P. 1. Identify the Differences between ISO9001:2000 與 ISO9001:2008 ISO9001:2008 ISO9001:2000 版本的異同. 5 January 2009 ISO 9000 SERIES

Similar documents
Main changes to ISO 9001 from the 2000 version to the 2008 version

Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry

ISO9001:2008 SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM SYSTEM KARAN ADVISER & INFORMATION CENTER

Abacus Quality Training Services Inc. (AQTS Inc.)

INTERNATIONAL STANDARD

VINÇOTTE INTERNATIONAL

INTERNATIONAL STANDARD

ISO/DIS9001:2008 VS ISO9001:2000. Speaker: Ir. Dr. Aaron TONG Date:

MALAYSIAN STANDARD. Licensed to UNIMAP LIBRARY / Downloaded on : 22-Dec :14:03 PM / Single user license only, copying and networking prohibited

Machined Integrations, LLC

MALAYSIAN STANDARD QUALITY MANAGEMENT SYSTEMS - REQUIREMENTS (FIRST REVISION) (ISO 9001:2008, IDT) (PUBLISHED BY STANDARDS MALAYSIA IN 2009)

CHAPTER 8 INTEGRATION OF QMS AND LMS

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER

INTERNATIONAL STANDARD

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

OPERATIONS MANUAL ISO 9001 Quality Management System

Welcome! ISO9001:2008 Information Session

Sensor Scientific, Inc.

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

UPGRADE ASSESSMENT CHECKLIST

ISO9001 QUALITY POLICY MANUAL

Quality management systems Requirements

The following is an example systems manual from a low volume (TE, but not an automotive supplier) company.

APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

SYSTEMKARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM ISO9001:

QMS Team: MR and all HODs (Internal Auditors) MR March 10. Quality policy Define quality policy The Steering committee Objectives and targets

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy

Proprietary Document Disclosure Restricted To Employees and Authorized Holders

Quality System Manual

ISO 9001:2015 AWARENESS

25 D.L. Martin Drive Mercersburg, PA (717)

Comparison Matrix ISO 9001:2015 vs ISO 9001:2008

ISO 9001:2000 The International Quality Management Business System

Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008

4. Quality Management System 4.1 GENERAL REQUIREMENTS

<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By

ISO 9001:2015. Quality Management System. Manual

Railroad Friction Products Corporation

CORPORATE MANUAL OF INTEGRATED MANAGEMENT SYSTEM

Herndon, Virginia l

ISO/TS TECHNICAL SPECIFICATION

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

AS 9100 Rev C Quality Systems Manual AS-050C-QM

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

Quality Systems Manual

Awareness to ISO 9001:2000

9110 Correlation matrices

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

RULES FOR A QUALITY STANDARDS SYSTEM (QSS) IN MARITIME ACADEMIES/INSTITUTIONS

CAPITAL AVIONICS, INC. Quality Manual

Eagle Machining, Inc.

ISO 9001:2015 Readiness Review

Quality Commitment. Quality Management System Manual

Correlation Matrix & Change Summary

Continental Steel & Tube Co. Quality Manual

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler.

Stanley Industries, Inc. ISO 9001:2008 Quality Policy Manual

External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No. Yes PROPRIETARY DOCUMENT No

DOCUMENT NO: QM-01 TITLE: QUALITY MANUAL TOTAL PAGES: 39 PREPARED BY: Barry Scott INITIAL ISSUE: REVISION DATE: 3/1/13 REVISION NO: 28

ISO9001:2008. Quality Manual. Hyundai Heavy Industries South Huron Drive Santa Ana, CA USA. Quality Manual QM001 Revision A Page 1

Document: ISO/TC 176/SC 2/N 730. Our ref

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

SUPPLIER SURVEY FORM Instructions

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

Atlantic Technical Systems, Inc. 415 Headquarters Drive # 2 Millersville, MD USA Office: (410) Fax: (410)

