Wavin: Range 600 Inspection Chambers

Similar documents
Product and Installation Guide

Rodding Eye Details. Inspection Chambers

(For compliance with the new sewers for adoption regulation or building regulations part H1)

G632:G581 JR12 CI/SfB (52.7) In6 June 2015 OWIC001. Water management PRODUCT AND INSTALLATION MANUAL. Wavin. Inspection Chambers

Osma UltraRib System:

Hepworth SuperSleve Drainage Specification

Product guide. TwinWall. Surface and Stormwater Drainage

Adoptable and Non-Adoptable Assemblies.

DRAFT. Draft Bill of Quantities. Drainage

Oil Separation Systems Product and Installation Guide

7.00 MANHOLES AND INSPECTION CHAMBERS. Hunter Underground Systems

Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints Installation Manual

Perfect Manhole Installation Manual May 2012 Rev 8 Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints

CI/SfB (52.5) X June 2008 CH301. Domestic Channel Drainage Systems. Product Guide

Installation Overview

AWASHAFT DN400. Product and Installation Guide

Installation Procedure FP McCann DN1050 Easi-Pit

CPM Concrete Drainage Systems

Installation Instructions for Perfect Manhole System DN 1200 DN PD 71 rev B 31/01/12

JR12:L731/L71121/L2123 J3413:X721 CI/SfB (52.5) (H1) October 2015 WM424. Water management PRODUCT AND INSTALLATION MANUAL.

Infiltration and Attenuation Systems Product and Installation Guide

L7315+L21233 J342 X2. CI/SfB (52.5) If9 FOR RESIDENTIAL AND LIGHT COMMERCIAL APPLICATIONS

NELSON CITY COUNCIL INFRASTRUCTURAL ASSETS SD 601 APPROVED SENIOR EXECUTIVE INFRASTRUCTURE

OSMADRAIN UNDERGROUND DRAINAGE SYSTEM OSMADRAIN UNIVERSAL GULLY SYSTEM

Product and installation manual. UltraRib. Foul and Surface Water Drainage

Polysewer Gravity Sewer System SPECIFICATION

DRAINAGE SYSTEMS FOR BELOW GROUND

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

Technical Data Sheet NEC/GRAN/95:01

Specification for Installation of Quadbox Modular Access Chambers JMF102, JMF104, JMF106

ACO Building Drainage

Maintenance Access Shafts

Drain DESIGN & INSTALLATION GUIDE 316L STAINLESS STEEL INDUSTRIAL FLOOR DRAINS & LINEAR DRAINAGE CHANNELS

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

SECTION 39 - MANHOLES TABLE OF CONTENTS

Manufacturing standard

12/03/12 T.P V1.0. Pipex px Product Group: Manholes, Chambers & Tanks. Pipex px Product Type: Packaged Pumping Station

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

Standard products Tasmania 2010

GL0025P Washdown & Silt Separator Installation & Operation Guidelines

TABLE OF CONTENTS

Uniclass L L2123 EPIC J3413. CI/SfB (52.5) Next generation of surface drainage ACO ParkDrain

BS EN :1998. Fittings Description Dia mm Code. Equal Junction. Double Socket

Drexus Pave Drain. Linear Channel. Water Management. Water Linear Management Drainage Design Guide Drexus Pave Drain Linear Drainage Channel

Summary of the 2011 Changes

SECTION STORM SEWER COLLECTION SYSTEM

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY

Specification for Installation of Modular Access Chambers MJB104

Installation and maintenance instructions for PLATIN and PLATIN XL Rainwater Underground Tank

Sewerage connections guidance notes

Method for Installation of PEHD Manholes - a technical report with 29 self-explanatory Figures -

WAVIN ROAD GULLIES. Date of First issue: 16 April 2014 Brian Chamberlain Claire Curtis-Thomas

Bridge Drainage Systems

Uniclass L7315 CI/SfB (52.5) X EPIC J3413. Liberty-Drain. Copyright 2010 Peter Savage Limited. LDV2 - Sep 10

