How Lean Saves Money. Joe Margarucci January Copyright Bureau Veritas

Similar documents
Ch 26 Just-In-Time and Lean Production. What is Lean Production? Structure of Lean Production System. Activities in Manufacturing.

Finished goods available to meet Takt time when variations in customer demand exist.

PLUS VALUE STREAM MAPPING

Lean: Improve Your Shop Efficiency and Productivity January 30, Lean: Improve Your Shop Efficiency and Productivity Introduction to 5S

PRINCIPLES OF LEAN MANUFACTURING. Purdue Manufacturing Extension Partnership (800)

Lean 101: An Introduction

Lean Principles. Jerry D. Kilpatrick. This article was originally written for and published by MEP Utah in 2003 (

COLUMBUS McKINNON CORPORATION MIDLAND FORGE DIVISION. 6S Training Overview

WHAT IS LEAN? LEAN PRINCIPLES SOME FURTHER CONCEPTS THE LEAN TOOLBOX MANAGING CHANGE

An Introduction to the Lean Process

From KAIZEN to LEAN to GREEN. Kaizen Institute Masaaki Imai

An Application of Lean Manufacturing to Enhance the Runtime in the Machine Shop

The 5S Philosophy. A better Work Environment for Everyone

LEAN MANUFACTURING & TPM.

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

INTRODUCTION 1. When manufacturing processes of products being examine through customer s perspective, we will be able to identify 2 types of processe

Lean Thinking: Examples and Applications in the Wood Products Industry

Value Stream Mapping in the Converting Industry. Lance Cullen October 22 nd, 2012

MAS BEST PRACTICE SKILLS EVENT LEAN AWARENESS WORKSHOP

Lean Thinking: Examples and Applications in the Wood Products Industry

Lean Manufacturing 1

Learning Objectives. 1. Explain how lean systems improve internal and supply chain operations

Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L9: Lean synchronization

Lean Manufacturing at Spirit

What is 5S principle? 5S Training of Trainers for Training Institutions Training material No. 13

Lean and Agile Systems. Rajiv Gupta FORE School of Management October 2013 Session 6

Value Stream Analysis and other

Historical Phases of Production

Lean Basics Overview. EMC 2011 Training. NCDENR April Copyright 2010 EMC Corporation. All rights reserved.

Lean Manufacturing. Overview and Perspectives on Lean Methods and Tools. WIW at WERC

5S METHOD IN LEAN MANUFACTURING

Scientia Research Library

Operations Management - 5 th Edition

Supply Chain & Procurement Roundtable. Lean Supply Chain. Workshop

What is the Goal of 5S?

An Introduction to Lean. Heidi Maier Sagstad

LEAN MANUFACTUING-CONCEPT, LIMITATION, APPLICATIONS: AN OVERVIEW

Enhancing Overall Equipment Effectiveness in Battery Industries through Total Productive Maintenance

Lean ITIL at Jazz Aviation April Professional Development Summit (PDS)

The Toyota Way. Using Operational Excellence as a Strategic Weapon. Chapter 1 9/11/ Ps. September 11, 2014

Research Article Special Issue

JUST IN TIME (JIT), LEAN, AND TOYOTA PRODUCTION SYSTEM (TPS)

Session III. LEAN Enterprise and Six Sigma

THE SECRET TO JAPANESE SUCCESS

South Central. Course Catalog

Sharing Your Lean System For Total Success

Flow and Pull Systems

IT 470a Six Sigma Chapter X

Managing for Daily Improvement

CHAPTER 4 INTEGRATING LEAN TOOLS AND TECHNIQUES IN PLANT MAINTENANCE FUNCTION

Profit = Price - Cost. TAKT Time Map Capacity Tables. Total Productive Maintenance. Visual Control. Poka-yoke (mistake proofing) Kanban.

5S FIVE DISCIPLINES FOR HIGH WORKPLACE PRODUCTIVITY. Presented by: R.C.N.S.Ramachandra Shinwa Lanka (pvt) ltd.