DOCUMENTATION FOR QUALITY MANAGEMENT SYSTEM AS PER IS/ISO 9001 : 2015

ISO 9001:2000 Revision G

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24

Quality Assurance Manual, Revision F Page 1 of 20

UNIT 10 CLAUSE-WISE INTERPRETATION OF ISO 22000: 2005

ISO/DIS 9001: 2014 comparison with ISO 9001:2008. ISO 9001:2015 Updates. (Based on Draft International Standard, DIS) ISO/DIS 9001 ISO 9001:2008

QUALITY SYSTEM MANUAL

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing

UNCONTROLLED DOCUMENT

Supplier Quality System Survey

Harmony Castings LLC Aluminum V-Process Castings Quality Manual Section: Page 1 of 27

Clause Map IATF 16949:2016 to ISO/TS 16949:2009

AAMI Quality Systems White Paper

Monroe Engineering is committed to customer satisfaction; we strive for Continuous Improvement in our products and our people.

PRINTED COPY IS NOT CONTROLLED

IMPLEMENTATION OF ISO 9001:2008 PARTICULAR ASPECTS

Mapping ISO/IEC 27001:2005 -> ISO/IEC 27001:2013

Vendor Qualification Survey

Quality Systems Manual Rev. NC Issued July 9 / 2018

AEROSPACE STANDARD. (R) Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations RATIONALE

Quality Manual. AARD Spring & Stamping Quality Manual

ISO 22000:2005 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER FOOD SAFETY MANAGEMENT SYSTEM ISO 22000:2005

QUALITY MANUAL. This document defines the requirements, processes, structure and documentation for the Teledyne DGO Quality Management System.

Reference Paragraphs. Appendix B AQS Auditor Handbook

Quality Manual In support of ISO 9001:2015 ANSI/NCSL Z , ISO/IEC17025 ISO10012

Quality Manual ISSUED JANUARY Approved By: January 12, 2004 (President & Chief Executive Officer)

ISO 9001:2008 Quality Management System QMS Manual

ISO 9001 PMA and 14 CFR 21 QUALITY POLICIES HANDBOOK

1050 Day Hill Road Windsor, Connecticut Telephone (860) Fax (860) SUPPLIER SURVEY DATE OF SURVEY TYPE OF SURVEY

Pre Audit Transition Gap Analysis QMS and EMS

PRECISION SENSORS QUALITY ASSURANCE MANUAL THIS DOCUMENT IS CONTROLLED ONLY IF COPY IS STAMPED CONTROLLED IN RED INK

Quality Manual ISO 9001:2015 Quality Management System

PRECISE INDUSTRIES INC. Quality Manual

Transcription:

Identify the Differences between ISO9001:2000 and ISO 9001:2008 審視 ISO9001:2000 與 ISO9001:2008 版本的異同 ISO 9000 SERIES ISO 19011 ISO9000 5 January 2009 ISO9001 ISO9004 2 ISO 9000 SERIES ISO 9001 ISO 9000 Family amendment history Definition Specification Guidance 1982 - Work started 1987 - First publication ISO 9001:1987 1994 - Second edition ISO 9001:1994 ISO8042:1986 ISO9001/2/3:1987 ISO9004:1987 2000 Third edition ISO 9001:2000 ISO9001/2/3:1994 ISO9004:1994 2008 Fourth edition ISO 9001:2008 (Latest) ISO9000:2000 ISO9001:2000 ISO9004:2000 ISO9000:2005 ISO9001:2008 ISO9004:2009 3 4 TC176 Key Messages for ISO 9001 Amendment TC176 Key Messages for ISO 9001 Amendment project should be undertaken for a limited amendment to ISO 9001:2000 in order to satisfy user needs, the amended standard shall remain generic and be applicable to all sizes and types of organization operating in any sector the impact on the users shall be limited, and changes will only be introduced where there are clear benefits to users. The current scope and purpose of the standard, the title and the field of application shall be unchanged from ISO 9001:2000 Certification to ISO9001:2008 is not an upgrade, organization certified to ISO9001:2000 should be the same status...enhanced compatibility with ISO14001:2004 (in turns, OHSAS18001:2007) Improved clarity and easy for use, changes made only there are benefits Changes confined to minimized impact on users The process model as shown in ISO 9001:2000, Figure 1, shall remain unchanged. 5 6 P. 1

