An Approach for a Bidding Process Knowledge Capitalization

Similar documents
A generic approach for the design of organizational decision support systems (ODSS)

Management Decision Support and Intelligent Systems

Innovative method for data collection and risk analysis during the bidding process

Simulation and implementation of Computerized Maintenance Management System (CMMS)

WKU-MIS-B11 Management Decision Support and Intelligent Systems. Management Information Systems

Unit 2 : Decision Making Concepts. By Mahesh R. Sanghavi SNJB s KBJ CoE, Chandwad.

Models simulation and interoperability using MDA and HLA

Increasing Bid Success Through Integrated Knowledge Management

Ontologies and the Dynamics of Organisational Environments: An Example of a Group Memory System for the Management of Group Competencies

The 7 th International Scientific Conference DEFENSE RESOURCES MANAGEMENT IN THE 21st CENTURY Braşov, November 15 th 2012

Managing Systems Engineering Processes: a Multi- Standard Approach

A MODELLING LANGUAGE FOR USER ORIENTED ENTERPRISE MODELLING

Unstructured Nature of Important Decisions. Understanding the Business Value of Systems and Managing Change. Diversity of Managerial Roles

: What are the features of a model-driven DSS?

Responding to RFPs. Slide 1 Responding to RFIs and RFPs Welcome this module on responding to RFIs and RFPs.

Analysis of external and internal risks in project early phase

Production Management Modelling Based on MAS

7. Project Management

Contextual Modelling of Collaboration System

Model-based Architectural Framework for Rapid Business Transformation of Global Operations

Methodology for risk management in systems development

Continuous Improvement of Strategic Alignment Model

Organisational Structure. Professor Ming Sun School of Energy, Geoscience, Infrastructure & Society Heriot-Watt University

The Organizational Context: Strategy, Structure, and Culture

Fuzzy Logic: Intellectual Knowledge Management

Requirement Engineering. L3 The requirement study. Change is constant. Communication problem? People are hard to understand!

Multi-Agent Model for Power System Simulation

HOW EFFECTIVE STRATEGIC SOURCING WILL GIVE YOU VALUE FOR MONEY

A Business-Driven Web Service Creation Methodology

Intelligent Automation Opportunities in the Federal Government

Analysis and design of production and control structures

Design of an Integrated Model for Development of Business and Enterprise Systems

Knowledge mechanisms in IEEE 1471 & ISO/IEC Rich Hilliard

Agent-based Architecture for Flexible Lean Cell Design, Analysis and Evaluation

Volume 5, Issue 5, May 2017 International Journal of Advance Research in Computer Science and Management Studies

LIUC - UNIVERSITA CARLO CATTANEO. Managing by process. Marco Raimondi.

SERVICE ORIENTED ARCHITECTURE (SOA)

IMPROVING THE QUALITY OF INFORMATION IN STRATEGIC SCANNING SYSTEM NETWORK: APPROACH BASED ON COOPERATIVE MULTI-AGENT SYSTEM

Programme & Project Planning and Execution

Requirements Elicitation. Proactive vs. Reactive Elicitation

Bidding and Tendering. National Occupational Standards October 2018

CATALOGUE OF SERVICES ( ) IDENTIFICATION OF THE ACTION EXECUTIVE SUMMARY

Conception of a new engineering curriculum in smart buildings

machine design, Vol.5(2013) No.2, ISSN pp

Process-Oriented Requirement Analysis Supporting the Data Warehouse Design Process A Use Case Driven Approach

Tassc:Estimator technical briefing

NATO Research & Technology Organization Studies, Analysis and Simulation Panel Lectures Series 222

Guidance on project management

Systems Engineering, Knowledge Management, Artificial Intelligence, the Semantic Web and Operations Research

Business case studies. (Logistic and production models)

Software Maintenance Maturity Model(S3 m DSS) A Decision Support System

Proposal of Multi-Agent based Model for Dynamic Scheduling in Manufacturing

DoD as a Model-Based Enterprise

Proposal of professional referential evaluating the performance of downstream supply chain in Moroccan automotive industry

An Integrative Model of Clients' Decision to Adopt an Application Service Provider

Modeling Commercial Knowledge to Develop Advanced Agent-based Marketplaces for E-commerce

An Application of E-Commerce in Auction Process

*Ajit S. Deshpande,**Vikas Hirulkar

PMP MOCK EXAMS BASED ON PMBOK 5TH EDITION

White Paper: Manage Your Critical Knowledge!