Lab Quality Confab LEAN Principles. 4 Fundamental LEAN Tools to Transform your Laboratory. Rita D Angelo, Bonnie Messinger, Bill Krzisnik

Process Mapping What It Means for You. FAQs. Desired Results. 5) What are Fastenal s objectives? 1) What is a process mapping?

Energy Savings through Lean Thinking. Learning to See through Value Stream Mapping

A Maintenance Philosophy. Asset Management: Phase II Total Productive Maintenance

lean value assessment Creating Higher Profi ts by Reducing Waste

ELECTRONETICS. Scope: Prep Area

Achieving Operational Excellence Using Lean. Paul Gilbarg September 25, 2015

Michigan Manufacturing Technology Center Presents: Improving Government Using Lean Principles. Bryan Beach, Program Manager, MMTC

Profit = Price - Cost. TAKT Time Map Capacity Tables. Total Productive Maintenance. Visual Control. Poka-yoke (mistake proofing) Kanban.

Applying 5S Lean Technology: An Infrastructure for Continuous Process Improvement

Lean for Service Overview

Continuous Process Improvement & Lean Six Sigma in Humes

5S Training Module. Presenter:

Lean Flow Enterprise Elements

Benefits of Lean Management in Liquid Waste Operations - One Company's Journey Rodney Blackmon and John Windham Savannah River Remediation, LLC

These tend to be sequential, and offer increasing levels of efficiency to an organisation.

IMPLEMENTATION OF LEAN TOOLS IN AN SME

Application of the Lean Manufacturing principles to an Injection Moulding Industry

Ashvath Sharma (Correspondence) +

Micro & Macro Plan for Implementation of 5S in a Manufacturing Organisation

Value Stream Mapping Train the Trainer

Lean Leader Manual. How to Manage Operations in a Lean Environment

Successful Lean Implementation Through Strategic Selection, Execution and Continuous Improvement. Martin Nazareth & Mark Keneipp

Lean Gold Certification Blueprint

DEVELOPMENT OF TPM IMPLEMENTATION PLAN IN SWITCHGEAR & ENGINEERING COMPANY

Efficient Plant Management

CHAPTER 1 INTRODUCTION

LEARNING TO SEE an introduction to lean thinking

Welcome to sharing session on

IMPROVING WORKPLACE ORGANIZATION USING 5S METHOD

Lean Manufacturing and Implications to Procurement

1.6. THE LEAN EFFECT OF THE 5S AND STANDARD WORK DEVELOPMENT IN DIFFERENT AUTOMATED MACHINE PROCESS STANDARDIZATION

BPIF SPECIALIST SERVICES PROCESS IMPROVEMENT

Lean Principles in Facility Management

Continuous Improvement Toolkit

5S Overview. An initiative from Sri Padhmam Consultancy & Training For free circulation only! 1

6S Workplace Organization & Safety. Building a Lean and Safe Foundation

Lean Design and Construction

Available online Journal of Scientific and Engineering Research, 2018, 5(4): Review Article

Applying Lean to Internal Auditing. Chris Baker B App Sc (Applied Physics) AIMM Principal Consultant Kallista Consulting

Lean Overview. Northeast Indiana Advanced Manufacturing (Lean) Network Meetings: February 21 Fort Wayne February 29 Warsaw

Fueling the Fire of Kaizen throughout the Lean Enterprise. Mark Preston, cell

Knowing how to identify fake flow develops your eyes for recognizing continuous flow

FMDS Training to Suppliers Supplier Advancement Engineer Karen Stapleton Yuri Garcia B

LEAN Best Practices for Laboratories

C8: Stream Mapping: Making Improvements That Add Value

Company Business Excellence Self-Assessment

Improving Scrum with. Lean Thinking Nuno Rafael SGMUN 2016

Transcription:

