Strategic Management and Project Selection

Similar documents
Design-Build Data Sourcebook

A Primer Indianapolis, Indiana June 16, 2010

AN OVERVIEW OF DESIGN-BUILD. Presented by: David Umstot, PE, CEM Umstot Project and Facilities Solutions, LLC January 20, 2014

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO

CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS

PROGRESSIVE DESIGN-BUILD. Praful M. Kulkarni, AIA Iraj Ghaemi, P.E. J. Brandon Dekker, M.S., DBIA

Choosing a Project Delivery Method. A Design-Build Done Right Primer

ALTERNATE FORMS OF PROJECT DELIVERY

REQUEST FOR PROPOSALS. Construction Manager CM Services Pre-Construction and Construction Services

PROVING OUR PROFESSIONALISM

DESIGN CONSTRUCTION: PROJECT DELIVERY METHODS (SUPERPOWERS OPTIONAL!) FISHBECK, THOMPSON, CARR & HUBER engineers scientists architects constructors

APPENDIX D Forms for the Analytical Delivery Decision Approach (Tier 1)

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program

Presented By: Jeffrey T. Folden, P.E. Chief, Innovative Contracting Division

EXHIBIT A. 1) General:

Progressive Design Build

Lease-Leaseback Project Delivery Method

Best Practices for Exceeding Project Goals and Reducing Risk on Construction Projects

45. Feedlot construction delivery

1/4/2014. Alternative Project Delivery Methods 1. Agenda

Jim Porter is the Director of Public Works for the County of San Mateo. The Department of Public Works has a staff of over 300 and performs a wide

Progressive Design-Build

Constructive Expertise. Is Design-Build the right choice. March for you? March i -

ECI: Two-Stage Contracts

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

The Owner s Role in Successful Design-Build Project Delivery

Sounds good. What could possibly go wrong? 5/6/2014. Potential Benefits of Design Build. Potential Downsides of Design Build

DESIGN IS GOOD BUSINESS

DESIGN BUILD INSTITUTE OF AMERICA

LB 889 The Political Subdivisions Construction Alternatives Act

SH 183 Managed Lanes Project RFQ Q & A MATRIX #2. (June 4, 2013)

Construction Project Delivery Methods

APPENDIX D Forms for Analytical Delivery Decision Approach (Tier 1)

SCADA System Procurement Alternatives

TABLE OF CONTENTS I. PARTIES TO THE CONSTRUCTION PROJECT...1 A. OWNER...1 B. ARCHITECT...1 C. INSPECTING ARCHITECT...1 D. CONTRACTOR...

Construction Family of Documents

The First Caltrans Design-Build Project: A Case Study

Construction Documents Education Program

SEPARATED PROJECT DELIVERY SYSTEMS

Multi-Family Housing Program Directors, Coordinators, Specialists, State Architects and Engineers

CHAPTER 1 INTRODUCTION

Public Building Commission of Chicago Terms and Tools for Public Capital Development and Financing

DEFINING THE SPECTRUM OF PROJECT DELIVERY OPTIONS AND THEIR IMPLICATIONS FOR YOUR PROJECT 2017 Airport Construction Strategy Summit

Risks Associated with Alternative Delivery Methods. Managing Expectations. Presented by Dan Becker, CCM, PMP, CCE

Contracting for Architectural and Engineering (A/E) Services Webinar. August 30, AM to 11:30 AM

The documents in the A-Series relate to various forms of agreement between an owner and a contractor.

Procurement Policies and Procedures

Improved Operational Profitability: Is IIoT a game changer in Asset Performance?