Process (PDCA) Model Highlighted Differences between ISO9001:2000 and ISO9001:2008 Key Value adding activities Information flow Figure 1 - Illustration of a process-based quality management system 7 This session consists of highlighted changes in ISO9001:2008, but not an in-depth comprehensive explanation of each clauses Details of the changes between ISO9001:2000 and ISO9001:2008 are given in Annex B Table B.1 of the standard. 0.1 General Highlighted changes: ISO9001:2008 adds organization environment, changes, risk to factors that influence the design and implementation of QMS. The design and implementation of an organization s quality management system is influenced by a) its organizational environment, change in that environment, and the risks associated with that environment [Added] This International Standard can be used by internal and external parties,., the organization s ability to meet customer, statutory [Added] and regulatory requirements applicable to the product [Added], and the organization s own requirements. 9 10 1 Scope 0.2 Process approach Highlighted changes: Definition of process approach is clarified by adding to produce the desired outcome Highlighted changes: ISO9001:2008 expands the use of regulatory to statutory and regulatory and may be expressed as legal requirements. The application of a system within an organization, together with the identification and interactions of these processes, and their management to produce the desired outcome [Added], can be referred to as the process approach. (add for clarification) 1.1 General a) needs to demonstrate its ability to consistently provide product that meets customer and applicable statutory [Added] and regulatory requirements, and b) aims to enhance customer satisfaction through the effective application of the system, including processes for continual improvement of the system and the assurance of conformity to customer and applicable statutory [Added] and regulatory requirements. NOTE 1 In this International Standard, the term product applies to the product intended for, or required by, a customer or the product realization processes. This applies to any intended output resulting from [Added] product realization processes, including purchasing. NOTE 2 Statutory and regulatory requirements may be expressed as legal requirements. [Added] 11 12 P. 2

4 Quality Management System 2 Normative reference Only re-phrasing of sentence. The text has been significantly reduced. Updating version of ISO 9000 to 2005 version. 4.1 General requirements Highlighted changes: Product is now required to meet customer and applicable statutory and regulatory requirements. Identify (the processes) was replaced by determine 3 Terms and definitions Only deleting explanation of supply chain terms, Organisation replaced supplier ; Supplier replaced subcontractor. (i.e. Remark to explain the difference between terminologies from ISO9001:1994 and ISO9001:2000) a) determine [is amended from identify ] the processes needed for the quality management system and their application throughout the organization (see 1.2) e) monitor, measure (where applicable) [Added], and analyse these processes, and... Where an organization chooses to outsource any process that affects product conformity to [is amended from with] requirements, the organization shall ensure control over such processes. The type and extent of control [Rewording] to be applied to these outsourced processes shall be defined within the quality management system. 13 14 4.1 General requirements New notes added on what is considered an outsourced process and identifies factors influencing the control of outsourced process. NOTE 1 Processes needed for the quality management system referred to above include processes for management activities, provision of resources, product realization and measurement, analysis and improvement [Added]. NOTE 2 An outsourced process is identified as one being needed for the organization s quality management system but chosen to be performed by a party external to the organization. [Added] NOTE 3 Ensuring control over outsourced processes does not absolve the organization of the responsibility of conformity to all customer, statutory and regulatory requirements. The type and nature of control to be applied to the outsourced process may be influenced by factors such as: a) the potential impact of the outsourced process on the organization s capability to provide product that conforms to requirements; b) the extent to which the control for the process is shared; c) the capability of achieving the necessary control through the application of clause 7.4. [Added] 4.2 Documentation requirements Highlighted Changes: Clarifications include a single document may now address the requirements of one or more procedures and that a documented procedure may be covered by more than one document. Documents of external origin determined by the organisation to be necessary for the planning and operation of the QMS are to be identified and their distribution controlled. 15 16 4.2 Documentation requirements 4.2.1 General c) documented procedures and records [Added] required by this International Standard, and d) documents, including records [Added], determined [is amended from needed] by the organization to be necessary to ensure the effective planning, operation and control of its processes. NOTE 1 Where the term documented procedure appears within this International Standard, this means that the procedure is established, documented, implemented and maintained. A single document may include the requirements for one or more procedures. A requirement for a documented procedure may be covered by more than one document. [Added] 4.2 Documentation requirements 4.2.3 Control of documents f) to ensure that documents of external origin determined by the organization to be necessary for the planning and operation of the quality management system [Added] are identified and their distribution controlled, and 4.2.4 Control of records (Rewritten with editorial change for alignment with ISO14001 only) Records established to provide evidence of conformity to requirements and of the effective operation of the quality management system shall be controlled. The organization shall establish a documented procedure to define the controls needed for the identification, storage, protection, retrieval, retention and disposition of records. Records shall remain legible, readily identifiable and retrievable. 17 18 P. 3

