Unit Substation Transformer Construction Checklist (under 500 kva)

Similar documents
Low Voltage Switchgear Construction Checklist (under 500 kva)

PROJECT TITLE PROJECT NO.: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

FIELD TEST AND OPERATIONAL CHECK SECTION A. Refer to Section 16010, Electrical General Requirements.

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /19/2011 PAGE 1 OF 4 FACILITY LIGHTING SYSTEMS INSTALLATION

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC

SECTION BUSWAYS

SECTION CONVECTORS

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

A. Section includes busway and fittings including plug-in units.

SECTION FUEL-FIRED UNIT HEATERS

SECTION AIR TERMINAL UNITS

OAKDALE CHILLED WATER PLANT CAPACITY UPGRADES UI PROJECT INSTALL CHILLERS SECTION COMMISSIONING

SWITCH GEAR SERVICE AND MAINTAINNANCE SAFETY MEASURES AND REQUIREMENTS

ELECTRICAL INSPECTION BULLETIN (Effective )

Houston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER

University of Delaware

SECTION LOW-VOLTAGE TRANSFORMERS

SECTION SECONDARY UNIT SUBSTATIONS

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION

XAP Series Busduct Storage, Installation, and Maintenance

SECTION BASIC ELECTRICAL REQUIREMENTS

SECTION MOTOR CONTROL CENTER

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT

University of Delaware

1 29SEP03 ALL General update with miscellaneous changes in entire document.

POWER TRANSFORMER INSTALLATION

SECTION COMMISSIONING

SECTION COMMISSIONING

PIKES PEAK PARKING RESTORATION TABLE OF CONTENTS

SECTION HVAC AIR CLEANING DEVICES

BUS DUCT INSTALLATION

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

SECTION ENCLOSED BUS ASSEMBLIES

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION PACKAGED, SUBMERSIBLE, DRAINAGE PUMP UNITS

A. This Section includes the following types of dry-type transformers rated 600 V and less, with capacities up to 1000 kva:

SECTION PROJECT CLOSEOUT

SECTION GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT

This section applies to the requirements for electrical Inspection, calibration, and testing.

ADDENDUM NO. 1 BID AND CONTRACT DOCUMENTS FOR. BID No. 2019PW299

Installation, Inspection and Maintenance of Dry Type Transformers

Architect s Project Number of 5 Decentralized HVAC Equipment District Master Specs 2013 Edition

SECTION SECONDARY UNIT SUBSTATIONS

16300 HIGH VOLTAGE DISTRIBUTION

SECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL

A. The purpose of this section is to specify Division 23 responsibilities in the commissioning process.

MRI Chiller Installation Guidelines

37-SDMS-01 REV. 03 SPECIFICATIONS FOR

SECTION PACKAGED, SUBMERSIBLE SEWERAGE PUMP UNITS

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION AIR-TO-AIR ENERGY RECOVERY EQUIPMENT

SERVICE ENTRANCES. OPPD S Electrical Service Designer (ESD) shall designate the Point Of Entrance.

SECTION G40 SITE ELECTRICAL UTILITIES 11/10

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Capital Projects Group Gas Fired Warm Air Furnace Specification

SECTION ENCLOSED BUS ASSEMBLIES

Capital Projects Group Air Terminal Units Specification

The complete guide to transformers and packaged substations

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Fiber Optic Dynamic Lane Control Sign

Candidate NICET ID No.: NICET ENGINEERING TECHNICIAN CERTIFICATION Experience Application, Part II: Verifier Data. (Please print legibly or type)

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES

SECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE

SECTION FIELD PANELS

SPECIFICATION FOR SIMPLEX SWITCHBOARDS

All applicable equipment trip settings must be checked and recorded on the appropriate record sheet.

SECTION REQUIREMENTS FOR ELECTRICAL INSTALLATIONS

Statement of Work. Single Phase Power Up Service Single Phase Power-UP. Implementation Services. Table of Contents. 1.0 Executive Summary

GUC LNG Facility Phase IIB Expansion 6/20/14 INSTRUMENTATION SPECIFICATION. A. This Section includes instrumentation for process piping systems.

NEUTRAL GROUNDING TRANSFORMERS INSTALLATION AND MAINTENANCE INSTRUCTIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System

SECTION AIR COILS

SECTION A. NEC Compliance: Comply with NEC as applicable to installation and construction of electrical power/distribution transformers.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

- 1 - InfraStruXure InRow SC Assembly and Start-Up. Installation Service

SECTION CHEMICAL FEED SYSTEM

Capital Projects Group Liquid Filled Transformer Specification

SECTION INFLUENT EQUALIZATION TANK PUMPS

SECTION AUTOMATIC TRANSFER SWITCH

A. All drawings and general provisions of the contract, including all other Division 01 and general and supplementary conditions.