Software Engineering II - Exercise

Chapter 1. Overview of Electronic Commerce

Flexible job control in heterogeneous production structures

Gathering Production Processes of Services and Goods: Towards the Mixed Enterprise

SBM2401 Strategic Information Systems: Managerial Perspective

Defense Logistics Agency Instruction. Enterprise License Strategy/Process

Chapter 1. Contents. 1.1 What is Software Engineering! Solving Problems. Objectives. What is Software Engineering

An MDA Method for Service Modeling by Formalizing REA and Open-edi Business Frameworks with SBVR

Knowledge Management, Social capital and Intellectual capital Relationships in Process-Oriented Organizations

Planning and developing of a relationship marketing project: challenges and opportunities

ARCHITECTURAL PROGRAMMING: PROVIDING ESSENTIAL KNOWLEDGE OF PROJECT PARTICIPANTS NEEDS IN THE PRE-DESIGN PHASE

SEMINAIRE E+;3=!C SEMINAR PLANNING AND MANAGEMENT OF THE IMPLEMENTATION OF IT-RELATED STATISTICAL PROJECTS WITH OUTSOURCING DEVELOPMENT.

Software review Evaluating campaign management or MRM vendors: A business view point Received: 11th October, 2006

Project Management Professional (PMP) Exam Review

EDF R&D. Systemic approach to Safety : Human and Organisational Factors Research Areas

7.11b: Quality in Project Management: A Comparison of PRINCE2 Against PMBOK

Establishing Business Collaboration between Contractors and Developers Based on Management Information System

Introduction to Information Technology

Socio-technical Organisation

Protocols for Processes

Chapter 3 DECISION SUPPORT SYSTEMS CONCEPTS, METHODOLOGIES, AND TECHNOLOGIES: AN OVERVIEW

Why Machine Learning for Enterprise IT Operations

A Method for Integrating Knowledge Management into Business Processes

Logistics 4.0 The impact of IoT and Big Data on the industry. ECTA Annual Meeting 10 th November Düsseldorf, Germany

RESOLVING APPLICATION DEVELOPMENT ISSUES USING SOA Y. KIRAN KUMAR 1, G.SUJATHA 2, G. JAGADEESH KUMAR 3

EVALUATION OF ARIS AND ZACHMAN FRAMEWORKS AS ENTERPRISE ARCHITECTURES

Organizational Behaviour

Knowledge in Planning Scheduling and Control. Abstract

Connoisseur Solutions Project Procurement Management

Systems Analysis and Design Methods Chapter 3: Information Systems Development

Obstacles for the ignorant, by Folke Hermansson Snickars, Associate, Standards & Market Access, Ambi Prospect AB. Standardization research

HOW DIGITAL WILL TRANSFORM THE UPSTREAM OIL ECOSYSTEM

TRENDS IN MODELLING SUPPLY CHAIN AND LOGISTIC NETWORKS

OntosCAI Competitive Affairs/Intelligence Analyze, Monitor, Understand your Competitive Environment

Analysis of Spiral Model in Software Projects for the Software Houses of Pakistan

ENA Future Worlds Consultation

The Work Breakdown Structure in the Systems Engineering Process. Abstract. Introduction

Material available on web at

Model-Driven Enterprise Resource Planning Specifications in SMEs

Bidding House: A Web Service and Ontology based Framework for Auctions

Transcription:

