I was always searching for new techniques to produce biogas from animal and kitchen organic waste at house level suitable for any urban area

Biogas Plant Construction Guide

Recycle Program in JIS College of Engineering, Kalyani. 1. Biogas Generation Project

Government Rebate Forms

M/s. B-Sustain Energy Projects Pvt Ltd

Build Your Own. Biogas Generator. Basic Principles

AWS D10.18M/D10.18:2018 An American National Standard. Guide for Welding Ferritic/Austenitic Duplex Stainless Steel Piping and Tubing

1- What is Biogas? 2- Advantages of biogas digestion: gas, compost, less pollution 3-How does it work

PLAINSCAPITAL BANK APPLE PAY TERMS AND CONDITIONS - BUSINESS

Things You Need to Have in Your Home in Times of Crisis

of biogas from kitchen waste

M/s. B-Sustain Energy Projects Pvt Ltd

DESIGN AND FABRICATION OF LOW COST BIOGAS DIGESTER USING POULTRY WASTE AND PIG MANURE

Shamsundar Subbarao. BE (Mech) MSc(Renewable Energy, University of Oldenburg, Germany)

Comparative Study of Biogas Generation from Chicken Waste, Cow Dung and Pig Waste Using Constructed Plastic Bio Digesters

INSTALLATION MANUAL MOSER STAINLESS STEEL KITCHEN FAUCET MODEL MANCHESTER

AWS A5.35/A5.35M: 2015-AMD1 An American National Standard. Specification for Covered Electrodes for Underwater Wet Shielded Metal Arc Welding

Composite-wrapping services

Gravity Fed Drip Irrigation Kit

AWS G2.1M/G2.1:2012 An American National Standard. Guide for the Joining of Wrought Nickel-Based Alloys

By agreeing to these Terms and Conditions, you represent the following:

Installation Instructions

AWS D14.3/D14.3M:2010 An American National Standard. Specification for Welding Earthmoving, Construction, and Agricultural Equipment

Assembly Instructions Legacy Basic Acoustical Shell

UNITS MUST BE INSTALLED AFTER PRESSURE TANK

HRO-50 Water Purifier

Additional Terms & Conditions for Use of Apple Pay to Supplement Your Interactive Brokers Debit Mastercard Cardholder Agreement

Disclaimer. By Rachel Mathews Successful Garden Design. Editor: Anna Obarzanowska

instructions 8 x 4 ft Proslat panel section 8PRO001-AUG1815

Quick-Start Operating Guide Document No Exhaust Fume Hood Copyright 2010 Terra Universal Inc. All rights reserved. Revised September 2010

> Pre-installation reference guide Toroid underground tanks >

SAP Online Knowledge Products (OKP) Rapid Deployment Solutions

Analysis and Processing of Kitchen waste using portable Bio-Methanation Digester

NEMA Standards Publication TC Electrical Nonmetallic Tubing (ENT)

Industry Guidance on Records Review for Re-affirming Transmission Pipeline MAOPs

Date. Invoice No. Job No. SPEL Ecoceptor / 4000 / 6000 / 8000 Series. Operation & Maintenace Manual.

BRODERSON (Rough Terrain) TELESCOPIC BOOM CRANE FIXED CAB (TSS)

For Electrical Intermediate Metal Conduit (EIMC)

Model Number: 1300 Series

INSTALLATION MANUAL & Warranty Information

V.) FedEx Trade Networks shall not be liable for any delay or loss of any kind, which occurs while a shipment is in the custody or control of a Third

GS1 CLOUD BRAND OWNER TERMS OF PARTICIPATION

PS-31 (SUS304, 300 mm) PS-31 (SUS304, 1,000 mm)

This Installation Guide uses the following symbols to indicate important information. Always observe the instructions indicated by these symbols.

Small-scale. dairy farming manual. Vol. 6

Owners Manual 320-USP-DS-10, 320-USP-DS-20. US Water Systems Pulsar Disruptor Pre-Filter. Visit us online at

End User Biogas Manual

IF YOU DO NOT AGREE TO THESE TERMS, DO NOT DOWNLOAD, INSTALL OR USE BSS.

