SURFACE WATER WITHDRAWALS & LOW FLOW PROTECTION POLICY MICHAEL COLLEGE, P.E. SUSQUEHANNA RIVER BASIN COMMISSION

Similar documents
Natural Gas Development in the Susquehanna River Basin. Jennifer Hoffman September 29, 2010 Pittsburgh, PA

Water Supply Outlook. Interstate Commission on the Potomac River Basin (ICPRB) 30 W. Gude Drive, Suite 450 Rockville, MD Tel: (301)

PEACE RIVER MANASOTA REGIONAL WATER SUPPLY AUTHORITY BOARD OF DIRECTORS MEETING December 5, 2018 ROUTINE STATUS REPORTS ITEM 1

Science Supporting Policy: The Case For Flow Quantity

NC Water Resources Planning April 4, Tom Fransen. North Carolina Division of Water Resources 1

Water Supply Outlook. Interstate Commission on the Potomac River Basin (ICPRB) 30 W. Gude Drive, Suite 450 Rockville, MD Tel: (301)

Cedar River Watershed Habitat Conservation Plan

City of San Clemente Water Usage Report

An Investigation into the 2012 drought on Apalachicola River. Steve Leitman, Bill Pine and Greg Kiker

Irrigation modeling in Prairie Ronde Township, Kalamazoo County. SW Michigan Water Resources Council meeting May 15, 2012

Impacts of Permit-Exempt Wells

The Impacts of Climate Change on Portland s Water Supply

Electric Forward Market Report

Jordan River TMDL Update

Woking. q business confidence report

Establishing Environmental Flows for California Streams. Eric Stein Southern California Coastal Water Research Project

University of Michigan Eco-Driving Index (EDI) Latest data: August 2017

Guidelines for Preparing an Alternatives Analysis

Source Water Protection Integrating with Existing Watershed and Water Management Frameworks

Hood River Basin Study

A Time Series Approach to Instream Flow Mitigation Forecasting. Presented by Alan Keizur

An Introduction to Environmental Flows

Hood River Basin Study

Environmental Flows Allocation Process in Texas. Kevin Mayes Texas Parks and Wildlife Department March 2010

Hood River Basin Study

Water Planning and Stewardship Committee Item 6a February 8, 2016

Modeling the Middle and Lower Cape Fear River using the Soil and Water Assessment Tool Sam Sarkar Civil Engineer

Wapato Access Feasibility Study

Traffic Division Public Works Department Anchorage: Performance. Value. Results.

Salinity TMDL Development and Modeling in the Otter Creek Watershed. Erik Makus DEQ Hydrologist June 6, 2013

RUNOFF VOLUMES FOR ANNUAL OPERATING PLAN STUDIES

Reservoir Drought Operations

Water Allocation. Permit Program 1

Hetch Hetchy Water and Power

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed?

Temperature Issues. Resolution Plan. Outline DRAFT. June 22, Version 0.1

ANNUAL PLATTE RIVER SURFACE WATER FLOW SUMMARY

Monitoring Networks for Assessing Small Stream Hydropower Potential, Cosmos Hills, Alaska

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216)

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Water Supply Reallocation Workshop

Water planning and climate change: actionable intelligence yet?

Water Development Office

Instream Flow Protection Efforts in Pennsylvania

Welcome STEP 1: STEP 2: STEP 3:

Overview of the Surface Hydrology of Hawai i Watersheds. Ali Fares Associate Professor of Hydrology NREM-CTAHR

Real time Water Quality Monitoring

Traffic Department Anchorage: Performance. Value. Results.

FREQUENTLY ASKED QUESTIONS Environmental Protection Performance Standards at Oil and Gas Well Sites Water management plans ( 78a.