An Approach for a ding Process Knowledge Capitalization R. Chalal, and A. R. Ghomari Abstract Preparation and negotiation of innovative and future projects can be characterized as a strategic-type decision situation, involving many uncertainties and an unpredictable environment. We will focus in this paper on the bidding process. It includes cooperative and strategic decisions. Our approach for bidding process knowledge capitalization is aimed at information management in project-oriented organizations, based on the MUSIC (Management and Use of Co-operative s) model. We will show how to capitalize the company strategic knowledge and also how to organize the corporate memory. The result of the adopted approach is improvement of corporate memory quality. Keywords ding process, corporate memory, Knowledge capitalization, knowledge acquisition, strategic decisions. I. INTRODUCTION N order to improve their efficiency, Companies are obliged I to resort to the principles and to the methods of project management so as to be innovative on one hand and answer better and more quickly customer needs on the other hand [2]. The new way of distributing the tasks between the actors focuses on the key processes of the company. She allows identification of the key competences, which the company implemented, and necessary for these processes. This competence is maturity, in the sense of CMM (Capability Maturity Model) [7]. This capability can generate other knowledge; favour the innovation and the competitiveness. We focus in this paper on the bidding process, which is a typical process. It is one of twenty key processes such as define by T.H. Davenport [8]. This process includes cooperative and strategic decisions [2]. A methodology for knowledge capitalization and corporate memory in improving bidding process is proposed. It aims to organize knowledge capture, storage and re-use in order to support strategic decisions at bidding process, through communication and information technology. The approach presented here are aimed at information management in project-oriented organizations, based on the MUSIC (Management and Use of Co-operative s) Model [1], which is an information system structure and a generic model called Co-operative s Architecture. The paper is organized as follows. Section 2 introduces the co-operative information system model.. Section 3 presents the co-operative work in the bidding process. The section 4 presents our approach. We first describe the structure of business memory and second ally the knowledge capitalization process. We show that corporate knowledge management process organizes Knowledge reuse and sharing and also learning from experiences. Lastly, we conclude the paper and discuss related works. II. THE CO-OPERATIVE INFORMATION SYSTEM MODEL Technology is the most powerful tool of change in project management, if fully exploited as a process innovation enabler for process-oriented organizations. Unfortunately management of information is largely neglected. The application of such concepts to a situation, which is particularly valued in project management, is shown to demonstrate the significance of the proposed approach. The approach is based on the MUSIC (Management and Use of Co-operative s) model [1]. The MUSIC model aims to design global intelligent information systems, integrating all decision support systems, process automation, all types of communication requirements, and their interactions. The MUSIC model propose an architecture called cooperative (Fig. 1) which is based on three concepts and related modeling: Individuel IndividualKnowledge Co-operative Co-operative Knowledge Knowledge Departmental Specialised Knowledge Fig. 1 Co-operative s Architecture model in MUSIC profoundness, which corresponds to differing degrees of interpretative, value and use: - Knowledge, linked and leading to the modeling of decisions, - Linguistics, semantics, and work organization, - Data, and related software design. 786

