Energy Audit of two Apartment Buildings in Cagliari using Energy Simulation

Upgrading the energy performance of residential buildings in Cyprus

BPE Case study of Pippin Close and Barnlea Close

School Tito Maccio Plauto Cesena (IT)

Cost optimality and nzeb target in the renovation of Portuguese building stock. Rainha Dona Leonor neighborhood case study

Healthy Buildings 2017 Europe July 2-5, 2017, Lublin, Poland

Verified net Zero Energy Building with air source heat pumps for SME

ENERGY DEMAND ANALYSIS AND ENERGY LABELLING OF NEW RESIDENTIAL BUILDINGS IN TUSCANY (ITALY)

TASK 3.1. Project Infinite Solutions. INnovative FINancIng for Local SusTainable Energy Solutions. Local Study and Action Plan.

Danish national plans for Nearly Zero Energy Buildings

CCHVAC REHVA Workshop in CLIMA nzeb experiences in South Europe and Mediterranean Climate

EXECUTIVE SUMMARY: Best practices and lists of technologies to refurbish buildings & Proposed packages of measures

2000 Antwerp, terraced house

SIMULATION MODEL IN TRNSYS OF A SOLAR HOUSE FROM BRAŞOV, ROMANIA

Nearly Zero Energy Building in Lecco Modern technological building compared to an ancient Villa

NZEB: The new challenge of HVAC Manufacturers. ASTRO Tower (Archi Urbain)

Single owner building stock management and technical economical analysis

Building Concepts for a mid-century energy-neutral society

Energy efficiency of buildings from Europe to Slovakia

The Elithis Tower is an experimental and demonstration. Elithis Tower in Dijon, France. nzeb case studies

Modeling and Simulation of Energy Use and Indoor Thermal Environment of Highly-Insulated Buildings

Solar cooling design: a case study

Towards nzeb buildings: a historical building case study

Opportunities to decarbonize the building sector through renewables

> Performance requirements: Part L UK vs Energiesprong vs Passivhaus.

Long-term monitoring and smart heat pumps for nzeb

30/09/2016 Balancing Energy Efficient Systems and Renewable Energy Sources: Collaboration or Competition?

Bruck an der Mur. Project summary. Energy concept: Background for the renovation reasons

Residential buildings retrofit: the role of solar technologies

Retrofit of an historical building toward NZEB

AM-55, AM-56) B U I L D I N G P A R T N E R S H I P S F O R E N E R G Y S E C U R I T Y

Pilot project: DUTH Student residences, Komotini, Greece. Detailed technical and financial action plans for each individual building block

ENERGETIC MONITORING AND OPTIMIZATION OF A SOLAR HOUSE

Project Description. Projected build start date 12 Apr 2010 Projected date of occupation 28 Feb

Near zero energy building with steel solutions case study. Jyrki Kesti, Technology Director, Ruukki Construction

OFFICE BUILDINGS IN DIFFERENT CLIMATE ZONES FROM ROMANIA - COMPARATIVE STUDY ON ENERGY EFFICIENCY INDICATORS

5 social row houses (Wachtebeke)

ROADMAP TOWARDS NEARLY ZERO ENERGY SPORT BUILDINGS

Low energy buildings

D3.9_Overall Refurbishment Plan DRAFT CS03. Hotel Restaurant Valcanover

The Effects of Set-Points and Dead-Bands of the HVAC System on the Energy Consumption and Occupant Thermal Comfort

SOLAR XXI: A Portuguese Office Building towards Net Zero-Energy Building

The BIG Energy Upgrade Energy Innovation for Retrofitting Deprived Community Housing in the UK

INNOVATIVE METHODS TO ENCOURAGE BUILDING ENERGY EFFICIENCY IN FRANCE Francis Allard LaSIE, University of La Rochelle/CNRS

Passiv Haus Institut. Certification as "Quality Approved Passive House" Criteria for Non-Residential Passive House Buildings

SOLAR PHOTOVOLTAIC ENERGY

Engineers Ireland Cork Region CPD lecture series

Dienstleistung. Certification as "Quality Approved Passive House" Criteria for Residential-Use Passive Houses

PASSIVHAUS Designed for you to enjoy maximum comfort with minimum energy.