How Lean Saves Money Joe Margarucci January 2016

Lean Initiative Objectives To Learn the 8 Wastes for Lean To understand several tools of Lean l 5S l Standardized Work l Quality @ the Source l Total Productive Maintenance l Single Minute Exchange of Dies To see examples of how these tools can be used to save money 2

All we are doing is looking at the time line, from the moment the customer gives us an order to the point when we collect the cash. And we are reducing the time line by reducing the non-value adding wastes. Taiichi Ohno (father of the Toyota Production System, which became Lean Manufacturing in the U.S) http://www.leankaizen.co.uk/inspirational-quotations.html 3

The 8 Wastes 1. Overproduction 2. Excess Inventory 3. Defects/Errors 4. Excess Motion 5. Excess Transportation 6. Waiting 7. Underutilized People 8. Non-value Added Process 4

8 Categories of Waste: 1. OVER PRODUCTION Making more, earlier or faster than is required by the next process Examples: High WIP between operations Over testing 5

8 Categories of Waste 2. DEFECTS / ERRORS Mistakes that cause us to rework or redo a task Examples: Rejected samples/lots Typos Missed tests Errors missed during first review Wrong Set-ups 6

8 Categories of Waste 3. EXCESS INVENTORY Any supply in excess of a one-piece flow through a process Examples: Large batches before sending to next step Too many directions (overly complicated procedures/too many procedures) Excess supplies 7

8 Categories of Waste 4. NON-VALUE PROCESSING Effort that adds no value to the product or service from the customers viewpoint. Examples: Adding product functionality or quality that the customer doesn t need or want Quality control not Quality Assurance Too many people involved in decisionmaking Requiring adjustments to be done by person with special qualifications or job title. 8

8 Categories of Waste 4 EXCESS MOTION 5. EXCESS MOTION Any movement of people that does not add value to the product or service. Examples: Moving tools around in tool box or at work station to find the right one Walking &/or over-reaching at work station Work elements not properly sequenced to promote flow Walking back & forth to get samples or paperwork 9

8 Categories of Waste 6. EXCESSIVE TRANSPORTATION Transporting inventory, forms & information within & between departments & offices Examples: Moving products/ paperwork/ samples to next step before it is finished then chasing. Spaghetti diagram 10

8 Categories of Waste 7. WAITING Idle time created when waiting for? Examples: Waiting for down or upstream production to be complete Change over Line / equipment cleaning Waiting while equipment or computer systems are down (or slow). Waiting for Quality Check before releasing results Waiting for pre-payment 11

8 Categories of Waste 8. UNDERUTILIZED PEOPLE The waste of not using people s KSA s. (Knowledge, Skills & Abilities). Examples: Using technical staff for Admin processing Putting creative people in isolated routine jobs Insufficient & improper training 12

5S 13

5 S s (+ 1) Workplace Organization Sort Keep only what is needed in your area. Shine Seiri Clean up the workplace Seiso Set in Order A place for everything and everything in its place Seiton Standardize Develop system (rules) to maintain what has been done Seiketsu Safety Exits clearly marked; unobstructed Floor openings covered Cords and wire off floor Stacked material stable Flammable materials properly stored Fire equipment clearly marked Sustain Self discipline to maintain established procedures. Shitsuke 14

Workplace Organization 15

Department Results: Facilities Sort Straighten Shine Standardize Sustain Avg Score Facilities Closets / Machine Shop 4 3 4 3 2 3.2 First area 5S d with min/max quantities Machine shop much safer HIGHLIGHTS AREAS FOR IMPROVEMENT Need to expand sorting and straightening to mezzanine Identified area leader with regular checks 16

Department Results: Hardlines Sort Straighten Shine Standardize Sustain Avg Score Hardlines Lab 3 4 2 3 2 2.8 Good surface taping of benchtop equipment Better management of samples within the lab HIGHLIGHTS AREAS FOR IMPROVEMENT Need to move to micro level in drawers and cabinets Need to assign owners to each area and institute checklist 17

