Liquefied Natural Gas Conversion Systems for Plant Startup and Shutdown and Natural Gas Curtailment at CT Stations

Similar documents
High Energy Piping Inspection Program for Power Generation and Process Industries. For Regulatory Compliance, Safety, and System Longevity

Technical Supplement to Opening Statement April 28, 2016 Clean Air Council Hearing The Clean Power Plan: Impact on New Jersey

Power Generation Full Service Design and Engineering

Generation from Lignite

White Paper The Greening of the Conventional Oil Industry Meridian Energy Group, Inc. Green Investment Highlights

How the City of Lebanon TN Implemented Gasification for Biosolids Disposal and Power Generation

Dry Sorbent Injection and Gas Co-Fire / FLGR for Small to Medium Plants

Update on ICI Boiler MACT

Combined Heat and Power: Markets and Challenges

Fast Deliveries Quality Flare Systems Economical Solutions

Turbine Inlet Cooling. A Valuable Tool to INCREASE Electric Energy Production

The SAFEST, most RELIABLE, and most EFFICIENT gas-fired LPG waterbath vaporizer on the market. START HERE

Conventional and Emerging Technology Applications for Utilizing Landfill Gas

A Presentation Prepared For: PROCESS COMBUSTION CORPORATION

Turbine Inlet Cooling: An Energy Solution That s Good for the Environment, Rate Payers and Plant Owners

PureCycle 200 Heat-to-Electricity Power System

Texas Industries of the Future November 20, 2013

Power Optimization Center Leveraging plant process data for advanced analytical diagnostics. June 16, 2016

Optimizing Clean Energy Systems with Thermal Energy Storage and/or Turbine Inlet Cooling

Baton Rouge Office Petroleum Drive Baton Rouge, Louisiana (225)

John Jechura Updated: January 4, Electricity Overview

RSR- SSM IMPACTS COMPLIANCE AND OPTIMIZATION

NATURAL GAS DELIVERED TO YOUR DOOR

Robert Remkes - Principal, Remkes Technology and Services

Advanced Monitoring Solution. Monitoring System (PEMS) as a Complete. Cogeneration Facility in the U.S.

THERMAL POWER PLANT SIMULATOR TPP 200 LABORATORY EXERCISE TUTORIAL N4: INTRODUCTION TO THE HEAT PRODUCTION SYSTEM

Conventional and Emerging Technology Applications for Utilizing Landfill Gas

IDEA th Annual Conference, St. Paul, MN

TruePeak TDLS200. NH 3 Slip Measurement. <Document Number> Copyright Yokogawa Electric Corporation <date/time>

The expected outcome of utility integrated resource planning (IRP) is the. A Flexible Generation and Energy Storage Solution POWER PLANT OPTIMIZATION

Session Summaries and SHIPS Codes

Managing the Catalysts of a Combustion Turbine Fleet

NSPS Subpart OOOO Overview

Basin Electric Post Combustion CO 2 Capture Demonstration Project McIlvaine Hot Topic

Honeywell UOP Callidus Solutions

AN INTEGRATED VIRTUAL PIPELINE SYSTEM Proven Clean Energy Compression technology harmonized to deliver optimal return on investment.

Wind Outlook GE portfolio. GE Energy. Matt Guyette Wind Product Line Leader. NBC Universal. Infrastructure Industrial.

DONGFANG ELECTRIC CORPORATION LIMITED. Dr. Harry Chen, Vice President April 20 th, 2012

Las Gallinas Valley Sanitation District Biogas Utilization Evaluation. LGVSD Board Meeting Presentation April 24, 2014

ELEVATING VAM RTO INLET CONCENTRATION THROUGH CMM BLENDING FOR POWER GENERATION

University of Illinois Utility Master Plan and Dispatch Model

ENGINEERING SERVICES

Ontario Power Generation s Biomass Journey. September 2017

Distributed Energy System - pooling heat and power -

Methane Emission Reductions in Oil and Gas Processing

2 Demanding Markets. 3 Competitive Solutions. 4 International Presence. 6 Gas Turbines and Combined Cycle Plants. 10 Steam Power Plants.