DESIGN-BID-BUILD CONSTRUCTION MANAGER AT RISK DESIGN-BUILD

Design/Build Institute of America Rocky Mountain Region Water/Wastewater Committee. Project Delivery Selection Approach

CONSTRUCTION MANAGEMENT CORE COMPETENCIES

Procurement Guidelines

Advancing analytics and automation within internal audit

Procurement Documents for Progressive Design-Build Projects

Design-Build Project/Team Awards Submission Details

Construction Back-Log Solution Begins With Proposal Stage

Procurement Options for NZ Construction Contracts

Choosing Delivery Method

Project vs Operation. Project Constraints. Pankaj Sharma, Pankaj Sharma,

Contracting Methods and Risk Management

Organizational and Compensation Review Project (RFP No. CO ADMIN-01-19)

Partnering for Alternative Delivery Projects

Performance Based Contracts in Non- Revenue Water Reduction Programs March 2017

2016 Architecture & Engineering

Effective Utility Coordination Practices Using Alternative Contract Methods

Chapter 02. Organization Strategy and Project Selection. Multiple Choice Questions

What You Should Know For Auditing Capital Projects Presented by: Robert S. Bright, President

Comparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013

Considerations for Mechanical, Electrical and Plumbing (MEP) Engineers Pursuing Design Build Projects

Design-Bid-Build Vs Design Build Projects: Performance Assessment of Commercial Projects In Sri Lanka

Project Delivery Systems

Building Contract Closeout. Ahmed Abd Alla Gouda, Chief Contracting Officer

Publicly Bid: Negotiated, Non-Bid: Hybrid: 5/12/2017. Design-Bid-Build Multiple-Prime Contracting. Lease-Leaseback* Design-Build

Connoisseur Solutions Project Procurement Management

DESIGN + BUILD CONSTRUCTION

Metropolitan Washington Airports Authority. Request for Qualifications Information. On-Call Consultant for Construction Claims Analysis Services.

Project Delivery Selection Matrix If the Project Delivery Approach Fits, Use It

Request for Proposal for Annual Financial Audit Services

Construction Manager as Constructor (CMc) Manual

Florida Cleanroom Systems

Commissioners Mital, Simpson, Helgeson, Manning, and Brown Mel Damewood, Engineering Manager; Mike McCann, Generation Manager

PMI Scheduling Professional (PMI-SP)

AIA Contract Documents

ConsensusDocs. Catalog. Updated Docs Inside

Choosing an External Auditor: A Guide to Making a Sound Decision, Developed by the Mid-America Intergovernmental Audit Forum

Additional information summarizing the alternatives and development of this recommendation by staff is attached.

Design-Build (DB) and Construction Manager / General Contractor (CMGC)

In partnership with EXCLUSIVE COURSE OFFERING - PAN PACIFIC HOTEL, PERTH. Course 1 Course 2

JOB ORDER CONTRACTING. United Brotherhood of Carpenters and Joiners Interior-Exterior Systems Leadership Conference

2016 National Tribal Transportation Conference

ConsensusDocs. ConsensusDocs CONTRACTS CATALOG. Updated Docs Inside. ou Ah. ead o f the Cur v. e K

Qualifications-Based Selection (QBS)

Alternative Project Delivery for America s Water Infrastructure

Project Delivery Methods

School Construction: Contract Basics OSBA BONDS, BALLOTS AND BUILDINGS CONFERENCE FEBRUARY 09, 2018

Relationship between Design-Build Procurement Duration and Project Success

Practice Bulletin No

Responding to RFPs. Slide 1 Responding to RFIs and RFPs Welcome this module on responding to RFIs and RFPs.

A PROJECT DELIVERY SELECTION MATRIX FOR HIGHWAY DESIGN AND CONSTRUCTION

Channel Incentive Study B2B Technology Industry

Transcription:

Strategic Management and Project Selection

Strategic Management and Project Selection Maturity of Project Management Overview Criteria for PS Models Nature of PS Models Types of PS Models Uncertainty Analysis and Risk Management Information Base for PS Models Project Portfolio Process (PPP) Project Proposal

Project Management Maturity Levels Ad-hoc (essentially disorganized) Abbreviated (some processes exist) Organized (standardized processes) Managed (measured processes) Adaptive (continuous improvement)

Overview of PS Process Project Management Office (PMO) Project selection Dealing with uncertainty Strategically selecting best projects Locking up the deal

PS Models Idealized view of reality Representing the STRUCTURE of the problem, not the detail Deterministic or stochastic

Criteria for Project Selection Models Realism (technical-,, resource-,, market-risk) risk) Capability (adequately sophisticated) Flexibility (valid results over large domain) Ease of Use (no expert needed to run model) Cost (much less than project benefit) Easy Computerization (use standard software)

Nature of PS models: Caveats Project decisions are made by PM -- - NOT by PS model! A PS model APPROXIMATES, but does NOT DUPLICATE reality!