5.5 Responsibility, authority and communication Highlighted Changes: Reinforces the principle that a member of the organization s management shall be responsible for all aspects of the QMS. 5.5.2 Top management shall appoint a member of the organization s management [Added] who, irrespective of other responsibilities, shall have responsibility and authority that includes,. 6.2 Human resources Highlighted changes: Expands the responsibility of those overseeing product quality to include that those performing work affecting product requirements are competent. In addition, encourages training of these personnel and confirmation that they have reached the required level of competence. Product quality replaced by conformity to product requirements. 6.2.1 General Personnel performing work affecting conformity to product requirements [is amended from product quality ] shall be competent on the basis of appropriate.. NOTE Conformity to product requirements may be affected directly or indirectly by personnel performing any task within the quality management system. [Added] 6.2.2 Competence, training and awareness [new sequence, alignment with ISO 14001:2004] a) determine the necessary competence for personnel performing work affecting conformity to product requirements [is amended from product quality ], b) where applicable [Added], provide training or take other actions to achieve the necessary competence [is amended from satisfy these needs ] 19 20 6.3 Infrastructure Highlighted changes: Broadens the definition of support services and infrastructure to include information systems. c) supporting services (such as transport, communication or information systems [Added]) 7.1 Planning of product realization Highlighted Changes: Addition of measurement as one of the required activities to be determined during the planning of product realization 6.4 Work Environment Highlighted changes: Clarifies that proper work environments for achieving conformity to product requirements, includes physical, environmental and other factors such as noise, temperature, humidity, lighting or weather. In planning product realization, the organization shall determine c) required verification, validation, monitoring, measurement [Added], inspection and test activities specific to the product and the criteria for product acceptance A new note added for clarification NOTE The term "work environment" relates to conditions under which work is performed including physical, environmental and other factors (such as noise, temperature, humidity, lighting, or weather). [Added] 21 22 7.3 Design and development 7.2 Customer-related processes Highlighted Changes: Minor vocabulary change slightly broadening the requirements for the product and the organization. Explanation given in relation to post delivery activities. Highlighted changes: Minor changes to the notes in this section for clarification. Includes the fact that review, verification and validation can be conducted separately or in any combination. Information for production and service provision can include details for the preservation of product. 7.2.1 Determination of requirements related to the product c) statutory and regulatory requirements applicable [is amended from related ] to the product, and d) any additional requirements considered [is amended from determined ] necessary by the organization. NOTE Post delivery activities include, for example, actions under warranty provisions, contractual obligations such as maintenance services, and supplementary services such as recycling or final disposal. [Added] 7.3.1 Design and development planning NOTE Design and development review, verification and validation have distinct purposes. They may be conducted and recorded separately or in any combination as suitable for the product and the organization. 7.3.3 Design and development planning The outputs of design and development shall be in a form suitable for [formerly, provided in a form that enables] verification against. NOTE Information for production and service provision can include details for the preservation of product. 23 24 P. 4

