Reducing THM via Aeration: A Case Study August 28, 2014

Similar documents
Aeration Strategies for TTHM Control

Strategies for Using Tank Aeration for Stage 2 DBP Compliance

Process Treatment Selection and. Jeff Macomber, P.E. One Water Conference August 28, 2014

Using a Recirculating Aeration System to Remove Bromoform and Other THMs. Russell Porter, P.E. May 9, 2014

VILLAGE OF NORTH BALTIMORE WTP CLEARWELL THM REMOVAL SYSTEM

Chlorine Dioxide One Year Later. Shazelle Terry Treatment & WQ Department Manager

-SELECTION- -MAINTENANCE- -WATER AGE AND THM REMOVAL- Robert C. Heady, P.E., S.I., ENV SP Project Manager Civil Design Associates, Inc.

ACHIEVING STAGE 2 DBPR COMPLIANCE THROUGH SYSTEM OPTIMIZATION AND EFFICIENT USE OF POST-FILTRATION GAC: A 5 YEAR CASE STUDY

In-Reservoir TTHM Surface Aeration: A year of results, experience and lessons learned

Disinfection By-Products

Lowering THMs in Your Distribution System Using In-Tank Aeration

Integrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant

TOTAL TRIHALOMETHANES (TTHM) MITIGATION FEASIBILITY STUDY AND PILOT TESTING ABSTRACT KEYWORDS

THM Analysis From Compliance to Optimization

By Ethan Brooke and M. Collins

Reduction of THMs Within Storage Tanks Using Aeration

THM Removal by Water Spray Aeration- Tank Top Results. Thomas F. Clark, P.E. Production Engineer Monroe County Water Authority Rochester, New York

Side by Side Piloting of Process Alternatives Yields Direct Performance Comparison

Meeting Manganese Removal Goals: A Pilot Study

TTHM Reduction Corrective Action Update 1 st Progress Meeting October 18, Robert Horvat, P.E x1501

DBP AND DISTRIBUTION SYSTEM CHLORINE RESIDUAL CONTROL IN CARLISLE BOROUGH

FROM RAW WATER INTAKE TO DISTRIBUTION NETWORK: THE JOURNEY OF DBP CONTROL

THIS POLICY DOES NOT HAVE THE FORCE OF LAW

Trials and Tribulations of Building a Pilot Plant:

UTILIZING AN ON-LINE TTHM ANALYZER TO AID IN COMPLIANCE WITH DBP REGULATIONS

Submerged Membranes to Replace Media Filters to Increase Capacity 4X for a Small Community. Richard Stratton, PE HDR Engineering, Inc.

Policy and Planning to Address Impacts of Forest Fires to Source Water Quality. Troy Hayes, P.E. Water Services Deputy Director (Water Quality)

Expanding Capacity and Treatment. Treatment Plant

Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings

Drinking Water Treatment Using Air Strippers

DBP Treatment Strategies. Learning Objectives. DBP Control Options Optimize existing facilities

In-Tank Aeration for THM Removal

An Operational Definition of Biostability for Drinking Water Project #4312. Case Studies

A New Approach to Drinking Water Nitrate Removal. Ali Dorri Director of Business Development

Energy Efficient Mixing

Hannibal Chloramine Replacement Evaluation

Drinking Water Treatment Using Air Strippers

Tiffin Water Treatment Plant. Comprehensive Facility Plan (Audit)

CASCADING BENEFITS: OPTIMIZING DISINFECTION FOR CHEMICAL SAVINGS, CONTROL NITRIFICATION AND DISINFECTION BY-PRODUCTS.

CITY OF SUMNER: CENTRAL WELL DEVELOPMENT

CASE STUDY. In-Tank THM Removal System Achieves Over 50 Percent Reduction. Texas Utility Reaches Compliance for First Time in 5 Years.

Long Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE

Drinking Water Treatment Using Air Strippers

Ferric Sulfate Success Story - OWASA s Switch to Ferric Sulfate Leads to a Reduction in Disinfection Byproducts

THM Removal by Water Spray Aeration- Tank Top Results. Thomas F. Clark, P.E. Production Engineer Monroe County Water Authority Rochester, New York

Treatment techniques for control of disinfection byproduct (DBP) precursors.

