PROCESS SPECIFICATION- COUNTERFEIT PARTS PREVENTION

KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts

The purpose of this document is to describe the process and due diligence performed by

The Counterfeit Parts Prevention procedure applies to all employees within the company and extends to our suppliers and outsourced services.

TITLE: Counterfeit Parts Avoidance Plan DOCUMENT #: DOCUMENT CLASS: K-Purchase PRC RESPONSIBLE DEPT: Purchasing REF: QMS 7.

COUNTERFEIT PARTS PLAN

JUL 14 Rev B All Paragraphs Revised

Counterfeit Parts Prevention Revision: C

Work Instructions No. 0621P2 Rev: AG Counterfeit Parts Risk Mitigation Date: 09/07/12 Procedure Page: 1 of 13

Approved for public release; distribution is unlimited.

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

L-3 PHOTONICS QUALITY CODES Reference

January 21, 2013 Huaqiang Square Hotel Shenzhen, China Mark A. Rinehart, Managing Director

QUALITY CONTROL INSTRUCTION

Document Title: Icore Supplier Quality Requirements Revision: D Released Date:

Counterfeit Control Plan for Electrical, Electronic and Electromechanical Parts

Counterfeit Material Prevention I. PURPOSE

Counterfeit Part Prevention Policy

ZODIAC INTERCONNECT US

ThinKom Purchase Order Quality Provisions Number: Q4000 Revision: D

STRAN Technologies Quality Notes

Purchase Order Quality Clause SCC40 Revision G, Effective 1/20/2015

Counterfeit Part Prevention & Mitigation Process

ZODIAC INTERCONNECT US

TITLE: TEKTRONIX COMPONENT SOLUTIONS SUPPLIER QUALITY MANUAL

Supplier Quality Manual

INS QA Programme Requirements

Counterfeit Mitigation

IKHANA Aircraft Services, Fabrication Division PO Quality Clauses

ECIA Distributor Counterfeit Product Mitigation Internal Audit Checklist

SQR Supplier Quality Requirements TRANSLINE TECHNOLOGY, INC. (TTI) SQRs SUPPLIER QUALITY REQUIREMENTS

Procedure QAP-10 Date Issue Page ALTA Quality Requirements for Suppliers 25 Sept

Work Instructions No. 0621P2 Rev: AH Counterfeit Parts Risk Mitigation Date: 10/27/15 Procedure Page: 1 of 18

DSPO PSMC - #LRR

Counterfeit Electronic Parts Risk Management Plan

VOLTAGE MULTIPLIERS, INC. QUALITY SUPPLEMENT TO PURCHASE ORDERS

PROTECTION AGAINST COUNTERFEIT GOODS PROCEDURE

2. GENERAL REQUIREMENTS

TERMS AND CONDITIONS. No charges are allowed for boxing, packing, crating, and insurance unless specifically provided for in the Purchase Order.

AMRDEC Counterfeit Risk Management Recommendations

Purchase Order Quality Terms and Conditions

SUPPLIER QUALITY REQUIREMENTS (SQR S)

Supplier Quality Clauses

SUPPLIER QUALITY REQUIREMENTS (SQR S)

L3 Counterfeit Parts Prevention

HILLPRO LLC PURCHASE ORDER TERMS AND CONDITIONS

A Year On... Why Trusted Independent Distribution is Key to the Solution. Geoff Hill President/Managing Director, Astute Electronics 19th April 2013

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Meggitt Oregon Purchase Order Quality Notes

REQUIREMENTS FOR SAFETY RELATED (ASME AND NON-ASME) ITEMS OR SERVICES

SQRs SUPPLIER QUALITY REQUIREMENTS

SQRs SUPPLIER QUALITY REQUIREMENTS

ASM AEROSPACE SPECIFICATION METALS, INC NW 34 th Place #B28 Terrace Pompano Beach, Florida Tel: Fax:

Risk Management for Counterfeit Materials: The Role of the COTS Board Manufacturer

Purchase Order Quality Clauses

PP Quality Assurance Procurement Clauses for Suppliers

Quality Assurance Policy and Procedures

PURCHASE ORDER QUALITY SYSTEM REQUIREMENTS

ALTA Precision Inc. Quality Procedure

NQA-1 Graded Approach, 55-Gallon Drum Summary

Section I: General Quality Assurance Requirements Applicable To All Purchase/Subcontract Orders;

STANDARD QUALITY ASSURANCE PROVISIONS FOR PURCHASED MATERIALS

Purchase Order Quality Requirement Clauses

Document Type: Main Process: Revision Level: Page: POLICY QUALITY ASSURANCE 3 1 of 6 Process Owner Title:

PURCHASE ORDER SUPPLEMENT

Supplier Quality Requirements (Including Terms & Conditions)

I. Development, Submittal, and Acceptance of a Quality Management System

BC Systems, Inc. Quality Assurance Department. Q.A. Provisions. (Clauses are incorporated in and part of the Contract or Purchase Order.

