CDC Natural Disasters Healthcare Water System Repair Following Disruption of Water...

Similar documents
Keep Food and Water Safe After a Disaster or Emergency

An Introduction to Plumbing and Gas Systems for Medical Facilities

Facility Manager Basic Training: Infection Prevention and Control

Assessment and Inspection Guidelines for Potable Water on Passenger Conveyances. September 2016

Assessment and Inspection Guidelines for Potable Water on Passenger Conveyances. April 2016

Form 9: Infection Control Preventive Measures Level 4

MECKLENBURG COUNTY. Health Department BACKUP WATER SUPPLY PLAN CHECKLIST

Mold Remediation. 1. Purpose and Requirements. 2. Scope. 3. General Responsibilities HS13_IAQ_SOP_002. Occupational Safety & Health

Developed and Presented by: Wisconsin Healthcare Engineering Association

STANDARD OPERATING PROCEDURES FOR MOISTURE INTRUSION

Appendix B. Sanitation Performance Standards

Mold Remediation. Containment guidelines: based on the size of the infected area.

Risk Assessment and Preventive Measures Checklist for Construction and Renovation. Location of Construction: Project Start Date: Estimated Duration:

Flood / Mold Remediation (FMR) 29 CFR

LODI UNIFIED SCHOOL DISTRICT

St. Mary s Hospital, Camrose LOSS OF WATER SUPPLY EMERGENCY RESPONSE PLAN

Administrative and Non-classroom inspection areas. (A) Inspection of the auditoriums and student dining areas shall include the following:

Check if Issues Found. Check if Reviewed. Assessment Elements

Adverse Water Event Planning Tool for Saskatchewan Healthcare Facilities. Saskatchewan Infection Prevention and Control Program

EVALUATION OF CHLORINE DIOXIDE IN POTABLE WATER SYSTEMS FOR LEGIONELLA CONTROL IN A ACUTE CARE HOSPITAL ENVIRONMENT

MODEL ORDINANCE FOR CROSS CONNECTION CONTROL BE IT ORDAINED BY THE GOVERNING BODY OF THE CITY OF, STATE OF WYOMING:

Legionella Mitigation

Legionella & Legionellosis

NADCA S MOLD AWARENESS

VILLA CARITAS LOSS OF WATER SUPPLY EMERGENCY RESPONSE PLAN

STANDARD OPERATING PROCEDURES FOR MOLD REMEDIATION

Orientation Program for New Infection Control Professionals

Private Well Water Safety Measures

John F. Koerner, MPH, CIH

Appendix B PROCEDURES FOR REMOVAL OF MOULD-CONTAMINATED MATERIALS

LEGIONELLA WATER SAFETY PLANS

This policy will generally explain the following in regards to the City sewerage collection systems:

Recommendations for Physical Space for Decontamination Areas

APPENDIX A: EMERGENCY RESPONSE AND CONTINGENCY PLAN TEMPLATE

How to prepare your well for the next flood: Evacuation Preparations and Return Home

Environmental Health Training in Emergency Response. Objectives. Environmental Health Role. Objectives (continued) Reasons for Concern.

Chapter 5 Water, Plumbing, and Waste

MONOCHLORAMINE Hot Water Treatment For Legionella Control

Part 3 House Packing Facility

Water Hygiene Chlorination Water Treatment Legionella Control

Sanitation SSOP and SPS

Water for Instrument Processing

Environmental sampling for LD: When and how?

SPAN-WORLD Distribution

Read Health Canada s Tools for schools Action Kit s Introduction, Backgrounder and pages 14-3 to

Virginia Department of Health Office of Drinking Water

BOIL WATER ADVISORY SYSTEM ASSESSMENT FORM

HOLLEY NAVARRE WATER SYSTEM, INC. BACKFLOW PREVENTION & CROSS CONNECTION CONTROL POLICIES & REGULATIONS

Identify and Correct Impact of Water Health Challenges Associated with Flooding. Susan Watkins and Mike Daniels

RULES AND REGULATIONS FOR WATER AND WASTEWATER SERVICE APPENDIX G BACKFLOW PREVENTION AND CROSS CONNECTION CONTROL (BPCCC) PROGRAM

Health Care and Hospital Premise Plumbing for existing buildings

Riviera Beach DIVISION 2. CROSS CONNECTION CONTROL

Healthcare construction

Bear Valley USD. Administrative Regulation. Environmental Safety AR Business and Noninstructional Operations

SUBCHAPTER E REGULATORY REQUIREMENTS UNDER THE FEDERAL MEAT INSPECTION ACT AND THE POULTRY PRODUCTS INSPECTION ACT

Module 6 Shock Chlorination. For more information refer to the Water Wells That Last video (Part III Shock Chlorination).