Balancing Microbial Control and Stage 2 DBP Rule Compliance (at Ocean City, Maryland)

Drinking Water Treatment Using Air Strippers

Chlorine Dioxide Feed System for Pre-Oxidation

Example Plan Small PWS

Benchmarking Case Studies for Water and Wastewater Facilities

Air Strippers for VOC and Dissolved Gas Removal with a focus on Water and Wastewater Applications

CHLORAMINE REPLACEMENT ALTERNATIVE EVALUATION

Dipti Shah, Town of Gilbert Tuesday, January 25, 2011

Benchmarking, Metrics Assessments, and Gap Analyses for Water and Wastewater

DBP Reduction and SCADA Improvements at the SGWASA Water Treatment Plant

Mike Nixon, E.I. Phil Locke, P.E.

Ocean Water Desalination Water Quality Integration Study

Free Chlorine Distribution System Influent Hold Study Protocol (April 2019)

Zero Liquid Discharge Project Extends Potable Water Supplies

Utility Partner Data Report

Disinfection and Disinfection Byproducts (DBP)

THE WONDERFUL WORLD OF WATER. Steve Turner, P.E., PMP, ENV SP Bite of Science October 25, 2017

DBP Control: Update on WaterRF and Mid-Sized Utilities

Bench-Scale Testing for Controlling Desalinated Seawater Quality

Water distribution systems throughout

Water Treatment Plant Year-end Report for 2014

City of Boca Raton s NF Plant: A Plant History

MONITORING PLAN FOR THE DISINFECTANTS/DISINFECTION BYPRODUCTS RULES

Performance of GAC Filter-Adsorbers for Herbicide and DBP Control at Higginsville,, MO

Matt Leach, P.E. CH2M. Mark Eppich, P.E. City of Columbus Division of Water. S. Dean Ramsey, P.E. CH2M

Disinfection By-Products Reduction and SCADA Evaluation and WTP Sludge Removal System and Dewatering Facility

Localized Treatment for DBP s using Spray Aeration and Online Monitoring

Assessment of POU device for the removal of chloroform and MTBE

Comparing the Leopold Clari-DAF System to Upflow Contact Clarification

AERALATER. Packaged Iron and Manganese Removal

Ohio Section AWWA NW District Fall Meeting April 20, City of Delaware Water Plant Improvements

Aerators. Aeration and Gas Stripping

Achieving Stage 2 Compliance by Online Monitoring In Surface Water

INITIAL OPERATIONAL EVALUATION REPORT TREATMENT PROCESSES AND FINISHED WATER QUALITY CITY OF TYLER, TEXAS TABLE OF CONTENTS EXECUTIVE SUMMARY...

Hydrogen sulfide (H2S), is now regulated

Avon Lake Corrosion Control Study and Orthophosphate Implementation. Andrew Skeriotis, Stantec Greg Yuronich, Avon Lake Regional Water

The Stage 2 Disinfection By-Products Rule

Online THM Analyzer Integral to City of Benicia s Stage 2 DBPR Compliance Strategy

2015 HDR, Inc., all rights reserved.

Instructions. Disinfectants and Disinfection Byproducts Rule (DBPR) Monitoring Plan Template 6/4/03

Comparing Carbons for Disinfection Byproduct Control. Maggie H. Pierce, EI Sara N. Gibson, PE Mark M. Bishop, PE David S.

SESSION 10. Operational Savings through Online THM Monitoring

The Wait is Over Tier 3 and 4 Operational Evaluation Level Reporting

Application of Electrodialysis Reversal (EDR) Membrane Technology in Drinking Water Treatment Plant to Supply the Metropolitan Area of Barcelona

Trihalomethane Formation Concern

Advanced Oxidation Processes: Treatment of 1,4-Dioxane and VOCs for Potable Water Applications

Hetch Hetchy Treatability at the Sunol Valley Water Treatment Plant

City of Enderby Water Treatment Plant

Chlorine Dioxide Feed System for Pre-Oxidation at an 8 MGD WTP

Granular Activated Carbon System

A NANOFILTRATION MEMBRANE FOR THE REMOVAL OF COLOR AND DISINFECTION BYPRODUCTS FROM SURFACE WATER TO MEET STATE AND FEDERAL STANDARDS