The spatial organization of information, which takes into account knowledge heterogeneity and distribution and the related upper co-operative structure: - Centralization, or collective information system. It is the normalized knowledge, the common language that structures the enterprise as a global unit - Decentralization or departmental and individual systems. Departmental or individual information system corresponds to decentralization and project division. Co-operation between decentralized and autonomous systems through co-operative systems Time, which corresponds to knowledge construction in the organization and the modeling of the temporal evolution of the organization: - Knowledge capitalization, - Management of organization change, - Evolution of information system. The Co-operative includes four subsystems, linked by an upper co-operative and inter-operative structure: The or a whole organization collective semantics. The organization's efficiency requires coordination that spans an organization, implying consistency and standardized usage patterns. is the organization skeleton, and is necessary for its survival, The Departmental : and processes have a specialized semantics, which is collective for a limited number of people (for example, a department), The Individual : or individual information semantics and individual process semantics. Each decider defines the meaning and aggregation for interpretations, analysis of actions, simulations, etc. The global structure is completed by a communication model, defined as the totality of the communications between collective, departmental, and individual s. It provides exchanges between specialized organizational units to achieve a global finality. It is called Co-operative, defined by cognitive, linguistic and conceptual modeling. The Cooperative is a conceptual structure, which organizes appropriate access to the information needed for strategic decisions from the of the company. It operates in a distributed context, with Departments considered as independent areas of excellence, outstanding in their own context and for their local decisions: machines, DSS, skills. The access is organized by cooperation with and between departments throughout transverse knowledge and semantics processes [12] The model can be applied to differing situations: Decision Support s, co-operative work, knowledge capitalization and corporate memory. III. THE CO-OPERATIVE WORK IN THE BIDDING PROCESS The typical bidding process (Fig. 2) includes four activities [10]: Request for Proposal Client s formal requirements Competitors strategy der s Strategy Analysis of opportunity Client s formal requirements der s Capacity Products & Services Design of technical offer Calculation of Price No Fig. 2 The typical bidding process Proposal to the Client Winning On receiving an ITD (Invitation To Tender), a decision to bid or not to bid is taken after a rough analysis of the ITD which provides the formal requirements. An estimate of the ability of the bidder to respond technically to this tender is a part of this decision making process. A rough analysis of the likely competitors strategy is, in most cases, performed, as well as an analysis of the bidder s own strategy. This first activity ends by the decision to bid or not to bid. Before preparing the bid, a deep analysis of the buyer s formal requirements is performed in order to design the technical offer to be proposed to the buyer. Then, the cost of the offer is estimated and a business case is put together which analyses the bid environment (ders and expected Competitors Strategy, advantages to win the bid, justification of the price asked.) Finally, the offer (both technical and financial) is submitted to the potential buyer. The decision situation for the bidding process is identified according to the company objectives explained above: Answer to a bidding process only if there is a real possibility to get the contract: go/no go step. The evaluation step "go/no go" takes place as soon as the bidding process is done. It consists of quickly mobilizing the information that is necessary to evaluate the interest or the capability to get the contract, Improve the chances to get the contract. For this purpose, one must be able to elaborate a technical offer that satisfies the client needs at an attractive cost, while minimizing the risks incurred on the product or the industrial processes. To design intelligent decision support for the bidding process, it is necessary to examine how the current bidding process could be modified in order to take maximal advantage of the possibilities offered by the capture and use of business knowledge alongside the use of existing information. The decision situation for the bidding process is identified according to the company objectives explained above: Answer to a bidding process only if there is a real possibility to get the contract: go/no go step. The evaluation step "go/no go" takes place as soon as the bidding process is Lost 787