Otter Creek Watershed TMDL Project. Stakeholder Meeting June 6, 2013

Finch Drinking Water System O. Reg 170/03 Schedule 22 - Summary Report for Municipalities

AGENDA ITEM D6. Climate Outlook

Relicensing Study 3.8.1

Low Inflow Protocol for the Yadkin & Yadkin-Pee Dee River Hydroelectric Projects

The Confluence Model. Presentation to Modeling and Forecasting Working Group January 21, 2015

Continuous, Real-time Nutrient Data and Regression Models Valuable Information for Monitoring Aquatic Ecosystem Restoration

The Seventh Power Plan The Proposed Mix of Generation Resources and Strategies for the Region

San Francisco Public Utilities Commission Hydrological Conditions Report For June 2015

BLACK & VEATCH CORPORATION NISP EIS SUPPORT. Carl Brouwer, Northern Colorado Water Conservancy District

Initial Assessment of Climate Change in the Chesapeake Bay Watershed

Chapter 6 Planning and Controlling Production: Work-in-Process and Finished-Good Inventories. Omar Maguiña Rivero

Draft Application for New License for Major Water Power Project Existing Dam

CRT Operations in Low Water Conditions

AGENDA ITEM C9 TAMPA WATER

Watershed Management Area Recommendations for NJ Water Policy

OVERVIEW OF WATER RESOURCE ISSUES IN THE CARSON RIVER WATERSHED EDWIN JAMES, P.E. CWSD GENERAL MANAGER 2016

Solar, Wind and Market Power in the New Zealand Electricity Market (and hydro lake dynamics) Mina Bahrami Gholami and Stephen Poletti

CHAPTER FIVE Runoff. Engineering Hydrology (ECIV 4323) Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib. Overland flow interflow

AGENDA DATE: November 14, 2018

Camp Far West Hydroelectric Project Relicensing

Instream Flows in the San Antonio River Basin From Science to Environmental flow Standards. Steven J. Raabe, P.E

Appendix I: Fixed-400,000 af Flood Storage Operation

Gail Melgren, Executive Director, Tri-State Water Resources Coalition. Southwest Missouri Water Resource Study: Summary of Phases

Flexible turnaround planning for integrated chemical sites

Water Supply in Coastal Georgia Meeting Water Demand Using Alternative Water Sources to the Upper Floridan Aquifer

Regional Habitat Indicators Project. Workshop #1. Nov 9, 2016

From the cornbeltto the north woods; understanding the response of Minnesota. Chris Lenhart Research Assistant Professor BBE Department

OVERVIEW. Report Summary CUMULATIVE WATER USE AND AVAILABILITY STUDY. for the Susquehanna River Basin

Peter Randall Solar Kingdom Ltd

Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD Phone: 605/ FAX: 605/

Recent hydrologic change in a rainfalldriven. Everglades swamp. Shawn E. Clem. Michael J. Duever Natural Ecosystems

Appendix 5. Fox River Study Group Interim Monitoring Evaluation

Analysis of Vermillion River Stream Flow Data (Dakota and Scott Counties, Minnesota)

Management Objectives and Targets

Instream Flows in the San Antonio River Basin From Science to Environmental flow Standards. Steven J. Raabe, P.E

Gwydir Operations Plan. August 2018

MRC's role in relation to planning and implementation of mainstream dams and its strategic assessment framework

DRAFT Tuolumne River Daily Operations Model Model Description and User s Guide

..Title Receive Report on Salinas Valley Water Conditions for the Third Quarter of Water Year

Hydrologic, Hydraulic, and Ecological Modeling Issues and Implementation for the Blind River Fresh Water Diversion Project

AQUIFER TESTING WAIVER REQUESTS. Brent Bauman, P.G.

NON-TREATY STORAGE AGREEMENT

Operations Report. Stephanie Monzon Manager, Markets Coordination MC Webinar January 22, PJM 2018

Water Supply & Demand Management Policy Update. Website Presentation December 12, 2011

Operations Report. Stephanie Monzon Manager, Markets Coordination Operating Committee July 10, PJM 2018

CENTRAL ASSINIBOINE INTEGRATED WATERSHED MANAGEMENT PLAN SURFACE WATER HYDROLOGY REPORT

Final Report. Lisheen Mine Discharge Limit for Phosphorous in Terms of Irish and EU Legislation. November 2007 PROJECT NO.

Outline. Regional Overview Mine Study Area. Transportation Corridor Study Area. Streamflow Low Flow Peak Flow Snow Small Pools.

