PIONEERING PELLET SOFTENING TREATMENT IN PENNSYLVANIA

Similar documents
Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY

Long Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE

NELSONVILLE WATER TREATMENT PLANT IMPROVEMENTS

MWUA 92 nd Annual February Meeting & Trade Show

Understanding Pretreatment. WesTech Engineering, Inc. Salt Lake City, Utah, USA

Zero Liquid Discharge Project Extends Potable Water Supplies

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager

Innovative Approach to Expanding the Olentangy WTP

EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY

Utility Partner Data Report

THIS POLICY DOES NOT HAVE THE FORCE OF LAW

Matt Leach, P.E. CH2M. Mark Eppich, P.E. City of Columbus Division of Water. S. Dean Ramsey, P.E. CH2M

Meeting Manganese Removal Goals: A Pilot Study

Overcoming Challenges to Achieve Optimization at the Crown Water Treatment Plant. Barbara Martin AWWA Mark Petrie Cleveland Water

SECTION 6.0 DESIGN CRITERIA, LAYOUTS, & HYDRAULICS

CONTRAFAST. High-Rate Thickening Clarifier

Trident. Package Water Treatment System

Amherst, MA, Drinking Water System

WEFTEC.06. Lake Okeechobee, Actiflo, peroxone, surface water, Cyanobacteria

Water Treatment Plant Design at the Idaho Cobalt Project

Cartwright Consulting Co.

Cartwright Consulting Co.

St. John the Baptist Parish

TTHM Reduction Corrective Action Update 1 st Progress Meeting October 18, Robert Horvat, P.E x1501

Cover. Pressure Filters

Cover. Pressure Filters

Engineering Request for Qualifications (RFQ) BJWSA Project CIP #1366 Purrysburg WTP Expansion to 30 MGD Engineering Contract

Ali Leeds, MWH Austin Peters, MWH

Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting

Expanding Capacity and Treatment. Treatment Plant

CEE 371 Water and Wastewater Systems

Commercial. Softeners Filters Reverse Osmosis

Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings

Submerged Membranes to Replace Media Filters to Increase Capacity 4X for a Small Community. Richard Stratton, PE HDR Engineering, Inc.

DW Module 22 Inorganic Removal Basics Answer Key

Silver Lake WTP Clearwell Part 2 The Tracer Study PHOTO OPTIONAL. NEWWA 2009 Spring Joint Regional Conference and Exhibition The Value of Water

Hybrid RO & Softening Birjand Water Treatment Plant

Mike Nixon, E.I. Phil Locke, P.E.

City of Boca Raton s NF Plant: A Plant History

Producing High-Purity Recycled Water for Industrial Applications with Microfiltration and Reverse Osmosis: Lessons Learned

Brackish Desalination: Zero Discharge. Thomas F. Seacord, P.E.

PNW AWWA Conference 2009 Todd Reynolds, PE, BCEE

CITY OF SUMNER: CENTRAL WELL DEVELOPMENT

AD26 Systems for Iron, Manganese, Sulfide and Arsenic Removal

City of Davis Introduction of Surface Water. Community Meeting May 5, 2016

Case history on the reduction

Granular Activated Carbon System

UNIT WELL 15 VOLATILE ORGANIC COMPOUND (VOC) MITIGATION

April 28 th, Cambria County, Pennsylvania

Utility Partner Data Report

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv

IMPLEMENTING COMPRESSIBLE MEDIA FILTRATION FOR SPRINGFIELD S WET WEATHER MANAGEMENT PROGRAM

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E.

Avon Lake Corrosion Control Study and Orthophosphate Implementation. Andrew Skeriotis, Stantec Greg Yuronich, Avon Lake Regional Water

How are they doing? Check-up on the Enaville and Glenns Ferry Microfiltration WTPs

Amesville Water System

Woodford County Health Department 1831 S. Main Street, Eureka, IL Phone: (309) Fax: (309)

Water Treatment & Purification Chemicals

biologically active filtration

Pilot Study Report. Z-92 Uranium Treatment Process

Integrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant

POREX Tubular Membrane Filter (TMF ) Applied in a ZLD System as Critical Solid/Liquid Separation Process

DRINKING WATER CONSTRUCTION PERMIT APPLICATON

PUR-1241 ADDENDUM NO. 2 INVITATION TO BID GREENSAND FILTER SYSTEM AT ELK RIDGE WATER TREATMENT PLANT

Fridley Filter Plant Rehabilitation

REQUEST FOR PROPOSALS DESAL ANTISCALANT/CLEAN-IN-PLACE CHEMICALS BID NO: ADDENDUM 1

APPENDIX B THE MUNICIPAL AUTHORITY OF THE TOWNSHIP OF ROBINSON DESCRIPTION OF THE AUTHORITY ' S WATER AND SEWER SYSTEM AND FINANCIAL INFORMATION

Comparing Carbons for Disinfection Byproduct Control. Maggie H. Pierce, EI Sara N. Gibson, PE Mark M. Bishop, PE David S.