done. It consists of quickly mobilizing the information that is necessary to evaluate the interest or the capability to get the contract. Improve the chances to get the contract. For this purpose, one must be able to elaborate a technical offer that satisfies the client needs at an attractive cost, while minimizing the risks incurred on the product or the industrial processes. In the field of industrial engineering, PDBMS (Product Data Base Management s) are in fact supposed to solve this problem. They are the centralized storage of detailed product (and partly process) description, that support the entire life-cycle of the product, and can even be shared with the customer. They are now normalized for certain types of product (initiative CALS by example -Continuous Acquisition Life-Cycle Support- of the DoD, with the MIL-STD-1388-2B norm for weapon systems) [6]. Storage and integration is an important problem for manufacturers, like CIM (Computer Integrated Manufacturing). The experience of the manufacturers involved in the project contradicts this implicit belief held by the industrial engineering community. PDBMS are useful, but far from sufficient. In fact, the assemblage of know-how is not the addition of specific data bases, joined together in a global, centralized and standardized product database. Knowledge and consequently information is specific to skills, people, or functions in the company. It cannot be shared and does not need to be shared. Even objects that could be shared are not likely to communicate easily between specialized skills. Each specialist has a different point of view on the same object or on the project. For example, a piece of sluice gate is not the same object from the point of view of the production manager, of the designer, financial manager, logistics support manager or project manager. Nevertheless, a common technical language generally exists in a company. So this type of data can be modeled, but this «collective language» only represents a minimum. This is in fact the aim of the PDBMS. Specific information exists in far higher proportions, and it needs to remain diverse. There must be coherence with collective data of the PDBMS and means of knowledge exchange are also necessary. Means are required for suitable assemblage of know-how. This is achieved by integration, co-operation... The way this assemblage has to be made is a research prospective in itself. From our point of view, this is achieved by defining at least two levels of languages: The first, clearly identified, is the level of the languages of specialist heterogeneous and diverse skills. These languages are considered diverse and heterogeneous, and must remain so, because they cannot or do not need to communicate in their specialized forms, The second, which is called corporate language or knowhow, is the means by which integration, co-operation,... is constructed. As a foundation for our work, we use the MUSIC model [1]. According to this model, the problematic of the cooperative work has been characterized in the following way (Fig. 3): High level of aggregation global knowledge global level sub- level negotiation co-operative IS specialised knowledge piece-part products and corresponding processes ding process Co-operative work within the IIS IS risks and cost goals established from early trades with performance and schedule Dept IS actual costs known from previous projects Fig. 3 Conceptual structure for the bidding process IV. APPROACH FOR BIDDING PROCESS KNOWLEDGE CAPITALIZATION A. Structure of Knowledge in the ding Process The decision in the bidding process is a cooperative decision where several actors (logisticians, ecologists, and risks specialists) intervene for very precise contributions For the knowledge capitalization problem, the model is used in the following way (Fig. 4): global level sub- level Engineers estimate Risks Specialists Corporate Memory for bidding process Production Management Financial Management Humain ressource Management Logisticians Fig. 4 Intelligent IS architecture for the bidding process Ecologists Knowledge is capitalized through an observer at a global level (In bidding process, sales managers and the bidder). This global level knowledge corresponds to the sales manager s work mainly the negotiation with the customer. This level of the Intelligent includes the general requirements with a high level of granularity, the high level piece-parts of the product. Sales managers can capture and store this specialized knowledge and expertise on products and processes in an aggregated form, which is the Cost Element Structure through the co-operative IS. This specialized knowledge of engineers 788

in charge of quotations of products and processes is at a sublevel (lower level of granularity) and can be found in different s of the company. For each proposal, bid managers: Use this Intelligent to describe for example the Cost Breakdown Structure of the product using recurring sub-products (knowledge re-use and updating). Can enter, with the co-operation of the quotation engineers, the description of new components (innovation storage). Knowledge manipulated (Fig. 5) by the specialized organizational units, as a part of the biding process, is structured around the PBS (Product Breakdown Structure) to support the cooperation between the different actors: The product functions: validate implicit and explicit customer requirements thanks to the functionalities defined after reading the biding process, PBS and functional analysis: goes from functionalities to the components of the future product by engineering approaches. It aims at defining industrial processes and associated resources, CBS (Cost Breakdown Structure): allocate cost estimation tasks to company jobs in order to negotiate an objective cost design. This generic structure has been developed as a part of the ESPRIT project (DECIDE project, ESPRIT 2298, ended in 1998) [3], LBS (Logistic Breakdown Structure): insert the support elements as well as the associated processes into the product [4], EBS (Environmental Breakdown Structure): analyze the product and the associated industrial processes, from an environmental point of view, to capture the ecological preoccupations [5], RBS (Risk Breakdown Structure): manage the risks in relation with the industrial organization of the company in order to negotiate a risk objective design. This generic structure has been developed as a part of PRIMA (Project Risk Management) project, n IST-1999-10193, ended in 2002 [2]. knowledge they couldn t acquire by any other way (young employees for example), Learning from experience: The Corporate memory for the bidding process concentrates returns from experience, both from bids themselves and from detailed design corporate memory when it exists. B. Memory Organization for ding Process During the bidding process different kinds of information are required to design technical solutions. To support the different kinds of user, i.e. sales managers and engineers, the prototype developed allows one to create new technical solutions by re-using previous bids and the associated information concerning the products, the processes and the resources or by adding new information that concerns the cost and risks or the technical feasibility. The corporate memory management is organized into tree kinds of item (the temporary items, the to-be examined items, the recurring items) (Fig. 6): Recurring To be Examined Temporary Basket Fig. 6 Memory organization for bidding process The temporary items are an extraction of the information system. The user creates completely new technical solution, products at the moment of the bidding process. The temporary items form completely new technical solutions. From the temporary items, users have the possibility of creating items to be examined. These items are those which could probably be reused for another bid. This required anticipating possible reusable items. It is worthwhile organising this anticipation as it occurs in a non-urgent situation. From the temporary and to be examined items, recurring items are created. Recurring items are those which are reused from previous bids and will certainly be reused for future bids. Recurring items could be reused just as they are or brought up to date. Fig. 5 Risk ontology for corporate memory organization The corporate knowledge management process organizes: Knowledge reuse and sharing: managers get V. CONCLUSION Our objective in this paper was to provide an approach to strategic knowledge capitalization for the whole company.. The proposed approach capitalizes a company strategic knowledge through the bidding process, which is one of the twenty key processes [8]. The result is a corporate memory 789