Nature of PS Models: Methodology Start with goals Create list of factors (PEF s) Weigh every element in list Compute an score for project Select project aligned with firm s goals Select

Project Evaluation Factors (PEFs) Production Factors Marketing Factors Financial Factors Personnel Factors Administrative and Misc. Factors

Types of PS Models: Nonnumeric Sacred Cow Operating Necessity Competitive Necessity Product Line Extension Comparative Benefit Model See Q sort

Comparative Benefit Model Q sort Groups of 8

Numeric PS Models: Profit / Profitability Payback Period (PB) Discounted Cash Flow (NPV) Internal Rate of Return Profitability Index Other Profitability Models

Numeric PS Models: Scoring 1. Unweighted 0-10 Factor Model 2. Unweighted Factor Scoring Model 3. Weighted Factor Scoring Model 4. Constrained Weighted Factor Scoring Model S = (x) S = (s) S = (s w) S = (s w) (c)

Choosing the PS Model Dependent on wishes and philosophy of management 80% of Fortune 500 firms choose nonnumeric PS models Firms with outside funding often choose scoring PS models Firms without outside funding often choose profit / profitability PS models

Management of Risk: Terminology Risk: Decision based on complete information about the probability of each possible outcome. Risk: Uncertainty: Decision based on incomplete or insufficient data. Uncertainty: Game: Decision based under conditions of conflict. Game:

Areas of Uncertainty Project timing & expected cash flow Direct outcome of project, i.e. what exactly will the project accomplish Side effects and unforeseen consequences of project Reward assess plan

Risk Analysis Crystal Ball 2000 Software 1) Start with estimated risk profile for all key parameters of project 2) Use Crystal Ball,, an EXCEL plug in, to represent decision by statistical model 3) Repeat many times to get a statistical distribution of all possible outcomes

Risk Analysis: Crystal Ball 2000 Software 1) Input of Cash Flow parameter from Psycho Ceramic example

Risk Analysis: Crystal Ball 2000 Software 2) Select distribution parameter (Triangular for this example)

Risk Analysis: Crystal Ball 2000 Software 3) Output, 1000 Monte Carlo Runs (example:average Project NPV $10,821)

Window-of of-opportunity Analysis Estimate in advance economic impact of innovation before R&D is undertaken Estimate a baseline of current process as the sum of all current sub-processes Set up a baseline of current process Compute cost/performance of new innovation as a multiple of each sub- process in the baseline system Compute

Problems Affecting Data Used in PS Models Accounting: arbitrary assignment of overhead costs, linear cost and revenue forecasts Accounting:

Problems Affecting Data Used in PS Models Measurements: subjective vs. objective, quantitative vs. qualitative Measurements: New technology has to overcome initial resistance threshold. Technology shock: New

Project Portfolio Process (PPP) Step 1: Establish a Project Council Step 2: Identify project categories & criteria Step 3: Collect project data Step 4: Assess resource availability Step 5: Reduce project and criteria Set Step 6: Prioritize projects within categories Step 7: Prioritize the projects within categories Step 8: Implement the Process

Step 1: Establish a Project Council Includes: Senior Management Project Managers of major projects Relevant general managers Those who identify key risks Those who could derail PPP later

Step 2: Identify Project Categories and Criteria Derivative Projects Platform Projects Breakthrough Projects R & D Projects

Step 3: Collect Project Data Use activity based costs Verify all data Include timing for benefits and resource needs Document assumptions for future checking

