ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

Similar documents
TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

Ohio Contractor Association Annual Work Forecast Program. John Picuri, District 4 Deputy Director Myron Pakush, District 12 Deputy Director

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

IMPROVING I 81 IN MARYLAND

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

I-17 and Happy Valley Road Diverging Diamond Interchange (DDI)

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Four

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Highway Construction Program

ADA Training Design Case Studies MnDOT

Highway Construction Program

STAFF REPORT. Kevin Rohani, P.E. Public Works Director/City Engineer. FY 2017/18 First Quarter Report on the Capital Improvement Program

Capital District Transportation Committee November 6, Unit Costs for Non-State Highway Reconstructions with Federal Funds

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

5/11/2016 SR 15 SECTION 088 CSVT SOUTHERN SECTION SR 15 SECTION 088 CSVT SOUTHERN SECTION AGENDA

For Public Input Period

Berkshire Region TIP Project Data Form

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

2016/2017 Organizational Chart. Effective 7/1/2016 Budgeted 29 FTE Positions Budgeted 1 Part-Time Position Budgeted 4 Intern Positions

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees

Construction Cost Estimation Preparation Manual (Metric Units)

Administrative Modification 22 FY FY 2021 Transportation Improvement Program October 25, Page 1

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

CITY OF ANN ARBOR, MICHIGAN Public Services Area/Project Management Unit 301 E. Huron Street P.O. Box 8647, Ann Arbor, Michigan 48107

CITY OF ROCKLIN STANDARD DRAWINGS

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

} SURVEY SR 429 STANDARD CLEARING & GRUBBING LIMITS OF FRICTION COURSE 8" 8" 8" 8" 12' VARIES 24'-36' VARIES VARIES * 4' SHLDR. PAVT.

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

Pinellas County Capital Improvement Program, FY FY2016 Project Summary Report

CHAPTER 3 SCOPE SUMMARY

Preventive Maintenance Project & Treatment Selection

ROADWAY DESIGN AND CONSTRUCTION STANDARDS

Project Initiation Form

Future Programmatic Date 09/04/2018 Sorted By District (Subject to Departmental Changes) Run Date 6/22/2018

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

Fuller /Fuller Heights Road Improvements

connections 2040 the waco metropolitan transportation plan amendment 1

Page 1D-1 Revised language to link from Project Management Manual to Project Management Online Guide.

RAIL-HWY PROJECT DEVELOPMENT GUIDE AND

NW 47TH AVENUE PROJECT DEVELOPMENT & ENVIRONMENTAL

BROWARD COUNTY. Solicitation Bid #V P1 Construction Engineering & Inspection Services Transit Bus Stop Infrastructure

PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

PAVEMENT DESIGN MEMORANDUM

Public Works Capital Projects Management. Presented by: Joseph Cordts P. E., Portfolio Manager Capital Projects Management

FY 2019 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

The Main Street Bridge - Supporting Transportation Systems

Request for Proposals No ; Various On-call Professional Design and Engineering Services Addendum No. 1 Page 2

Public Works Department Five Year Capital Improvement Plan FY PROPOSED

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

SUBDIVISION CHECKLIST. Subdivision Name. Prior To Review. Preliminary plan approved by Planning Commission / Council as required.

SECTION 6. ROAD CONSTRUCTION STANDARDS

DRAFT Geotechnical Technical Memorandum

Future Programmatic Beyond 01/06/2020 Sorted By District (Subject to Departmental Changes)

ADMINISTRATIVE AMENDMENTS TO THE TIP AND RTP

Engineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017

Sustainable Pavement Practices Help Local Agencies in California Improve Their Road Infrastructure

US-101 CORRIDOR ADVISOR S UPDATE 19 MARCH 2015

US-101 CORRIDOR ADVISOR S UPDATE

Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements

CHAPTER 8 TRANSPORTATION ELEMENT

STRUCTURE AND BRIDGE DIVISION

Final Air Quality Report

CLA /10.54, PID Project Description:

Construction Engineering and Inspection Services Pembroke Road from Dykes Road to Silver Shores Boulevard Broward County, FL

COST ESTIMATE STREET IMPROVEMENTS (Off Site)

Agenda TxDOT PAVED Transportation Summit Tyler March 20,

Standard Performance Attributes for Transportation Projects

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

Tarbutton Road Interchange and I-20 Frontage Roads. Estimating and Planning Group

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

2017 Highway Safety Improvement Program Call

TABLE OF DRAWINGS. Pierce County Public Works & Utilities

2016 Arizona Pavement/Materials Conference. Dennis Smith MAG Executive Director (602)

Minnesota Statewide Freight Bottlenecks

FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07

WELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016

Tangerine Road Dove Mountain Boulevard to La Cañada Drive

STIP Project Description Guidance Revised December 14, 2015

I-11 Project Nevada Transportation Conference. Ryan Wheeler, P.E. NDOT, Senior Project Manager. Nevada Department of Transportation

SUPPLEMENTAL ECMS ADVANCED INFORMATION AUGUST 10, 2017 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

Annual CSAH Needs Update for 2017

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Design-Build and Design-Bid-Build