organization is in fact a part of an ODSS (Organizational Decision Support ) associated to this process [13] From a practical point of view, we recommend to acquire of knowledge in two phases. In the first phase, it is necessary to feed the memory directly with risks. The second phase will consist in enriching this memory starting from the information system. The knowledge acquisition starting from heterogeneous sources that are the decision makers (departmental information system) concerned with the bidding process is a problem under study [11]. The potentially useful knowledge according to the point of view of decision makers are repatriate into business memory. The result of the adopted approach is improvement of corporate memory quality considered as major component of ODSS. REFERENCES [1] Alquier A.M., MUSIC : Management et Utilisation des Systèmes d Coopératifs, Habilitation à diriger des recherches, Université de Toulouse, 1993. [2] Alquier A.M, Tignol M.H., Project management technique to estimate and manage risk of innovative projects, IPMA International Symposium and NORDNET 2001, Stockholm, Sweden, 31 May - 1 June 2001. [3] Alquier A.M., Soliveres H., 1997, A particular aspect of DECIDE bid decision support system: modeling of life-cycle processes and costs, IEEE Conference on s, Man and Cybernetics,Orlando. [4] Chalal R., Nader F., Constitution d une mémoire sur les risques dans les projets et son intégration dans le système d information de l entreprise industrielle, MOSIM 06, 6e Conférence Francophone de MOdélisation et SIMulation, Rabat, Maroc, du 3 au 5 avril, 2006. [5] Chalal R., Alquier A.M., Une approche hybride pour la constitution d un référentiel risques, CPI 2003, 3rd International Conference: Integrated Design and Production, Maroc, Meknes, 2003. [6] Chevalier P., CALS et les systèmes d informations électroniques, Edition Hermès, 1993. [7] Cmm, Engineering Capability Maturity model, Software Engineering Institute, 1995. [8] Davenport T.H., Process innovation; Reengineering work through information technology, Harvard Business School, 1993. [9] Duncan W.R., A guide to the Project Management Body of Knowledge (PMBOK), PMI Standards Committee, 1996. [10] Friedman L., 1996, A competitive ding Strategy, Operation Research, 4, 104-118 [11] Ghomari A.R, «Strategic decision support system: Integration between expert knowledge and historical data», ICTTA 04, Damascus, Syria, April 19-23, 2004 [12] Holsapple C.W., Whinston A.B., Decision support systems; a knowledge based approach, West Publishing Company, 1996. [13] Turban E., Aronson J.E., 2001, Decision Support s and Intelligent s, Prentice-Hall International Inc. 790