CI/SfB Oct 12 (52.5) Uniclass L7314

Regulations Detail Sheet 1

CI/SfB (11.5) In6. WavinCoil Product and Installation Guide. Land Drainage Systems FOR SURFACE AND SUB-SURFACE WATER DRAINAGE

EnviroModule TM 2 installation guide

CI/SfB Oct 12 (52.5) Uniclass L7314

Agrément Certificate 89/2206 website: Product Sheet 6

Precast Concrete Trench Drain Systems INSTALLATION INSTRUCTIONS

Miller Collective Safety at Height Solutions EPIC ULTRA Barrier System EPIC Post-N-Barrier System EPIC Basic Barrier System

SUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

Sewerage Code WSA Addendum PART 3 STANDARD DRAWINGS

CI/SfB (52.5) January 2004 Uniclass L L2123. ACO LightShaft Daylight and fresh air. Naturally.

Birco. Water Linear Management Drainage Design Guide Birco Introduction Linear Drainage Channel. Grate Drainage System

11/30/12 T.P V1.0. Pipex px Product Group: Manholes, Chambers & Tanks Pipex px Product Type: Combined Sewer Overflow CSO

Althon slot channels Althon

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

UNDERGROUND DRAIN, SEWER, SURFACE WATER & DUCT

Product and installation manual AquaCell Systems

Modular Plastic Chambers

Illustrated Hard Landscape Seminars - Student Notes Copyright 1995 John Heather Rev Curriculum No. GD x 1.25hrs.

LIPUMAX-G GREASE SEPARATOR

Agrément Certificate 03/3979 website: www. polypipe.com Product Sheet 1

Never ones to rest on our laurels, at NDS we ve taken our popular, easy-to-install Pro Series Channel Drain and made it even better.

Please read these guidance notes carefully before completing the attached application form.

Box Culverts. Easy to install, suitable for very shallow or deep fill, ideal for use in a wide variety of civil engineering applications.

Instructions for installation the GRAF EcoBloc Inspect flex

Below Ground Drainage, Water Supply, Utilities & Insulation

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

Integrated Manhole Ladder System

FOX METRO WATER RECLAMATION DISTRICT MANHOLE / SEWER PIPE MATERIALS AND INSTALLATION SPECIFICATIONS MATERIALS 1. PIPE & FITTINGS

Below ground System of pipework required to carry waste fluids from building to disposal site.

building the future PVC-UE Roofline, Window & Cladding Systems Soil & Waste Systems Underground Drainage Systems Rainwater Systems

INSTALLATION, OPERATING & MAINTENANCE GUIDELINES FOR WASH DOWN & SILT SEPARATORS

SECTION FACILITY SANITARY SEWERS

component developments Stainless Steel Industrial Floor Drainage

Manholes. ...a real breakthrough in sewer technology. Jeevan bhar ka saath... Unique features. Design Registered

Skeletank. Rainwater Storage Unit PRODUCT SPECIFICATION SHEET. Product Code: SELH01001

SIROPLAST-K. Pipe system for civil engineering subsoil drainage inspection chambers and subsoil drainage pipes to DIN

STANDARD CONSTRUCTION DETAILS SANITARY SEWER REVISED MARCH 2018 DEPARTMENT OF ENGINEERING

SECTION TRENCHING

Lateral Connections Pioneering Evolving Connecting

TraffikDrain. 2 bolts per half meter grates for removable grate option

SECTION STORM DRAINAGE

SANITARY WASTE AND VENT PIPING

GWINNETT COUNTY STORM SEWER PIPE STANDARDS

GB-20. Submittal Specifications Installation Application Specific Details

Transcription:

Uniclass EPIC G632:G581 JR12 CI/SfB (52.7) In6 August 2013 WP004 J34 Wavin: Range 600 Inspection Chambers Product Technical Guide Solutions for Essentials

