep Excavations In Difficult Soil Conditions With Superficial Water Table

Ductile Iron Systems trm.at

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

h Installation Manual

SAFE SYSTEMS FOR PILING OPERATIONS

Influence of Deep Foundation Installation Methods Presented by: Morgan NeSmith, PE

Atlaspile. Full soil displacement bored pile, vibration free - low noise economical

Ground Improvement. Cutter Soil Mixing Multi-Axis Soil Mixing Deep Soil Mixing Jet Grouting Vibro Systems Specialized Geotechnical Grouting

Deep Foundation. Deep Foundation Applications

Grouting Bilfinger Spezialtiefbau GmbH

Multi-Institutional Academic Health Science & Research Center Evansville, IN

ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS

Vibroflot Modular Product Range

GeoEng2000 An International Conference on Geotechnical & Geological Engineering

SITE INVESTIGATION. Foundation Engineering

An Introduction to. By Michael L. Schumaker, P.E. An Introduction to Shaner Industries Metal Foundation System

Performance Control Tests and Numerical Simulations for Concrete in Deep Foundations

Modular Course on Foundations and Earth retaining Structures for Building and Infrastructure Projects 9th March 2000

DHANALAKSHMI COLLEGE OF ENGINEERING, CHENNAI DEPARTMENT OF CIVIL ENGINEERING 2 MARK QUESTIONS WITH ANSWERS CE FOUNDATION ENGINEERING UNIT 1

Specialising in Ground Engineering & Slope Stabilisation

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

Hydraulic Excavators

Ching Guan Kee ABSTRACT

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig

Drilling bit classification

DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS

Silent Vibrationless. Technology. teel Sheet Piles. Vinyl Piling. etaining Walls. Piles. tory Piling. oundations. ite Piles. n Free Piling.

Lesson 4. Construction Techniques and Materials. Learning Outcomes. Basic Construction

ITEM 404 DRIVING STEEL PILING

Bauer Jet Grouting. Process

Hydraulic cutting units

Geoprobe SDT45 Sonic Dual Tube Sampling System

Admixtures in Pile Concreting: A Case Study

Table of Contents 18.1 GENERAL Overview Responsibilities References

Overview Sonic Drilling Technology

3.1 Scope of the work-capacity Estimation of Drilled Shaft Bearing on Rock

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS

LOAD CAPACITY OF AUGER DISPLACEMENT PILES

Quality Assurance Review for Bridge Construction

Brochure E. Deep Vibro Techniques

Foundation Engineering ECIV 4352

freestone eco Prestige & quality DIY vertical wall Large blocks - 10/m 2 Smooth surface finish No concrete footings

Recent Advances in the Selection and Use of Drilled Foundations

Sabah Shawkat Cabinet of Structural Engineering 2017

UNIT 7 TESTS ON WORKABILITY OF CONCRETE

Compaction and Jet Grouting

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement

Unit title: Construction Technology: Substructure (SCQF level 7)

Wassara Jet grouting hammer. - Enabling single fluid jet grouting in difficult formations!

TECHNICAL SPECIFICATIONS DEEP SOIL MIXING (CUTOFF WALL, RETAINING WALL, IN-SITU TREATMENT, IN-SITU FIXATION)

TRENCHLESS INSTALLATION OF ROAD DRAINAGE & SERVICE DUCTS

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems LTD. Titan Hollow Bar

INTRODUCTION TO INNOVATIVE PILING SOLUTIONS

Large-diameter bored piles and Large-hole drillings Applications

New Development -Sonic Drilling with Sampling

National Occupational Standards for Piling Operations

WM2012 Conference, February 26 March 1, Phoenix, Arizona, USA

Stabilisation/Solidification of Manufactured Gas Plant Wastes: Pilot Test Study Part 2

Thermal Pile Installation

Transcription:

TECHNOLOGY Continuous Flight Auger

CFA (Continuous Flight Auger) technology joins the advantages of driven piles with the versatility of application of drilled piles. Moreover, a wide range of diameters and lengths can be obtained. Indeed it is possible to drill piles of a diameter from 40 to 140 cm. In terms of length, the equipment currently available allows to reach 31 m depth.

Wide range of application in any type of soil without the use of a drilling fluid Minimum job site installation Absence of vibrations and shocks during the pile construction Higher production rate compared to other piling techniques

Technology Continuous flight auger piles is a type of drilled foundation in which the pile is drilled to its final depth in one continuous process using a continuous flight auger. CFA piles are a replacement and cast in place piles type with a slight displacement of the soil, more noticeable using a large diameter hollow stem, that increases the final load bearing capacity. The construction procedure consists of three steps, the drilling phase (demolition), the auger extraction (spoil removal and concreting) and the cage insertion (reinforcing).