Trihalomethane Formation Concern

Dave Mercer, P.E. District Engineer DEQ

Mitigation of Bromate during Ozonation

Transcription:

1 Reducing THM via Aeration: A Case Study August 28, 2014 by Gary Williams, P.E. Jones & Henry Engineers WEA-AWWA 2014 Technical Conference & Expo

Agenda 2 Location History Pilot Implementation Take Away Information

3 Location Map

Water Quality 2008 4 Raw Water Total Hardness 285 mg/l as CaCO 3 Total Alkalinity 133 mg/l as CaCO 3 ph 8.2 Turbidity 3.2 Total Organic Carbon 4.5 mg/l Finished Water Total Hardness 150 mg/l as CaCO 3 Total Alkalinity 36 mg/l as CaCO 3 ph 9.2 Total Organic Carbon (average) 2.1 mg/l TOC Removal (average) 51%

THM 2008 5 Total Trihalomethane & HAA5 2007/2008 Date of Sample Location Second MR002 HAA5 Sample Quarter 2007 Average RAA LRAA Average RAA 5/24/2007 RD002 38.9 13.4 RD003 40.8 14.4 MR002 50.2 43.3 47.8 59.3 11.8 13.2 17.8 Thrid Quarter 2007 7/10/2007 RD002 82.3 16.6 RD003 85.3 15.2 MR002 102.0 89.9 50.4 60.6 16.7 16.2 14.4 Fourth Quarter 2007 10/11/2007 RD002 54.1 17.3 RD003 58.3 16.4 MR002 81.7 64.7 58.1 69.3 22.0 18.6 15.9 First Quarter 2008 1/16/2008 RD002 40.6 19.3 RD003 40.7 20.8 MR002 54.9 45.4 60.8 72.2 20.4 20.2 17.0 Second Quarter 2008 4/2/2008 RD002 40.5 13.6 RD003 40.6 13.1 MR002 60.3 47.1 61.8 74.7 14.2 13.6 17.1 Third Quarter 2008 7/8/2008 RD002 85.1 33.1 RD003 85.3 32.1 MR002 131.0 100.5 64.4 82.0 34.7 33.3 21.4 Fourth Quarter 2008 10/9/2008 RD002 52.0 28.8 RD003 55.7 28.8 MR002 80.6 62.8 63.9 81.7 33.3 30.3 24.4

Water History 6 1972 Water Treatment Plant, Low Head Dam, and Reservoir Constructed 1993 Water Treatment Plant Study 1996 Reservoir Study 1999-2000 Water Treatment Plant Expansion $3,000,000 2002 Second Reservoir $2,300,000 2004 Water Distribution System DBP Reduction Study 2005 Chlorine Dioxide Benchtop Study 2005 MIEX Benchtop Study 2006 RSSCT for GAC Benchtop Study 2008 THM Reduction via Aeration Opflow Article

7 2008 THM Reduction via Aeration Opflow Article

Research 8 Limited Research Available for Dynamic System One Company Marketed a System $$$$$$$$ Air : Water Ratios (cfm : gpm) 5 to 60 If A:W = 40 and processing water @ 700 gpm = 28,000 cfm blower Approximately 200 hp Blower

Pilot 9 Assumed 20:1 A:W ratio or 14,000 cfm Determined Approximate Area Diffusors for 14,000 cfm in Clearwell 2 Assumed One/half Depth of Clearwell or 7 feet Calculated the Volume over the Diffusors Developed the Detention Times in the Three Celled Clearwell Influent Cell Aeration Cell Effluent Cell 60 minutes 75 minutes 60 minutes Scaled down the flows of air and water to match a 4-inch PVC pipe

10 Pilot

Test Pipe Arrangement 11 Pilot Air Requirements Air: Water Ratio Required (cfm) Total Air (cf) 2:1 0.1 9.5 5:1 0.25 23.8 10:1 0.5 47.5 20:1 1.0 95

Pilot Protocol 12 Two Pilot Steps First Step Test Entire A:W Range Second Step Optimize Results of the First Step Goal was to Optimize Air Required Parameters Tested TOC THM HAA5 Chlorine Residual Stability ph Total Alkalinity Total Hardness Calcium Hardness TDS Chlorides Sulphates

