Supplier Quality Management Q

Similar documents
SUPPLIER QUALITY REQUIREMENTS

Supplier Quality Requirements Document (SQRD)

Supplier Quality Manual

UNCONTROLLED IF PRINTED 2 of 13

Vendor Qualification Survey

Charleston Metals Products, Inc.

Supplier Quality Manual

RFC-SOP-0002 Skyworks RF Ceramics Supplier Quality Manual

Supplier Quality Manual

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

Table of Contents Table of Contents... 2 Introduction to Manual... 3 Scope... 3

Document Number: QSP-06-01

Quality Supplier Requirements for Beckwith Electric Co., Inc.

Supplier Quality Manual

AUNA Supplier Quality Manual

Supplier Quality Manual

Materion AMTS Supplier Quality Manual

Approved Supplier Guidance

SUPPLIER QUALITY REQUIRMENTS MANUAL (SQRM)

Operating Procedure 6-02 Supplier Quality Requirements

ASM AEROSPACE SPECIFICATION METALS, INC NW 34 th Place #B28 Terrace Pompano Beach, Florida Tel: Fax:

EIT, LLC Quality Assurance Provisions

EIT, LLC Quality Assurance Provisions

EIT, LLC Quality Assurance Provisions

SUPPLIER MANUAL. Griffith Rubber Mills - HQ 2625 Northwest Industrial Street Portland, Oregon 97210

Supplier Requirements Manual

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

The purpose of this document is to define the basic supplier quality requirements for Cobham Aerospace Communications Prescott facility.

QUALITY MANUAL QM0492 AS9100 SUPPLEMENT II

QP-740. Revision J. Revision Date Reason Signature. B 4/14/11 Add sections: 6.4, 6.5, 9.9, 9.10 & Amend sections 6.2, & 9.

QUALITY MANUAL QM0492 ISO SUPPLEMENT III

EVANS CAPACITOR COMPANY

SUPPLIER QUALITY MANUAL

Quality Manual. Wilson-Hurd Manufacturing Company. Electronic Control Products (ECP) 311 Winton Street Wausau, WI 54402

Purchase Order Quality Requirement Clauses

SUPPLIER QUALITY PROGRAM Procurement Standard

PURCHASING QUALITY CLAUSES

Supplier Quality Manual

Supplier Quality Specification 3DS Document P14 Rock Hill, South Carolina Revision A

Supplier Quality Manual PREPARED AND MAINTAINED BY FIRESTONE INDUSTRIAL PRODUCTS COMPANY DIVISION OFFICE 250 W. 96 th Street INDIANAPOLIS, IN 46260

QUALITY MANUAL QM0492 AS9100 SUPPLEMENT II

Purchase Order Quality Clause SCC20 Revision E, Effective 1/20/2015

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS

PMA SUPPLIER QUALITY REQUIREMENTS QS Revision J

IBS Electronics, Inc.

Supplier Assessment Questionnaire Audit Date : On-Site Audit Self Assessment Audit

Reliance Aerospace Solutions

Quality (Supplier Flow Down) Requirements

VACCO. Supplier Training. Updated 8/21/18

PRINTED COPY IS NOT CONTROLLED

TITLE: TEKTRONIX COMPONENT SOLUTIONS SUPPLIER QUALITY MANUAL

Global Supplier Quality Process Manual. Quality Processes for Suppliers to Merkle-Korff Industries. Abstract

Supplier Requirements Manual

QMS-002. Quality Management System Manual. Conforms to ISO 13485

TURBO MACH A DIVISION OF VT SAA

PCB IPC-A 600 PCB IPC- 6012, 6018

Wilson-Hurd ATF Quality Manual

SUPPLIER QUALITY ASSESSMENT

Supplier Requirements Retail Information Svcs LLC Fastener Division

SUPPLIER QUALITY REQUIREMENTS

Supplier Quality Manual

SUPPLIER QUALITY AGREEMENT

Case Study. Contract Manufacturer C19 Failure Analysis. CM C19 Failure Analysis 2014 SWC Page!1

Purchasing PURPOSE SCOPE

Supply Chain Supplier Quality Manual. Creation Date: 19 th September 2012 Last Updated: February 16, 2016 Revision Number: 03 Document Number: AQM005

12. Inventory - Receiving & Shipping

World Class Industries

SECURE COMMUNICATION SYSTEMS INC. (Secure) QUALITY CLAUSES

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

Supplier Quality Requirements Manual

CAPITAL AVIONICS, INC. Quality Manual

NAME/LOCATION AMETEK POWER AND DATA SYSTEMS 33 LEWIS ROAD BINGHAMTON N.Y 13905

Table of Contents. 1.0 Introduction 1.1 Overview 1.2 Customer Responsibilities

TABLE 1 PCB IPC-A 600 PCB IPC- 6012, 6018

Umbra Cuscinetti. Quality Supplier Requirements

CENTURYLINK DRAFT SUPPLY CHAIN RISK MANAGEMENT (SCRM) PLAN

PROCUREMENT QUALITY REQUIREMENTS

QUALITY DEPT request to have FORM 1135 for REVIEW/APPROVAL Cycle everytime form will be updated/revised.

