Vietnam s Power Sector: An Overview. Richard Spencer Power Sector Experience Sharing Event Dhaka February 9, 2011

Similar documents
Fourth Power Sector Reform Development Policy Operation Region

Peak demand and times

A Case Study on Power Sector Restructuring in Vietnam

ASIA CLEAN ENERGY FORUM

Opportunity in Vietnam s Renewable Energy Sector. Tien Nguyen - Infunde Development

REVIEW OF POWER SYSTEM EXPANSION PLANNING IN VIETNAM

Vietnam enacts key power sector restructuring reforms

TRADE, SERVICES AND DEVELOPMENT

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems and Opportunities

Reform in China s Electric Power Industry. - A Case Study of East China s Wholesale Electric Power Market -

World Small Hydropower Development Report 2016

Options to scale up solar PV in. Vietnam. - Introduction. Vietnam

Interactions Among Key Stakeholders in Hydropower Development in Vietnam

Ministry of Industry and Trade General Directorate of Energy. Viet Nam s Power Development Plan

CHINA 2050 HIGH RENEWABLE ENERGY PENETRATION SCENARIO AND ROADMAP STUDY. Energy Research Institute National Development and Reform Commission

Socialist Republic of Viet Nam: Power Sector Reform Program

CURRENT STATUS & DEVELOPMENT PLAN FOR GRID SMALL HYDRO POWER IN VIETNAM - BARRIERS & MEASURES TO OVERCOME BARRIERS IN THE FUTURE

Case Presentation: Law for Benefit sharing on hydropower projects in Viet Nam - & - Linking national benefit sharing to Transboundary benefit sharing

Update on Slovenia Nuclear Energy Programme

MOIT/GIZ ENERGY SUPPORT PROGRAMME Together for a better energy future. Mitigating Financial Risks for Biomass Energy projects in Viet Nam

PAKISTAN Renewable Energy Distributed Generation NAMA

HYDROPOWER DEVELOPMENT AND REGIONAL INTEGRATION FOR NEPAL

Renewable Energy Policies in Southeast Asia. Renewable Energy Auctions: A New Paradigm for Asia ACEF, 8 June 2018

By: PeaPros Consulting JSC

ERAV Electricity Regulatory Authority of Vietnam

Renewable Energy Market Transformation Initiative (REMTI): Support to the Philippines Renewable Market Development

SECTOR ASSESSMENT (SUMMARY): ENERGY

INTEGRATION OF RENEWABLE BASED GENERATION INTO SRI LANKAN GRID

IEA In-depth review of Greece

Cost of Service and Public Policy. Ted Kury Director of Energy Studies, PURC

Sustainable Power Sector Development in the GMS

Renewables in Vietnam OPPORTUNITIES FOR INVESTMENT

MARKET CONDITIONS AND CHANGE FOR LOW-CARBON ELECTRICITY TRANSITION IN VIETNAM

ROBERT G FITZGIBBONS, JR.

WATER AND WIND QUÉBEC S CLEAN, RENEWABLE ENERGY RESOURCES

Developing a Regional Roadmap on Energy Connectivity. China Electric Power Planning & Engineering Institute Bangkok

EFFECTIVE REGULATORY REGIMES AS A REQUIREMENT FOR RENEWABLE ENERGY DEVELOPMENT. Zambia Lusaka August 7 to

AZERBAIJAN ECONOMY AND POWER SECTOR: CHALLENGES AND OPPORTUNITIES

Power Integrated Resource Plan Progress Update

RURAL ELECTRIFICATION WITH PV - MARKET POTENTIAL IN CAMBODIA

ADB and Renewable Energy

ENERGY AND POWER SUMMARY (Avoidance, mitigation and enhancement considerations)

VIET NAM: ROADMAP FOR NATURAL GAS MARKET DEVELOPMENT

Meeting in Yichang China 25 Oct 2008 By Lawrence Haas Independent Consultant, UK

Myanmar Power Sector Financial Analysis and Viability Action Plan. Key Findings & Recommendations

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region

Table of contents. 4 Summary. 6 Global and EU climate protection goals

VIETNAM UNION OF SCIENCE AND TECHNOLOGY ASSOCIATIONS (VUSTA) ASSESSMENT OF VIETNAM POWER DEVELOPMENT PLAN

The Philippines Renewable Market Development

Rural Electrification by Renewable Energy in Cambodia

Vietnam Renewable Energy development project to 2030 with outlook to 2050

China s Electric Power Industry and Its Trends

Creating a Competitive Electricity Market in Vietnam October 2017 Sarah Fairhurst

