Funding was provided by the City of New York via the Hudson Yards Infrastructure Corporation and Hudson Yards Development Corporation.

Similar documents
Second Avenue Subway

Second Avenue Subway

MTA CAPITAL CONSTRUCTION NEW YORK BUILDING CONGRESS NOVEMBER 7, MTA Capital Construction 0

Description of Phase 2 Modified Design

Customer Service and Operations Committee. Board Information Item III-B. October 9, 2014

COMMUNITY BOARD EIGHT

Soft Ground Tunneling through Contaminated Groundwater

CTA Capital Construction Update August 8, 2007

4.0 CONSTRUCTION METHODS AND ACTIVITIES

Stevens & Associates, Inc. Tunnel Construction Projects. Fact Sheets

Metro Purple Line Extension

Second Avenue Subway. Quarterly Public Workshop. February 25, 2015

TRANSPORTATION RESEARCH FORUM March A State-of-the-Art of Underground Construction In Urban Areas

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:

COMMUNITY BOARD EIGHT

HUDSON TUNNEL PROJECT

STATE UNIVERSITY CONSTRUCTION FUND

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today!

Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion Tunnel

TABLE OF CONTENTS Public Safety Building

Appendix 2-3. Subway Design Standards and Construction Methods

Westside Purple Line Extension Section 1 Project Overview

Westside Subway Extension

STATUS REPORT On the

Progress update (November to March) 03/23/2009 2

Second Avenue Subway - A Status Report

Construction Project Briefing. November 19, 2014

Construction Project Briefing. November 16, 2016

SECTION The specification section is organized by placing information in three standard parts:

Construction Project Briefing. June 14, 2017

Construction Project Briefing. July 11, 2018

Phase 2 Update. October 12, 2017

Indirect and Cumulative Effects

Introduction. Disclaimer. Table of contents

Executive Summary A. INTRODUCTION

ANNEX 9-F CONSTRUCTION SERVICES AND WORKS CONCESSIONS PART 1 SINGAPORE S COMMITMENTS

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Minneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C

Construction Look Ahead February 2018

260,000 SF Building Profile

New Main Hospital, Site Park, and Underground Garage Construction Progress Update #16

SECTION 11 Architectural and Nonstructural Elements Field Investigation

Expanding Your Development & Investment Perspectives 159,000 SF Building Profile

TORONTO TRANSIT COMMISSION REPORT NO.

WELCOME LOCAL SEGMENT PUBLIC MEETING SUMMARY OF PRELIMINARY RESULTS CORRIDOR EVALUATION

The 19 th Saudi Int l Building, Construction & Heavy Equipment Exhibition MARCH 2017

VTA s BART Silicon Valley Phase II Extension

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality

SECTION RESIDENTIAL ELEVATOR. (Freedom Green Residential Elevator)

Purple Line Extension. Beverly Hills Community Meeting August 22, 2016

A New Era of Tunnel Blasting: Electronic Detonators and Geohazard Reduction

TTC Presentation to the Sheppard Transit Expert Advisory Panel. Date: February 24, 2012


2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY

Learning Legacy Document Duration of data recorded (approx.) 1

Division D CONSTRUCTION

DESIGN & CONSTRUCTION GUIDELINES

.2 These guidelines should be read with the specific technical sections of McGill s Building Design and Technical Standards.

The Drainage Basin. From Peaks of Colorado to Mexico 1,400 miles Drains 242,000 square miles of Western US Colored River because of sediments

You dream it. We build it. ELEVATORS

Ongoing and Future Project Work. Construction Management

Cover Photo: The Bank of America Tower at One Bryant Park, New York City

Woodbine Station Upgrades

SECTION RESIDENTIAL ELEVATOR. (Freedom Elite Residential Elevator)

OAK BROOK AMC This unique structure within a shopping mall in the western suburbs, contains a twenty four theater complex above the parking structure.

Los Angeles Westside Purple Line Extension Project Challenges and Lessons Learned

APPLICATION NUMBER:, TAX MAP KEY: STREET ADDRESS:, PRPOJECT: APPLICANT:, PHONE NO: MAILING ADDRESS:, FAX NO:

Construction Project Briefing. January 16, 2015

AGILITAS Property Development

John James Audubon Bridge. The Dispute Resolution Board Foundation's 14th Annual Meeting and Conference

City Of Mendota Construction Procedures

FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY

Capital Rail Constructors a Clark & Kiewit Joint Venture Jim Ansari Senior Vice President & General Manager

CITY COUNCIL MEETING INTRODUCTION

Construction Project Briefing. October 10, 2018

How to Estimate the Cost of a Medical Office Building Using Conceptual BIM (DProfiler)

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

Building Permit Application

ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV

2.3.6 Design Development

Second Avenue Subway (SAS) Project. Construction on Second Avenue. Interim Report. Prepared for: MTA Capital Construction.