ROTEK. IIInnInstI Instrument Corp. ISO 9001 Quality System Manual

OPW Engineered Systems

Supplier Quality Clauses

SUPPLIER QUALITY MANUAL

External Providers Quality Requirements.

Supplier Quality Assurance Manual

Supplier Expectation Manual

Quality Assurance Procurement Clauses and Flow Down Requirements

SUPPLIER SELECTION AND MANAGEMENT

AERO GEAR, INC. SUPPLIER QUALITY MANUAL

PRECISE INDUSTRIES INC. Quality Manual

CTM. SUBJECT: Quality Clauses (Q Clauses) WI The purpose of this work instruction is to control the content of the CTM Quality clauses.

SUPPLIER QUALITY ASSURANCE MANUAL. Requirements for Suppliers to SSI Technologies Controls and Sintered Divisions

PROCUREMENT QUALITY REQUIREMENTS

Purchase Order Quality Requirement Clauses

GLB QM 02. Supplier Quality Manual 05. 3/2/18 Supplier Quality 1 of 19. Issue Date Issuing Department Page

Space Information Laboratories, LLC. Suppler Quality Notes Rev C

Springdale Site Specific Requirements. Addendum to. DAYCO Global Supplier Policy Manual

Definitions contained in the above mentioned document and industry regulations are applicable herein.

Tooling Ranir Responsibility... 4 Supplier Responsibility... 4

Satellite Aerospace, Inc. TERMS & CONDITIONS Page 1 of 6

SHELTON INDUSTRIAL PATTERN INC.

Transcription:

Supplier Quality Management Q0000017

Revision History The following table shows all revisions for this document. Please always go to Agile idirect TL9000 Quality System to receive and download the latest version of this document. Contact quality@idirect.net with any questions. Revision Date Changes Submitted Reason for Change(s) Approvals A 5/7/2007 Initial release Michael Boyd C 10/30/2010 Restructured supplier qualification process; Add New Product Introduction process ; Add Packaging and Labeling requirements ; Add Performance Scorecard. D 08/01/2011 Add ASN; change OTD to be implemented by the end of 3Q, 2011; replaced customer Sat with # of SCAR in section 9 E 3/5/2012 Modified section 4, Removed 4.1.1-5, modified section 5.0, 6.0, 8.0, add 7.0 ASN, 9.0 RMA return ; modified supplier scorecard metrics to include CMs, and section number changes F 9/30/2012 Add a note under section 5.0: rework, repair or prototype products shall be packed in the original packaging or agreed upon by idirect, add Q14, remove SCAR-over required time from scorecard and change rating accordantly. G 4/30/2014 Adding the detail definition to 3 rd party suppliers changed temporarily activated to set as probationary in section 5. Change On-time delivery to +/- 7 days, rearrange sections, introduced Ann Kong Ann Kong Ann Kong Ann Kong Ann Kong This document is considered UNCONTROLLED when it exists in any printed form Q0000017 Rev J Page 1

process flow and removed related process H 12/17/2015 Removed section 6 and 7; Separated Supplier Monitor in section 5.2 to section 6; Moved 5.1.2. to 5.2; Added section 5.3; Clarified 12 month return rate to exclude NPF and Design issues on CM manufactured products: Updated RMA repair with guideline J 4/14/2017 Added D0000449 under section 2.1; removed 5.1.2.c; added note in section 7.2 Ann Kong Ann Kong This document is considered UNCONTROLLED when it exists in any printed form Q0000017 RevJ Page 2

