An indicative program for works to be conducted within the Sydney Park construction compound is provided in Table 6-20.

Similar documents
Construction Contaminated Land Management Plan

Construction Contaminated Land Management Plan

REPORT Condition D19 Permanent Noise Barriers

Six above ground substations would be constructed for the project. The construction methodology for these facilities would typically involve:

SEARs project justification and conclusion

18 Flooding and drainage

(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

The following hazards and risks may be associated with the project during construction:

6 Preliminary Assessment of Construction Method and Constructability Issues

The HKIE Structural Examination Written Examination

3 TUNNEL PORTALS AND DIVE STRUCTURES

SEARs climate change risk and adaptation

MCKAYS CREEK HYDRO-ELECTRIC POWER SCHEME ENHANCEMENT FEASIBILITY AND SCOPING REPORT PREPARED FOR SCHEME RECONSENTING

14.0 MONITORING AND CONTINGENCY 14.1 Effects Monitoring

29 Environmental risk analysis

PROJECT DESCRIPTION CONSTRUCTION

NZQA Expiring unit standard version 3 Page 1 of 6

4.0 CONSTRUCTION METHODS AND ACTIVITIES

Secretary s environmental assessment requirements Sustainability. Where addressed

Shallow Cover Tunnel Under Heritage Listed Brick Buildings: Brisbane Boggo Road Busway Tunnel

DETROIT RIVER INTERNATIONAL CROSSING STUDY MAG

Hydraulic Excavators

Pipe Jacking Association: Introduction Presentation. Lecture notes. Slide 1. Slide 2

Appendix 15 Estimated costs of dams

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Roads and Maritime Services

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B

CHAPTER 11: WALLS.

3.6 Construction Methods

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

Eglinton Crosstown LRT Construction Liaison Committee

EXECUTIVE SUMMARY. Figure 1 - Rail Deck Park Study Area. Executive Summary Rail Deck Park Engineering & Costing Study Report Page 1 of 10

Section 9: Sand Mounds. 9. Sand Mounds

NOTICE OF A PROPOSED CHANGE TO AN APPROVED DEVELOPMENT

Management Plan: Hazardous Materials Removal & Demolition

COMMON WORK RESULTS FOR EXISTING CONDITIONS SCHEDULES FOR EXISTING CONDITIONS

Learning Legacy Document Duration of data recorded (approx.) 1

introduction Introduction to Bridge and Tunnel Engineering Characteristics of ideal bridge Ideal location Factors affecting bridge type Classification

Construction Technology B (CON4313)

Requirements for Measuring and Pricing of Site Clearance

Chapter 3: Permit Procedures and Requirements

Save time. Save money. Specify a fast, economical Vist-A-Wall MSE. fast and easy to install. They adapt well to curves, angles and

Details of the Proposed Action

ROTARY DRILLING TECHNIQUES LARGE DIAMETER

Construction of a Semi-Buried Building A Super-sized Shopping Mall : The Festival Walk

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

Construction Spoil Management Plan

BUILDING THE MERSEY GATEWAY a step by step guide

WASTE MANAGEMENT CHAPTER TWENTY-FOUR

ENGINEERING DIRECTIVE

Annex F Scoping Checklist

Temporary Watercourse Crossing: Fords

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer

Large-diameter bored piles and Large-hole drillings Applications

Dry structural excavation is usually done with front-end loaders, bulldozers or backhoes.

