The USC School of Cinematic Arts is the oldest and largest film school in the United States. In 2006, George Lucas donated US$175 million to expand

Similar documents
EcoDomus, Inc

Management. Igor Starkov, EcoDomus. EcoDomus, Inc. 2011

Owners- How to contract for BIM deliverables and actually get what you want. Birgitta Foster & Cindy Baldwin

THEME: Enabling Tomorrow s Connected Infrastructure

Building Information Modeling to Facilities Information Management and Beyond

Understanding Your Facilities Information Needs and the Potential of BIM to Your Organization

ICT in BUILDING ABPL90331 Dr Dominik Holzer, Semester 2, 2017

BIM for FM Opportunities: Overcoming Challenges and Sharing Lessons Learned

CS21793 Transition to Operations with Building Ops: The (Eye) in BIM

Delivering Building Information to Owners Birgitta Foster Vice President, Facilities Integration VDCO Tech, Inc.

10:00 SMART and BIM: how they work together Richard Saxon, Deploi: BIM Strategies

Building Information Modeling (BIM) for operational management of facilities

DoD BIM Contract Requirements BEST PRACTICES

TUTORIALS. BIM Workflow in Advance Design

Predicting not just detecting

DoD BIM Contract Requirements BEST PRACTICES

BIM for Healthcare. Healthcare BIM Consortium. Department of Veterans Affairs. Military Health System (Tricare Management Activity / Health Affairs)

BIM Design & Construction Requirements Indiana University

Real Time Geospatial Data: The Fusion of PI and ArcGIS. Enabling Smarter Facilities Management

Building Intelligence 2017 BIM Enabled FM

CHAPTER 7 Building Information Modeling

BUILDING INFORMATION MODELLING BOUYGUES UK THE USE OF BIM TO IMPROVE PROJECT PERFORMANCE

Deliver higher value and maximize lifecycle building performance to support VA s mission to deliver excellent medical service.

ADDENDUM TO USC BIM GUIDELINES VS.

BIM Design & Construction Requirements. Follow-up Seminar. September 10,

VIRTUAL DESIGN & CONSTRUCTION, THE NEXT LEVEL OF COLLABORATION AND INTEGRATION 2016 Airport Construction Strategy Summit. Special Thanks To:

FROM AUTOCAD TO ADVANCE STEEL 1 MOVE FROM 2D TO 3D WITH ADVANCE STEEL BASED ON AUTOCAD

HBC Owners & Industry Partners Discussion Oakland, CA February 2, 2011

25% 22% 10% 10% 12% Modern IT shops are a mix of on-premises (legacy) applications and cloud applications. 40% use cloud only. 60% use hybrid model

FAQs. Introductory. Q. What is Proteus MMX?

Healthcare BIM Consortium Session #2

INTEGRATED PARTS ORDERING FROM NEXPART SUPPLIERS

Managing Digital Hand-over. Doug Wood

Enterprise Asset Management STREAMLINE FACILITY MAINTENANCE OPERATIONS & REDUCE COSTS

10 BIM for FM Deliverables in 20 Minutes

CAD+BIM+GIS+CMMS for Airport Facility Maintenance/Management: Making the best of each tool work - together

Removing the Barriers to Efficient Water Leakage Management

2012 Kristine Fallon Associates, Inc. Complete Facility Lifecycle Management

Autodesk and the UK BIM Level 2 Mandate

Practical Collaboration Issues & Practice on Major Projects. Integrating IFC into the Process

BIM TECHNOLOGY THE FUTURE STARTS NOW!

Case Study 567 Collins Street: The Client's view of BIM

DELIVERING STRUCTURED DATA. Bobby Gallagher (DFM SYSTEMS)

AGENDA. BIM Opportunities for CMMS

IV.E.8 - BIM Standards

Role of CAFM: How to make the right investment 16:30 17:15

D: A Client s Most Influential Dimension to Make BIM Fly

Great River Energy GIS. John Auel United Services Group

Sylvia Kendra Associate Director Facilities Knowledge Management. January 11, 2017

BU21079 Building Information Modeling to Facilities Information Management and Beyond

2010 Bentley Systems Incorporated. FM Handover (COBie2) Aquarium

Design + Construction Strategies 30 April 2014 IDIQ Contract #F10CC10036 Task Order #: Page 0 of 54

Overview of the BIM Execution Plan... 1

White Paper Microsoft SharePoint for Engineering Document Management and Control

Xavier University s Facility Management BIM Integration A Case Study

The Power of Spatially Enabling Your Real-time Facilities Data. Copyright 2015 OSIsoft, LLC

CIBSE West Midlands Developments in BIM. Colin Magner, Associate BIM Manager, Arup

BIM TECHNOLOGY THE IMPACT ON THE PLANNING AND UTILIZATION PHASE HDR TMK, all rights reserved.