How to Get Cash Back on Nearly Everything You Buy

USER MANUAL BIODIGESTER S USE & MAINTENANCE

2.0 Normal and customary equipment used on a core drill job include:

BIOGAS TECHNOLOGY FOR POVERTY REDUCTION AND SUSTAINABLE DEVELOPMENT B P NEMA. Principal Scientist. Central Institute of Agricultural Engineering

HU-10 Water Purifier. Product Installation & Operation Manual. Honeywell Environmental & Combustion Controls (Tianjin) Co., Ltd.

BEST PRACTICES IN PLANNING AND PERFORMANCE MANAGEMENT RADICALLY RETHINKING MANAGEMENT FOR A VOLATILE WORLD. Third Edition. David A. J.

Cash Valve. Type C-776. ASME Section VIII Air/Gas and Cryogenic, UV National Board Certified Safety Valve. Flow Control

IP Rating and Manufactures Instructions. AS3000:2017 Changes. What you need to know The Top 10 1 of 10

Group Editor: John F. Taylor (The Herp Father) Managing Editor: Dr. Robert G. Sprackland Exec. Director & Design: Rebecca Billard-Taylor

QA 2 / 2011 OCCURRENCE OF REVENUE FROM SALE OF GOODS

92831 TEL: (714) FAX:

Natura Series White Matte Undermount Bathroom Sink

Research Paper on Design and Implementation of Solid Organic Waste Managing System

3601 E. 34th St. Tucson, AZ USA Tel Fax Web:

EP-CORKEL2 OWNER S MANUAL

INSTALLATION, MAINTENANCE & WARRANTY GUIDELINES

Owner s Manual Calcite Cartridge System

Production of biogas from animal manure for rural household. Document Prepared and Submitted by Agriculture Technology Transfer Society (ATTS)

Installation Guide Document No BioSafe Cleanroom Windows Copyright 2017 Terra Universal Inc. All rights reserved. Revised December 2017

Models FWB, LWB, MWB and HWB Brakes AIR CHAMP PRODUCTS. User Manual. (i) MTY (81)

Oracle E-Business Suite Development and Extensibility Handbook

APPLE PAY TERMS & CONDITIONS

Waterborne Sustainable Ecological Sanitation. Household Energy from Sanitation

HU-20 Water Purifier. Product Installation & Operation Manual. Honeywell Environmental & Combustion Controls (Tianjin) Co., Ltd.

Elavo White Ceramic Small Rectangular Undermount Bathroom Sink w/ Overflow

Daily Commodity News Letter

APPLICATION OF BIOGAS FOR MUNICIPAL SOLID WASTE MANAGEMENT IN SRI LANKA

TrueClean ToteTilter TM

Owners Manual Models: 200-RODI4-XXX. US Water Systems 4 Stage RO/DI System Installation and Maintenance Manual.

Installation and Operating Instructions

RACK HAT / STRIP DOOR

Sharpen Your Focus: Become More Effective With the 3 Sides of the Sword

E-Series Installing E-Series U Cabinet

Elemental Mass Percent and Empirical Formula From Decomposition of a Copper Oxide

Documentation Management

Biogas Construction Process

MR GLOBAL LOGISTICS TERMS & CONDITIONS OF SERVICE

Stretch Wire. P/N Rev. 2. IOM Stretched wire festoon manual

saturn is a self-contained 6-plant flood and

Grinnell Mechanical Products Figure 730 Mechanical Tees - Threaded / Grooved General Description. Technical Data. Page 1 of 8 MAY, 2009 G210

precision pipe fittings

Rocker Tool Post ASSEMBLY AND OPERATING INSTRUCTIONS

Heating and Cooling Efficiency Program

Material Handling Equipment Manufacturing

BPO Feasibility Framework

Plastic Pipe Timeline

Tourmaster 3-Step Riser

INSTALLATION MANUAL RECTANGULAR COLUMN

Carbon Canister Vapor Polisher

DRYWALL DOLLY 900 LB. CAPACITY

SHCM SHOWER COLUMN INSTALLATION INSTRUCTIONS

End of Life Announcement BusinessPhone Platform

Transcription:

D I S C L A I M E R O F L I A B I L I T Y A N D W A R R A N T Y This publication describes the author s opinions regarding the subject matter herein. The author and publisher are not rendering advice or services pertaining to specific individuals or situations. For specific advice, or if expert assistance is required, the services of a qualified professional should be obtained. The author and publisher assume no responsibility whatsoever for the use of the information in this publication or for decisions made or actions taken based, in whole or in part, on the information in this publication. The author and publisher make no warranties, express or implied, regarding the information. Without limiting the foregoing, the author and publisher specifically disclaim and will not be responsible for any liability, loss, or risk incurred directly, indirectly or incidentally as a consequence of the use or misuse of any advice or information presented herein. Use this publication and information with good judgment and do the best you can in your particular situation. You agree to indemnify and hold the author and publisher, and their respective officers, directors, agents, employees, contractors and suppliers, harmless from any claim or demand, including reasonable attorneys fees, related to your use or misuse of this publication or the information contained therein. You further agree that you will cooperate fully in the defense of any such claims. Notice: As the purchaser of this electronic document you are permitted to store it and print it for your own personal use only. Otherwise, no part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise without the prior written permission of the copyright owner and publisher. It is illegal to make a copy of all or part of this publication for someone else, even if you do not charge for the copy. If you have purchased this book from anywhere other than OffGrid-Independence.net, including ebay, please report it to david@offgrid-independence.net immediately. C O P Y R I G H T Those who have received or purchased the guide are neither authorized nor permitted to transmit copies of this guide to anyone without written permission. Giving away copies to people who haven t paid for them is illegal under international copyright laws and will submit you to possible legal action. Therefore, the utilization of this file is limited to personal use only. T E R M S A N D D I S C L A I M E R By using, viewing, and interacting with this guide or the OffGrid-Independence.net website, you agree to all terms of engagement, thus assuming complete responsibility for your own actions. The authors and publishers will not be held liable or claim accountability for any loss or injuries. Use, view, and interact with these resources at your own risk. All products from OffGrid-Independence.net and its related companies are strictly for informational purposes only. While all attempts have been made to verify the accuracy of information provided on our website and within the publications, neither the authors nor the publishers are responsible for assuming liability for possible inaccuracies. The authors and publishers disclaim any responsibility for the inaccuracy of the content, including but not limited to errors or omissions. Loss of property, injury to self or others, and even death could occur as a direct or indirect consequence of the use and application of any content found herein.

DIY Mini Bio-gas plant

I have been searching for some method of using the food waste, decomposable organic material and kitchen waste efficiently, and came across information on producing bio-gas from organic waste. The bio-gas produced from food waste, decomposable organic material and kitchen waste, consisting of methane and a little amount of carbon dioxide is an alternative fuel for cooking gas (LPG). Also, the waste materials can be disposed off efficiently without any odor or flies and the digested slurry from the bio-gas unit can be used as an-organic manure in the garden. Components of the Bio-gas Plant The major components of the bio-gas plant are a digester tank, an inlet for feeding the kitchen waste, gas holder tank, an outlet for the digested slurry and the gas delivery system for taking out and utilizing the produced gas. This project is also useful for students to have a hands-on learning experience in constructing a Mini Bio-Gas Plant, using locally available material.

Material Required: 1. Empty PVC can 50 ltrs capacity: 1 No. (to be used as Digester Tank) 2. Empty PVC can 40 ltrs capacity: 1 no. (to be used as Gas Holder Tank) (Make sure the smaller can fits inside larger one and moves freely) 3. 64 mm dia pvc pipe: about 40 cm long (to be used for feeding waste material) 4. 32 mm dia pvc pipe: about 50 cm long (fixed inside gas holder tank as a guide pipe) 5. 25 mm dia pvc pipe: about 75 cm long (fixed inside the digester tank as a guide pipe) 6. 32 mm dia pvc pipe: about 25 cm long (fixed on digester tank to act as outlet for digested slurry) 7. M-seal or any water-proof adhesive 8. Gas outlet system: Please see Step 4 below for required materials and construction Tools required Do not require many tools here. A hack saw blade for cutting the cans & pipes and a sharp knife for cutting holes on the cans are all the tools we need. Additional accessories A single burner bio-gas stove or a Bunsen Burner used in school laboratories