E. CONSTRUCTION PROCEDURES

An Introduction to. By Michael L. Schumaker, P.E. An Introduction to Shaner Industries Metal Foundation System

Environmental Assessment Chapter 8 Surface Water

SECTION GENERAL EXCAVATION

SECTION SOILS REPORT

Civil Engineering Construction I (CBE5031)

Kiewit Approach for Tunnel Stabilization and Sewer Pipeline Replacement Project

21 July Anthony Yeates RATCH-Australia Corporation Limited Level 7, 111 Pacific Highway North Sydney NSW 2060

Annex L. Project Risk Analysis Matrix

Earthwork Methods - Introduction. 1 Phase 1, Month 2

Stage 2: WestConnex M5 King Georges Road Interchange Upgrade. Appendix B7 Construction Waste Management Plan

WEIGHBRIDGE FORMAT SPECIFICATIONS

Detailed Estimating-Introduction. Dr. Al-Hammad

SECTION TRENCHING

APPENDIX N RICHARD SIMONDS GROUNDWATER REPORT

Red and Purple Lines Update

VOLUME IV DESIGN AND OPERATIONS REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE

17 Contamination. in the Technical working paper (Contamination)

The HKIE Structural Examination Written Examination 2017

Modular System Advantages

(Old examination format for reference only)

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

Patons Lane CLC Meeting

Description Accessibility Standards. University of Toronto

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION

New M5. Appendix U. Environmental Impact Statement. Detailed greenhouse gas calculations

Misan University - College of Engineering Civil Engineering Department

GRADING, EROSION AND SEDIMENTATION CONTROL

Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

REPORT. Review of Application TE KUHA MINE. 22 December Submitted to: Department of Conservation 10 Sewell St Hokitika 7810

Appendix. Groundwater impact assessment

Contaminated Land Management

Section 8: Amended Soil Mounds. 8. Amended Soil Mounds

SPECIFICATION FOR ENGINEERED FILLS

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment

Ground Freezing for Tunnel, Shafts, and Adits

Diaphragm wall Construction

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

- Earthwork Operations & Equipments

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description.

Technical Data

Carpinteria Avenue Bridge Replacement Project Description Introduction

Annex V Concrete Structures Removal Plan

Temporary Watercourse Crossing: Culverts

Transcription:

The land required for the Sydney Park construction compound would be used temporarily throughout construction only. The construction compound site would be rehabilitated at the completion of construction, with the exception of the areas of land required permanently for the footprint of the bridge and pedestrian and cycle paths. An indicative program for works to be conducted within the Sydney Park construction compound is provided in Table 6-20. Table 6-20 Construction activity Site establishment Construction of shared path and bridge Demobilisation and rehabilitation Indicative program for the Sydney Park construction compound (C14) Indicative construction timeframe 2017 2018 2019 WestConnex New M5 6-33