SUPPLIER REQUIREMENTS FOR QUALITY, DESIGN & MANUFACTURING

Anti-Counterfeit Control Plan Version A Dated 08/24/2018

Trident Precision Manufacturing

QUALITY TERMS & CONDITIONS FOR PROCUREMENT Rev A

EP-QC Supplier s General Requirements. Revision AH

AP Quality Consulting works with you to provide a custom solution

QUALITY ASSURANCE AND QUALITY CONTROL MANUAL

Supplier Quality Clauses

EP-QC Supplier s General Requirements. Revision AK

NUMBER OF EMPLOYEES TOTAL ENGINEERING MANUFACTURING QUALITY SUPPLIER IN-HOUSE SPECIAL PROCESS CAPABILITIES

Quality (Supplier Flow Down) Requirements

Quality Assurance Procedure Issued: 14FEB2017 Page 1 of 11 PURCHASING. Issue 0 Revision 9 QAP 6.0

6. KLH Industries, Inc. performs inspection activities to ensure that purchased product meets purchase requirements.

Axiom Electronics LLC. Axiom Electronic LLC AS9100 Flow-down Requirements for Suppliers

Teledyne QPR 001 Electronic Safety Products Rev F Page 1 of 9 QUALITY INSTRUCTION

Altech Machining, Inc. Terms and Conditions

Supplier Quality Codes

STRAN Technologies Quality Notes

National Aeronautics and Space Administration

Q-CLAUSES FOR STAFFORD SPRINGS REVISION HISTORY. Updated to change the retention period to 7 years 10/03/07

SHELTON INDUSTRIAL PATTERN INC.

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0)

QUALITY MANUAL. Conforming To AS9100D and ISO9001:2015. QM-001 Page 0 of 36 Revision 24:

Supply Chain Quality Assurance (SCQA) Page 1 of 6

D.P.E.LTD QUALITY CONTROL PROCEDURE NO 9 QUALITY CONTROL REQUIREMENTS FOR SUPPLIERS MASTER COPY

Avoiding Counterfeit Components

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

Supplier Requirements Manual

Requirements for Suppliers

Aero-Tech Engineering (ATEI) Quality Clauses

9100 revision Changes presentation clause-by-clause. IAQG 9100 Team November 2016

QUALITY ASSURANCE TERMS & CONDITIONS FOR PROCUREMENT Rev E

Transcription:

Counterfeit Parts Prevention 1.0 Purpose The purpose of this document is to describe the process performed to prevent the purchase and / or use of Counterfeit Parts and to outline the Detection, Mitigation and Disposition. a. Maximize availability of authentic parts. b. Procure parts from reliable sources. c. Assure authenticity and conformance of purchased product. d Control parts identified as counterfeit. e. And Report counterfeit parts to other potential users and Government investigative authorities. 2.0 Scope This document applies to the procurement activities of MilAero Electronics 3.0 Applicable Documents AS9100 REV C, Quality Management System Requirements QCP- 11.0, Control of Non Conforming Products QCP- 6.0, Purchasing 4.0 Definitions 4.1 Suspect Part A part in which there is an indication by visual inspection, testing, or other information indicating the item may have been misrepresented by the Supplier or Manufacturer and may in turn meet the definition of a Counterfeit Part.

4.2 Counterfeit Part A suspect part identified as a copy or substitute without the legal right or authority to do so or a part whose material, performance, or characteristics are knowingly misrepresented by a Supplier in the Supply Chain. The Counterfeit Parts include but are not limited to: 4.2.1 Parts not containing the proper internal construction (manufacturer, wire bonding, etc.) consistent with the ordered part. 4.2.2 Used, refurbished, or reclaimed parts represented as new product. 4.2.3 Parts with a different package style, type of package, or surface plating/finish than the required or order product. 4.2.4 Parts not successfully completing the full production and/or test procedures of the Original Component Manufacturer 4.2.5 Parts sold or delivered with modified labeling or markings intended to misrepresent the form, fit, function, or grade of the intended product. Note: Refinished, or updated parts identified accordingly are not considered counterfeit product. 4.3 Aftermarket Manufacturer A manufacturer meeting one or more of these criteria: 4.3.1 A manufacturer authorized by the original component manufacturer to produce or provide replacement parts. The parts supplied originate from the original component manufacturer to the aftermarket manufacturer. 4.3.2 The manufacturer produces parts using tooling or equipment manufactured by and traceable to an Original Component Manufacturer that was properly stored until use. The parts are subsequently assembled, tested, and qualified using processes meeting the technical specifications without violating the intellectual property rights, patents, or copyrights of the Original Component Manufacturer. 4.3.3 The manufacturer produces parts by emulation, reverse engineering, or redesign using processes matching the Original Component Manufacturer specification. The parts must meet the Customer needs without violating the OCM intellectual property rights, patents, or copyrights. 4.4 Approved Supplier Suppliers who are formally assessed and determined to have a low risk of providing counterfeit product. MilAero Electronics Counterfeit Measures Policy February 8, 2015 2