Heat Pump Systems Adapted to Energy-Flexible and Highly Insulated Buildings in Cold Climate. BuildSim Nordic 2016 John Clauß

OPEN COMPETITION Energy Design of High Performance Buildings Organised by EC-JRC and ESRU

Theory versus practice of energy and comfort in 4 low energy houses in Belgium

Project Description. Projected build start date 03 May 2010 Projected date of occupation 06 Aug

Homesol Passive House Design Process

Attic conversion in Innsbruck AT

BUILDING DESIGN AND THERMAL INERTIA: WHEN, WHY, WHERE

Title of the project: The health care in the sunlight

Energy Audit. Project: ENergy Efficiency and Renewables SUPporting Policies in Local level for EnergY (ENER-SUPPLY) Work Package 4

Koniklecová 4, Brno-Nový Lískovec

Passive House Object Documentation

Energy study of a non-residential and historic building in transient conditions

BUILDING ENERGY SYSTEMS

Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles

IEA HPT Annex 49 Vögelebichl Innsbruck Monitoring and simulation of two multi-family houses with heat pump, PV and collectors

IEA. Retrofit of the Library Building of the University of Bremen

CSIRO Energy Centre Newcastle, New South Wales, Australia

Zero Energy House in Japan: Actual results and future target. Isamu Ohta Misawa Homes Institute of Research & Development CO., LTD.

Evaluation of PV technology implementation in the building sector

Strategic Decision Making For Zero Energy Buildings in Jordan

Energy Efficiency, GeoExchange Systems and Renewable Energy MiAPPA Winter 2010

EXAMPLES ON DEEP RENOVATION IN PUBLIC BUILDINGS

Ulvøya, Oslo, Norway. One Stop Shop Demonstration Project 1. OVERVIEW

SAVE THE ENVIRONMENT BY BUILDING ECOLOGICAL PASSIVE HOUSES

Summer season temperature control in Finnish apartment buildings

Energy Audit. Project: ENergy Efficiency and Renewables SUPporting Policies in Local level for EnergY (ENER-SUPPLY) Work Package 4

ADEC S SUSTAINABLE FUTURE SCHOOLS PROGRAM

Evaluation methods for indoor environmental quality assessment according to EN15251

CERNUSCO SUL NAVIGLIO Province of Milan

BEEP Guidelines for Energy Efficient Design of Multi-Storey Residential Buildings

Role of daylight in the existent and future French building regulations

OSU Cascades Net Zero Campus. Recommendations

Analysis of different shading strategies on energy demand and operating cost of office building

Built examples and project certification. Zeno Bastian, Passive House Institute

Cyprus Energy Agency. Nearly Zero Energy Buildings

Frequently Asked Questions: Existing Houses/Buildings

ISOVER Multi-Comfort House Students Contest Edition 2015 Residential function in cold climate Astana, Kazakhstan

Passivhaus Introduction

Deep thermomodernization of three residential buildings in Kryvyi Rih, Ukraine

Achieving the nearly zero energy building concept - A study based on practical experience

Energy-Efficient Passive House using thermal mass to achieve high thermal comfort

Cooling potential of heating-cooling wall panels

Transcription:

ZEMedS: Implementation

Implementation Case: IPCT Bonifazi, Recanati, Italy

General data 3 Name of the School Type of school IPCT Recanati High School High School Number of students Owner 277 public Location Year of construction Municipality of Recanati (MC), Italy Via di Santo Stefano, 1 Altitude: 293 m AMSL Sec. XVI

General data IPCT Virginio i i Bonifazi i High hschool, Municipality i of frecanati (MC), Italy Building typology Heated area (m 2 ) 4 3 floors building 3788 m 2 Heating degree days (base 18): 1982 (DPR 412/1993 base 20) Cooling degree days (base 26): xxxxxxx Site Urban Plane

General data IPCT Virginio i i Bonifazi i High School, Municipality i of Recanati (MC), Italy 5