Contents Foul water Surface water Indicates where Range 600 Inspection Chambers may typically be installed. Fig.1: Adoptable and non-adoptable drainage Introduction Range 600 Product Details Adoptable drainage: scope 3 Base options New rules for access chambers 3 Shaft 7 Cover & Frame options 7 Accessories and spares 8 Regulations for Access Chambers Chambers for adoptable areas 4 Installation Guidance Chambers for non-adoptable areas 4 Transportation, handling and storage Range 600 Introduction Range 600 inspection chambers 5 on site 8 Chamber and shaft 9 Cover & frame 2 Advice and General Information 6-7 14 Wavin total solutions 14 10-11 Backdrop connections 12 Testing & Maintenance 13 Customer Services: 0844 856 5152 Wavin Chambers ranges summary Technical Advice: 0844 856 5165

Introduction Adoptable drainage: scope Fig.2: Lateral sewers and drains: typical SfA7 layout example Lateral drains and sewers that serve two or more properties, and connect to the UK public sewerage network, are now the Boundary responsibility of the relevant Water and Sewerage Company [WASC]. See Figs.1 and 2 for typical layouts RB(4)h according to the principles of Sewers for 8.60 Adoption 7th edition [SfA7]. HB 8.60 For regulations and typical details specifically applicable to Inspection Chambers in adoptable applications, see pages 4-5. Non-adoptable drainage Drains that only serve individual properties remain the responsibility of each house- Public Footpath holder. These are still subject to Building Regulations H1, see page 4. Access in Public Area Key Foul Water Surface Water Private drain run Osma SIC/MBIC (0.6>0.9m deep) Osma UIC (<1.2m deep) Adoptable Sewer New rules for access chambers Key changes affecting design and specification Design and installation of inspection chambers in adoptable applications are now subject to the following: NEW 7th edition of Sewers for Adoption (SfA7) published 2012 SfA7 standardises all relevant performance Wavin Range 200 (SfA7 Type 4) Wavin Range 315 (SfA7 Type 4) Wavin Range 600 (SfA7 Type 3) Flexible (plastic) deep inspection chambers now authorised SfA7 now incorporates Typical Access Chamber Details for flexible material (= plastic) versions of Chamber Type 4 (see Fig.3). criteria, newly-defined design detailing, Rigid traditional concrete chambers are no and installation standards for all adoptable longer the only authorised type that may be drainage networks including manholes used for adoptable drainage installations and inspection chambers. down to 3 metres. NEW standards for chamber design specifications Inspection Chambers manufactured from plastics are now required to comply fully with BS EN 13598 1 for installations down to maximum 1.2* metres invert depth 2 for installations down to maximum 3 metres invert depth *NOTE: For chambers with 450mm minimum diameter. For smaller chambers (min. dia. 190mm) max invert depth is 0.9m. 3

Regulations for Access Chambers Chambers for adoptable areas Typical details Wavin chambers for Sewers for Adoption For installation guidance specifically (Type 3 / 4) installations can fully comply with applicable to Range 600 Inspection all relevant specifications within the standard Chambers for Type 3 / 4 installations, see details reproduced here (see Fig.3). page 9 General Installation, page 12 Backdrops. These include requirements for correct installation of covers and frames suitable For typical details and installation guidance for the anticipated loading of each location, specifically applicable to Covers & Frames in accordance with Classifications under options, see pages 10-11. BS EN 124. Fig.3: Typical Access Chamber Detail Type 4 (Flexible material detail) Maximum depth from cover level to soffit of pipe 2m, non entry Typical details for chambers sited in driveways/paved areas Garden Cover & Frame complying with BS EN 124 and BS 7903 for driveways, footways and landscaped areas Class B125 Driveway 150mm deep concrete collar Minimum radius to be 500mm for a 100mm diameter pipe and 600mm for a 150mm diameter pipe to allow entry of maintenance equipment Minimum internal dimensions 180mm diameter or 225mm x100mm DOT Type 1 sub base (thickness varies) or concrete surround Joints between base and shaft components to be fitted with watertight seals Base unit to have all connections with a diameter greater than 150mm set at soffits level Granular bedding material Chambers for non-adoptable areas Non-adoptable drainage: Building Regulations still apply For drains that are not part of the newlyextended adoptable areas, H1 of the Building Regulations is still applicable. These include minimum dimensions for circular inspection chambers, and for covers, as follows: Type Depth to invert from cover level (m) Internal size (mm) Length x width (mm) Cover sizes Circular (mm) 0.6 or less 190* 190 Shallow 1.2 or less 450 430 x 430 430 Restricted access Deep > 1.2 450 300 x 300** to max. 350mm** * Drains up to 150mm ** Size restricted for Health & Safety reasons. Larger openings may be used in conjunction with a restricted access. 4 Customer Services: 0844 856 5152 Technical Advice: 0844 856 5165