State of Alaska Department of Corrections Policies and Procedures Chapter: Subject:

Ten (+) Ways to Protect Against Legionella and Other Waterborne Bacteria

PRESENTED BY: Chris Ebener Senior Engineer, LiquiTech

Drinking Water Treatment: Shock Chlorination

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

Environmental aspects of Legionnaires disease

UNIVERSITY OF TOLEDO

MODULE 14: Off-site Transport and Storage of Healthcare Waste

September 11 th, 2012

Good Agricultural Practices (GAP) for Fresh Fruit and Vegetable Growers. Water

Australian/New Zealand Standard

Table of Contents. C. Recommended Remediation Firms: upon request

Identifying and eradicating biofilm

Modular Education Program Course Catalog Certificates, Badges, and Learning Activity descriptions.

KNOWLEDGE EXPANDER WATER Shell Global Solutions International B.V.

The Town of Fort Frances

Oregon Health Services - Drinking Water Program

Bowen Island Municipality

WATER BASICS ENGR. ALBERT SAMUELA KHUN UNNOP TONGYA

Drinking. Water Rules

DRINKING WATER IN CHILD CARE CENTERS & SCHOOLS MARYLAND State Policy Profile

Determination of Clearance Criteria Following Mercury Decontamination Projects

For more information on the Revised Total Coliform Rule, visit our website at

Water Management. How do we reduce and recycle our wastewater?

Bowen Island Municipality

ARCHBOLD WATER TREATMENT PLANT 700 NORTH STREET ARCHBOLD, OHIO

The Town of Fort Frances

Revised Total Coliform Rule (RTCR) Level 1 Assessment Form

Water Production for Pharmaceutical Manufacturing: Looking Beyond Compliance at the Entire Manufacturing Process

City of Millbrae 2016 CALIFORNIA GREEN BUILDING CODE CHECKLIST FOR NEW NONRESIDENTIAL BUILDINGS

Safe Handling of Pesticides. Presented by Dr. H. B. Singh

LEGIONELLA MONITORING AND RISK ASSESSMENTS

Odors in Your Water. Your Household Water Quality:

BACKFLOW PREVENTION ASSEMBLY INSTALLATION STANDARDS

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET SERVICES 78 FOX STREET BUILDING

Indoor Air Quality Plan

CROSS CONNECTION CONTROL PROGRAM

Cross-Connection Control Program

Legionella Compliance For The Social Housing Sector. 7 th November 2018 Ian Childs Client Relationship Director

A cure for water damage to your property: Planning and preparation

Indoor Air Quality Program

A.B.A. Well and Septic Services Inc. P.O. Box 35 Ivor, VA (757) A Homeowner s Guide to Septic Systems

Quality Drinking Water. Answers to common questions about water in Grand Ledge

Determination of Sewage Contamination on Personal Belongings or Equipment Following Flooding or Waste System Malfunctions

Transcription:

CDC Natural Disasters Healthcare Water System Repair Following Disruption of Water... ATTACHMENT F Page 1 of 5 DISASTER RECOVERY INFORMATION Emergency Preparedness and Response Healthcare Water System Repair Following Disruption of Water Supply Excerpted from the Guidelines for Environmental Infection Control in Health-Care Facilities, 2003 Recommendations of CDC and the Healthcare Infection Control Advisory Committee (HICPAC) To see the entire document and find references go to http://www.cdc.gov/ncidod/dhqp/gl_environinfection.html (http://www.cdc.gov/ncidod/dhqp/gl_environinfection.html). On this page: Infection Control Impact of Water System Maintenance and Repair (#1) Recovery and Remediation Measures for Water-Related Emergencies (#2) Contingency Planning Flooding (#3) Water Demand in Healthcare Facilities During Water Disruption Emergencies (#4) Recommendations (#5) Infection Control Impact of Water System Maintenance and Repair Corrective measures for water system failures have not been studied in well-designed experiments, but rather are based on empiric engineering and infection control principles. Healthcare facilities can occasionally sustain intentional cut-offs by the municipal water authority to permit new construction project tie-ins and unintentional breaks in service when a water main breaks due to aging infrastructure or a construction accident. Vacuum breakers or other similar devices can prevent backflow of water in the facility s distribution system during water-disruption emergencies. 11 To be prepared for such an emergency, all healthcare facilities need contingency plans that identify: 1) the total demand for potable water; 2) the quantity of replacement water (e.g., bottled water) required for a minimum of 24 hours when the water system is down; 3) mechanisms for emergency water distribution; and 4) procedures for correcting drops in water pressure that affect operation of essential devices and equipment that are driven or cooled by a water system. Detailed current plans for hot and cold water piping systems should be readily available for maintenance and repair purposes in case of system problems. Opening potable water systems for repair or construction and subjecting systems to water-pressure changes can result in water discoloration and dramatic increases in the concentrations of Legionella spp. and other gram-negative bacteria. The maintenance of a chlorine residual at all points within the piping system also offers some protection from entry of contamination to the pipes in the event of an inadvertent cross-connection between potable and non-potable water lines. As a minimum preventive measure, ASHRAE recommends a thorough flushing of the system. 637 High-temperature flushing or chlorination may also be appropriate strategies to decrease potentially high concentrations of waterborne organisms. The decision to pursue either of these remediation strategies, however, should be made on a case-by -case basis. If only a portion of the system is involved, high temperature flushing or chlorination may be used on only that portion of the system. 637 When shock decontamination of hot water systems is necessary (e.g., after disruption due to construction, cross-connections), the hot water temperature should be raised to 71 C - 77 C (160 F - 170 F) and maintained at that level while progressively flushing each outlet around the system. A minimum flush time of 5 minutes has been recommended; 3 the optimal flush time is not known, however, and longer flush times may be necessary. 681 The number of outlets that can be flushed simultaneously depends on the capacity of the water heater and the flow capability of the system. Appropriate safety procedures to prevent scalding are essential. When possible, flushing should be performed when the fewest building occupants are present (e.g., nights and weekends). When thermal shock treatment is not possible, shock chlorination may provide an alternative. 637 Experience with this method of decontamination is limited, however, and high levels of free chlorine can corrode metals. Chlorine should be added, preferably overnight, to achieve a free chlorine residual of at least 2 mg/l (2 ppm) throughout the system. 637 This may require chlorination of the water heater or tank to levels of 20-50 mg/l (20-50 ppm). The ph of the water should be maintained between 7.0 and

Page 2 of 5 8.0. 637 After completion of the decontamination, recolonization of the hot water system is likely to occur unless proper temperatures are maintained or a procedure such as continuous supplemental chlorination is continued. Interruptions of the water supply and sewage spills are situations which require immediate recovery and remediation measures to assure the health and safety of patients and staff. 682 When delivery of potable water through the municipal distribution system has been disrupted, the public water supplier must issue a boil water advisory if microbial contamination presents an immediate public health risk to customers. The hospital engineer should oversee the restoration of the water system in the facility and clear it for use when appropriate to do so. Hospitals must maintain a high level of surveillance for waterborne disease among patients and staff after the advisory is lifted. 619 Flooding from either external (e.g., from a hurricane) or internal sources (e.g., a water system break) usually results in property damage and 683-685 a temporary loss of water and sanitation. The JCAHO requires all hospitals have plans which address facility response for recovery from both internal and external disasters. 686 The plans are required to address: 1) general emergency preparedness; 2) staffing; 3) regional planning among area hospitals; 4) emergency supply of potable water; 5) infection control and medical services needs; 6) climate control; and 7) remediation. The basic principles of structural recovery from flooding are similar to those for recovery from sewage contamination. Tables 21-23 summarize actions that will help to restore facility function and operations after water disruptions, sewage spills, and flooding. Medical records should be allowed to dry, and either photocopied or placed in plastic covers before returning them to the record. Moisture meters can be used to assess water-damaged structural materials. Recovery and Remediation Measures for Water-Related Emergencies 683-695 Potable Water Disruptions Contingencyplan items: Water treatment: Ensure access to plumbing network so that repairs can be made. Provide sufficient potable water, either from bottled sources or truck delivery. Post advisory notices against consuming tap water, ice, or beverages made with water. Rinse raw foods as needed in disinfected water. Heat water to a rolling boil for 1 minute. Remediation of the water system after the boil water advisory is rescinded: Flush fixtures (e.g., faucets, drinking fountains) and equipment for several minutes and restart. Run water softeners through a regeneration cycle. Drain, disinfect, and refill water storage tanks if needed. Change pre-treatment filters and disinfect the dialysis water system. Sewage Spills / Malfunction Overall strategy: Move patients and clean/sterile supplies out of the area. Redirect traffic away from the area. Close the doors or use plastic sheeting to isolate the area prior to clean-up. Restore sewage system function first, then the potable water system (if both are malfunctioning). Remove sewage solids, drain the area, let dry, then clean with a detergent/disinfectant. Remediation of the structure: Furniture: Hard surfaces - drain and dry the area, then clean with a detergent/disinfectant. Carpeting, loose tiles, buckled flooring - remove and allow the support surface to dry; replace the items; wet down carpeting with a low-level disinfectant prior to removal. Wallboard and other porous structural materials - remove and replace if they cannot be cleaned and dried within 72 hours. Hard surface furniture (i.e., metal, plastic) - clean and allow to dry.