Current Situation 6 High Priority: energy efficiency Renovation needs Building use Schedule for High school: Standard Use: From 9 th of September till 14 th of June Reduce Use: From 15 th of June till 12 th of August From 19 th of August till 6 th of September 2 nd, 3 rd, 4 th of January 12 th, 16 th of April 23 rd, 24 th, 27 th, 30 th, 31 st of December Standard Use: Monday till Saturday: 08:00 to 13:00 and Monday till Friday: 15:00 to 17:00 Reduce Use: Monday till Friday: 08:00 to 13:00

Current Situation IPCT Virginio i i Bonifazi i High hschool, Municipality i of frecanati (MC), Italy 7 Building envelope: Walls Brick Wall 0.65 m U = 1.074 W/m².K Building envelope: Roof U = 2.004 W/m².K Building envelope: Groundfloor U = 0.335 W/m².K Building envelope: Windows Mainly Single glazed Uw = 5.9 W/m².K Partial Replacement: Windows in the cloister replaced in 2011 with 2 layers 6/7 glasses (no air gap) 8 windows in the first floordouble glazed (partial, 2000)

Current Situation 8 Airtightness: No measurements Heating/Cooling: Ventilation: Radiators on external walls (without insulation) Monitoring System and Control system on 2 zones + gymnasium (since 2010) No mechanical Ventilation Ventilation by opening windows Lighting: Fluorescent tubes T5 controlled by users (2009) Appliances: Lab: PC, Projector, Printer Office: PC, Printer, Copy Machine DHW: Electric Boilers in some Toilettes 8.40 kw Cooking: No cooking Current final energy consumption kwh/m 2 conditioned area (from bills, metering etc.): *113.72 kwh/m² y for heating *12.22 kwh/m² y for electricity *Total =125.93 kwh/m² per year

Current Situation Equipment Age and Maintenance Needs 9 Lighting : Fluorescent lamp T5 : continuous replacement. Luminaires replaced in 2009 HVAC/ Boiler: Traditional lboiler, Natural lgas, 420 kw, installed in 2001 HVAC/Distribution Network: Piping update would be needed (no insulation) HVAC/other components HVAC/other components Windows Other Building Components Other Maintenance Needs Other Renovation Needs Structural Compliance to be verified

Current Situation 10 Health & Comfort Winter cold problems Summer comfort: No data Interior air quality: No data Visual comfort: No data Running Contracts and Management Running cost: Energy: no data Water: no data Maintenance: no data Energy Supply Contract ESCO, contract expiring in 2019 Energy Management Contract ESCO, contract expiring in 2019 Building Maintenance Manageddirectly by the Province technical office

NZEB Renovation ZEMedS Goals: Requeriment 1: C PE Prod RES 0 Primary energy consumption yearly (heating, cooling, ventillation, DHW and lighting) is produced by local renewable energies. Requeriment 2: C FE 25 kwh/m2 y FE consumption yearly (heating, cooling, ventillation and lighting) per conditioned area Requeriment 3: Indoor air quality guaranteed (CO 2 1000 ppm) and temperature above 28ºC 40 hours yearly during occupancy National factors for conversion in energy and CO 2 have been taken into account (data 2014). 11 Primary Energy from non renewable energy sources covered by renewable energy Final energy Indoor Environmental consumption (all uses Overheating limited to Quality (IEQ) is except DHW & cooking) guaranteed 0 kwh/m².year (annual balance) C FE 25 kwh/m².year 40 hours over 28ºC annually CO 2 1000 ppm

NZEB Renovation Status 12 Actual status refering to the the foreseen ZEMedS Renovation Process Diagnostic /Current Planning Design situation Companies consulting Works Reception of works Use and maintenance Diagnostic/ Current Situtation: A preliminary energy audit developed by the company managing the Energy Supply and HVAC management was developed in 2012. A further investigation is needed for: Detailing actual energy behavior through energy simulation Identifying actual comfort conditions Defining the actual energy saving potential of a set of possible measures Electrical Consumption