Spokane Valley-Rathdrum Prairie Aquifer Storage and Recovery for Summer Flow Augmentation

Finch Drinking Water System O. Reg. 170/03 Schedule 22 - Summary Report for Municipalities

Transcription:

SURFACE WATER WITHDRAWALS & LOW FLOW PROTECTION POLICY MICHAEL COLLEGE, P.E. SUSQUEHANNA RIVER BASIN COMMISSION

SCENARIOS Direct withdrawal from surface water (SW): PA MOU w/padep NY MOU w/nysdec MD No existing MOU Groundwater (GW) withdrawal with surface water impacts: Coordinated review with SRBC groundwater staff

GW WITHDRAWAL IMPACTING SW

SRBC Low Flow Protection Policy (LFPP) Mike College mcollege@srbc.net

TERMINOLOGY Passby Flow: Prescribed quantity of (water) flow that must be allowed to pass the anticipated point of impact at all times during which a withdrawal is occurring. The amount of water that has to pass by the point of withdrawal during low flow events. Think interruptible withdrawal. Is not meant to supplement naturally occurring low flow conditions.

TERMINOLOGY P Values (Percent Exceedance Values): What s a P value? Example a P95 flow is the flow that is exceeded 95% of the time Low flow / high flow: P5 is a high flow event P95 is a low flow event Sources of data: USGS Gages (flow values to calculate P values) LFPP Appendix E (calculated P values)

P VALUES 5/13/2016, 8:00 AM) @ SRBC Building 32,800 CFS = P55 for May

P VALUES Same flow (32,800 cfs) in different months: Month Pxx Jan 40 Feb 40 Mar 75 Apr 80 May 50 Jun 20 Jul 10 Aug 5 Sep 5 Oct 10 Nov 25 Dec 40

SRBC Low Flow Protection Policy (LFPP)

LOW FLOW PROTECTION POLICY Policy: SRBC Policy No. 2012-01 - Low Flow Protection Policy Related to Withdrawal Approvals Technical Guidance: Technical Guidance for Low Flow Protection Related to Withdrawal Approvals Supersedes: SRBC Policy No. 2003-01 Guidelines for Using and Determining Passby Flows and Conservation Releases for Surface-Water and Ground-Water Withdrawal Approvals.

LOW FLOW PROTECTION POLICY 2012-01 (LFPP) Replaced previous passby policy (No. 2003-01). Ensures flow alterations related to withdrawals do not cause significant adverse impacts to water resources during low flows. Incorporates scientific advances in ecosystem flow protection criteria. Used to establish limits and conditions on withdrawal approvals or supports a denial of an application request where such standards cannot be met.

AQUATIC RESOURCE CLASSES (ARC) Streams and rivers are placed in one of six possible classes in an effort to apply the appropriate level of protection to each surface water feature in the Basin. The objective of having the resource classes is to generally recognize smaller stream systems and their potential sensitivity to water withdrawals and, accordingly, require higher levels of low flow protection.

PASSBY FLOW De minimis thresholds De minimis withdrawals: Unless a proposed net withdrawal, evaluated both individually and cumulatively, is considered by the Commission to be too low in magnitude to have any appreciable effect on instream flows, a passby flow or conservation release condition will be imposed in the approval. De minimis withdrawal thresholds are stepped by ARC as previously described (see Table 2).

PASSBY FLOW When Recommended? Individual Instantaneous withdrawal is greater than x% of P95 OR Cumulative Water Demand = Proposed Withdrawal + Existing Upstream Users, is greater than x% P95.

LFPP ADDITIONAL CONSIDERATIONS Exceptional Quality Waters Impaired Waters Monthly vs. Seasonal Statistics (Operations Impacts) Project Specific Instream Flow Studies Agency Coordination Sensitive Resources Impacts to Flow Variability (Median Flows) Conservation Releases (Reservoirs) PA-MD Instream Flow Study (PA-MD IFS) Method

LFPP ADDITIONAL CONSIDERATIONS Additional Considerations (Continued): Reservation:

LFPP - DISCRETION Policy/Technical Guidance vs. Regulation Case-by-case: PWS Point of return Existing Withdrawal Projects: Previously unregulated w/o passby flows Renewals (w/o increase) Interim operating periods

Questions?