SECTION HIGH EFFICIENCY DISTRIBUTION TRANSFORMERS

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

A. Hazardous Areas: Hazardous areas as defined by the NEC as Class I, Division 1, Group D, or Class I, Division 2, Group D hazardous are as follows:

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

The Medical Center Company Electrical System Installation Requirements

START-UP CHECKLIST. Date: Job Name: Customer Name: Address: City: State: Zip: Model Number: Serial Number: Qualified Start-up Technician:

Equipment Specifications Low Voltage. Active Harmonic Filter

1.07 SUPPLEMENTS PRODUCTS (NOT USED) EXECUTION (NOT USED) END OF SECTION

MRI Chiller Installation Guidelines

The Nuts and Bolts of the Commissioning Process

CONTENTS. B. System Design and Performance Requirements

Absolute Energy Raters Commissioning Plan Outline Template

SECTION MEDIUM VOLTAGE TRANSFORMERS

SECTION COOLING TOWER

SECTION SLUDGE HOLDING TANK DECANTER PUMP

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

Transcription:

Unit Substation Transformer Checklist (under 500 kva) Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, as marked below, respective to each responsible contractor. This construction checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reliable functional tests being performed. List attached. Electrical Contractor Date General Contractor Date checklist items are to be completed as part of startup & initial checkout, preparatory to performing test procedures. This checklist does not take the place of the manufacturer s recommended checkout and startup procedures or report. If this form is not used for documenting, one of similar rigor shall be used. Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off. Approvals. This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted below. Commissioning Authority Date Owner s Representative Date Unit Substation Transformer Checklist Page 1 of 6

Unit Substation Transformer Checklist Page 2 of 6

Transformer Information Equipment Tag Location System (Check one) Power or Lighting 208-120 or 480-277 Normal or Emergency Manufacturer Model Number Serial Number Short Circuit Capacity Prim Volt Rating Second Volt Rating BIL Ratings HV/LV Main Bus Amperage Service Area kva Rating Associated Checklists Unit Substation Switchgear Other Requested documentation submitted Rec d Comments Manufacturer s cut sheets Installation and startup manual and plan O&M manuals Factory test results Sequences and control strategies Warranty Certificate Transformer Enclosure/Cabinetry Check if Acceptable; Provide comment if unacceptable NA Comment Equipment installed per manufacturer s instructions and specifications Unit Substation Transformer Checklist Page 3 of 6

Equipment installed agrees with shop drawings and specifications Verify mounting, location and clearances are per plans and specifications Inspect for physical, electrical and mechanical condition of equipment and cabinet - no damage evident Inspect panels and doors for proper fit and alignment Equipment labels permanently affixed Panel is clean and clear of dust or dirt Verify the application of manufacturer recommended torque values applied to bolted connections Verify correct circuit breaker sizes and types per the specifications and manufacturer s drawings Seismic anchoring installed and functional where applicable (nonshort circuiting) Verify that all manufacturer control wiring between shipping splits is properly connected per manufacturer s drawings and specifications Inspect insulators, barriers and shields for damage or contamination Verify that ground bus is properly bonded to enclosure, enclosure is grounded and resistance to ground meets grounding specifications Neutral bus isolated from cabinet Verify three or four wire configuration Metering transformer nameplate matches specified and approved transformer Transformer installed per manufacturer s instruction, plans and specifications Inspect metering transformer cables and connections for defects or physical damage Verify metering transformer connections are correct per the single line Verify all grounding and shorting connections for the metering transformer are in place Verify correct fusing for the metering transformer primary and secondary Verify the metering transformer taps are in accordance with the manufacturer s nameplate and specifications Verify the vents and air inlets are free and unobstructed. Clean air filters installed (if required) Megger test of bus phase to phase and phase to ground. Test voltage per manufacturer s recommendations Hi-potential test of bus phase to phase and phase to ground. Test voltage per manufacturer s recommendations Operational Checks Unit Substation Transformer Checklist Page 4 of 6

Check if Acceptable; Provide comment if unacceptable NA Comment Specified sequences of operation and operating schedules have been provided with all variations documented Specified point-to-point checks have been completed and documentation record submitted for this system Verify all incoming cables are terminated and ABC phasing is correct. Terminations are torqued, checked, stress cones are properly grounded and exposed energized surfaces are insulated Unit Substation Transformer Checklist Page 5 of 6

Sensor and Actuator Calibration All field-installed sensors and gages, and all actuators (dampers and valves) on this piece of equipment shall be calibrated in accordance with Specification Section 01810. All test instruments shall have had a certified calibration within the last 12 months: Y/N. Sensors installed in the unit at the factory with calibration certification provided need not be field calibrated. Sensor or Actuator Tag & Location Location OK 1 st Gage or BAS Value Instrument Measured Value Final Gage or BAS Value Pass Y / N Unit Substation Transformer Checklist Page 6 of 6