Construction stages Continuous Flight Auger (CFA) piles are constructed with partial soil removal, which generates lateral soil compression. As a result the final lateral load bearing capacity is increased and becomes higher than in piles where ben-tonite slurry is used. The level of lateral soil compression depends on the ratio between auger diameter and central stem diameter. The operating process consists in drilling soil with a continuousflight auger welded to a hollow central stem. The bit of the auger drills the soil that is partly pushed upward along the augerflights. Once the design depth corresponding to the length of theauger being used is reached, the auger is withdrawn from the borehole while concrete is pumped through the hollow central stem to fill the hole. The reinforcement cage is lowered into the hole through the mass of fresh concrete. This technique is usually employed to realise piles with diameters ranging from 400 to 1,400 mm, down to a depth of 31 metres. A plug is located or realised directly at the bottom end of theauger and prevents soil from entering the hollow stem duringdrilling; the plug will then be ejected by the pressure of concrete filling the hollow stem when concrete pumping begins. A cleaner is usually installed at the base of the mast that guides the auger. It cleans the flights of the auger as it is extracted andkeeps the auger centred during the early meters of drilling. On top of the auger stands an extension that goes throughthe rotary head for the concrete to pass through. Concrete is pumped by a suitable concrete pump connected to theauger extension by either flexible hoses or pipes. The auger extension allows to increase the drilling depth. STAGE 1 Drilling STAGE 2 The design depth is reached STAGE 3 Auger with drawal and simultaneous concrete injection STAGE 4 Concrete injection up to borehole mouth STAGE 5 Reinforcement cage positioning

Construction stages Concreting is one of the most delicate stages of the whole process as it is necessary to ensure that the void left by the auger being withdrawn is filled in a constant and homogeneous way. The concrete pressure (or rather, the presence ofconcrete throughout the auger stem), the feeding flow rateand the auger withdrawal speed are the key parameters tobe constantly monitored and recorded during this construction stage. Concrete specifications & properties Since the reinforcement cage is installed after concreting,it is necessary to choose concrete specifications and designer defined strength parameters that ensure the easy penetration of the cage through the soil. Aggregates maximum diameter shall not exceed 18 mm. The amount of concrete to be pumped for an easy installation of steel reinforcement varies between 350 and 450 kg/m 3 of mix. It is also necessary to employ suitable plasticizers and retarders to ensure a slump suitable for the penetration ofthe reinforcement cage. Generally speaking, when using S5 concrete characterized by a slump value exceeding 220 mm, it is possible to insert reinforcement cages of a lengthup to 18 m. As an alternative, superfluid self-compacting concrete (SCC) can be used. This type of concrete does nothave a specific slump value, its main features being the diameter of the patty generated after the Abrams coneis removed (recommended value >650 mm) and T500, i.e.time needed for the patty to spread and rech 500 mm diameter (recommended value < 5 seconds). If the concrete complies with said specifications it is possible for the reinforcement cages to be lowered 36 m deep. S5 Concrete_ Slump > 220 mm S5 Concrete_ Pile diameter > 650 mm. Time to get 500 mm < sec Concreting Pile concreting shall be carried out using a concrete pumpproviding an output of 80 to 120 m 3 /hour at a working pressure of about 50 bar, equipped with 4-5 flexible hosesand rigid pipes.soilmec has developed special concrete pumps for piles. Theyare crawler-mounted concrete pumps equipped with watertank and air compressor to let the pump autonomously cleanthe concrete hopper and the concrete delivery line up to the CFA bit.

Construction stages Reinforcement cages Since the reinforcement cages are lowered down to thebottom of the pile through a mass of fresh concrete, theyshall be assembled with the utmost care and according towell defined specifications. The spiral shall be rigidly fixed to the longitudinal bars, preferably welded. For increased stiffness, fewer vertical bars with larger diameter are to bepreferred to a high number of small diameter bars, considering the same steel bending resisting section. This allows to make the cage assembly stiffer and reduces the total lateral surface of friction against concrete. The end section of the cage shall be slightly conical so as to facilitate insertion and centring into the borehole. Lastly, the cage outer diameter shall be smaller than the diameter of a cage tobe used for a pile having the same diameter but bored with bentonite slurry. Besides installing the auger extension, an alternative way to increase total drilling depth by 6 to 9 metres is to use aloader connected to the drill rig mast: the loader, through an automatic rotation system, makes it possible to add anauger section to the drill string in use. While pile concreting shall be always carried out up to the ground level so as to avoid soil collapsing superficially that may contaminate the concrete, during the subsequentstage of cage installation the cage can be pushed below that height by using a vibrator.