TABLE OF CONTENTS 1.1 Purpose/Objectives... 4 1.2 Responsibilities... 4 2.0 RELATED DOCUMENTS... 5 2.1 Related Documents... 5 2.2 Related Records... 5 3.0 DEFINITION OF TERMS... 6 4.0 PROCESS FLOW DIAGRAM... 7 5.0 SUPPLIER QUALIFICATION PROCESSS... 8 5.1. General Supplier Qualification... 8 5.2 Contract Manufacturer (CM) Qualification... 8 5.3 Supplier can be approved if meets above process.... 9 5.4 isqr (idirect Supplier Quality Requirements)... 9 6.0 NEW PRODUCT INTRODUCTION TO IDIRECT... 10 7.0 SUPPLIER QUALITY PERFORMANCE MANAGEMENT... 11 7.1 Corrective and Preventative Actions... 11 7.2 Supplier Quality Performance Monitoring... 11 7.3. Supplier Assessment... 14 8.0 ADVANCED SHIPMENT NOTIFICATION (ASN)... 16 9.0 INSPECTION OF GOODS AND RMA RETURNS... 16 9.1 Inspection of Goods... 16 9.2 RMA returns... 16 This document is considered UNCONTROLLED when it exists in any printed form Q0000017 Rev J Page 3

1.0 INTRODUCTION This Supplier Quality Management Document is intended to assist current suppliers and potential new suppliers with the basis for understanding the quality management process of VT idirect. 1.1 PURPOSE/OBJECTIVES This Document establishes the quality requirements for qualifying and managing all suppliers of direct spend production materials, which are purchased from Contract Manufacturers (CMs) and 3 rd party suppliers or manufacturers for the use in or in conjunction with VT idirect Products. These suppliers can either manufacture to VT idirect specification but own the proprietary rights, compared to off the shelf who just manufacture to their own specifications. The suppliers of indirect spend items, such as services, expensed items used for prototypes, or any VT idirect product part number that starts with TPE are not required to comply with requirements per this procedure. 1.2 RESPONSIBILITIES Purchasing Logistics Quality Engineering Manufacturing Engineering This document is considered UNCONTROLLED when it exists in any printed form Q0000017 RevJ Page 4

2.0 RELATED DOCUMENTS 2.1 RELATED DOCUMENTS Q0000260 isqr VT idirect Supplier Quality Requirements Q0000036 Purchasing Process and Procedure Q0000016 Corrective and Preventive Action Process Q0000223 Configuration Management Process Q0000115 Return Material Authorization Process D0000441 Supplier Status Change Form D0000449 Supplier Profile Q0000200 Global Supply chain New Production Introduction Process Q0000288 Supplier Management Process D0000515 Advanced Ship Notice, IDIRECT 8300-0031 Product Packaging Labeling Requirements on VT idirect built to print products 2.2 RELATED RECORDS Supplier Profile (Agile when required) Supplier Corrective Action Request QCR (Agile) Supplier Assessment report (Agile when required) Supplier Status Change form (records are in Supplier folder) Advanced Shipment Notice (records are in email format) This document is considered UNCONTROLLED when it exists in any printed form Q0000017 Rev J Page 5

3.0 DEFINITION OF TERMS ASN Advanced Shipment Notice AOI Automated Optical Inspection BOM Bill of Material CE - European Conformity CM Contract Manufacturer CTQ Critical to Quality (factors) ICT In Circuit Test OOBA Out of Box Audit OTD On-Time Delivery PCBA Printed Circuit Board Assemblies RMA Return Material Authorization RTV Return to Vendor SCAR Supplier Corrective Action Request SLA Service Level Agreement SPC Statistical Process Control Supplier - Within the context of this document, a blanket description of all sources of supply for a part. Types of Suppliers include Original Component Manufacturer, Original Equipment Manufacturer, Authorized (Franchised) Distributor, Independent Distributor, Broker Distributor, Stocking Distributor, Aftermarket Manufacturer, Government Supply Depot, and 3PL Provider. This document is considered UNCONTROLLED when it exists in any printed form Q0000017 RevJ Page 6

4.0 PROCESS FLOW DIAGRAM Supplier qualification and Performance monitoring Supplier Global Sourcing Quality Engineering Manufacturing Engineering Approved yes New Supplier 5.0 no Supplier Performance Management 7.0 CM On-Going Performance Monitoring Weekly meetings 5.1/5.2 Supplier Evaluation On-site Assessment required Yes On-site assessment No No Approved Yes Yes 6.0 Product introduction/ evaluation No Approved This document is considered UNCONTROLLED when it exists in any printed form Q0000017 Rev J Page 7