Range 600 Introduction Range 600 Inspection Chambers Description 600mm diameter polypropylene inspection chambers for adoptable and non-adoptable applications. Compliant with Sewers for Adoption 7th edition [SfA7]. Choice of twelve bases for equal pipe connections. For use directly with 150mm, 225mm and 300mm UltraRib system. For use with other 150mm, 225mm and 300mm plastic pipework and clay pipework via the appropriate adaptor. 600mm diameter shaft may be cut to length to achieve required invert up to maximum 3000mm. Applications l For above ground access and maintenance inspection of buried pipework up to 3 metres deep Key Features & Benefits l Fast, easy installation: no wet trades l Lightweight: no lifting equipment required l Reinforced base plate to withstand groundwater pressure l Shaft can be cut to required length l All inlets and outlet sockets allow 7.5 movement in all directions Compliance Range 600 chambers comply with the following standards and regulations BS EN 13598-2:2009 a SfA7 Typical Chamber Detail Type 3: (Non-entry. Maximum depth from cover level to soffit of pipe: 3m) Building Regulations H1 (type Deep, to maximum depth >1.2m) l For loading applications: B125 (12.5 tonnes) * D400 (40 tonnes) * * with cover & frame supported by concrete plinth Key Dimensions l Invert depth of base: 646mm [for 150mm system] 705mm [for 225mm and 300mm systems] l External shaft diameter: 683mm l Shaft length: 3m l Maximum installation depth: 3m Range 600 chamber assembly 5

Range 600 Inspection Chambers Product Details Bases All Range 600 bases are polypropylene and supplied with a base-toshaft sealing ring. When used in adoptable applications, maximum invert depth 3m. E D/S Equal Inspection Chamber Base a straight channel only l 600mm dia. base straight channel and single inlet B D C A F l For use with 150mm, 225mm and 300mm UltraRib l Also for use with 150mm, 225mm and 300mm clay pipework, using Adaptor TA/2 (150mm), Adaptor TA/4 (225mm), or Adaptor TA/7 (300mm) l Also for connection to 150mm, 225mm and 300mm TwinWall using Adaptors 6TW145 (with150 Base), 9TW145 (with 225 Base) or 12TW145 (with 300 Base) Dimensions (mm) A B C D E F G 150 66NE300 720 720-150 720 646 207 225 69NE300 720 720-225 720 705 207 300 612NE300 720 720-300 720 705 207 E D/S Equal Inspection Chamber Base a bent 90 channel only l 600mm dia. base incorporating bent 90 channel and single inlet B D C A F l For use with 150mm, 225mm and 300mm UltraRib l Also for use with 150mm, 225mm and 300mm clay pipework, using Adaptor TA/2 (150mm), Adaptor TA/4 (225mm), or Adaptor TA/7 (300mm) l Also for connection to 150mm, 225mm and 300mm TwinWall using Adaptors 6TW145 (with150 Base), 9TW145 (with 225 Base) or 12TW145 (with 300 Base) Dimensions (mm) A B C D E F G 150 66NE314 720 720-150 720 646 207 225 69NE314 720 720-225 720 705 207 300 612NE314 720 720-300 720 705 207 E D/S Equal Inspection Chamber Base a bent 30 channel only l 600mm dia. base incorporating bent 30 channel and single inlet B D C A F l For use with 150mm, 225mm and 300mm UltraRib l Also for use with 150mm, 225mm and 300mm clay pipework, using Adaptor TA/2 (150mm), Adaptor TA/4 (225mm), or Adaptor TA/7 (300mm) l Also for connection to 150mm, 225mm and 300mm TwinWall using Adaptors 6TW145 (with150 Base), 9TW145 (with 225 Base) or 12TW145 (with 300 Base) Dimensions (mm) A B C D E F G 150 66NE315 720 720-150 720 646 207 225 69NE315 720 720-225 720 705 207 300 612NE315 720 720-300 720 705 207 6 Customer Services: 0844 856 5152 Technical Advice: 0844 856 5165