(blank page) WestConnex New M5 6-34

(blank page) WestConnex New M5 6-36

(blank page) WestConnex New M5 6-38

(blank page) WestConnex New M5 6-40

(blank page) WestConnex New M5 6-42

(blank page) WestConnex New M5 6-44

(blank page) WestConnex New M5 6-46

(blank page) WestConnex New M5 6-48

(blank page) WestConnex New M5 6-50

(blank page) WestConnex New M5 6-52

(blank page) WestConnex New M5 6-54

(blank page) WestConnex New M5 6-56

6.5.4 Tunnelling Construction of the project tunnels would require excavation, civil finishing works and fit-out with operational systems. Tunnel excavation The project would involve tunnel excavation for: The main alignment tunnels (two tunnels each about nine kilometres in length), including the St Peters caverns and the southern extension caverns Cross passages between the mainline tunnels at approximately 120 metre spacing for emergency pedestrian egress Vehicular cross passages Low point sumps On-and off-ramps Stub tunnels for future connection to the possible future M4-M5 Link and the possible future Southern extension. The depth of the main alignment tunnels would vary depending on geological constraints. The maximum depth of the tunnels would be about 80 metres below the ground surface, with shallower sections on the approach to the western and eastern tunnel portals. Tunnel excavations would be carried out with roadheaders. A roadheader is a machine which comprises a boom-mounted rotating cutter head on track-mounted frames and a loader device (usually on a conveyor). Roadheader excavation method is illustrated in Figure 6-17. Rock breaking and controlled blasting would be used in some areas of the tunnel excavation to improve the efficiency of excavation activities and shorten the overall excavation program. Areas that are likely to require controlled blasting would be confirmed during detailed design and refined where necessary in response to geological conditions experienced during construction. It is anticipated that controlled blasting would be suitable for cross passage and bench excavations throughout the project. Roadheaders would be launched from: The Kingsgrove North construction compound (C1) The Commercial Road construction compound (C3) The Bexley Road North construction compound (C4) The Bexley Road South construction compound (C5). The Arncliffe construction compound (C7) The Canal Road construction compound (C8). The installation of ground support, including structural lining would be carried out progressively as the roadheaders advance. Two types of structural lining would be used for the project, depending on the local geology. In relatively dry sections of tunnel (namely areas of sandstone), ground support would consist of corrosion-protected rock bolts and a primary (permanent) shotcrete lining. In wet sections of the tunnel (mostly areas of shale and shallow areas above sandstone), ground support may consist of temporary rock dowels, an initial shotcrete lining with a membrane and a secondary shotcrete lining. The tunnel cross section would be a relatively flat arched profile. The arch profile would vary slightly depending on the local geology. Indicative dimensions of the main alignment tunnels (without fit-out) are summarised in Table 6-21. WestConnex New M5 6-57

Table 6-21 Indicative tunnel dimensions Tunnel section Width tunnel floor (metres) From the western portals to the southern extension caverns. From the southern extension caverns to the St Peters caverns. M4-M5 Link and Southern extension stub tunnels. Width arched tunnel roof (metres) Height (metres) 12.4 14.1 6.5 16.9 19.4 7.3 12.4 14.1 6.5 Areas with breakdown bays. 14.5 18.7 7.1 Note: indicative tunnel dimensions are within Hawkesbury Sandstone and without tunnel fit-out. Widths and heights may vary locally along the length of the project due to geological constraints, and areas where additional tunnel features are present. To accommodate traffic line of sight requirements and enlargements of egress tunnels and emergency breakdown bays, some sections of the project tunnels would be widened beyond these standard widths. In addition to the space required for the traffic envelope, the tunnels would also provide space required for tunnel services, including deluge systems, drainage infrastructure, communications cables, mechanical and electrical equipment, incident response infrastructure and ventilation infrastructure. Pedestrian and vehicular cross passages would be excavated between the main alignment tunnels at regular intervals. These cross passages would be excavated using either, roadheaders, excavators and blasting. Tunnel civil finishing works On completion of the tunnel excavation, civil finishing works would be carried out, including the installation of: Roadway drainage Road pavement Road furniture Electrical substations Low point sumps Cross passages, including electrical rooms Emergency smoke extraction outlets. Tunnel fit-out Tunnel excavation and civil finishing works would be followed by fitting out the tunnel with operational infrastructure. This would include power, ventilation, fire safety systems, communications infrastructure, traffic control, tunnel lighting and the operational management control systems and secondary tunnel lighting (refer to Section 5.8.2). WestConnex New M5 6-58

TUNNEL EXCAVATION METHOD - PLAN Articulated dump truck Spoil conveyor Road header Cutting wheel Spoil conveyor Cutting wheel Articulated dump truck Road header TUNNEL EXCAVATION METHOD - ELEVATION Articulated dump truck Spoil conveyor Road header Cutting wheel Figure 6-17 Conceptual road header excavation method