5.0 SUPPLIER QUALIFICATION PROCESSS All suppliers who are in Oracle/Agile prior to 2011 are waived from below qualification process as they are grandfathered in. 5.1. GENERAL SUPPLIER QUALIFICATION 5.1.1. New Supplier required by engineering or global sourcing 5.1.2. Supplier shall be reviewed by Engineering, Global Sourcing, Quality and Manufacturer Engineering a. Supplier Profile (D0000449) (required on Tier I supplier, optional on Tier II supplier) b. Financial analysis (denied party screening/business information) c. On-site supplier audit at idirect management discretion 5.2 CONTRACT MANUFACTURER (CM) QUALIFICATION (additional to New Supplier Qualification requirement described in 5.1.1) 5.2.1 idirect shall perform an on-site audit of the Contract Manufacturer and submit an audit report to both idirect and the contract manufacturer for review and actions. 5.2.2 Quality Representative shall review the technical capabilities, including: a. Surface Mount Technology b. PCBA Inspection (X-Ray, AOI, and ICT) c. SPC of CTQ variables (for example: paste height) d. Environmental Test Capability e. Employee Test & Technical experience f. Change Control methods g. Electronic Assembly, minimum IPC-A-610 class 2 Acceptability of Printed Board Assemblies; IPC-7711/7721 Rework, Modifications and Repair of Electronic Assembling. Technical capabilities can also be reviewed or determined as part of the onsite This document is considered UNCONTROLLED when it exists in any printed form Q0000017 RevJ Page 8

visit. 5.2.3 Director of Quality and the Director of Global Sourcing shall review: a. Quality System Overview b. Technical capabilities 5.3 SUPPLIER CAN BE APPROVED IF MEETS ABOVE PROCESS. 5.3.1 A MCR CR shall be created and completed in order to add a supplier to Agile. Minimum sign offs shall include Global Sourcing, Quality, Manufacturing Engineering and Engineering. At minimum, a supplier shall maintain a certified quality management system to ISO9001 or equivalent industry standard. 5.3.2 Supplier Status Change form (D0000441) shall be completed in order to add a supplier to Oracle. Note: it is the supplier s responsibility to ensure that their own suppliers and subcontractors are qualified to provide quality products on a repeatable basis. idirect reserves the right to visit and inspect the facilities and operations of these suppliers and subcontractors, as needed, and at its own discretion. 5.4 ISQR (IDIRECT SUPPLIER QUALITY REQUIREMENTS) All Tier I suppliers are required to read and comply with isqr. This document is considered UNCONTROLLED when it exists in any printed form Q0000017 Rev J Page 9

6.0 NEW PRODUCT INTRODUCTION TO IDIRECT 6.1 All build to idirect s print products shall be introduced to idirect following New Product Introduction process and Configuration Management Process (Q0000223) 6.2 All 3 rd shelf item products can be qualified following Configuration Management Process (Q0000223) This document is considered UNCONTROLLED when it exists in any printed form Q0000017 RevJ Page 10

7.0 SUPPLIER QUALITY PERFORMANCE MANAGEMENT 7.1 CORRECTIVE AND PREVENTATIVE ACTIONS A Supplier Corrective Action Request may be issued if situation warrants. SCAR will be generated in Agile to document CAPA process. 7.2 SUPPLIER QUALITY PERFORMANCE MONITORING Contract Manufacturer Performance is managed through Manufacturer Service Agreement, quarterly scorecard as well as Business Review if needed. VT idirect is tracking the performance of selected 3 rd party suppliers who provide products include but not limited to; BUCs/LNBs Servers Switches Antennas To effectively rate supplier performance, VT idirect relies on, including but not limited to Supplier Scorecard Process. The Scorecard is used to support commodity management and strategic sourcing objectives. Note: it is the supplier s responsibility to ensure that their own suppliers and subcontractors are monitored to provide quality products on a repeatable basis. VT idirect reserves the right to request quality performance data and action plan for improvements, as needed, and at its own discretion. Quarterly Scorecard contains Quality Metrics and On-Time Delivery 7.2.1 Quality Metrics (QM) (80% wt.) For 3 rd party product suppliers: Quality Metrics is the combination of Return Rate (50% weighted), number of Supplier Corrective Action Request (SCAR) (30%) For CMs: Quality Metrics is the combination of Return Rate (40% weighted), number of Supplier Corrective Action Request (SCAR) (20%), and RMA repair Time (20%). a. Return Rate (50% weighted on 3 rd party suppliers and 40% on CMs) This document is considered UNCONTROLLED when it exists in any printed form Q0000017 Rev J Page 11