BOILER AREA MACT 40 CFR PART 63 SUBPART JJJJJJ. Industrial Boilers used in manufacturing processing, mining, refining or other industry.

Learn about the Biomass Clean Energy Project proposed to be developed on the GTH site. Share your views and ideas with Project representatives

ASTEC Large Modular Wood Pellet Plants. Wood Pellet Plants

Country Report - City Gas Industry in Japan -

CPS Creative Power Solutions

RELEASE POINT TYPE Enter or select one of the following stack/emission point release orientation: downward

engineering. procurement. construction. management

Before the Public Utilities Commission of the State of South Dakota. In the Matter of the Application of Black Hills Power, Inc.

OPTIMAX Advanced Control and Optimization of Power Plants

Stephen Nelson COO. Longview Power, LLC

CombineD cycle gas turbine plants. Conventional steam cycle power plants. hydro power stations

Paul M. Sotkiewicz, Ph.D. Chief Economist M. Gary Helm Senior Market Strategist PJM Interconnection October 20, 2011

Case No Dominion Energy Cove Point LNG, LP Motion to Amend Certain Conditions of its Certificate of Public Convenience and Necessity

City of Colton Regional Biosolids Processing and Renewable Energy Project

New Carbon Initiatives, Tax and the Implications

filtration solutions for the Power industry Tetratex eptfe Membrane Filter Media Creating Safer and Cleaner Environments

Presentation on Soorty Denim SNG(LPG Air Mix) Project at WLPG Regional Sub continental Regional Summit at Delhi on 14 th Feb 2012 by Owais Mir CEO

Module 2: Conventional Power Generation I

Specialized in providing integrated solutions with advanced delivery to the oilfield industry

MEMORANDUM. December 3, Power Committee. Jeff King, Senior Resource Analyst. Assessment of coal generating resource potential

Paper Mill Repowering with Gasification

Sustainable Energy Management

Carleton College Utility Master Plan. Martha M. Larson, CEM Manager of Campus Energy & Sustainability

Japanese Strategy for CO Reduction

COAL WATER SLURRY FUEL Alternate Fuel for Thailand

Whiting Business Unit

Fluid Bed Scrubbing TECHNOLOGY

Energy Upgrade Screening Study

Wastewater Disinfection with Renewable Energy Generation

CMM Offset Generating Project Case Studies

American Electric Power

A Utility Perspective on Coal Utilization and West Virginia s Electric Infrastructure

Longview Power- An Advanced Supercritical Coal Plant

Environment & Power Systems International. VOCGEN /CHP Feasibility Screening Data Form. Level 1 Feasibility Analysis

The Future of Coal-fired Generation: Challenging the EPA

Combined Heat and Power. Applications and Guidelines Jeffrey Ihnen, P.E.

Thompson Construction Group

A.6 Boilers. A.6.1 New and Existing Boilers located within AQCR 131

Energy Use and the University of Kentucky Info Sheet and Frequently Asked Questions

Coal Quality & Boiler Efficiency

The Optimal Approach to Firming Windpower

Windpower: Can MISO Get Too Much of a Good Thing? VITO Perspective Karl Kohlrus P.E. City Water, Light & Power (CWLP) Springfield, IL 4 th Annual

Sree Lakshmi Energy Systems Pvt. Ltd.

Versatile technology for ever changing markets

Improving Fossil Fleet Performance through Actionable Benchmarking

OUR FFICIENCY ARTNER

4. Existing Supply-side Resources

Cost Benefits of Critical Valve Repair in the Heat Recovery Steam Generator 02/13/2015

The Production of Electricity Power from Natural Gas. Image Source: Mscalora

ENERGY PEOPLE MAKING ENERGY FACILITIES WORK BETTER

Lecture (5) on. Thermal Power Plant Unit Selection. By Dr. Emad M. Saad. Mechanical Engineering Dept. Faculty of Engineering.

Coal Transformation: Clean Coal

WRAP O&G Workgroup Website.