Step 4: Access Resource Availability Access availability of Internal and External Resources by: Type Department Timing: : can vary 100% over project life cycle

Step 5: Reduce the Project and Criteria Set Narrow down existing projects required competence exists in organization Market for offering Profitability Risk Potential partner to assist with project Right resources available at the right times Good technological fit with organization Uses organization s s strengths Synergetic with other important projects Slipped in desirability

Step 6: Prioritize Projects within Categories Rank projects within each category Measure by Risk Development of new knowledge Consider benefits first Consider cost second

Step 7: Select the projects to be Funded and Held in Reserve Determine the mix of projects across various categories and time periods Leave 10-15 15 % of organization s resources free Focus on committing to FEWER projects

Step 8: Implement the Process Make results of the PPP widely known Senior management must fully fund Process will be repeated on a regular basis

Project Proposal: Content Cover letter Executive summary Description and past experience of project team Nature of technical problem to be solved How to approach solution of technical problem Plan for implementation of project Plan for logistic support and administration

Project Proposal: Cover Letter & Executive Summary Compose a cover letter Explain nature and benefits Minimize technical language

Project Proposal: Past Experience of Project Team List key personnel Include resume of principals Provide references

Project Proposal: Technical Approach General description of project Major subsystems Methodology Special requirements Test procedures

Project Proposal: Implementation Plan Estimates Establish milestones List costs Develop contingency plans

Project Proposal: Plan for Administration and Logistic Support Control subs Nature and Timing of all reports Change management Termination Procedures Touch of class capabilities

End

DESIGN-BID-BUILD BUILD DESIGN-BUILD CONSTRUCTION MANAGEMENT AT RISK (CM @ RISK) JOB ORDER CONTRACTING

In the Beginning.. Project delivery systems evolved over time. In centuries past the master builder was hired by a facility owner to design, engineer and construct an entire facility. The master builder had complete control of the design and construction of a facility.

Project Delivery System Evolution.. This master builder system was common until the industrial revolution and, in some cases, into the early 20 th century. Frank Lloyd Wright was one such example. Subsequently, changes in technology and the increasing sophistication in buildings required specialization of design and construction services. Designers and constructors began to separately specialize in the design, fabrication and/or construction of particular building systems.

Project Delivery System Evolution.. Specialists became separate companies Hired to provide their specific service or install products. Led to the traditional design-bid bid-buildbuild system Separation of design and build services in the public sector was also a response to perceived corruption in the public sector. Sealed bidding was seen as the only way to select teams objectively.

Project Delivery System Evolution.. Separation and specialization of services increased, design and construction entities shared information only at the end of design and during the construction process. Interaction was extremely low. Results? Inefficient designs, increased errors, disputes, higher costs and, ultimately, longer schedules. In the 1970s and 1980s, facility owners brought in third parties to assist them in managing design and construction entities.

Project Delivery System Evolution.. Third parties, often called agency construction managers, did not hold the trade contracts nor contractually guarantee the cost or schedule to the owner. Projects were still awarded to a low bid general contractor. agency construction managers act as an agent of/or advisor to the owner. Late 1980s and 1990s, the concept of the contractor in a similar role as the agency construction manager, but contractually taking responsibility for the work, and guaranteeing both the cost and schedule.

Project Delivery System Evolution.. As general contractors developed capabilities, the construction manager/general contractor (CM/GC) or construction manager at risk (CM at-risk) evolved. Under this approach the construction manager, could also self perform some or all portions of the work in order to meet a contract guarantee. In CM @ Risk, the contractor has significant input in the design process and guarantees the maximum construction price. (GMP)

Project Delivery System Evolution.. A desire for unified responsibility in the project delivery process and a faster, more seamless, delivery led many owners toward single source design build contracting. Widespread efforts to downsize in-house project management staff and costly disputes between design and construction parties also made design-build contracting popular In the 1990s the design-build project delivery system saw increased use. This project delivery system is characterized by a single contract between the design- build entity and the owner.