Range 600 Inspection Chambers Product Details Bases D/S Equal Inspection Chamber Base a straight channel with two 90 branches (left and right) l 600mm dia. base incorporating straight channel and three inlets E including 2 x 90 equal branch inlets l For use with 150mm, 225mm and 300mm UltraRib l Also for use with 150mm, 225mm and 300mm clay pipework, C A F using Adaptor TA/2 (150mm), Adaptor TA/4 (225mm), or Adaptor TA/7 (300mm) B D l Also for connection to 150mm, 225mm and 300mm TwinWall using Adaptors 6TW145 (with150 Base), 9TW145 (with 225 Base) or 12TW145 (with 300 Base) Dimensions (mm) A B C D E F G 150 66NE316 720 720-150 720 646 207 225 69NE316 720 720-225 720 705 207 300 612NE316 720 720-300 720 705 207 Shaft A P/E Inspection Chamber Shaft l 600mm dia. plain-ended shaft. Length: 3 metres l For use with all Range 600 bases B Dimensions (mm) A B** 600 60NE003 683 3000 ** Dimension B = effective height Restriction Access Cap Restriction Access Cap A l For use with 60NE003 B l Restricts access to 350mm l Supplied with one 600mm sealing ring Dimensions (mm) A B 600 60NE930 704 270 7

Range 600 Inspection Chambers Product Details Accessories Connector Kit l For connecting 110/160mm plastic pipework to Range 600 Inspection Chamber shaft 110 NE950 160 NE960 Adaptors for clay pipe l For connecting 100/150mm clay pipe to chamber base 100 SA15/1 150 SA15/2 Chamber Shaft Cutter components l For cutting 110/160mm connection holes to receive plastic pipework in Range 600 Inspection Chamber shaft 110 NE955 160 NE965 Adaptor for UltraRib pipe l For connecting 150mm UltraRib pipe to chamber base 150 6UR141 Spares Chamber Base to Shaft Seal l 600mm diameter for use with 60NE003 Dimensions (mm) dia. 600TW117 600 Transportation, handling and storage Transportation If chambers are carried on vehicles with characteristics. So they are easier to a flat bed, ensure that: handle and less likely to be damaged. l The bed is free from nails and other However, to minimise risk of damage: projections. l Load/unload chambers by hand: l Chambers are adequately secured. avoid use of mechanical handling Handling Range 600 polypropylene chambers are lighter than other, more traditional materials, yet have excellent strength and impact equipment if possible. l If mechanical equipment employed, use special hoist equipment with textile straps. Do NOT use metal hooks or chains. l Do not drop chambers onto hard surfaces or drag them along the ground. Storage Store chambers on level ground that is free of stones and sharp objects. Exercise reasonable care to avoid damage prior to their installation. 8 Customer Services: 0844 856 5152 Technical Advice: 0844 856 5165