(blank page) WestConnex New M5 6-60

6.5.5 Other bulk earthworks In addition to tunnel excavation, bulk earthworks would also be required for: Cut and cover structures Landfill closure Surface road works. Cut and cover structures Cut and cover is a tunnel excavation methodology that involves excavation downwards from the surface of the ground, installation of a roof structure across the top of the excavation, and backfilling with spoil or other material. Three cut and cover structures would be constructed for the project: The western main alignment tunnel portals The eastern main alignment tunnel portals The structure beneath Campbell Road as part of the potential future connection with the possible future M4-M5 Link. Typical construction activities associated with the construction of these structures would include: Piling works Construction of capping beams Excavation Installation of temporary and permanent roof beams Installation of permanent struts and form, reinforcement and pouring of whalers Form, reinforcement and pouring of base slab Finishing works. The Campbell Road cut and cover structure would be constructed to provide a connection between the St Peters interchange and future M4-M5 Link. The cut and cover structure would be constructed as part of the project to avoid repeated disruption of Campbell Road with the future construction of the future M4-M5 Link. The northern and southern sections of the cut and cover structure would be constructed offline, and the section of cut and cover immediately below Campbell Road would be constructed simultaneously with the upgrades to Campbell Road as part of the local road upgrades. Landfill closure Earthworks within the St Peters interchange site as part of the closure of the Alexandria Landfill would include constructing a raised and vegetated containment mound in the south-western portion of the site. The mound would contain around 70,000 cubic metres of material excavated from a stockpile in the north-western corner of the Alexandria Landfill site. The construction of the containment mound would be staged, with the final form of the mound being around 25 metres AHD and would be the highest point of the final landform within the St Peters interchange. The location of the stockpile mound is shown on Figure 5-46. Across the Alexandria Landfill site, about 620,000 cubic metres of material would be cut during construction and an estimated total of about 556,000 cubic metres would be filled. The volume of cut material is expected to be compacted by about 10 per cent, resulting in a balanced cut and fill across the site. The classification, management and treatment (if required) of this material is described in Section 17.3.4 of Chapter 17 (Contamination) and Chapter 24 (Resource use and waste minimisation). WestConnex New M5 6-61

Surface road works Earthworks would be required for the construction of aboveground sections of the project, including the western surface works, St Peters interchange and local road upgrades. Earthworks would be completed using conventional road construction methodologies including: Vegetation clearance and topsoil stripping. Mulched vegetation would be stockpiled for later reuse in site rehabilitation and landscaping works Areas of new cut and fill to design levels, including the construction of retaining walls Installation of road drainage infrastructure A Landfill Closure Management Plan is included in Appendix F (Landfill Closure Management Plan). 6.5.6 Landfill closure The Alexandria Landfill site was acquired by the NSW Government in December 2014 and the operations of the previous landowner ceased at that time. Activities consistent with the existing planning approvals are continuing on site. Typical continuing operations include: Sorting through the various stockpiles of waste and materials stored for resource recovery Evaluating opportunities to recycle and/or recover materials for reuse Processing of materials scheduled for reuse Removing and disposing of waste materials assessed to be unsuitable for recycling/reuse, to the landfill, or to another suitably licensed landfill facility in accordance with EPA requirements Stabilisation of a cliff face landslip. A landfill closure management plan has been prepared for the project, in consultation with the EPA. Closure of the Alexandria Landfill would involve: Bulk earthworks to prepare the site for construction of the St Peters interchange Installation of a capping layer Installation of a cut off wall to minimise inflow from the Botany Sands aquifer Upgrade of the leachate management system Installation of a landfill gas collection and management system Installation of a groundwater management system. Bulk earthworks Earthworks within the St Peters interchange site as part of the closure of the Alexandria Landfill would include constructing a raised and vegetated containment mound in the south-western portion of the site. More information about the earthworks activities to be undertaken for the closure of the Alexandria Landfill is provided in Section 6.5.5. The classification, management and treatment (if required) of this material is described in Section 17.3.4 of Chapter 17 (Contamination) and Chapter 24 (Resource use and waste minimisation). WestConnex New M5 6-62