Project Delivery System Evolution.. By 1996, design-build was recognized for use in public agency procurement in over half of the 50 U.S. states and accounted for over 24 percent of the $286 billion of non-residential construction put in place (Forest, 1997). Congress also enacted specific authorization that enabled federal contracting officers to use the design- build project delivery system in the public sector. Also, civil and infrastructure industries developed new applications of design-build to procure highway and bridge projects (Powers, 1997).

Project Delivery System Definitions... A project delivery system defines the relationships, roles, and responsibilities of parties and the sequence of activities required to provide a facility. More commonly stated, delivery methods describe the roles of participants, the relationships between them, both formal and informal, the timing of events and the practices and techniques of management that are used (Ireland, 1982).

Design-Bid-Build... Bid-Build... Build... Traditional project delivery system in the U.S. construction industry under which the owner contracts separately with a designer and a constructor. The owner normally contracts with a design entity to provide complete design documents. The owner subsequently solicits fixed price bids from construction contractors to perform the work. A general contractor is selected and enters into an agreement with the owner to construct the facility in accordance with the plans and specifications.

D-B-B client Several variations The design entity subcontracts parts of design scope to several specialty design consultants. The construction contractor subcontracts part or all of its construction scope. The owner selects a designer, a constructor takes possession at substantial completion. designer -design consultants general contractor -subs -suppliers

Design-Bid-Build... Build... Project start Substantial completion Select designer design Select constructor construction Design-bid build project timeline

Design-bid-build build advantages... Established way of doing things Suitable for competitive bidding A/E directly works for owner Extensive litigation has resulted in well established legal precedents. No legal barriers in procurement and licensing Insurance and bonding are well defined

Design-bid-build build disadvantages... Two contracts for owner to manage Disagreements go through owner, owner bears design adequacy risk All parties have different agendas/objectives Initial low bid doesn t t result in final best value Bids over budget presents most difficulties in reducing costs/creates significant delay No constructor involvement in design Slowest project delivery system Most litigious delivery process

Design-build... Design-build represents the most recent evolution of project delivery systems. It is a project delivery system where the owner contracts with a single entity to perform both design and construction under a single design build contract. Contractually, design-build offers the owner a single point of responsibility for design and construction services and often guarantees the performance of the facility. Portions or all of the design and construction may be performed by a single integrated design-build entity.

Design-build... client Selected specialty work, or in some cases all work, may be subcontracted to other design, construction or design-build specialty companies. The owner selects a design-build entity to design and build the facility. The constructor portion of the entity provides constructability input to design and then constructs the facility as portions of the design become available. The owner takes possession of the facility at substantial completion Design-build entity

Project start Design-build... Substantial completion Select design-builder design Pre- construction construction Design-build project timeline

Design-build Advantages... Single point of responsibility for owner One RFQ and or RFP required vs. two for other systems More professional relationship with contractor A/E and constructor on the same team providing unified recommendations to owner Fastest most cost-effective delivery system Design submission and pricing project at proposal stage possible Earliest knowledge of firm costs

Design-Build Advantages... Allows most innovations/options for owner to select Delivers equal or higher quality Allows clearest definition of risks Fewer changes Fewer claims and less litigation

Design-Build Disadvantages... Owners pushed for earlier and timely decisions New learning curve for owners Different process in front end of project Barriers in some states with procurement and licensing Use of new insurance bonding products Resistance among those not familiar with approach

Construction Management at Risk.. Construction Management at Risk evolved from the traditional project delivery system as a method to somewhat overlap the design and construction phases and to obtain significant constructability input during the design phase of a project. Construction Management at Risk is a project delivery system where the owner contracts separately but somewhat simultaneously with a designer and a contractor. The owner contracts with a design entity to provide a facility design. As with the design-bid-build methodology, the designer may subcontract part of its design scope to specialty sub consultants.