Step 1: Bought this 50 ltrs capacity PVC can, which will act as the digester unit and removed the top portion of the can, by cutting it with a hack saw blade:

Step 2: The smaller white can, which will act as the gas holder fits inside the red one. Here, again removed the top of the white can, also with the help of a hack saw blade:

Step 3: 64 mm, 32 mm and 25 mm dia PVC pipes which will be used for feeding the kitchen waste, guide pipe for the gas holder and guide pipe fixed with the digestion chamber respectively. A small piece of 32 mm dia pipe will be used as outlet for the slurry:

Step 4: 1. items required for the gas delivery system: got these items from a hardware store 1. Ball valve : one no ( to adjust the gas flow) 2. 'T' joint : one no ( to connect the gas holder and the ball valve) 3. Cap to block one end of 'T' joint : one no 4. Coupling or Adapter : one no (to connect vertical end of 'T' in to the gas collector) 5. Nipple: one no (added to the coupling in to the gas collector) 6. Gas pipe (flexible) : two meters 7. Barb : one no (fitted with the gas pipe, to join with the Ball valve) 8. Clip : one no (used for crimping the barb with the gas pipe and make it leak-proof) 9. Teflon tape : one roll (used as thread tape in all joints)

Step 5: Here I have marked the cuts to be made in the bottom of the gas collection tank. The smaller hole on the left for gas delivery system, center hole for fixing the 32 mm guide pipe and 64 mm hole for fixing the waste feeding pipe on the right side. Made these holes with the help of a sharp knife and hack saw blade. The next image is Inside of the gas holder showing the 32 mm guide pipe (center) and the 64 mm feeding pipe fixed with M-seal

Step 6: Top view of the gas holder showing the feeding pipe, central guide pipe and the gas delivery system: I have closed the feeding pipe withe an old lid (red one). This will facilitate opening the feed pipe only during feeding the system.

Step 7: Digestion tank fitted with the central guide pipe and the outlet pipe for the slurry:

Step 8: Completed unit. I have removed the gas pipe, so that the joints will get cured without any stress: Wait for a day or two before feeding the system, allowing all joints to get cured and become leak-proof. Initially, cow-dung mixed with water will be fed in to the system, which will start the gas formation process. Subsequently, food waste, decomposable organic material and kitchen waste will be diluted with water and used to feed the system. The gas holder will rise along the guide pipes based on the amount of gas produced. We can add some weight on top of the gas holder to increase the gas pressure. When we feed the system, the excess digested slurry will fall out through the outlet pipe, which can be collected, diluted and used as organic manure. Initial production of gas will consist of oxygen, methane, carbon di oxide and some other gases and will not burn. These gases can be released to the atmosphere by opening the ball valve at least three / four times. Subsequent gas will consist of about 70 to 80 percent methane and the rest carbon di oxide,

which can be used in a single bio-gas burning stove or a Bunsen burner. Total cost of this proto-type system is about one thousand Indian Rupees (about 20 dollars) This is a basic prototype of a Bio-gas system using the food waste, decomposable organic material and kitchen waste to produce gas. An one thousand litre capacity Digestion tank will be sufficient for a small household for daily cooking purpose. The bigger commercial models provide a water seal between the digestion tank and gas holder tank. Step 9: Charged the digester tank with cow dung diluted with water. Placed the gas holder tank and left it for two three days. The cow dung slurry started the process of gas forming.

Gas formation started and the gas holder tank gets lifted up. I have placed two bricks on top of the gas holder to get more gas pressure. Step 10: Note for students who are doing this as their School Project: 1. Take guidance from your teacher while using the gas in a stove or Bunsen burner. 2. Collect surplus food and wastage during lunch, dilute and feed the system. 3. Fruit peels, extracted tea powder, waste milk and milk products can also be used for feeding the system. 4. DO NOT USE eggshells, Onion peels or left-over bones in this system as they will affect the efficient functioning of the system 5. Plant some seedling 6. while feeding, collect the slurry from the outlet, feed the seedlings and watch them grow