Installation Guidance Installation guidance: chamber and shaft NOTE: The following is a summary of installation procedures following selection of a suitable Range 600 Base for the required number of inlets. Excavation l Take precautions against trench collapse: support trench sides deeper than 1.2m. Preparation l Prepare and compact 100mm regulating bed of granular material in trench bottom. Positioning/connection l Position Base on regulating bed. Check outlet is facing in the correct direction: i.e. with side inlets swept to follow water flow. l Ensure all inlets/outlet are free from dirt or grit. Cover & Frame Class B125 loading Driveway Class B engineering bricks set in class 1 mortar 150mm deep concrete collar Shuttering to external cap Restrictor cap 600mm dia to 350mm dia 600mm dia Shaft Compacted backfill as-dug or granular bedding material l Use standard jointing sequence to connect 150mm, 225mm or 300mm UltraRib pipes to inlets/outlet. For connection of TwinWall pipes in these sizes, use Adaptors 6TW145, 9TW145 or 12TW145 If connecting to 150mm, 225mm or 300mm Hepworth Clay, insert the appropriate adaptors into the required inlet/outlet as follows: 150mm Clay use Adaptor TA/2 225mm Clay use Adaptor TA/4 300mm Clay use Adaptor TA/7 NOTE: The main through channel MUST be used. Bends up to 45 may be used on any inlet or outlet. Backfill l Using same material as bedding, backfill around Base in 150mm layers up to underside of shaft socket. Ensure inside of Base is free of debris. Preparing shaft l Cut corrugated shaft to approx. Invert depth of Chamber. RECOMMENDATION: leave extra 300mm depth to allow for possible final site changes. l Locate sealing ring between 2 nd and 3 rd ribs from shaft bottom. Ensure ring is seated correctly/not twisted. l Clean inside of Base socket and lubricate this entire area. Fig. 4: Typical installation detail: Range 600 Inspection Chamber. Type 3 l Position shaft at 45 angle into Base socket. Vertically push home manually or, if required, with mechanical assistance (if so, protect top of shaft). Backfill trench l Before starting backfill, cover top of shaft to prevent ingress of dirt or grit. Trafficked application (e.g. roadway) l Follow Highway Specification: use Type 1 or similar backfill, and compact. Non-trafficked application (e.g. garden area) l Use as-dug material (excluding stones >40mm dia., frozen or vegetable matter) in 300mm layers. Tamp mechanically around full circumference of Base so that current conditions re ground and water table, and anticipated future loading, can be supported. 150mm, 225mm or 300mm dia Pipe Granular bedding material RECOMMENDED SPD LEVELS: Green areas 90% Paved areas/limited traffic load 95% Roads/heavy traffic loads 98% l Avoid knocking shaft during backfilling and keep free of debris. l Backfill to formation level. Trim shaft/fit restriction access cap l Trim shaft to required height using finetoothed saw. NOTE: If finished ground level is not yet known, leave shaft proud of surface and keep open end covered until final completion. l When shaft trimmed to final height, locate sealing ring between 2nd and 3rd ribs from shaft top. Ensure ring is seated correctly/not twisted. l Lubricate inside of 350mm restrictor cap, position over top of shaft, and push fully home. 9

Installation Guidance Installation guidance: cover and frame Use the appropriate Cover and Frame to suit application area/function: A15 non-loaded green/landscaped areas only accessible to pedestrians and bicycles B125 paved areas with limited traffic load, where heavy vehicles do not have access D400 roads with heavy duty traffic loads Galvanised cover and frames Galvanised options are recommended for A15 applications. For A15 applications in areas such as domestic gardens and/or applications subject to occasional/temporary loading up to 15kN (1.5 tonnes) such as domestic driveways, the frame should always be supported by a concrete plinth. (See Fig. 5). Ductile iron covers and frames Ductile iron options are recommended for heavier loaded applications: Class B125 - with medium duty loading capacity of 125kN (12.5 tonnes) where the frame is supported by a concrete plinth. Suitable for applications such as car parks and service roads. Class D400 classification - with loading capability of up to 400kN (40 tonnes) where supported by a concrete plinth. Suitable for carriageways and roads subject to motor vehicle trafficking. Cover & Frame Class B125 loading Car Surface 150mm deep concrete collar Shuttering to external cap Restrictor cap 600mm dia to 350mm dia 600mm dia Shaft Compacted backfill as-dug or granular bedding material Fig.5. Installation detail A15 domestic gardens and/or areas subject to occasional vehicle loading up to 15kN (1.5 tonnes) Installation procedures: For A15 applications in domestic garden areas and/or subject to occasional vehicle loading up to 15kN (1.5 tonnes) (See Fig.5) EXAMPLE: domestic driveways l Leave top 150mm of shaft clear of backfill l Lay 150mm thick slab of pre-cast or in situ concrete around top of shaft chamber l Prepare A15 Cover and Frame for installation in accordance with manufacturer s instructions l Position the cover and frame socket on top of slab and fix in accordance with manufacturer s instructions 150mm, 225mm or 300mm dia Pipe Granular bedding material 10 Customer Services: 0844 856 5152 Technical Advice: 0844 856 5165