Well Water Quality Update and Next Steps. Public Works Commission Meeting April 17,

DRAFT July 26, Engineer s Report Water Softening Alternatives for Boyack Road Water Treatment Plant. Town of Clifton Park, New York

13. High Rate Filtration Process

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

Evaporative Condenser Passivation. Cameron Klein Strand Associates, Inc.

3/25/2015. MARCH 24, 2015 Chad T. Olsen, P.E., BCEE. WRWA 27 th ANNUAL TECHNICAL CONFERENCE. City of Chilton, Wisconsin. Chilton.

EVALUATING ALTERNATIVES FOR DISPOSING OF WATER PLANT SOLIDS INTO A WASTEWATER PLANT

Membrane Technology: From Manufacture to. May Production

MAKING THE SWITCH FROM LIME TO MEMBRANE SOFTENING: WHEN IS IT THE RIGHT TIME? Introduction

Disinfection By-Products Reduction and SCADA Evaluation and WTP Sludge Removal System and Dewatering Facility

Ohio Section AWWA NW District Fall Meeting April 20, City of Delaware Water Plant Improvements

Rectangular Basin = Volume, gal (Length, ft) x (Width, ft) x (Height, ft) x7.48 gal/cu.ft.

Side by Side Piloting of Process Alternatives Yields Direct Performance Comparison

Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013

Rapid Sand Filtration: Laboratory Analysis and Profiling

Hetch Hetchy Treatability at the Sunol Valley Water Treatment Plant

Jungzhina Water Treatment Plant Thimpu, Bhutan

Beginning the Treatment Journey

Oakland Storage. in Oakland. part of the. Water water. being. Demand. Treatment. Required Storage (gallons) Population. Condition.

Zero Blowdown Technology - ZBT Arizona Transportation Center

Summary of Flint s Implementation of Veolia s Recommendations

R & R IDENTIFICATION CO.

ISR (IRON SPECIFIC RESIN)

Treatment Technologies

DW Module 21: Chemical Addition Answer Key- Revised Oct 2015

Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado

Process Treatment Selection and. Jeff Macomber, P.E. One Water Conference August 28, 2014

Water Fit for Use. Avoiding the Unintended Consequences of Good Intentions

City of Gardiner, Maine Wastewater Committee Meeting. CSO Storage Tank & Screening Evaluation

SPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S

Water Treatment Overview. Gabe Sasser December 2016

FILTRATION INDUSTRY -An Overview

Transcription:

PIONEERING PELLET SOFTENING TREATMENT IN PENNSYLVANIA April Winklmann Authority Manager, MTJMA Jared Hutchins Engineering Manager, Black & Veatch

AGENDA Project Background and Drivers Process Equipment Procurement and Facility Design Construction Update 2

PROJECT BACKGROUND AND DRIVERS APRIL WINKLMANN AUTHORITY MANAGER, MTJMA 3

Manor Township Joint Municipal Authority (MTJMA) Armstrong County, PA 5 staff Customers: Manor Township, Manorville Borough, and Ford Cliff Borough, as well as some areas of Rayburn, Bethel, Valley, and Kittanning Townships +2 Consecutive Systems 4

Project Drivers Brine discharge from current ion exchange process to be discontinued Lack of redundancy at existing WTP No clearwell at existing WTP Aging WTP infrastructure Limited ability to expand for future demand Additional demand by consecutive systems Black & Veatch 6

Pellet Softening Enters the Picture April Winklmann hired as MTJMA Manager in 2012 Prior investigation of process for manganese removal Recommended the process be investigated for calcium hardness Pilot Study in 2012 Double blind taste test RFP for Engineering Services Open communications with PADEP Black & Veatch 7

Technology Evaluation Technology Evaluation by Black & Veatch in 2014 Proven technology capable of meeting performance requirements Pool of qualified vendors Pellet Softening Technology Recommended for Detailed Design 8

Challenges - Timing Condition of existing plant New consecutive system being built simultaneously Timing of changes from old plant to new plant and well pump selections Black & Veatch 9

Challenges Facility Space & Existing Conditions Limited space at existing WTP Three of four wells at WTP site Residential setting Soil conditions Varied size of pellet softening equipment Black & Veatch 10

Challenges Budget Anticipated rate increases PennVest Loan ~$8.5M, Project at over $9M Black & Veatch 11

Challenges Board Acceptance Taste is important! Resistance to chemical usage Clearwell, wet well, pumping modification Cost and rates Black & Veatch 12