4.5 Franchised Distributor A distributor with which the Original Component Manufacturer has a contractual agreement to buy, stock, re-package, sell and distribute its product 4.6 Independent Distributors A distributor that purchases new parts with the intention to sell and redistribute them back into the market. Purchased parts may be obtained from original equipment manufacturers (OEM s) or contract manufacturers (typically from excess inventories), or from other independent distributors. Re-sale of the purchased parts (re-distribution) may be to OEM s, contract manufactures, or other independent distributors 4.7 Used Electrically charged parts removed from a prior application. Parts should be examined for nonstandard packaging, mixed lots / dates, parts from various sites, scratches, bends, test dots, faded marking, chemical residue, or other signs of use. Used parts should be declared accordingly. 5.0 Responsibility Purchasing, engineering, Operations and other associates as appropriate or required are responsible to comply with the requirements and processes identified in this document. 5.1 Purchasing is responsible to procure the correct part using the applicable drawing, specification, description, or other information. 5.2 Engineering is responsible to ensure the drawing, specification, process, or description identifies the applicable type, class, style, part number, manufacturer, or other related information so the correct part or product is identified. 5.3 Receiving Inspection/Quality Manager is responsible to examine, inspect, and/or maintain the parts to identify or mitigate the receipt and/or use of counterfeit parts. 6.0 Procedure 6.1 Part Availability: The processes shall maximize availability of authentic, originally designed and/or qualified parts throughout the product s life cycle, including management of parts obsolescence. 6.2 Purchasing to examine a potential source of supply and assess the risk of receiving counterfeit parts. Assessment may be a survey, audit and a review of the supplier quality data to determine performance. MilAero Electronics Counterfeit Measures Policy February 8, 2015 3

6.3 Purchasing must maintain a list of suppliers to minimize the risk associated with the supply and / or receipt of counterfeit parts. (REF. Form # -Approved Supplier List) 6.4 Purchasing should focus buying efforts to obtain parts directly from a Manufacturer, approved distributor, authorized resell organization, or franchised aftermarket supplier. 6.5 Assure that approved sources of supply are maintaining effective processes for mitigating the risks of supplying counterfeit parts. At a minimum, the supplier should be required to provide certificates of conformance and acquisition traceability. These certification requirements must be clearly identified on the purchase document as deliverable data. 6.6 Purchasing must specify the flowdown requirements from the Counterfeit Parts Procedure applicable to the supplier or subcontractor. Purchasing must perform some level of risk assessment if the supplier or subcontractor does not maintain a documented counterfeit part control plan. (REF. Supplier RA Survey) 6.7 The purchase order must specify the applicable requirements of the Counterfeit Part Procedure to the supplier to minimize the risk of receiving counterfeit parts. In order to minimize the risk of procuring counterfeit parts the purchase order should include requirements to ensure conformance, and authentic parts are provided. The purchase order will also list certification or traceability requirements, test and / or inspection results and Quality System requirement for the supplier. 6.8 Receiving inspectors, or personnel processing parts must examine the product to ensure the drawing, specification, type, class, style, part number, manufacturer, Certificate of conformance or other related information is present to detect or identify suspect or counterfeit parts. Suspect or counterfeit parts are then placed on a nonconformance report so the items may be identified and moved to the quarantine cabinet. 6.9 This procedure shall assure that all occurrences of counterfeit parts are reported to customers, government reporting organizations. 7.0 Verification MilAero Electronics considers the due diligence applied to the material purchased successful when this procedure is followed and when finished product meet the test or inspection requirements identified for the product or the standard established for the product. A failed Product does not mean that it is/was caused MilAero Electronics Counterfeit Measures Policy February 8, 2015 4

by a counterfeit part. MilAero Electronics QA department, must verify the cause of the nonconformance and disposition the defect per QCP-11.0 Control of Nonconforming Product. This procedure will apply if the deficiency is suspected or connected to a counterfeit part. MilAero Electronics Counterfeit Measures Policy February 8, 2015 5