Overview of Maintenance and Construction Programs. Mike Holder, PE, Chief Engineer Jennifer Brandenburg, PE, State Asset Management Engineer

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

I-90 Pavement Rehab VE Study

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

ATP-6 STIP APPLICATION FORM FOR FISCAL YEAR 2017 Page AGENCY (Requestor or Agency who'll open bids): Contact: Phone:

Department of Street Services

Information for File # RJH

Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)

Annual CSAH Needs Update for 2018

TRANSPORTATION. Governmental Projects

Transcription:

ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle Dome-La Paz CL (MP 54-63) I-8, State Line-Fortuna Rd (MP 0-13.5) I-8, Ligurta-Dateland (MP 19-66) Sign Rehab I-8, Foothills Blvd-Wellton Crack Seal I-10, Bouse Wash Rest Area Gas Line Rd (MP 52-63) I-10, Dike Repairs (MP 47-48) SR 85 @ Gila Bend Ph I Oxbow Bridge

SR 85 @ Gila Bend Ph I Contractor- Haydon Building Corp. Contract Amount- $13,473,722 Project Status- 48% Complete Project consists the realignment of Pima St. and Maricopa Rd, demolition of SR 85/B8 interchange and the construction of Pima/B8 intersection. Work consists of removal of 2 bridges, AC pavement, and existing box culvert; constructing new AC pavement, curb & gutter, drainage improvements, construction of new bridges, lighting, landscape and other related items.

Oxbow Bridge Contractor- Lawrence Construction Company Contract Amount- $979,712 Project Status- 70% Complete Project consists of removing bridge deck and replacing with new wooden bridge deck.

SR 95, Colorado River Bridge Replacement Prime Contractor- MCM Construction, Inc. Project Cost- $23,465,000.00 Project Start Date- 4/15/11 Project Description- Project consists of removing existing bridge and constructing a new bridge.

Ave 3E, Gila Ridge Road- 24 th Street Existing Bridge Project Estimate- $8.2 Million Joint project between ADOT & City of Yuma Project consists of widening the bridge over the railroad to accommodate 3 lanes in each direction with concrete median. Project received $7 Million of Coordinated Border Infrastructure Funding

I-8, Fortuna Road & South Frontage Road Improvements o Project is scheduled for construction in FY 12 o Project consists of widening the existing south frontage road, placing new chain link fence along the r/w line, and widening the return radius from Fortuna Road to the south frontage road o Joint project with Yuma County & ADOT

US 95, MP 82 & 89 Intersection Improvements Project cost estimated at $1.6 Million Construction scheduled for FY 12 Work consists of adding a right and left turn lane at each intersection. At MP 89.2 the turnout will be realigned to remove the existing skew. MP 89.2

US 95, International Border-Juan Sanchez Blvd. Construction Estimate- $5 Million Design FY 12 thru 13 Construction FY 13 Project improvements will include: improvement traffic circulation to and from the port of entry. One-way streets at Archibald & 1 st Ave. New pavement, new curb & gutter, pedestrian lights, luminares, signage, & storm drain system

US 95, International Border-Juan Sanchez Blvd. Other Work Elements- Enhancement project on US 95 (Main St) from D Street to Border 1. Install raised curb median between B St & Juan Sanchez Blvd. and curb bump outs for on street parking between A St. and D St. 2. New sidewalk, street furniture, bike racks 3. New signage & pedestrian lighting Installing storm drain system for Yuma County Flood Control District Enhancement Project Storm Drain System

I-10, Ehrenberg Roundabout & Pavement Preservation Project construction scheduled for FY 12 Estimated Construction Cost- $4.67 Million Project consists of constructing a roundabout at The crossroad and south frontage road, milling and replacing pavement, and reconstructing portion of the roadway near the roundabout

US 95, Ave 9E to Aberdeen Corridor Gila River Bridge The Project consists of widening the existing roadway from a two-lane roadway to a five-lane section with 10 shoulders from Ave 9E to the Gila River Bridge and from the Gila River Bridge to Aberdeen Road the roadway will be widened to a four-lane divided highway section. 30% General Plan Complete Corridor will be split into 4 to 5 separate smaller projects. Corridor Cost Estimate- $118 Million Castle Dome Road & US 95 Intersection

US 95, Ave 9E to Aberdeen Ph I Phase I- Ave 9E to Fortuna Wash Bridge (MP 31.87-34.66) Project consists of widening the roadway to a five lane section with 10 shoulders, constructing a new bridge over the Fortuna Wash, constructing a roundabout at the intersection of US 95 & Fortuna Road, widening an existing canal bridge. Roundabout Existing US 95

I-8, Araby TI Improvements

I-10, West Quartzsite TI Improvements Construct roundabouts at ramp intersections to alleviate traffic congestion without widening the crossroad The construction of roundabouts at the ramp intersections could handle increasing traffic volumes for a number of years before any other improvements will need to be made.

I-10, West Quartzsite TI Improvements

Highway Safety Improvement Program Projects Ave 8E & US 95 Intersection Improvements (Roundabout) SR 95 & Cienega Springs Road (MP 149.2) Intersection Improvement (left turn lane) SR 95 & Mohave Road (MP 142.9) Intersection Improvements (Roundabout)

Questions?