CONCENTRATED SOLAR POWER POTENTIAL OVERVIEW

Outlook on Power Interconnection in North-East Asia. China Electric Power Planning & Engineering Institute (EPPEI)

Towards Implementing Energy Conservation

Introduction: from regulated to liberalized markets in electricity

DEVELOPMENT OF ENERGY INDUSTRY IN VIETNAM

An IPP s perspective on power plant flexibility in Japan

BỘ CÔNG THƯƠNG TỔNG CỤC NĂNG LƯỢNG

GHANA POWER MARKET OUTLOOK TO 2025, UPDATE 2015 MARKET TRENDS, REGULATIONS, AND COMPETITIVE LANDSCAPE

Theme 3 Conventional Energy Technologies Pham Hoang Luong Le Duc Dung Hanoi University of Science and Technology

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region

Chapter 10. Lao PDR Country Report. September 2016

Mrs. Singkham KHONGSAVANH Vice Governor, Vientiane Province, Lao PDR

THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom - Happiness. No.: 428/QD-TTg Hanoi, 18 March 2016

Modern Techniques including Renewable Energy Auctions for Economizing Renewable Energy Tariff. Pakistan Presentation

SECTOR ASSESSMENT (SUMMARY): ENERGY

UNDERTAKING J1.4. There are two other documents that are relevant to the referenced statement in the OPG Annual Report.

Lam Du Son Vice President of EVN, Vietnam

By Bot Sosani HAPUA Secretarat. Sustainable Energy Training, Bangkok 25 th November 2013

China s Efforts in Controlling GHG Emissions in Power Industry

Benefit sharing in hydropower development. Initiative on Sustainable Hydropower

Renewable Energy in Turkish Electricity Market

Sri Lanka s Power Generation Past, Present and Future

Current status and Development plan for Grid Small Hydro Power in Thailand

Luxembourg Energy efficiency report

Thailand Power Development Plan ( ) TANONGSAK WONGLA

SUPPORT SCHEMES FOR SMALL HYDRO. Medellin, November 2017 Brian Glover Associate professor NTNU Bærekraftig Investering AS

ELECTRICITY SUPPLY INDUSTRY OF SOUTH AFRICA

APEC Workshop on Small Hydro and Renewable Grid Integration Hanoi, April 2013

CAMBODIA ENERGY SECTOR

Renewable Energy Development in Cambodia. Institute of Technology of Cambodia

COAL INDUSTRY REPORT Q1/2019. Content is deleted for demo purpose

Brief Overview of Renewable Energy Regulation in Tanzania

Solar PV in ASEAN Challenges and Opportunities. Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia

Perspectives on the North-east Asia System Interconnection - From South Korea. Korea Electrotechnology Research Institute (KERI) Park, Dong -wook

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

The Green Transition of the Danish energy system

RENEWABLE ENERGY: POLICIES AND FINANCIAL INCENTIVES

Figure Gross Domestic Product Growth of Viet Nam,

BANGLADESH POWER MARKET OUTLOOK TO MARKET TRENDS, REGULATIONS AND COMPETITIVE LANDSCAPE

Federal Climate Change Policy: Implications for Electric Utility Industry

Electricity Grid Evolution in EU pre-access Countries: the Turkish case. Gaia Moretti

Towards a Stronger EU-Turkey Energy Dialogue: Energy Security Perspectives and Risks

RES Revolution! How the Sun and the Wind changed the Italian Electricity Market

Scaling up Electricity Trade in

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4400 Project Name. MIDDLE EAST AND NORTH AFRICA Sector Power (100%) Project ID

Power system flexibility: Vertically integrated systems

Reliable, affordable, and sustainable energy services for agriculture,

Transcription:

Vietnam s Power Sector: An Overview Richard Spencer Power Sector Experience Sharing Event Dhaka February 9, 2011

Outline Vietnam s power sector The reform program Investment planning

Who Does What in the Power Sector Office of Government Ministry of Industry and Trade Sector policy Sponsor of EVN Sponsor of Institute of Energy Ministry of Planning and Investment Ministry of Finance (and VDB) Ministry of Natural Resources and Environment State Bank of Vietnam Provincial, District and Commune People s Committees

Electricity production and consumption (GWh) Electricity consumption (GWh) Per capita electricity consumption (kwh/capita) Demand is Growing! Electricity Production and Consumption 1976-2009 Per Capita and Total Consumption 1976-2009 120,000 100,000 80,000 60,000 40,000 20,000 0 90,000 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 1200 1000 800 600 400 200 Years 0 0 Consumption Generation Years Total consumption, GWh Per capita consumption, kwh

