City of Roman Forest

Similar documents
CITY OF FATE SINGLE FAMILY BUILDING PERMIT PACKET. Adopted Codes:

City of Willow Park 516 Ranch House Road Willow Park, Texas Phone: (817) * Fax: (817)

RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS

RESIDENTIAL BUILDING PERMIT

Borough of Doylestown Building and Zoning Department

City Of Mendota Construction Procedures

1. Complete Building Permit Application forms on page 2. Include septic system design approval from the Washington County Health Department.

Permit Posting and Inspection Procedures

Building Permit Application

RESIDENTIAL PROJECT INFORMATION

APPLICATION FOR FINISHED BASEMENT PERMIT

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Residential Remodel/ Add On Rules and Regulations

BUILDING PERMIT APPLICATION CITY OF SIDNEY BUILDING INSPECTION DEPARTMENT

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

The following is required for a complete permit submittal for each unit.

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Contractor/Owner initials are verification that items #1 and #2 and items (a) thru (g) above are included in the submitted plan/drawing.

City of Lorena 107-A S. Frontage Road Lorena, Texas Phone: (254) Fax: (254)

City of Santa Monica Building and Safety Division

$ Plan Review Fee when Permit Application is submitted BASEMENT REMODEL BUILDING PERMIT APPLICATION. Status Sticker OFFICIAL USE ONLY

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

City of Oregon City. Community Development. Building Division Fee Schedule. Effective January 1, 2017 BUILDING DIVISION. Description. Fee 65% $86.

CONSTRUCTION GUIDELINES

VILLAGE OF NORTHFIELD (847) BUILDING CONSTRUCTION PERMIT SUBMISSION LIST

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

RESIDENTIAL BUILDING PLAN REQUIREMENTS

INSPECTION TIMING CHECKLIST FOR RESIDENTIAL FRAME BUILDING PRIOR TO INSPECTION REQUEST

Building Department Policies and Procedures

Village of Arlington Heights. Sewer Back-up Rebate Program

Residential New Home Requirements 200 South Main Blue Ridge, Texas

RESIDENTIAL BASEMENT ALTERATIONS GUIDE

Basement Finish/Remodel Permit Information Revised 10/2/18

Basement Finish/Remodel Permit Information Revised 10/2/18

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

NEW CONSTRUCTION PERMIT APPLICATION

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

CODE COMPLIANCE GUIDELINE GENERAL BUILDING

Applications for building permits will not be reviewed until all of the required information has been submitted.

Residential Building Plans

RESIDENTIAL GUIDELINES

The following is required for a complete permit submittal for each unit.

APPLICATION FOR BUILDING PLAN APPROVAL AND PERMIT

Elko County Building & Safety Division

NEW ONE & TWO FAMILY PERMIT REQUIREMENTS

HOMEOWNER PERMITS AND ELECTRICAL WIRING GUIDE

Commercial Submittal Packet

Madison's Home Inspections

Application for Commercial Plan Review and Building Permit. Address:

CITY OF LA MARQUE Gateway to the Gulf st St., La Marque, TX (409) Fax: (409)

COMMERCIAL PROJECT INFORMATION

BUILDERS REQUIREMENTS

RESIDENTIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS

City of Shawnee. Community Development Department. A Guide to Building Residential or Commercial Structures; or Locating or Expanding Your Business

Scale Drawing This drawing will need to show the full lot and location of the proposed

HARPER WOODS BUILDING DEPARTMENT PROCEDURES FOR OBTAINING CERTIFICATE OF OCCUPANCY

Office use only 115 S. FRANKLIN AVE. Permit No. POLO, IL 61064

City of Meadowlakes Builder s Packet for New Construction Builder/Contractor or Property Owner

Single Family Residential Building Permit. Application Guidelines. August 2000

VILLAGE OF SLINGER BUILDING INSPECTOR SCHEDULE OF PERMIT FEES EFFECTIVE January 1, 2018 $55.00

PERMIT APPLICATION FOR ALTERATION, BASEMENT FINISH, REMODEL, OR REPAIR

Application. Village of Morton Grove Department of Buildings 6101 Capulina, Morton Grove, IL Phone: 847/ Fax: 847/

Office Hours: 9 a.m. to 5 p.m. Kristal Bachman Community Development Administrator. Jaclynn Workman Inspections Coordinator

One and Two Family Additions

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

Basement Build-Out Guidelines

City of Jacksonville Development Guide Building Permits

BUILDING PERMIT PROCEDURE

FOR ADDITIONS and REMODELS Before filling out this application, read Green Building & Green Points Guideline Booklet for more in-depth information.

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

Sub-Chapter B To Chapter 14, Building Code

BUILDING PERMIT PROCEDURE PLEASE READ CAREFULLY AND FILL OUT COMPLETELY TO ASSURE QUICK AND ACCURATE SERVICE

CITY OF ANDERSON BUILDING AND CODES 601 South Main Street

CITY OF ROME/FLOYD COUNTY BUILDING INSPECTION DEPARTMENT FEE SCHEDULE

Residential Building Permit & Inspection Procedures

$ Plan Review Fee when Permit Application is submitted SHED BUILDING PERMIT APPLICATION. Application Date / /

Permit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2)

VILLAGE OF WATERLOO BUILDING PERMIT VALUATION FEES

Building Permit For new construction projects

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

Village of Gurnee Construction Documents Submittal Requirements

Residential Electrical Upgrade Permit Revised: 11/15/17

The Inspection Process. Waxhaw N.C.