Financial Benefits of Mobile Natural Gas

Transcription:

Liquefied Natural Gas Conversion Systems for Plant Startup and Shutdown and Natural Gas Curtailment at CT Stations Experience the Power of Partnership

EAPC Industrial Services and North Dakota LNG have partnered to provide liquefied natural gas startup conversion systems to displace fuel oil. TABLE OF CONTENTS EAPC Industrial Services...4 North Dakota LNG...6 Engineering the Conversion...8 Case in Point...10 Conversion Advantages... 12 How it Works... 14 The Need to Know... 16 The Power of Partnership... 18 2

EAPC INDUSTRIAL SERVICES ENGINEERING FOR HEAVY INDUSTRY EAPC Industrial Services is a multi-disciplinary consulting firm with offices in Grand Forks, Fargo, Bismarck, Minot, and Williston, ND; Sioux Falls, SD; Bemidji and St. Paul, MN; and Fort Collins, CO. EAPC has performed hundreds of power generation projects for multiple clients throughout the upper Midwest. ISO 9001:2008 CERTIFICATION EAPC expects to complete this ISO Certification by end of Q1 2016 which will formalize our culture of constant improvement and quality in our project management and execution process. HSE QUALIFICATIONS EAPC is certified under ISNetworld (ISN# 400-217037) NCMS NON-DOT Qualified EAPC has 145+ employees providing services in the following areas: Engineering: Chemical, Mechanical, Electrical, Civil, Structural Architecture Procurement Construction Management Maintenance Planning Forensics Wind Energy Consulting Business Excellence: LEAN Methodologies, Leadership Training 4 5

NORTH DAKOTA LNG THE PREMIERE UPPER MIDWEST LNG PRODUCER North Dakota LNG is part of Prairie Companies, a portfolio of growth-oriented businesses that support the energy industry in North Dakota. A pioneer in liquefied natural gas (LNG) production, North Dakota LNG provides turn-key alternative fuel solutions for customers at any point in the LNG logistics supply chain, resulting in lower costs, and reduced emissions and environmental impact. CORE OPERATIONS North Dakota LNG is a two-phase liquefied natural gas (LNG) production plant that can produce more than 70,000 gallons per day. SAFETY FIRST, ALWAYS Like other Prairie Companies operations, safety is the number one priority for North Dakota LNG. Strict safety and operating procedures guide the operation. LNG APPLICATIONS Potential LNG power generation industry applications include boiler startups and shutdowns, heating boiler operations, backup generator operations, and combustion turbine backup fuel supply. ENVIRONMENTALLY FRIENDLY Natural gas is the cleanest fossil fuel and supports the country s drive for clean energy. There is an abundant supply due to horizontal drilling and fracturing. TRANSPORTATION & LOGISTIC SERVICES Together with Prairie Field Services, a sister transportation company, we monitor your fuel to ensure we are always meeting your on site requirements and dispatch as needed. 6 7

ENGINEERING THE CONVERSION UTILIZING LNG OR NG TO REPLACE FUEL OIL FOR PLANT STARTUPS New EPA MATS Rule: Startup Definitions This requires all back-end emission control systems to be in service at the end of the startup period. (Baghouse, Scubbers, ESPs) 1. Startup ends 4 hours after the generation of electricity begins to the grid or station service 2. Startup ends within 1 hour of coal being fired in the boiler These new MATS rules limit the ability of some power plants to meet the new startup guidelines without causing damage to the back-end emission control systems. EAPC has completed fuel oil to natural gas conversions for boiler startups on two 450 MW units. Since most power plants do not have a reliable source of natural gas within a close proximity, LNG is a great solution to replace the current fuel oil systems used for startups and shutdowns as well as for natural gas curtailment issues at combustion turbine facilities. 8 9