Pilot Results 13 Air: Water Air Rate Trihalomethane Results (ug/l) Ratio (scfm) October 14 November 11 Control N/A 47.1 38.0 2:1 0.10 16.9 16.7 5:1 0.25 5.7 9.0 7:1 0.35 N/A 6.7 10:1 0.50 2.1 5.7 20:1 1.00 2.7 30:1 1.50 2.6 40:1 2.00 3.0 50:1 2.50 2.1

Pilot Results 14 Trihalomethanes (ug/l) 50.0 45.0 40.0 35.0 30.0 25.0 20.0 15.0 10.0 5.0 0.0 0 5 10 15 20 25 30 35 40 45 50 55 Air to Water Ratio October 14 November 11

Other Pilot Results 15 Temperature October 16 deg C November 12 deg C Control Sample (no aeration) Initial 52.6 ug/l Finish 47.1 ug/l TTHM ph Initial 9.3 Aerated 7.9 Cl 2 Free mg/l Initial 2.13 Aerated 1.19 Cl 2 Total mg/l Initial 2.45 Aerated 1.96 @ A:W ratio > 10:1 CHBrCl 2, CHBr 2 Cl, CHB 3 below Detectable Limit

Project Costs 16 Aeration System 5:1 A:W ratio 3,500 scfm Blower Stainless Steel Diffusors Caustic Soda Feed System to increase ph to 8.9 12-inch Air Piping to Clearwell Diffusors Electric and Controls Project Cost - $401,700 Annual O&M - $73,000 GAC System Project Cost - $1,225,600 Annual O&M - $145,000

Brand X 17 2011 SolarBee Aeration System Proposal Two 15 HP Blowers 580 scfm Each Three Submersible Mixers 86 Diffusor Assemblies Caustic Soda Feed System to increase ph to 8.9 8-inch Air Piping to Clearwell Diffusors Electric and Controls Project Cost - $571,700 Annual O&M - $21,000 SolarBee Offer Install Clearwell Equipment Provide Temporary Blower and Piping 6-month Trial If Satisfied, Purchase Price $360,000

18

Second Thoughts 19 April 1, 2012 SolarBee Oops Further Testing Showed Spray Aeration Preferable Highly Recommended Spray System One GS-12 Submersible Mixer in Clearwell 1 Two SN-15 Floating 15 HP Pump/Mixer/Spray Systems Two Ventilation 2HP Blowers 750 scfm Each Caustic Soda Feed System to increase ph to 8.9 12-inch Air Piping to Clearwell Electric and Controls Project Cost - $369,900 Annual O&M - $22,000 SolarBee Offer Provide In-Clearwell Equipment and Two Blowers Install Clearwell Equipment 6-month Trial If Satisfied, Purchase Price $168,000

20

Schedule 21 Bid October 2012 Preconstruction Meeting November 2012 Substantial Completion March 2013 Total Completion June 2013

TTHM Summary 22 (all values TTHM in ppb, except where noted) Sample Date Water Temp (deg C) Clearwell 1 Effluent Clearwell 2 Effluent DS202 (Max TTHM) % Removal In Clearwell #2 Regrowth in System 4/3/2013 7 29.6 18.4 31.8 38% 13.4 5/6/2013 15 47.2 20.4 43.4 57% 23.0 5/20/2013 18 56.2 24.8 64.7 56% 39.9 6/17/2013 22 62.7 21.2 62.3 66% 41.1 7/1/2013 24 63.2 30.7 64.7 51% 34.0 8/13/2013 23 53.3 20.3 52.1 62% 31.8 9/9/2013 20 56.0 20.5 52.6 63% 32.1 Note: Baffle wall opening sealed on 4/12/2013

23 Maximum Residence Time Running Annual Average 100.0 90.0 80.0 70.0 60.0 50.0 40.0 TTHM (ppb) HAA5 (ppb) 30.0 20.0 10.0 0.0 First Second Third Fourth First Second Third Fourth First Second Third Fourth First Second Third 2011 2012 2013 2014

24

Take Away Information 25 1. THMs Have to be Formed Aeration Does Not Reduce Formation Potential 2. Chloroform is Typical Target THM 3. Powered Air Supply for Ventilation Probably Required 4. Check ph/stability 5. Check Chlorine Residual 6. Means for Cleaning Nozzles