Using Building Information Modeling to Control Lifecycle Costs

BlueCielo Meridian What s New

IBM A EXAM QUESTIONS & ANSWERS

Achieve greater efficiency in asset management by managing all your asset types on a single platform.

From CAD to CEO with Autodesk and ARCHIBUS/FM

ABC Company Recommended Course of Action

Maximo v Feature Pack release. October 21, 2016

Controller s Office Physical Inventory. Approving Physical Inventory Transactions

Flare Specialised Modules

State of Tennessee Office of the State Architect {TN OSA) Building Information Modeling {BIM) Requirements. Version 1.0

Saurabh Gangwar 2018 Project Management Symposium

Supervisor Dashboard. Use the Supervisor Dashboard to monitor and respond to critical time and labor events.

IBM A EXAM QUESTIONS & ANSWERS

LINKING BIM TO CAFM. Turning Asset Data into Knowledge

5D BIM: Shaping the Future of the Construction Industry. Gain insights into how you can leverage tools to work smarter in this era

CIVIL ENGINEERING BENEFITS OF BIM. Helping Civil Engineers do more with BIM

BIM guide for members of the Institution of Mechanical Engineers

Crowe Project Management

Complete Guide to Field Service

ArcGIS Workflow Manager: Advanced Workflows and Concepts. Kevin Bedel & Nishi Mishra

Welcome! BIM in the DoD-MHS (an overview) HBC.4 Progression of the MHS BIM Implementation. March 15, 2012

PREVIEW. Complete Guide to Field Service. Salesforce, Winter

Certified Helpdesk. Frequently Asked Questions. October 5, 2013 // Revision 5

RFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018

22/11/2016 Emad Elbeltagi 1

BIM: Why Create Content?

Value Proposition of COBie at University of Washington

National Institute of Building Sciences

(BIM) Guidelines version 1.6

Reasons to Use a CMMS over . Published by FasTrak, SoftWorks, Inc.

2011 BIM Awards. Using BIM to Design and Build the Wounded Warrior Headquarters and Hope and Care Center. Category A: BIM Excellence

Procurement. User Guide

BIM Competency Delivers Competitive Advantages

New Client Training. Paychex Time and Labor Online Paychex, Inc. All rights reserved. TLO

Take Your CAMA to the Next Level

OPERATIONAL INTELLIGENCE. Operational Monitoring and Analysis That Performs. Objectives-Driven Insight

You can t manage what you don t measure

Introduction to Building Analytics

Product Documentation SAP Business ByDesign August Product Development

ACEC CAD AND BIM FOR SENIOR FIRM LEADERS

Leveraging Technology to Optimise Operations and Maintenance. Presented by Henrico van Niekerk Meridian Energy David Barker Dimension Software

Migrating 20-years of Spatial Data. The Knoxville, Knox County, Knoxville Utilities Board (KGIS) Experience

Transcription:

The USC School of Cinematic Arts is the oldest and largest film school in the United States. In 2006, George Lucas donated US$175 million to expand the film school with a new 137,000 square foot facility. An architectural hobbyist, Lucas laid out the original designs for the project, inspired by the Mediterranean Revival Style

As one of the first BIM users in the world, Lucasfilm requested BIM to be used on this project. Owner (USC) received as built Revit BIM from the architectural firm, updated to match field conditions. USC Facility Management Service decided to use BIM for maintenance purposes.

USC s CMMS (FAMIS) did not have BIM integration capability. USC FMS wanted to connect BIM to energy management system (Honeywell) and document management (BlueCielo) No open standards for data handover existed at the University level.