How It s Being Met is Changing EVN OWNED 85% Coal 1,205 12% Oil and gas 3,161 32% Hydro 4,121 41% 2004 9,989 MW OWNED BY OTHERS 15% Oil and gas 1,305 13% Coal 155 2% Other 42 EVN OWNED 69% Coal 2,285 12% Oil and gas 3,461 18% Other-1 300 1% 2010 19,735 MW Oil and gas 4,027 20% Hydro 7,420 38% OWNED BY OTHERS 31% Coal 725 4% Hydro 493 2% Other-2 1,024 5%

So Is Where It s Being Used Power Consumption by Sector, 2000 and 2010 Compared, TWh 8.2 10% 1.9 8% 2010 32 37% 11 49% 2000 0.4 2% 9.1 41% 44.4 52% 0.9 1% Industry and construction Residences and Administraion Agriculture, Forestry and Acquaculture Commerce, Hotels and Other

EVN Finances Increasing size of investment program not matched by tariff increases, risking a spiral of higher borrowing and debt service, further reducing ability to finance own investments Capitalization of National Power Transmission Company (too low) High proportion of foreign debt requiring revaluation because of exchange rate depreciation Vietnam s own macro instability in 2007 (before financial crisis) increasing costs not matched by tariff increases 15% 10% 5% 0% -5% -10% -15% 100% 80% 60% 40% 20% 0% 80% 53% 54% 37% 38% 32% 26% ROE SFR 17% 2002 2004 2006 2008 50% 47% 5.3 46% 47% 44% 47% 36% 32% 3.6 3.6 2.2 2.1 1.8 1.1 1.1 50% 53% 54% 53% 56% 53% 64% 68% 2002 2004 2006 2008 Debt Equity DSCR 90% 75% 60% 45% 30% 15% 0% 6 5 4 3 2 1 0

Key Challenges Above all: improving the quantity and quality of electric power for economic growth, inclusion and the environment Surging demand 15% annual growth Limited financing Reducing energy security Increasing carbon intensity Substantial State involvement A major reform program

Internal Single Buyer Market Competitive Generation Market (Single Buyer ) Pilot Wholesale Market Wholesale Competitive Market Pilot Retail Market Competitive Retail Market The Reform Program Aimed at ensuring that there is adequate financial resource to support continued growth in demand Retail Market Key legislation Electricity Law Started preparation in 1998, passed in 2004 Move to competition in electricity sector Planning process retained but oversight shifted to MoIT Creation of ERAV Roadmap for Market Development Three phases (see adjacent diagram) Two step trial and implement approach in each phase Restructuring of actors Competitive Generation Market (Single Buyer) Wholesale Competitive Market 2005 2011 2014 2016 2022 2024 Preparing for Single Buyer Market Preparing for Wholesale Market Preparing for Retail market Consensus driven slow but sure

Market Design Contract payment BOTs IPPs Joint Stock Generation companies Bids Market Payment Real time operation MO Dispatch schedule SO Market Payment Wholesaler / Single Buyer (SB) Payment Power Distribution Companies (PCs) Strategic Multipurpose hydropower (SMHPs) Power Transmission Operator (TNO) Power Power Generation Unit Service Providers Unit Wholesale Unit Distribution and Retail Unit

Expected Sector Structure Generation State-owned Services Wholesale, Retail and Distribution PVN Vinacomin Other IPPs BOTs GENCO 1 GENCO 2 GENCO 3 Equitized Gencos NLDC - System and Market Operator (SMO) National Power Transmission Company (TNO) EVN Electric Power Trading Company (SB) Power Corporations (DISCOs) SMHPs + Nuclear Power

The Planning System Political Orientation 2011-2030 Every 20 years Socio-Economic Development Strategy 2011-2020 Every 10 years Socio-Economic Development Plan 2011 2015 Every 5 years Power Master Development Plan 7 2011 2020 With a view to 2030 Every 5 years Various sub-plans e.g. Hydro Master Plan Province Power Plans

Power Master Development Plan 7 Prepared by IoE on behalf of MoIT: still Master Plan for VCGM, not yet indicative Two somewhat conflicting objectives Investment planning Investment approval Principles Least economic cost for a given level of reliability Limit impact on security of supply of transmission reliability (build generation in N, C and S) Diversify power sources, in particular start to build coal Accelerate regional integration (Lao and Cambodia) Plan for renewables

Power Master Development Plan 7 Planning tools: WASP III (with limits on hydro simulation) Strategist (optimizes expansion) PDPAT (treats system as interconnected subsystems and simulates operation of expansion system) Slow! Load forecasting based on GDP, regional/province plans, sector plans