Installation Guidance Installation guidance: B125 & D400 cover and frame Installation procedures: For B125 - Paved areas with limited traffic load and for D400 Roads with heavy traffic loads l Trim shaft section at last stage of construction. Ensure unit is at correct height. l Protect shaft from traffic loading by shuttering its external ribs. l Lay 150mm thick slab of pre-cast or in situ concrete around top of shaft chamber with minimum opening 750mm x 750mm or 750mm diameter to ensure that any loads are distributed away from the shaft. l On top of slab, construct Class B engineering brickwork OR concrete blocks OR pre-cast concrete seating rings up to required height. Cover & Frame Class B125 loading Driveway Class B engineering bricks set in class 1 mortar 150mm deep concrete collar Shuttering to external cap Restrictor cap 600mm dia to 350mm dia 600mm dia Shaft Compacted backfill as-dug or granular bedding material Fig.6. Installation detail for B125 loading: paved areas with limited traffic load; and for D400 loading: roads with heavy traffic loads l According to required loading application, position the appropriate Cover and Frame on top of slab. (See Fig.6) 150mm, 225mm or 300mm dia Pipe Granular bedding material 11

Installation Guidance Installation guidance: backdrop connections Cover & Frame Class B125 loading Driveway Class B engineering bricks set in class 1 mortar 150mm deep concrete collar Restrictor cap 600mm dia to 350mm dia 600mm dia Shaft Compacted backfill as-dug or granular bedding material 150mm, 225mm or 300mm dia Pipe Granular bedding material Fig.7. Installation detail typical backdrop situation Installation of backdrop connections A chamber which has substantially different invert levels will require backdrop connection of one or more drains. This operation can be done externally on site. (See Fig.7) Use a combination of Backdrop Kit [NE950 or NE960], with associated 100/110mm or 150/160mm fittings, for in situ connection to a 600 shaft, as follows: l Drill required opening into corrugated shaft section at appropriate place l Clean and remove any swarf from the opening l Install the special 110mm or 160mm seal into the opening l Fully lubricate around the entire internal surface of the seal l Insert specially designed in-situ socket connector into the seal opening l Lubricate the outside surface of the spigot pipe to be connected and insert into the socket connector l Make remaining connections in the same way as for standard jointing of 110mm or 160mm pipes and or fittings 12 Customer Services: 0844 856 5152 Technical Advice: 0844 856 5165

Installation Guidance Testing All testing of these non-man entry chambers and connecting pipework must be undertaken at ground level. For guidance, please use the following: Air Testing using remote test bags: equipment required l 3 x 1 metre x 8mm Steel Drainage Rods l 50mm Double Worm Screw for use with Steel Drainage Rods l PVC sealing bags fitted with Schrader Valve and 6 metre hose. l Steel drain plug with testing point l Bicycle Pump l Tyre pressure gauge to ensure correct inflation pressure of the test bags. Air Testing procedure 1. Assemble drain rods to 3 metres in length with double worm attachment on end. 2. Remove as much air as possible from the PVC Sealing Bag. Method: hold valve open and squeeze bag flat. Tip: folding the bag in half to make it as small as possible will make it easier to locate. 3. Twist neck of PVC Sealing Bag into double worm attachment until it has firm grip on bag. 4. Ensure valve end of hose is secure with no danger of falling down the chamber. 5. Hold drain rods and hose from the PVC Sealing Bag together. Start to lower the test bag into the base. Tip: Keep hose tight while lowering bag. This helps to keep bag in place. 6. When bag is in chamber base, position it into the channel of the run to be tested. 7. By using the channel as a guide, slide test bag into the mouth of the pipe, and as far as possible into the pipe. Method: use rods to push bag into position. 8. Leave rods attached (this ensures bag is held in position). Start to pump the bag up using a bicycle pump. NOTE: When inflating the test bags, follow manufacturer s instructions to ensure pressure is not exceeded. Use tyre pressure valve to monitor bag pressure. 9. If required, remove rods by twisting them in an anti-clockwise direction to release the double worm. Check the valve end of hose is safely positioned. 10. Place a similar sealing bag or a steel drain plug at the other end of the pipe length to be tested. (This could be another chamber or a terminal access point.) Both bag and steel drain plug must include a suitable testing point. 11. Attach a manometer. Carry out required air test method. 12. Remove sealing bag Method: twist double worm attachment around the hose at ground level. Lower it down the hose, guiding the rods to the bottom of the chamber and once again grip the bag. NOTE: No requirement to grip bag tightly. This is simply to aid its removal. Release as much air as possible from bag. Then slide bag back out the pipe with the rods. When this is done, lift/remove all test equipment out of the chamber. Maintenance As with all Wavin Chambers, the smooth interior bore of chamber channels and associated pipe systems will aid the flow of water and waste through the system. Because man-entry of Wavin chambers is not possible, maintenance work such as Rodding, Jetting and CCTV inspection must be undertaken at ground level. Always follow the Health & Safety and Operational procedures of equipment suppliers. 13