Design BIM (Revit) Construction BIM (Revit) MEPF CAD Shop Drawings Navisworks File As Built Handover Deliverable Results: 1) Design BIM is not field verified and often inaccurate. 2) No construction data quality control implemented = inaccurate data. 3) Navisworks file quickly becomes outdated and difficult to maintain. 4) No integration with the owner s FM packages (CMMS/CAFM).

COBie is selected in the new USC BIM Guidelines as the standard for collecting project data once it becomes available and for storing data in a common dataset available online. Requirements for COBie deliverables in the BIM Guidelines are described in extensive details the most complete set of COBie requirements in the industry. US Army Corps of Engineers, Engineering Research and Development Center (c) 2009

Data Acquisition Templates were created in 2008: describes what attributes are required for equipment and spaces Data Quality Control is established in EcoDomus PM software based on the Data Acquisition Templates BIM provides default values for COBie data Installed equipment data is provided by subcontractors

Data validation via automated quality control make sure the default COBie rules are followed, i.e. all components are assigned to spaces, all types have model numbers, etc. Missing attributes and missing documentation is clearly visible via reports OmniClass rules for attributes, naming conventions, and documentation

Design Architectural and MEPF Model (Revit) VALIDATE For COBie Add/Modify Design Model Data SUBCONTRACTOR INPUT Re VALIDATE For COBie NO Correct? YES COBie File to Contractors (reference only) Construction Construction Model (Revit) Subcontractors CAD Models (CADduct, QuickPen, etc) Navisworks File Field Verified? Update COBie File Import Updated COBie File Commissioning Update COBie File / Dataset with Commissioning Data NO Show Changes in As Built Compared to Design Update Architectural and MEPF Model to As Built (Revit)

Owners provide detailed project requirements based on existing Facility Management Program. A/E s, FM technology consultants, and Contractors help set up a program if it doesn t exist. A/E/C project team members create a detailed BIM/COBie Execution Plan based on owner s project requirements. Continuously collect and check quality of entered data and documents throughout the project in the appropriate software (like EcoDomus). Final acceptance of data handover as a COBie spread sheet or, preferably, as a dataset imported into CMMS/CAFM Continuous improvement of a Facility Management Program feeds future projects requirements.

Results: 1) Design BIM is now As Built : field verified and accurate, and it s a file in the format that owner can work with 2) Construction data quality control implemented accurate data 3) Navisworks file is used for easy model navigation but not critical in maintaining model data, since data is stored in SQL database or in COBie file 4) BIM is integrated with CMMS/CAFM via EcoDomus: allowing both to be synchronous and up to date.

After exporting BIM data from Revit into the EcoDomus it was exported as COBie Excel file for archiving purposes and data was pushed into CMMS via direct integration

Building Information Model (BIM) BIM integrated with CMMS, BAS, EDMS Geographical Information System (GIS) Computerized Maintenance Management System (CMMS) Building Management System (BMS) Computer Aided Facility Management (CAFM) Electronic Document Management System (EDMS)

1. FM Labor Utilization Savings 2. Utility Costs Reduction (Energy, Water) 3. Risk Management 4. Fuel and Material Savings 5. Comfort Management 6. Data Accuracy (As Builts) 7. Regulations Compliance 8. Space Optimization 9. Improved Inventory Management 10. Configuration Management Building owners/managers need it all! One focus area may not provide sufficient ROI.

Given: Task: Solution: CMMS application generates a work order Technicians are expected to complete the work in reasonable time, and they need information about the system or the equipment to be serviced Click the Link to the EcoDomus viewer to view the details about equipment that needs servicing.

The EcoDomus software opens a 3D view of the equipment that should be serviced. Equipment properties are displayed automatically.

The equipment s corresponding documents are attached, and can be accessed immediately. Time savings compared to previous process: 0.5 1 hours.

Building controls are managed by the intelligent Building Automation System (i.e. Honeywell, Siemens, Schneider Electric, or Johnson Controls). A cold call is received that room 101 is too cold. BAS doesn t throw any alerts. And a check of the BAS doesn t show anything out of the ordinary. Go to Room 101 in the BIM O & M Portal.

Select a VAV and review it s set points vs. actual data. Review the VAV s properties. Trace the other components of the same air supply system. Review any previous work orders performed on the equipment. Time savings and BAS optimization result in 5 10% of energy savings.

Igor Starkov 571 277 6617 Reston, VA igor@ecodomus.com