Department Results: Softlines Sort Straighten Shine Standardize Sustain Score Softlines Lab 3 4 3 3 2 3 Good identification for samples in progress Some excellent examples of micro level 5S in drawers Good visual controls HIGHLIGHTS AREAS FOR IMPROVEMENT Need to sustain items placed incorrectly Still some macro sorting in some areas Shine needs to be sustained 18

Department Results: Mailroom / RG Sort Straighten Shine Standardize Sustain Score Mailroom / RG 5 5 5 4 3 4.4 Good macro and micro level labeling with min/max marking Weekly 5S checklist posted and completed HIGHLIGHTS Need labeling of paper storage in RG area AREAS FOR IMPROVEMENT 19

5S 2016 Improvement Focus Focus on Standardization and Sustain Implement and standardize 5S checklist for all departments using same format. Identify area leaders. Begin doing your own audits. 20

Our Next Steps (year 2) Finish any areas that were missed/incomplete in 2015 Focus on 4 th and 5 th S. Create and implement a 5S checklist with images of how you want the area to look. Think about flow and work-in-progress. Spaghetti diagrams are a great way to check that you have optimized your set-up. Can you identify what the status of each sample is? Perform one last centralized audit Q1. After that, each area will perform their own audit and provide results in Q2, Q3, and Q4. 21

Standardized Work Establishing precise procedures for each person s work in a process, based on three elements: 1. Takt time 2. work sequence 3. standard inventory 22

Standardized Work 1. Takt time - the rate products/services must be made in a process to meet customer demand. 23

Standardized Work Takt Time Calculation Work Time Available Number of Units Sold / Period = TAKT Time Work Time Available / Period (one shift) Shift Time (ex. 8 hrs.) Breaks - 2 @ 10 minutes Clean-up at end of shift Other non-prod. time Work Time Available: 480 mins. - 20 mins. - 5 mins. - 5 mins. 450 mins. = 27,000 secs. 27,000 secs./shift TAKT Time = = 54.0 secs. 500 units/shift Working to a TAKT Time is one step in getting production to flow smoothly. 24

Standardized Work 2. The work sequence, in which a person performs tasks within takt time. Need to find the most efficient effective way and implement it 25

Standardized Work 3. The standard inventory, required inventory to keep the process operating smoothly. Keep just what is needed now to perform the function in the work area. 26

Quality at Source Each person must take full responsibility that what they pass along to the next person is within acceptable quality limits. To do this, each person must be supplied with a way to perform an inspection at the source and have simple & clear standards and documentation regarding acceptable quality limits. 27

Quality at the Source How did we do it? 28

Quality at the Source Start by understanding/defining Inputs & Outputs. 29

Quality at the Source Brainstorm with team to define inputs and outputs (post-it notes on a flipchart) Group by affinity 30

Quality at the Source Group to vote on most important 31

Quality at the Source Supervisor/Manager to help define cutoff (shoot for 3 to 6 Inputs and 3 to 6 outputs per process step. Document Train Implement Update as appropriate 32

TPM Total Productive Maintenance 33

The Flame Lab 1610 Chamber 09/25/2015

Total Productive Maintenance } Seven (7) steps are implemented to progressively increase operators knowledge, participation and responsibility for the equipment. } 1. Conduct initial cleaning and inspection } 2. Eliminate sources of contamination } 3. Establish provisional standards } 4. General inspection, development, and training } 5. Autonomous general inspection checks } 6. Improve workplace management and controls } 7. Participate in advanced improvement activities. 35

STEP 1 - Perform initial cleaning and inspection Cleaning as form of inspection! Purpose: To show the value cleaning as inspection Control equipment deterioration Establish team ownership through physical contact with equipment Involve team in identifying and addressing abnormal conditions By removing dirt and grime this results in discovery of abnormal conditions through the use of senses. 36