Auger cleaner One of the problems of CFA drilling is that soil and cuttings remain inside the auger flights. When the auger is extracted from soil, it is always full of cuttings, and actually the filling level between the flights can vary depending on the depth and type of soil: higher filling levels are caused by compact cohesive soils. Soil and debris removal from the auger while this is withdrawn from the ground is therefore essential. Spoil must be removed at the lowest possible level, as the flights come out of the hole. For this purpose, auger cleaners have been designed, the most common and effective one is the roller-type auger cleaner. Auger cleaners can have one or two rollers, and are available in different sizes and types, one roller cleaner can be fitted with a blade that scrapes the auger surface. Soilmec designed a revolving and openable auger cleaner with the special function to open itself in two part to allow the rotary to reach the lower position of the mast going beyond the cleaner itself. This allows to reach the same depth achievable without the auger cleaner. Over years, other auger cleaning methods have been designed: The brush-type cleaners, that consist of two rotating cylinders with steel cables fixed to them in the radial direction, so as to create a cylindrical brush. The star-type auger cleaner, two sets of rollers (or blades or even steel cables) are arranged in a star-like shape around an axis; the circumferential distance between the elements corresponds to the auger pitch.

Drilling Tools SOILMEC drilling rigs can be equipped with four different models of continuous flight auger: HD-4, HD-5, XHD-5 and 25HD-5, according to the torque on the rotary. The connections between auger elements are made of quick coupling exagonal joints. They are built with special steel and they have 2 safety pins to prevent disconnections. The auger tip element is provided with a disposable plug to prevent entering of the soil through the hollow shaft. The plug is blasted when the auger is extracted and concrete, is pumped. According to the different soil conditions the leading element can use flat teeth for medium-soft ground or rock teeth; all of them can be easily changed.

Job site logistics For the construction of CFA piles, the jobsite has to include a drilling rig, a small-sized tracked hydraulic pump, a backhoe excavator for debris handling and an auxiliary crane for cage positioning, whether needed.

Technologies advantages The main advantages of the CFA technology are listed below: No drilling slurry is used: the debris has the same environmental features of soil in-situ before drilling. No vibrations or impulses typical of percussion systems. No trenches or open-cut excavation resulting in soil decompression. This technology is especially suitable for the construction of diaphragm walls next to existing buildings and structures. No cumbersome mixing and desanding plants that are on the contrary needed for the construction of standard diaphragm walls or when working with a hydromill. Doubled operating speed, under the same geological conditions, with respect to standard Kelly method. The absence of soil decompression during pile construction makes it possible to work in the proximity of existing structures. Moreover, as no drilling slurries are used (bentonite or polymer), the size of the jobsite installation is reduced and the problems of cuttings disposal are minimized, as they are not contaminated by slurry. As the technology does not involve soil decompression, the bearing capacity of a CFA pile is higher than any equivalent drilled pile.

Soilmec Equipment 1 2 3 Since 1982, with the first CM-42, Soilmec experience for the construction of continuous flight augered pile rigs has enabled the operation of the system even in difficult grounds, thanks to the use of different teeth and augers. The auger system is operated by multifunctional selferecting fully hydraulic rigs of the SR series and the SF series, especially designed for the CFA pile. The rigs can cover a wide range of diameter, from 40 to 140 cm and depth down to 31 m, to overcome the problems connected to the project and execution of the piles. 4 1 2 3 4 5 6 7 8 9 10 11 SLEEVE EXTENSION CATHEAD ROTARY HEAD SLIDING MAST MAST CONTINUOUS FLIGHT AUGER OPENABLE AUGER GUIDE FOOT ELEMENT AUGER CLEANER CAB UNDERCARRIAGE 5 6 9 7 8 10 11

Soilmec Equipment Evolution range Dedicated kelly method drill rig optimally designed to give you the best drilling performance. EVO line - Model SR-40 SR-60 SR-80 Max pile diameter 1000 mm 1000 mm 1200 mm Max pile depth 20 m 22 m 23,7 m Extraction force 520 kn 560 kn 800 kn Operative weight 49 t 62 t 79 t Advanced range A flexible machine, optimized to give you the best drilling solution. ADV line - Model SR-30 SR-45 SR-75 Max pile diameter 900 mm 1000 mm 1200 mm Max pile depth 23 m 21,5 (24) m 25,5/27 (29) m Extraction force 380 kn 480 kn 984 kw Operative weight 38 t 41 t 71 t

Soilmec Equipment High technology range A multipurpose machine, optimized to give you the best technological solution HIT line - Model SR-95 SR-125 SR-145 Max pile diameter 1200 mm 1200 mm 1200 mm Max pile depth 30/32 m 32/36 m 32/36 m Extraction force 1100 kn 1036 kn 1362 kn Operative weight 94 t 127 t 140 t SF range Compact hydraulic drilling rig specially designed for CFA SF series SF-50 SF-65 Max pile diameter 900 mm 1000 mm Max pile depth 25 m 30 m Extraction force 510 kn 527 kn Operative weight 35 t 51,5 t

Continuous Flight Auger 001 02/2016 All technical data are purely indicative and subject to change without notice This brochure has been edited and distributed by SOILMEC Spa. The present document cancels and override any previous ones. This brochure shall not be distributed, reproduced or exhibited without SOILMEC Spa. authorization in accordance with to SOILMEC web site disclaimer condition. SOILMEC Spa distributes machinery and structures all over the world, supported by SOILMEC Spa subsidiary companies and dealers. The complete Soilmec network list is available on the web site www.soilmec.it www.soilmec.it