CITY OF FARGO SPECIFICATIONS AGGREGATE BASES

Similar documents
CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP

SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course

SPECIAL SPECIFICATION 2093 LIME/CEMENT STABALIZED SUBGRADE

ITEM 247 FLEXIBLE BASE

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE

ITEM 231 CEMENT STABILIZED CRUSHED AGGREGATE BASE COURSE

ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

ITEM 260 LIME TREATMENT FOR MATERIALS USED AS SUBGRADE (ROAD MIXED)

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

STANDARD SPECIFICATIONS JANUARY 2015 S-4 GRANULAR BASE and AGGREGATES TABLE OF CONTENTS

CITY OF SAN ANGELO ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)

SECTION AGGREGATES

ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING

CITY OF FARGO SPECIFICATIONS SEAL COATS

SECTION ASPHALT PAVING

Reinforced Soil Slopes (RSS)

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION

INDEX DESCRIPTION MATERIALS APPROVAL FOR BASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

Item 247 Flexible Base

Item 247 Flexible Base

SECTION ASPHALT CONCRETE

Section 25 Aggregate Subbase

DIVISION 2100 SITEWORK

SECTION EMBANKMENT

BASE CONSTRUCTION MATERIALS A Aggregate

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

Cement Stabilized Soil (CSS) (Portland cement)

Construction Specification 62 Grouted Rock Riprap

RECONSTRUCTION OF DISTRESSED PAVEMENTS Full-Depth Rehabilitation (FDR) (Portland cement)

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

SECTION 28 AGGREGATE BASE COURSE (FAA P-208) [For base course under runway and taxiway surfaces, use Section 29, FAA Item P-209.]

Draft Special Provision for. Asphalt Treated Permeable Base

SPECIAL SPECIFICATION. Item Micro-Surfacing (Polymer Modified)

ITEM 404LVT (Low Volume Traffic) ASPHALT CONCRETE Revised June 5, 2015

SECTION 2200 PAVING CITY OF BELTON, MISSOURI STANDARD SPECIFICATIONS

SPECIAL SPECIFICATION 3402 Reflective Crack Relief Interlayer (RCRI)

SPECIFICATIONS FOR FULL DEPTH RECLAMATION WITH CALCIUM CHLORIDE

MIDLAND COUNTY ROAD COMMISSION

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones.

CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL

Item P-219 Recycled Concrete Aggregate Base Course

SECTION 18 - EARTHWORK TABLE OF CONTENTS

asphalt (PWMA) processes in accordance with these Specifications. PWMA processes include organic 9

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

SECTION BITUMINOUS SURFACE TREATMENT

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 17 ASPHALT CONCRETE PAVEMENT General Materials

Stanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.

SECTION BITUMINOUS CONCRETE PAVING AND ATHLETIC SURFACING. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION 14 EMBANKMENT

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5

Special Provision Item P-152 Excavation and Embankment

CITY OF FARGO SPECIFICATIONS GEOTEXTILES AND GEOGRIDS

INDEX DESCRIPTION MATERIALS CONSTRUCTION MEASUREMENT PAYMENT 10

ITEM 522 PORTLAND CEMENT CONCRETE PLANTS

SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SPECIFICATIONS FOR BONDED WEARING COURSE

SPECIFICATIONS FOR ASPHALT-RUBBER SURFACE TREATMENT WITH AGGREGATE COVER

SECTION UTILITY BACKFILL MATERIALS

REQUEST FOR QUOTE (RFQ) DELIVER, PLACE, AND COMPACT DRIVING SURFACE AGGREGATE (DSA)

CITY OF FARGO SPECIFICATIONS ASPHALT LEVELING COURSE

CEMENT STABILIZED SAND

1995 Metric CSJ SPECIAL SPECIFICATION ITEM Fly Ash Treatment of Materials

The Work under this Section consists of performing all operations necessary to complete construction of the leveling course on the prepared subbase.

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section CEMENT STABILIZED BASE COURSE. 1. Foundation course of cement stabilized crushed stone.

INDEX GENERAL EQUIPMENT CONSTRUCTION SUBGRADE PROTECTION MEASUREMENT PAYMENT 5

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

Construction Specification 28 Lime Treated Earthfill

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION 1 STALOK FIBER FOR TURF PARKING / EVENT STAGING AND FIRE LANES

2003 SPECIFICATIONS SECTION 301 DIVISION 300 BASES AND GRANULAR SURFACES

TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984

1301 SCOPE. This section covers asphaltic concrete (AC) pavement for roadways and parking areas.

Information Bulletin:

MICHIGAN DEPARTMENT OF TRANSPORTATION

SECTION 18 - EARTHWORK TABLE OF CONTENTS

Townline Road Middle Village Road then south 4800 feet.

53.9 ASPHALT SURFACE TREATMENT

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

Cement Modified Recycled Base

Section 3 Specification 3.20 Slurry Seal TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

Suggested Guidelines for Hot Mix Asphalt (HMA) Underlayment in Track by AREMA Committee l-sub Committee No. 2 - Ballast.

ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

B. [LIST ANY SPECIAL CONDITIONS UNIQUE TO THIS PROJECT THAT DEAL WITH LIME-FLY ASH OR FLYASH STABILIZATION]

ITEM 302 AGGREGATES FOR SURFACE TREATMENTS

Percent Passing by Weight. 105% Payment #200

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 850 CEMENT TREATED FREE DRAINING BASE APRIL 18, 2008

100% Payment. 105% Payment #

Transcription:

AGGREGATE BASES PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, accessories, and equipment necessary to install aggregate base material for the construction of certain streets, avenues or alleys in the City of Fargo. Page 1

PART 2 MATERIALS 2.1. AGGREGATE Material for aggregate base shall conform to the requirements of ND Class 5 Aggregate, and shall consist of sound, durable particles of gravel or sand, free of sod, roots, and other organic matter. The physical characteristics and quality of the materials shall be approved by the Engineer. 2.2. ASPHALT MILLINGS USED FOR BASE When allowed by the Engineer, asphalt millings may be blended with ND Class 5 aggregate to produce a base material. The base material shall be made by uniformly blending asphalt millings with Class 5 aggregate. The percentage of recycled asphalt millings shall not exceed 50% of the blended base material. The maximum particle size of the base material shall be 1 inch, and the maximum percent passing the No. 200 sieve shall be 10%. 2.3. CRUSHED CONCRETE USED FOR BASE When allowed by the Engineer, clean crushed concrete may totally replace or be uniformly blended with ND Class 5 aggregate to produce the base material. The gradation shall be as follows: 100% passing the 1.5 sieve. 35% to 85% passing the #4 sieve. 16% to 50% passing the #30 sieve. Max. 12% passing the #200 sieve. 2.4. EQUIPMENT All equipment shall be kept in satisfactory repair at all times and shall meet the approval of the Engineer. 2.4.1. SCALES When a tonnage pay item is specified, the scales used shall be of the platform type sensitive to a weight of twenty (20) pounds and shall have the capacity to weigh the maximum load. The scales shall be approved and calibrated by the state in which it is located and proof of such calibration furnished to the Engineer upon his request. Page 2

2.4.2. OTHER EQUIPMENT Rollers, water hauling equipment, and material hauling equipment shall conform to Section 151 of the NDDOT Standard Specifications for Road and Bridge Construction. Page 3

PART 3 CONSTRUCTION 3.1. PREPARATION OF THE EXISTING SUBGRADE Excavation and subgrade preparation shall meet the requirements of Section #2000 of these Specifications. Any unstable areas shall be repaired prior to placing aggregate base. Geotextiles and/or Geogrids shall meet the requirements of Section #2050 of these Specifications. 3.2. MATERIAL PLACEMENT AND COMPACTION Where geotextiles or geogrids are used, small dozer equipment or front-end loaders with low ground pressures shall be used to spread the material. Water shall be applied to the base material during the mixing and spreading operations so that at the time of compaction the moisture content is not less than 5 percent of the dry weight. All compaction equipment shall be operated to produce uniform density throughout the entire section. Base material shall be compacted simultaneously with laydown operations until, in the sole opinion of the Engineer, a tightly bound surface is achieved and there is no further evidence of consolidation, rutting, or displacement under rolling operation. The Engineer may elect to perform density tests as needed to assist inspection. The test results must indicate that the aggregate base has been compacted to not less than 98% of Standard Proctor Density in order to be acceptable. 3.3. SURFACE TOLERANCE Final grade shall be within plus or minus ¼ (0.02 ) of specified grade. Page 4

PART 4 GUARANTEE, MEASUREMENT & PAYMENT 4.1. GUARANTEE The guarantee shall be per the contract. 4.2. MEASUREMENT AND PAYMENT Payment for aggregate base shall be full compensation for all labor, material, equipment and miscellaneous items necessary for constructing the base in place. 4.2.1. AGGREGATE BASE Aggregate base shall be paid for by the contract unit price per square yard for the corresponding Gravel Base bid item. The pay area shall the same as for subgrade preparation in Section 2000 of these Specifications. Payment shall include full compensation for all base material placed within the pay limits, including material required in medians and/or for the installation of drain tile and any other material. Any additional base material required to ensure a stable base for paving equipment shall be at the Contractor s cost. When called for in the special provisions and/or tonnage bid items are provided on the bid sheet, the Contractor shall provide the Engineer in the field at the point of delivery with computer-generated haul tickets for each load showing the scaled weight of the material incorporated into the project. If tickets are not delivered in this manner, the material will not be eligible for payment unless the Engineer has given prior written approval for some other ticket delivery method. 4.2.2. OTHER COSTS All other costs for work necessary to properly complete the work specified herein shall not be bid items; the costs shall be charged to other items unless a bid item is specifically included on the bid sheet. Page 5