Page 3 of 5 Wood furniture - let dry, sand the wood surface, and reapply varnish. Cloth furniture - replace. Electrical equipment: Replace if the item cannot be easily dismantled, cleaned, and reassembled. An exception to these recommendations is made for hemodialysis units where water is further treated either by portable water treatment or large-scale water treatment systems usually involving reverse osmosis (RO). In the United States, greater than 98% of dialysis facilities use RO treatment for their water. 687 It may be prudent, however, to change out pre-treatment filters and disinfect the system to prevent colonization of the RO membrane and microbial contamination down-stream of the pre-treatment filter. Contingency Planning - Flooding 683-685 General emergency preparedness: Ensure that emergency electrical generators are not located in flood-prone areas of the facility. Develop alternative strategies for moving patients, water containers, medical records, equipment, supplies, etc. if the elevators are inoperable. Establish in advance a centralized base of operations with batteries, flashlights, cellular phones. Ensure sufficient supplies of sandbags to sandbag the entrances and the area around boilers, incinerators, and generators. Establish alternative strategies for bringing core employees to the facility if high water prevents travel. Staffing patterns: Temporarily reassign licensed staff as needed to critical care areas to provide manual ventilation and to perform vital assessments on patients. Designate a core group of employees to remain on site to keep all services operational if the facility remains open. Train all employees in emergency preparedness procedures. Regional planning among area facilities for disaster management: Incorporate community support and involvement (e.g., media alerts, news, transportation). Develop in advance strategies for transferring patients as needed. Develop strategies for sharing supplies and providing essential services among participating facilities (e.g., central sterile department services, laundry). Identify sources for emergency provisions (e.g., blood, emergency vehicles, bottled water). Medical services and infection control: Climate control: Use waterless hand sanitizers in general patient-care areas. Postpone elective surgeries until full services are restored, or transfer these patients to other facilities. Consider using portable dialysis machines (water demand is less). Provide an adequate supply of tetanus and hepatitis A immunizations for patients and staff. Provide adequate water for cooling towers (may need to truck in, especially if the tower uses potable water). Water Demand in Healthcare Facilities During Water Disruption Emergencies Potable Water Drinking water Handwashing Cafeteria services

Page 4 of 5 Ice Manual flushing of toilets Patient baths, hygiene Hemodialysis Hydrotherapy Fire prevention (e.g., sprinkler systems) Surgery and critical care areas Laboratory services Laundry and central sterile departments (if these services cannot be arranged for elsewhere) Cooling towers a Bottled, Sterile Water Surgical scrub Emergency surgical procedures Pharmaceutical preparations Patient-care equipment (e.g., ventilators, nebulizers) if electrical power is available a. Some cooling towers may use a potable water source, but most units use non-potable water Recommendations III. Remediation Strategies for Distribution System Repair or Emergencies A. Whenever possible, disconnect the ice machine before planned water disruptions. B. Prepare a contingency plan to estimate water demands for the entire facility in advance of significant water disruptions (i.e., those expected to result in extensive and heavy microbial or chemical contamination of the potable water), sewage intrusion, or flooding.713, 719 Category IC (JCAHO: EC 4) C. When a significant water disruption or an emergency occurs, adhere to any advisory to boil water issued by the municipal water utility.642 Category IB, IC (Municipal order) Alert patients, families, staff, and visitors not to consume water from drinking fountains, ice, or drinks made from municipal tap water, while the advisory is in effect, unless the water has been disinfected (e.g., by bringing to a rolling boil for >1 minute).642 Category IB, IC (Municipal order) After the advisory is lifted, run faucets and drinking fountains at full flow for >5 minutes, or use high-temperature water flushing or chlorination.642, 661 Category IC, II (Municipal order; ASHRAE 12:2000) D. Maintain a high level of surveillance for waterborne disease among patients after a boil water advisory is lifted. E. Corrective decontamination of the hot water system might be necessary after a disruption in service or a cross-connection with sewer lines has occurred. 3. 4. Decontaminate the system when the fewest occupants are present in the building (e.g., nights or weekends).3, 661 Category IC (ASHRAE: 12:2000) If using high-temperature decontamination, raise the hot-water temperature to 160 F 170 F (71 C 77 C) and maintain that level while progressively flushing each outlet around the system for >5 minutes.3, 661 Category IC (ASHRAE: 12:2000) If using chlorination, add enough chlorine, preferably overnight, to achieve a free chlorine residual of >2 mg/l (>2 ppm) throughout the system.661 Category IC (ASHRAE: 12:2000) a. Flush each outlet until chlorine odor is detected. b. Maintain the elevated chlorine concentration in the system for >2 hrs (but <24 hrs). Use a very thorough flushing of the water system instead of chlorination if a highly chlorine-resistant microorganism (e.g., Cryptosporidium spp.) is suspected as the water contaminant. F. Flush and restart equipment and fixtures according to manufacturers instructions. G. Change the pretreatment filter and disinfect the dialysis water system with an EPA registered product to prevent colonization of the reverse osmosis membrane and downstream microbial contamination.721 H. Run water softeners through a regeneration cycle to restore their capacity and function.