Energy Saving Potential 13 Actual Final Energy Consumption (heating, cooling, ventillation and lighting) Consumption by Bills Natural Gas: nm3/year = 113.72 kwh/m².year Electricity: 12.22 kwh/m².year Other Fuel: 0 kwh/m².year Total: 125.93 kwh/m².year Estimation: Specific Electricity Consumption (not including Lighting): 4 kwh/m².year Domestic Hot Water Consumption: 1 kwh/m².year Expected Total Consumption after successful ZEMedS Renovation: 30 kwh/m².year ZEMedS Target Final energy consumption (all uses except DHW & cooking) C FE 25 kwh/m².year Heating/Cooling and Ventilation: C HVAC 20 kwh/m².year Lighting: Cligh 5 kwh/m².year Energy Saving Potential (heating, cooling, ventillation and lighting) Theoretical Saving 95.93 kwh/m².year Theoretical Gain 76 %

Energy Saving Potential 14 Actual Final Energy Consumption (heating, cooling, ventillation and lighting) Consumption by Bills Natural Gas: nm3/year = 430.755 kwh/year Electricity: 46.282 kwh/year Other Fuel: 0 kwh/year Total: 477.037 kwh/year Estimation: Specific Electricity Consumption (not including Lighting): 15.152 kwh/year Domestic Hot Water Consumption: 3.788 kwh/year Expected Total Consumption after successful ZEMedS Renovation: 113.640 kwh/year ZEMedS Target Final energy consumption (all uses except DHW & cooking) C FE 25 kwh/m².year Heating/Cooling and Ventilation: C HVAC 20 kwh/m².year Lighting: Cligh 5 kwh/m².year Energy Saving Potential (heating, cooling, ventillation and lighting) Theoretical Saving 363.397 kwh/year Theoretical Gain 76 %

Renewable Energy Source Potential 15 System Considerations and Recommendation Potential Production Photo Voltaic Flat Roof, south oriented panels System 16,6767 kwp (about 400 m2 of roof surface) + Tilt Roof, SSE oriented 20 kwp (about 160 m2) Solar Thermal for DHW RES Heat Pump 12.06 kwh/m².year XX kwh/m².year XX kwh/m².year Others RES Potential RES Production Potential 12.06 kwh/m².year

Recommended Measures 16 Controlled Natural Ventilation NOW Use and management Demand reduction Energy efficient systems Renewabl eenergy supply Building Manage ment System NZEB Windows Replacement PV System Heating: Functional Sectors and Level Sectors managed by BMS Lighting: Presence Control

Recommended Measures 17 Measure Why is recommended and what Windows Replacement Controlled Natural Ventilation Building Management System Photovoltaic System Replacement is highly needed for all the windows that are still single glass and should be considered d also for the once having double glass without air gaps Energy Saving and Comfort. Avoid wastes due to management. As windows need to be replaced, intervention cost can be limited. For reducing energy waste and optimizing usage efficinecy Further Electric Energy Production

Specific Features and Remarks 18 Specific Remarks Since 2011 a monitoring system is installed, mainly managed by the ESCO which has the energy management contract. These data are accessible in real time by the Province of Macerata but historical and statistical data are not directly accessible. They would be very useful in the dygnosis. Since it is an historical building, special care it is required in the envelope.

Funding Opportunities 19 Relevant Information: The on going contract with an ESCO is ongoing until 2019. In order to define how to proceed, new contract models are being explored, trying to maximize the possibility of investments in building renovation for energy performance. Funding Potential: Self funding: to be assessed Regional Initiatives: DGR 124 02.03.2015 03 2015 Regional Government Criteria for getting Ministerial Fund 3 year Planning for School Buildings (art.10 Law 128/2013, DM 23.01.2015, also known as IEB loan decree ERDF Thematic Objective 4 Action 13.1 Promozione dell eco efficienza e riduzione di consumi di energia primaria negli edifici e strutture pubbliche National Funding: European Direct Funding: The Province of Macerata was informed through the ZEMEDs project about the possibility of preparing an ELENA proposal, and it is assessing it.