CASE IN POINT EXAMPLES OF LNG AND NATURAL GAS USED FOR STARTUPS AND SHUTDOWNS IN THE POWER GENERATION INDUSTRY EAPC Industrial Services provided engineering and design services at Basin Electric Power Cooperative s Antelope Valley Station to convert two 450 MW units from fuel oil to natural gas for boiler startups. NEW SYSTEM REQUIREMENTS New natural gas vertical manifolds in all four corners of the boiler This West Virginia coal fired power plant experienced continued curtailment issues during startups. They installed a mobile LNG system consisting of 18 LNG trailers and 3 gas fired vaporizers. This system supplied 450,000 SCFH required for startup. Associated supply piping, control valves, isolation valves, venting system 4 new burners and 32 igniters with associated control system Electrical area classification evaluation 10 11

CONVERSION ADVANTAGES REDUCED ENVIRONMENTAL IMPACT LNG vs. Fuel Oil 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% CO2 20-30% CO Up to 75% NOx 50% GHG s 20% VOC s 55% Particulate Matter 95% Ground Water Contamination Risk = 0 OPERATIONAL RELIABILITY Igniters and warm-up guns start immediately. No issues with flame outs or plugged tips. Positive ignition and light-off every time. Boiler startups and unit tie-on meet pre-arranged schedules with system dispatch or designated ISO or RTO for your area. Master boiler trips can be avoided during unit upsets. LNG can be utilized to supplement fuel demands when coal quality becomes an issue without having to reduce load. Downstream emissions control systems Baghouse can be put in service immediately and warm-up slowly throughout startup without any impact to the bags. REDUCED O&M Pump and relief valve repairs OT for E&I throughout startup to deal with scanner issues Fuel oil tank cleaning due to decomposition and algae Fuel oil spill cleanup Scanner replacement and/or rebuilds Oil ring replacement Potential air heater fires REDUCED COSTS 30-40% reduction on startup costs compared to fuel oil Lost production due to extending startups related to fuel oil firing issues O&M costs related to fuel oil handling and firing for startups Lost production due to coal quality issues 12 13

HOW IT WORKS PRODUCTION TRANSPORTATION INTERCONNECTING PIPE REGULATION OFFLOAD/STORAGE VAPORIZATION CONTROLS 14 15

THE NEED TO KNOW DESIGN CONSIDERATIONS GAS CONSUMPTION Average Flow Rate (SCFH) Hours/Day Operation Peak Flow Rate (SCFH) Peak Duration/Duration Frequency DAYS/HOURS STORAGE REQUIRED OUTLET GAS PRIORITIES Max/Min Pressure Max/Min Temperature ENVIRONMENT Temperature Humidity Wind Earthquake Zone AVAILABILITY OF ON-SITE ENERGY Steam Hot Water Electrical HORIZONTAL VS VERTICAL TANKS PROPERTY SETBACKS LEVEL OF AUTOMATION ODORIZATION SAFETY SYSTEMS NUMBER OF UNITS BOILER SIZE IN MW NUMBER OF BURNERS AND IGNITERS PER BOILER AREA CLASSIFICATION ASSESSMENT 16 17

THE POWER OF PARTNERSHIP The EAPC and North Dakota LNG partnership brings together a seasoned engineering firm with over 15 years of experience working with power generation clients throughout the upper Midwest and a large scale LNG producer with industry expertise, production facilities, and transportation infrastructure. This partnership provides power generation companies a proven option for boiler startups. An LNG system can match or exceed current fuel oil startup system capacities while eliminating EPA MATS startup limitations and O&M issues related to fuel oil used for startups. These same LNG systems can also be a great option for natural gas fired generating stations. Many combustion turbine facilities experience curtailment issues. An LNG backup system would provide a seamless transition while eliminating the environmental and O&M issues related to using fuel oil as backup. 18 19

3100 DeMers Avenue Grand Forks, ND 58201 701.775.3000 www.eapc.net/is Paul Prout PE, Vice President 701.775.3009 paul.prout@eapc.net 10387 68th Street NW Tioga, ND 58852 701.609.1196 www.northdakotalng.com Amber Kinney, Director of Business Development 303.304.4724 akinney@northdakotalng.com Bruce Ogden, Director of Business Development 701.460.7218 bruce.ogden@eapc.net