Step 2 eliminating sources of contamination and inaccessible areas The focus here is to prevent contamination and eliminate obstacles to effective cleaning and inspection. 37

Step 3 Develop provisional Standards Cleaning Standards Lubrication Standards Inspection Standards Calibration Standards Schedules 38

Step 4 General inspection, developement, and training Purpose: Build team knowledge and equipment inspection/diagnostic skills Expand the scope of routine inspection Promote systematic restoration activities Enhance preventive maintenance through visual controls Focus on the 6 subsystems: Lubrication Machine elements Pneumatics Hydraulics Electrical systems Drive systems 39

Step 5 Autonomous general inspection checks Purpose: Train teams in general inspection Continue to establish partnerships Optimize periodic inspection Match routine cleaning/ inspection standards with general inspection standards 40

Step 6 Workplace Management and Controls Determine scope of expanded improvement activities Train groups in 5S and visual controls Before After 41

Step 7 Ongoing General Inspection and Improvement This is the milestone in the journey where we are partnering with each other. Speaking each others language. We now have Process Owners Communication Collaboration No Blame Cooperation Leadership in no particular order This step follows up on continuing projects, expands team participation to other equipment-related improvement projects, and continues to build operator diagnostic and maintenance skills. 42

D M A I C TPM 15-03 Total Productive Maintenance 1610 Flame Chamber Background (Define) Flame labs #1 piece of Key Critical Equipment(KCE) is the 1610 flame Chamber. Any downtime increases costs in testing, repair, and scheduling. Our goal is to increase the Overall Equipment Effectiveness(OEE) of this chamber. Current Condition (Measure) Target Condition (Improve) We gathered the appropriate team consisting of operators, maintenance, and management to focus on the Autonomous Maintenance pillar of TPM which uses a 7 step process. Implement provisional standard for Inspection and cleaning. Flame Chamber is run until failure. Gas flex lines wear and are inspected daily. Gas line changeovers are manually done. Most supplies needs and checks are done when needed and not planned Annual Chamber calibration for timer and flame gage Cause Analysis (Analyze) No collaboration. Operators, Facilities, and Management have specific roles and separate views on what their role is on this piece of equipment. Operators run it, Facilities maintains/repairs it, and Management schedules it. No systematic method for improving routine inspections and maintenance Eliminate soot buildup by replacing lower front cover with Plexiglas for immediate and simple visual aid. Eliminate hazardous flexible gas lines. Hard pipe back wall of hood and install quick disconnects for easy gas changeover and improved safety. Confirmation (Control) [90days] Elimination of gas line replacements and reduced daily inspection time. Reduction of machine contamination through visual control. Team based provisional standard has produced ZERO downtime since implementation No control over contamination to the internal parts of this machine. Gas lines wear out quickly and operators are inspecting gas lines. This takes caution and time. 43

Quick Changeover/Setup Reduction SMED (Single Minute Exchange of Dies) Identify internal vs. external changeover tasks Analyze each task s real purpose and function Focus on no/low cost solutions Aim to eliminate changeover time 44

SMED Example Not quick: Must heat molds and plates before changeover Quicker: Test stand with hot plates to pre-heat molds and plates Courtesy of Playtex Panama, Santo Domingo, DR 45

How Lean Saves Money? Space savings Fewer defects/errors Find problems earlier Less searching/movement First impression Increased morale Improved Safety Fewer Breakdowns 46

Reference Materials Lean Thinking by Jim Womack and Daniel Jones (What is Lean) Getting the Right Things Done by Pascal Dennis (Strategy Deployment) Learning to See, by Mike Rother, John Shook, (Value Stream Mapping) Toyota Kata by Mike Rother (How does Toyota do improvement) Work that Makes Sense by Gwendolyn Galsworth (Visuality) Creating Level Pull by John Shook (Pull Systems) And many more for specific applications (Finance, Design, IT, etc.) 47