Missouri Army National Guard (RTI) MOARNG Project No. T Rev. 0 Ft. Leonard Wood, Missouri 15 April 2013 Bid Final Submittal

3.6 Construction Methods

6 Preliminary Assessment of Construction Method and Constructability Issues

Energy & Data Transmission Systems for Underground Applications

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

555 Eighth Avenue (Suite 1603) New York, NY Tel: Fax:

THE GATEWAY PROGRAM. James Richter, P.E Dana Shaeffer, P.E. Number of words: 4006

Eglinton Crosstown LRT Construction Liaison Committee

Exhibit A Library Shell Construction

NEW MIDDLE SCHOOL PROJECT

BBL. Corporate Overview. National Rankings MODERN HEALTHCARE TOP DESIGN-BUILD COMPANIES 1

Stevens & Associates, Inc. Building Construction Projects. Fact Sheets

Tunnel. Immersed Tunnels

SHAFT SINKING MINE DEVELOPMENT CONTRACT MINING RAISE BORING GROUND FREEZING GROUTING

Manufacturing Facilities Proposal

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

Construction Project Briefing. May 9, 2018

Transcription:

FACT SHEET GENERAL INFORMATION The project extends the existing No.7 Line subway service via a 1.5 mile extension from Times Square to the new 34 Street Hudson Yards station located at West 34th Street and 11th Avenue, with additional train storage tracks south to West 25 th Street. This is the only station south of 59 Street to provide service west of 9th Avenue. The station is designed to handle 25,000 people in a peak hour and is anticipated to become the busiest single line station in the New York City Transit Subway system once Hudson Yards is fully developed. $2.42 billion - $2.1 billion allocated for subway related work - $266 million allocated for other infrastructure - $53 million contributed by MTA local funds for environmental studies and preliminary engineering design Funding was provided by the City of New York via the Hudson Yards Infrastructure Corporation and Hudson Yards Development Corporation. Owner: MTA New York City Transit Design and Construction Manager: MTA Capital Construction THE STATION The new 34 St- Hudson Yards station will be New York City Transit s 469 th subway station. Primary station entrance: West 34 th Street and Hudson Blvd East. Secondary station entrance: West 35 th Street and Hudson Blvd East this entrance is currently under construction. The underground station extends approximately 1,200 ft. along 11 th Avenue from West 32 nd Street to West 37 th Street. The station features high-end finishes such as stainless steel tile wall panels, painted steel ceiling panels, granite floor tile and energy efficient lighting. It is air-tempered, maintaining a year-round temperature on the lower mezzanine and platform levels between 72 and 78 degrees Fahrenheit. There are three public floors in the station: the upper mezzanine (27.6 ft. below street level), the lower mezzanine (109 ft. below street level) and the platform level (125 ft. below street level). 1

Access from the street level to the upper mezzanine at the main entrance is provided by four low-rise escalators and two staircases. An ADA elevator located in the new park outside of the main entrance provides access to the fare array area in the upper mezzanine. Upper Mezzanine Highlights: An oval shaped, stainless steel and glass Station Service Center (formerly referred to as a token booth) A Retail Concession area located behind the Station Service Center. 4 Metrocard vending machines 2 Customer Information Centers with subway and bus maps Passengers can access the lower mezzanine by 5 high-rise escalators or 2 inclined elevators. Lower Mezzanine Highlights: Length: 1,025 feet Public area: 585 feet long, 50 feet wide 24 Digital Screens for Advertising and Service Information 8 sets of stairs and 1 ADA accessible elevator provide access to the platform level. Platform Level Highlights: Column-free platform configuration. The station s platform is among the widest (36 ft.) and longest (585 ft.) in the transit system. Total On-the-Go Kiosks: 8 (to be installed: 2 at street level/station entrance, 2 in upper mezzanine, 4 on platform) Total Customer Information Panels: 6 (3 on lower mezzanine and 3 on platform) Total MTA Help Points: 10 (4 on upper mezzanine, 3 on lower mezzanine, 3 on platform) The station has the largest tunnel ventilation fans in the subway system. ELEVATORS AND ESCALATORS The station has the highest and longest escalators of any subway station in New York City Transit. Total Escalators: 9 (16 when Secondary entrance is complete) Total Elevators: 4 (2 vertical, 2 inclined) Inclined Elevators: 2 inclined elevators located on the upper mezzanine are the first of their kind for the MTA. Location: Upper Mezzanine to Lower Mezzanine Vertical distance traveled: 82 feet 2