Advice and General Information Wavin Chambers Comprehensive choice Wavin Range 600 is part of a comprehensive portfolio of inspection chambers that can provide the optimum solution for every adoptable and non-adoptable situation. Base Type Max Invert Depth* (m) Base Dia. (mm) SfA7 Type No. of Inlets Inlet Sizes (mm OD) 1 2-3 4-5 100/110 150/160 160 225 300 Shallow 0.6 250 4* l l Multi-Base 0.9 300 4* l l Mini-Access 0.9 315 4 l l Universal 1.2 450 4* l l l l l PPIC 1.2 475 4 l l l l l Range 200 2.0 200 4 l l l Range 315 2.0 315 4 l l l l Range 450 3.0 450 3, 4 l l l l l l Range 600 3.0 600 3, 4 l l l l l * NOTE: Maximum invert depths shown are for individual base types. Under SfA7 and Building Regulations, maximum permitted depth can be less. Wavin total solutions Wavin systems are integrated to provide a total solution for above and below ground drainage, water management, plumbing and surface heating and cooling for the Building and Construction markets. Wavin is Europe s leading supplier of effective solutions for essential needs of daily life: safe distribution of drinking water; sustainable management of rainwater and waste water; energy-efficient heating and cooling for buildings. Associated systems Contact Wavin Technical Design Department for further details regarding: l Below Ground Drainage systems l Surface Water Drainage systems l Stormwater Management systems Other Wavin systems l Hep 2 O Flexible Plumbing system l Hep 2 O Underfloor Heating and Cooling systems l Rainwater systems l Soil & Waste systems Technical advice and further Information Our Inspection Chambers are backed by Wavin s comprehensive technical advice service. This is available to provide expert assistance at every stage of a project, from planning and product selection to installation and maintenance. Contact Wavin Technical Design Department: Tel: 0844 856 5165 Fax: 01249 766653 Email: technical.design@wavin.co.uk or via online enquiry at www.wavin.co.uk 14 Customer Services: 0844 856 5152 Technical Advice: 0844 856 5165

15

Wavin: Range 600 Inspection Chambers Product Technical Guide Wavin provides effective solutions for essential needs of daily life: safe distribution of drinking water; sustainable management of rainwater and waste water; energy efficient heating and cooling for buildings. Wavin s European leadership, local presence, commitment to innovation and technical support, all benefit our customers. We consistently achieve the highest sustainability standards and ensure total reliability of supply to support our customers to achieve their objectives. Wavin operates a programme of continuous product development, and therefore reserves the right to modify or amend the specification of their products without notice. All information in this publication is given in good faith, and believed to be correct at the time of going to press. However, no responsibility can be accepted for any errors, omissions or incorrect assumptions. Users should satisfy themselves that products are suitable for the purpose and application intended. Wavin Registered Office Hazlehead Crow Edge Sheffield S36 4HG www.wavin.co.uk WP004 Solutions for Essentials