12 month rolling Return Rate* Quality Metrics Score Return Rate is based on 12 month rolling Field Return Rate @ the end of each quarter vs. 12 month rolling sold quantities at the end of each quarter. Return Rate for CM shall exclude NPF and Design issues. b. Supplier Corrective Action Request (SCAR) SCAR might be issued if one of the following scenarios occurs: Repeated Customer Complaints related to 3 rd party suppliers/cms; Repeated Field Failures related to 3 rd party suppliers/cms; Incoming Quality Issues; Low scorecard ratings. <0.50% 100 1%>RR>/=0.50% 90 2%>RR>/=1% 80 3>RR>/=2% 60 >3% 0 Number of SCAR (30% weighted on 3 rd party products, 20% on CM products) Quality Metrics # of SCAR Score 0 (within one quarter) 100 1 (within one quarter) 90 2 (within one quarter) 70 3 (within one quarter) 50 4 (within one quarter) 30 5 (within one quarter) 10 over 5 (within one quarter) 0 c. RMA Repair Time (only apply to CM products, 20% weighted) RMA Repair Time is measured based on Service Level Agreement (SLA). This document is considered UNCONTROLLED when it exists in any printed form Q0000017 RevJ Page 12

Guidelines: RMA Complete Date CM Receive Date, SLA as 45 days Assign the score based on number of days per scorecard for each RMA Average the score Note: RMAs do not include all NPFs, 3 rd strike units or other reasons that are not included for RMAs in the metric. Example (with random data): RMA Priority RMA complete date CM Receive Date Days over Priority Score 1 45 days 5-Sep 2-Jul 55 70 2 45 days 2-Sep 30-Aug -7 100 3 45 days 2-Jul 25-May 8 100 4 45 days 5-Aug 1-Aug -26 100 5 45 days 24-Sep 5-Aug 20 100 Average 94 RMA repair days (CM only, exclude NPF) Quality Metrics Score Meet SLA agreement 100 <2 days over SLA 90 2-5 days over SLA 80 6-10 days over SLA 70 11-15 days over SLA 50 > 15 days over SLA 0 7.2.2 On-Time Delivery (OTD) (20% wt.) will be implemented by the end of 2Q2014. On-Time Delivery is measured as: -7 shipped day vs. promised day. This document is considered UNCONTROLLED when it exists in any printed form Q0000017 Rev J Page 13

On-time delivery Goal Point 98 100 95 90 90 80 85 70 80 60 75 50 70 40 65 30 60 20 7.3. SUPPLIER ASSESSMENT 7.3.1 To evaluate Suppliers on any ongoing basis to ensure that they meet or exceed standards of manufacturing quality as defined by ISO/TL9000 or the Supplier s specific quality policy. Suppliers might be audited based on but not limited to: a. Supplier performance measures scorecard rating metrics This document is considered UNCONTROLLED when it exists in any printed form Q0000017 RevJ Page 14

Supplier Scorecard/Rating Action Supplier Status Green/81-100 Preferred Active Yellow/61-80 Red/0-60 Action might be required including onsite audit. If no improvement in a consecutive 4 quarters, supplier will be removed from the Approved Supplier list. Sourcing shall be informed if a supplier has below 80 rating after the 2nd quarter. Change supplier status to inactive unless approved by Quality Active inactive b. Suppliers with whom idirect does > $1,000,000 of business per annual. c. Suppliers with whom idirect is single-sourced. 7.3.2 Supplier audit includes: a. Supplier Quality System b. Verification of corrective action as part of SCAR Supplier Audit records are located in Agile 7.3.3 Suppliers Status can be changed based on: a. Quality issues b. Result of Quality Performance (Scorecard < 60) c. Result of Assessment Supplier Status Change form needs to be completed in order to change supplier s status (active or inactive) in Oracle. Quality shall create a request to change the supplier status if a supplier shall be disqualified. This document is considered UNCONTROLLED when it exists in any printed form Q0000017 Rev J Page 15

8.0 ADVANCED SHIPMENT NOTIFICATION (ASN) Suppliers might be required to complete the idirect Advanced Shipment Notice form and forward this to idirect upon shipment of the order, using the Notification Instructions detailed on the form. All information requested on the form shall be provided. 9.0 INSPECTION OF GOODS AND RMA RETURNS 9.1 INSPECTION OF GOODS idirect may require any combination of the following as our mean of goods inspection: 9.1.1 Source inspection results from suppliers 9.1.2 Certification of Conformity and test report 9.1.3 Inspection of Goods at sourced site as determined by idirect s Quality Assurance Department. 9.1.4 Inspection of Goods at idirect receiving dock (or Ship To location) as determined by idirect s Quality Assurance Department. 9.2 RMA RETURNS 9.2.1 All idirect CMs shall follow RMA process (Q0000014). 9.2.2 All 3 rd party suppliers requirements: 9.2.2.1 Suppliers shall provide RMA # on all returns 9.2.2.2 Suppliers shall fill out Failure Analysis and Corrective Action Report (FORM0003) if required. 9.2.2.3 Suppliers are required to issue idirect a Credit Memo on all RMA returns. This document is considered UNCONTROLLED when it exists in any printed form Q0000017 RevJ Page 16