Landfill capping Landfill capping would include: Preparatory works including clearing and levelling the ground surface, where required Installation of landfill capping layers, in accordance with the landfill closure management plan. This would include the installation of the subsurface drainage and gas collection systems, where required Land forming works to the final landform for the site, in accordance with the landfill closure management plan Stabilisation and revegetation of the new ground surface. Additional detail regarding the landfill capping system is provided in Section 5.9 and Section 17.3.4 of Chapter 17 (Contamination). Leachate management system The existing leachate management system across the Alexandria Landfill site would be retained and augmented where required to suit the final landform of the site. Upgrades to the existing leachate management system are occurring under existing consents. Augmentation of the existing leachate system as part of the project would include the installation of a new leachate barrier underneath the containment mound, upgrades to the leachate collection and transfer system and the construction of a new leachate treatment plant. The leachate collection, management and treatment system is summarised in Section 5.9.3 and detailed in Section 17.3.4 of Chapter 17 (Contamination). Construction activities to be undertaken as part of the works to the leachate management system within the Alexandria Landfill site would include: Installation of leachate barrier as part of the containment mound in accordance with the specifications prescribed in the Alexandria Landfill closure management plan Upgrades and augmentation of the existing leachate collection system throughout the site, including the leachate collection pipework Installation of new leachate drainage network in accordance with the landfill closure management plan, including a system of feeder and collector pipes and three leachate collection sumps Decommissioning of the existing leachate treatment plant Removal of redundant infrastructure off-site Extension and augmentation of the existing sump and well riser, and connection into the new leachate management network Construction of a new leachate treatment plant, including: Excavation, footing and base slab installation with retaining walls as required Construction of a building to house the leachate treatment plant, including construction of blockwork walls, erection a roof and columns and enclosure of building with precast walls and lightweight cladding Internal fit-out of treatment plant, including the installation of nine storage tanks, polymer blender and dosing system, dewatering screw press, sludge bun, plant control room and operations room. Gas collection and management system The gas collection and management system as part of the closure of the Alexandria Landfill would comprise both active and passive components (refer to Section 5.9). WestConnex New M5 6-63

The construction of the gas collection and management system would include: Drilling and installation of around 30 vertical gas extraction wells and 30 gas extraction well heads for the active gas collection system to an average depth of about 10 metres below the ground level Trenching and installation of gas collection trenches underneath the landfill capping layer Drilling and installation of around 40 passive gas vents Trenching and installation of pipework to connect the extraction wells with the flare Construction and installation of four wellhead stations Construction of a gas flare, including fencing controls for safe access Drilling and installation of between 40 and 100 subsurface gas monitoring wells around one metre below ground level Decommissioning and disposal of redundant gas collection and management system. Additional detail is provided in Section 17.3.4 of Chapter 17 (Contamination). Groundwater management system A sub-surface cut-off wall would be installed along parts of the western, eastern and southern boundary of the landfill site. The cut-off wall would be about 10 to 12 metres deep and would replace the existing groundwater extraction system within the site. Depending on the final location and ground conditions, the cut-off wall would be constructed by one of two ways: Excavation of a trench and construction of a bentonite clay slurry wall Sheet piling of a pre-fabricated cut off wall. The final construction methodology for the cut-off wall would be confirmed during detailed design. Additional detail regarding the management of groundwater for the project is provided in Section 17.3.4 of Chapter 17 (Contamination) and Chapter 19 (Groundwater). 6.5.7 Construction of permanent operational infrastructure As detailed in Section 5.1, permanent operational infrastructure would be required for the ongoing management and operation of the project. This operational infrastructure would be mainly located in five motorways operations complexes: The Kingsgrove motorway operations complex (MOC1), to be constructed on the site of the Kingsgrove South construction compound (C2) The Bexley Road South motorway operations complex (MOC2), to be constructed on the site of the Bexley Road South construction compound (C5) The Arncliffe motorway operations complex (MOC3), to be constructed on the site on the Arncliffe construction compound (C7) The St Peters motorway operations complex (MOC4), to be constructed on the site of the Canal Road construction compound (C8) The Burrows Road motorway operations complex (MOC 5), including the New M5 motorway control centre, to be constructed on the site of the Burrows Road construction compound (C11). WestConnex New M5 6-64