Length of cab travel: 172 feet Elevator weight capacity: 5000 lbs. per cab Occupancy: Approximately 15 standing or 3-5 wheelchair passengers Speed: 100 feet per minute (approximately 2 minutes from door close to door open) Manufacturer: Maspero Elevatori, Italy Installer: Kone Inc., Coal Valley Illinois Cost: $2.7M (includes fabrication and installation) STATION ART Station features 2 mosaic artwork installations, one over the low-rise escalators and one ceiling dome at the center of the upper mezzanine area. The artwork, Funktional Vibrations (2014) by Xenobia Bailey, was commissioned by MTA Arts & Design following an international competition. CONSTRUCTION HIGHLIGHTS Two Tunnel Boring Machines (TBMs) manufactured in Germany by Herrenknecht were used to mine the tunnels. Length of each assembled TBM: 150 feet. Commenced mining: May 2009 Completed mining: June 2010 Disassembled and removed from site: August 2010 For the first time in the world a tunnel boring machine drilled through a "ground freeze" area while simultaneously placing precast tunnel liners. This was under 11th Avenue between West 26th and West 28th Streets. Length of each tunnel: 4,700 feet Outside diameter: 22.5 feet Finished interior diameter: 19.5 feet Controlled "drill-and-blast" methods were used to excavate the underground facilities. Total excavation resulted in over 409,000 cubic yards of rock, hauled away for various uses via 26,900 truck trips. Part of the extension was constructed under the Port Authority Bus Terminal, the world s busiest bus terminal. A cavern was blasted out under the structure to receive the TBMs as they completed drilling operations. More than 6,500 cubic yards of rock was removed. This was done safely, without disruption to the 250,000 daily bus passengers and without impeding Port Authority Bus operations. 3

The existing A, C and E subway routes, running north south under 8 th Avenue, also needed to be protected during construction of the No. 7 Line Extension. These lines, above the work area, required extensive underpinning. There were no disruptions in service to those subway lines throughout the entire construction operation. Infrastructure Highlights Route miles: 1.5 miles Track miles: 3 miles Electrical Conduits: 100 miles Other Conduits: (Communications, Signals, Traction Power) 281 miles Ductwork: 43,000 linear feet Cable: 700 miles Piping: 52,600 linear feet Interlockings: 2 (located immediately north and south of station platform) Ventilation Buildings: 4 Substations: 2 traction power, 2 facility power 4

CONTRACTS/PARTICIPATING FIRMS Designer of Record, Environmental Impact Statement, Preliminary Engineering and Final Design WSP I Parsons Brinckerhoff $174 million Award Date: September 2002 (contract still active) Dattner Architects, DPC performed the architectural work for the project as a subcontractor to WSP I Parsons Brinckerhoff. Consultant Construction Management HLH7 (Joint venture of Hill International, Inc., LiRo Engineers, Inc., Lemley International and Henningson Durham & Richardson Architecture and Engineering, P.C. $61.95 million Award Date: April 2007 (contract still active) Construction of Running Tunnels and Station Structures S3 II Tunnel Constructors (Joint venture of Shea Construction Inc., Skanska Construction, Inc. & Schiavone Construction, Inc.) $1.144 billion Award Date: November 2007 Completion Date: April 2012 Mining and Lining of Shaft/Adit and Construction of a Two-Story Ventilation Building Structure at Site L CCA/Halmar International, LLC. (Joint venture of China Construction of America & Halmar International, Inc.) $58.778 million Award Date: July 2010 Completion Date: October 2012 Excavation/Mining/Lining of Vertical Shaft, E1 and E2, Inclined Tunnels and T1 Connector Tunnel; and Construction of a Ventilation Building and Station Entrance Structure at Site J (34 th Street) Yonkers Contracting Company Inc. $121 million Award Date: October 2010 Completion Date: February 2014 Core and Shell and 11 th Avenue Viaduct Reconstruction at Site K Scalamandre/Oliveira, JV (Joint venture of Scalamandre Construction, Inc. & Oliveira Contracting, Inc.) $58 million Award Date: February 2011 Completion: November 2012 5

Finishes and Systems Skanska/Railworks, JV (Joint venture of Skanska Construction, Inc. & Railworks Transit, Inc.) $554 million Award Date: August 2011 Completion Date: Active contract This contract consisted of furnishing and installing civil improvements, utility connections, architectural finishes, structural work, elevators, escalators, HVAC, tunnel ventilation, fire protection, plumbing, electrical power and lighting, instrumentation and controls, signal, communication, and traction power systems and track work required for the utilization and occupancy of these facilities for a fully operational subway. Site P Secondary Station Entrance Core & Shell and Building Systems/Finishes John P. Picone Inc. $85 million Award Date: September 2012 Completion Date: Active contract This was the last contract awarded for the No. 7 Line Extension project. Work includes installation of structural components and building systems/finishes for the secondary entrance to the 34 th Street Station located at West 34 th and 35 th Street and 10 th and 11 th Avenues. 6