CM @Risk The owner selects contractor to perform construction management services and construction work in accordance with the plans and specifications, for a fee and reimbursable costs. Construction manager has significant input during the design phase. The construction manager (CM) generally will subcontract part or all of its construction scope to specialty contractors as soon as that specific part of the design is completed. When the design is sufficiently complete, the CM usually guarantees the maximum price of the project and a project schedule to the owner.

CM @Risk client Any savings in actual costs under the guaranteed maximum price can be shared by the owner and contractor, or retained in full by the owner. The owner selects a designer to design the facility. The owner can simultaneously select a CM/GC to provide constructability input to design and then to build the facility. The CM/GC then constructs the facility and the owner takes possession at substantial completion. designer Construction Manager/ General contractor

Construction Management at Project start Risk... Substantial completion select designer design select CM/GC Pre- construction construction Construction management at risk project timeline

Construction Management at Risk Advantages.. More professional relationship with contractor Earlier knowledge of costs Earlier involvement of constructor possible Two contract system is less change for owner Project delivery faster than traditional

Construction Management at Risk Disadvantages.. Two contracts for owner to manage Disagreements go through owner Owner bears design adequacy risk Parties may still have different agendas/objectives Cannot firmly price project as part of proposal Constructor input may not be included by designer Project delivery slower than Design-build Agency CM places ever more risk on owner

United States Project Delivery System Study.. The objective was to empirically compare cost, schedule and quality performance of projects delivered using designbuild, design-bid-build, and cm @ risk. Data from 351 general building projects recently completed in the United States. Statistical analysis of cost, time data and quality results quantified the differences among the project delivery systems studied.

United States Project Delivery System Study.. In 1997, the top 400 contractors in the U.S. construction market generated $62.6 billion in revenues from the general building sector. This represented 45% of their total volume (Tulacz, 1998). The data was divided into six sectors of the U.S. general building market. The six general building sectors studied were: light industrial, multi-story dwelling, simple office, complex office, heavy industrial and high technology.

Summarizes the primary results of the study.. Metric Design-build Vs. Design-bid-build CM@R vs. Design-build vs. Design-bid-build CM@R Level of Certainty Unit Cost 6.1% lower 1.6% lower 4.5% lower 99% Construction Speed Delivery Speed 12% faster 5.8% faster 7% faster 89% 33.5% faster 13.3% faster 23.5% faster 88% * The level of certainty is a statistical measure used to express the ability of a particular regression model to explain differences in each performance metric. The higher the Level of certainty the more confident one can be about the results shown. (Sanvido & Konchar 1999)

Illustrates the average differences among the project delivery systems.. Metric Design-build Vs. Design-bid-build CM@R vs. Design-build vs. Design-bid-build CM@R Level of Certainty Cost Growth 5.2% less 7.8% more 12.6% less 24% Schedule Growth 11.4% less 9.2% less 2.2% less 24% * The level of certainty is a statistical measure used to express the ability of a particular regression model to explain differences in each performance metric. The higher the Level of certainty the more confident one can be about the results shown. (Sanvido & Konchar 1999)

Bibliography: Sanvido,, Victor, and Konchar,, Mark 1999. Selecting Project Delivery Systems Ph.D.diss.,., The Pennsylvania State University. Tulacz,, Gary J. 1998. Markets Are Mixed but Advancing Overall. Engineering News Record Sourcebook, November, p.4. Beard, Jeffrey, L., Wundram,, Edward C., Loulakis,, Michael, C. 2001. Design Build Planning through Development. No. ISBN 07049 Dell Isola Isola,, Michael D. 1987. The Construction Management Impact. The Construction Specifier April: 71-77 77 Forrest Products. 1997. Building Material and Construction Division. ion. U.S. Department of Commerce Washington, D.C. Ireland, V. 1982. Virtually Meaningless Distinctions Between Nominally Different Procurement methods.

Additional Reference: Design Build Institute of America (DBIA), Foundation for Integrated Services. 1010 Massachusetts Avenue NW, Third Floor Washington, D.C. 20001-5402 www.dbia.org