Page 5 of 5 I. If the facility has a water-holding reservoir or water-storage tank, consult the facility engineer or local health department to determine whether this equipment needs to be drained, disinfected with an EPA-registered product, and refilled. J. Implement facility management procedures to manage a sewage system failure or flooding (e.g., arranging with other health-care facilities for temporary transfer of patients or provision of services), and establish communications with the local municipal water utility and the local health department to ensure that advisories are received in a timely manner upon release.713, 719 Category IC (JCAHO: EC 4; Municipal order) K. Implement infection-control measures during sewage intrusion, flooding, or other water related emergencies. 3. 4. 5. Relocate patients and clean or sterilize supplies from affected areas. If hands are not visibly soiled or contaminated with proteinaceous material, include an alcohol-based hand rub in the hand hygiene process 1) before performing invasive procedures; 2) before and after each patient contact; and 3) whenever hand hygiene is indicated.1364 If hands are visibly soiled or contaminated with proteinaceous material, use soap and bottled water for handwashing.1364 Category II If the potable water system is not affected by flooding or sewage contamination, process surgical instruments for sterilization according to standard procedures. Contact the manufacturer of the automated endoscope reprocessor (AER) for specific instructions on the use of this equipment during a water advisory. L. Remediate the facility after sewage intrusion, flooding, or other water-related emergencies. Close off affected areas during cleanupprocedures. Ensure that the sewage system is fully functional before beginning remediation so contaminated solids and standing water can be removed. If hard-surface equipment, floors, and walls remain in good repair, ensure that these are dry within 72 hours; clean with detergent according to standard cleaning procedures. Clean wood furniture and materials (if still in good repair); allow them to dry thoroughly before restoring varnish or other surface coatings. Contain dust and debris during remediation and repair as outlined in air recommendations (Air: II G 4, 5). M. Regardless of the original source of water damage (e.g., flooding versus water leaks from point-of-use fixtures or roofs), remove wet, absorbent structural items (e.g., carpeting, wallboard, and wallpaper) and cloth furnishings if they cannot be easily and thoroughly cleaned and dried within 72 hours (e.g., moisture content <20% as determined by moisture meter readings); replace with new materials as soon as the underlying structure is declared by the facility engineer to be thoroughly dry.18, 266, 278, 1026 Category IB Page last updated September 2, 2005 Content source: National Center for Environmental Health (NCEH) (http://www.cdc.gov/nceh/) /Agency for Toxic Substances and Disease Registry (ATSDR) (http://www.atsdr.cdc.gov/), Office of Noncommunicable Diseases, Injury and Environmental Health (http://www.cdc.gov/about/organization/ccehip.htm), National Center for Chronic Disease Prevention and Health Promotion (NCCDPHP) (http://www.cdc.gov/chronicdisease/), National Center on Birth Defects and Developmental Disabilities (NCBDDD) (http://www.cdc.gov/ncbddd/) Centers for Disease Control and Prevention 1600 Clifton Rd. Atlanta, GA 30333, USA 800-CDC-INFO (800-232-4636) TTY: (888) 232-6348, 24 Hours/Every Day - cdcinfo@cdc.gov