7.5 Production and service provision Highlighted Changes: Changes allow for the verification of a service after delivery. Ensuring that organizations monitor product status throughout the product realization process. Additional changes also broaden the definition of customer property to include personal data. 7.5.1 Control of production and service provision d) the availability and use of monitoring and measuring equipment, [is amended from devices ] e) the implementation of product release [formerly, devices], delivery and post-delivery activities 7.5.3 Identification and traceability The organization shall identify the product status with respect to monitoring and measurement requirements throughout product realization. [Added] Where traceability is a requirement, the organization shall control the unique identification of the product and maintain records (see 4.2.4). [Re-phrasing only] 7.5.4 Customer property The organization shall exercise case with customer property, If any customer property is lost, damaged or otherwise found to be unsuitable for use, the organization shall report this to the customer and maintain records [from: shall be reported to the customer and records maintained.] NOTE Customer property can include intellectual property and personal data [Added] 7.5.2 Validation of processes for production and service provision The organization shall validate any processes for production and service provision where the resulting output cannot be verified by subsequent monitoring or measurement and as a consequence [amended from this includes any process where ], deficiencies become apparent only after the product is in use or the service has been delivered. 25 26 8.2 Monitoring and measurement 7.6 Control of monitoring and measuring equipment [amended from device ] Highlighted changes: Minor changes include requirements to keep records of internal audits and their results. Highlighted Changes: Broadens definition of monitoring and measuring equipment to include any equipment used to monitor conformance to product requirements. Now requires that records of calibration and/or verification are maintained. Note further clarifies the use of computer software. a) be calibrated or verified, or both [Added] c) have identification in order to determine its calibration status; [Re-phrasing] NOTE Confirmation of the ability of computer software to satisfy the intended application would typically include its verification and configuration management to maintain its suitability for use. In addition to determining the nature of the monitoring or measuring required to ensure product conformity, records of conformity shall be kept. Note added providing examples as to how customer satisfaction can be determined. Records indicating the person authorizing release of product for delivery to the customer have to be kept. 27 28 8.2.1 Customer satisfaction NOTE Monitoring customer perception may include obtaining input from sources such as customer satisfaction surveys, customer data on delivered product quality, user opinion surveys, lost business analysis, compliments, warranty claims, dealer reports. [Added] 8.2.2 Internal audit A documented procedure shall be established to define the responsibilities and requirements for planning and conducting audits, establishing records and reporting results. [Re-phrasing] The management responsible for the area being audited shall ensure that any necessary corrections and corrective [Added] actions are taken without undue delay to eliminate detected nonconformities and their causes. Follow-up activities shall include the verification of the actions taken and the reporting of verification results (see 8.5.2). Records of the audits and their results shall be maintained (See 4.2.4) [Added] NOTE See ISO19011 for guidance [Added] 8.2.3 Monitoring and measurement of processes When planned results are not achieved, correction and corrective action shall be taken, as appropriate. NOTE When determining suitable methods, the organization should consider the type and extent of monitoring or measurement appropriate to each of its processes in relation to their impact on the conformity to product requirements and on the effectiveness of the quality management system [Added] 29 30 P. 5

8.3 Control of Non-conforming product 8.5 Corrective action and Preventive action Highlighted changes: Clarification that non-conforming products that have already been delivered or used shall be addressed. Highlighted changes: For both corrective and preventive action there is an updated clarification showing the need for reviewing the effectiveness of the corrective/preventive action taken. Where applicable, the organization shall deal with NC product by one or more of the following ways: d) by taking action appropriate to the effects, or potential effects, of the nonconformity when nonconforming product is detected after delivery or use has started. [Moved from end of paragraph, becoming an option for dealing with NC products] 8.5.2 / 3 Control of Non-conforming product The organization shall take action to eliminate the causes of nonconformities in order to prevent recurrence. f) reviewing the effectiveness of the [added] corrective action taken 31 32 Overall Remarks of ISO9001:2008 Revisions There are no significant changes to the requirements Most changes are in terminologies and additional notes either seeking to clarify the intent, or aligning with other parts of the standard Certified organisations will need to review the detail of their system but should have to make no significant changes Transition should be managed through the normal surveillance cycle with no additional time in most cases Auditor training should be minimal requiring only familiarisation with the detail changes. End of presentation Thank You! 33 P. 6