Challenges Staff & Technology Previously unseen technology for veteran employees Young staff, still gaining experience Limited training/coursework availability Black & Veatch 13

Challenges Other Ability to start and stop operations Caustic injection point Lime requirement from pilot would have changed outcome High freezing points for caustic and sulfuric acid Recarbonation vs. sulfuric acid Gravity vs. pressure filter Black & Veatch 14

PROCESS EQUIPMENT PROCUREMENT & FACILITY DESIGN JARED HUTCHINS ENGINEERING MANAGER, BLACK & VEATCH 15

WTP Design Flows and Anticipated Raw Water Quality Average Day Maximum Day Current 0.6 MGD 1.3 MGD Design 0.6 MGD 1.4 MGD Future 1.4 MGD 2.1 MGD Black & Veatch Parameter Average Range ph (standard units) 7.5 7.3 7.6 Alkalinity (mg/l as CaCO3) 115 90-150 Calcium Hardness (mg/l as CaCO3) 160 110-200 Total Hardness (mg/l as CaCO3) 210 130-280 Iron (mg/l) 0.25 <0.02 1.97 Manganese (mg/l) <0.02 <0.02 0.04 16

Basis of Design 1.4 MGD initial capacity Expandable to 2.1 MGD New facility located adjacent to existing WTP Raw water feed from four existing wells 17

Process Schematic SAND & SODIUM HYDROXIDE SULFURIC ACID SODIUM HYPOCHLORITE BACKWASH PUMPS WELL PUMPS REACTOR PELLET DISCHARGE Procured Equipment FILTER SPENT FILTER BACKWASH CLEARWELL HIGH SERVICE PUMPS Black & Veatch 18

Equipment Procurement STSFE Conical Pellet Softening Reactors Horizontal Enclosed Filters Ancillaries, Controls Pump Units Startup, Commissioning & Training Support, Performance 19

Site Location Black & Veatch 20

Site Plan Black & Veatch 21

Process Layout Black & Veatch 22

Building Configuration Black & Veatch 23

Pellet Softening Reactors CATALYST BED OUTLET & OVERFLOW (BACKSIDE) 0.7 MGD per unit 2 units, space for a third 8.5 ft diameter 24.5 ft in height CHEM FEED SAMPLE PORTS Supplied by WesTech 24

Filter Vessels 2 filter cells per vessel 2 vessels installed initially, space for future third Two vessels rated for 1.4 MGD with one cell in standby Dual medial with anthracite and sand Supplied by WesTech 25

Sand Feed Seed material for pellet generation Fine silica sand Initial loading, then periodic recharge after blowdown Sand slurry injection with plant service water Vertical Reciprocating Conveyor promotes sand recharge from top 26

Chemical Feed Systems Caustic, Sulfuric Acid by STSFE Supplier Sodium Hypochlorite Feed System Provisions for chemical deliveries Chemical pipe flushing Containment drains 27

Pellet Discharge Slurry discharge to Indoor Pellet Drainage Area Discharge based on operational experience Discharge pellets for reuse in agricultural applications 28

Filter Backwash Backwash Holding Tank Gravity setting Pumps recycle up to 10% of process flow to head of WTP 31,200 gallon capacity 1.65 to 3.34 backwash cycles 29

Disinfection Two independent clearwells and wet well providing ~300,000 gal 12.5% concentration sodium hypochlorite delivered by PD peristaltic tube pumps 30

CONSTRUCTION UPDATE APRIL WINKLMANN AUTHORITY MANAGER, MTJMA 31

Construction Team General Thomas Construction, Inc. HVAC East West Manufacturing Plumbing Enders Plumbing, Inc. Electrical Bronder Technical Solutions MTJMA Owner/Inspector Black & Veatch Construction Administration Total Construction Contract Award $8.4M Black & Veatch 32

Construction Schedule Notice of Award 2/18/16 Construction NTP 4/11/16 Substantial Completion 7/14/2017 Final Completion 8/14/2017 33

Pellet Softening and Filtration Process Areas

Backwash Holding Tank

Pellet Softening Reactors Set

Filter Units and Piping

Backwash Pumps

PEMB In Progress

Upcoming Milestones PEMB Installation April 2017 New Well Pumps May 2017 New Plant Startup and Commissioning Aug/Sept 2017 New Plant Online Sept 2017 40

Contact Us April Winklmann Authority Manager 2310 Pleasant View Dr., Ford City, PA 16226 P: +1 724-763-2511 E: awink.mtjma@windstream.net W: www.mtjma.com Jared Hutchins Engineering Manager 4555 Lake Forest Dr., Ste. 310, Cincinnati, OH 45242 P: +1 513-936-5137 E: HutchinsJC@bv.com Learn more at bv.com.

Learn more at bv.com.