APPENDIX - PERMIT, LICENSE AND APPLICATION FEES AS SET BY MAYOR AND CITY COUNCIL Application Permit and License Fees Effective 1/1/2014

CITY OF PASADENA COMMERCIAL BUILDING PERMIT APPLICATION 1114 Davis St., Pasadena, Texas (713)

UCC Permit Application Procedures

Town of Pawling Residential Building Permit Application

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

TOWN OF FRANCESTOWN BUILDING/CODE ENFORCEMENT 27 MAIN STREET P.O. BOX 5 FRANCESTOWN, NEW HAMPSHIRE Building Permit Application Guide

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

Building a Wood Deck, Gazebo, or Pergola

Incorporated Village of Lawrence

RENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space.

B U I L D I N G P E R M I T A P P L I C A T I O N

TOWNSHIP OF FALLS USE & OCCUPANCY FACT SHEET

District of Ucluelet Building Permit Guide

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

Alabama Home Inspections

Building/Zoning Permit Fee Structure

Transcription:

City of Roman Forest Building Department Phone: 281-399-2660 Residential Construction & Land Development

Introduction The City of Roman Forest has adopted the 2006 International Building Codes and Amendments, the 2008 National Electric Code in addition to the City of Roman Forest Ordinances No. 218, No. 408, No. 411 and No. 412 as minimum standards for new construction. The builder/developer will be subject to required inspections for compliance. Further, the City of Roman Forest, in an effort to help clarify requirements and associated fees, is providing this information packet to all interested parties. Depending on the event or construction circumstance, permitting may be required with an associated fee. This packet will help the builder/developer forecast permit expenses and inspections; hence, preventing any unnecessary delays and construction expense. It is not the intent of the City to limit growth or inhibit construction, but rather to ensure the proper development thereof through regulatory limitations. In this light, the City of Roman Forest hopes to protect the health, safety and welfare of its citizens, the consumer and public interest. Sincerely, of the City of Roman Forest

Table of Contents Inspection Department/Plan Review and Inspection Requirements Inspections/Permits/Fees Building Permit Applications Required Inspections Additional Electrical Requirements All City Ordinances Pertaining to Building City Ordinance No. 218A (Logging Permit Ordinance) City Ordinance No. 401 (Building Ordinance) City Ordinance No. 408 (Building Ordinance) City Ordinance No. 410-A (Building Ordinance) City Ordinance No. 412-A (Building Ordinance) City Ordinance No. 194-04 (Electrical Licensing Ordinance) City Ordinance No. 196-04 (Building Ordinance) City Ordinance No. 197-04 (Building Ordinance)

The City of Roman Forest Inspection Department Plan Review and Inspection Requirements Any additional code requirements not specifically covered by this plan review due to lack of information or otherwise shall adhere to the City of Roman Forest Code of Ordinances and shall be field verified for code compliance and code conformance. Building Requirements: 1. Building to conform to 2006 International Building Codes 2. Finished floor elevation to be twelve inches above manhole or the crown of the street whichever is less 3. Dumpster and port-a-potty on job site 4. Anchor bolts spaced every four led 5. Purlin and ridge braces to terminate on load bearing walls 6. Span tables will be used to verify ceiling joists 7. Wind bracing is required 8. Brick ties to be spaced eighteen inches on center with two fasteners 9. Smoke detectors are required for final and shall be tied together 10. Sidewalk and driveway required to be called in for inspection before pouring concrete Plumbing Requirements: 1. Plumbing Tradesman or greater on job site at all times 2. Water test required for plumbing ground and top out 3. Diaphragm Gauge required for dishwasher 4. Spring Gauge required for gas rough in and Diaphragm Gauge for final 5. Main sewer run required to have water test 6. When ready for final gas for meter call City Inspector to notify gas supplier 7. Sewer clean outs are required to be cut to grade for final 8. The City of Roman Forest has adopted the Plumbing License Law for the State of Texas Note: Please be aware that the State Field Investigator will be coming by to check the job sites. Electrical Requirements: 1. All inspections are based on the 2008 NEC 2. Call for temp pole inspection 3. Concrete encased electrode required for slab inspection 4. Bore holes and box fill will be inspected 5. Electrical work to be done in a neat and workmanlike manner 6. Panel box to be labeled for final 7. GFI s will be tested for final also labels need to be installed for line side plugs 8. All electrical labor must be performed by a licensed electrician, licensed by the State of Texas 9. The City of Roman Forest has adopted the Electrical License Law for the State of Texas Mechanical Requirements: 1. All work must be completed by a licensed mechanical contractor 2. Return air has to be sealed 3. Primary and secondary drain lines need to have ¼ fall per foot 4. Pipe sealant required at drain pan connection 5. Need 36 clear pathway to equipment 6. Box in all registers for proper bracing and balancing 7. Exhaust fans to terminate outside structure 8. Maintain one inch clearance to wood framing for attic unit 9. 390 lb rated ladder for attic access If you have any questions concerning this plan and review please call Bureau Veritas 1-877-837-8775

Inspections/Permits/Fees Culvert Permit and Inspection 75.00 Logging Permit 250.00 T-Pole/Saw Pole Permit 75.00 City Building Permit 750.00 Building Plan Approval/Inspection See Schedule Administrative Fee 75.00 Plumbing Permit Fee 75.00 Electrical Permit Fee 75.00 Mechanical Permit Fee 75.00 HVAC Permit Fee See Schedule Parking and Paved Area Permit Fee See Schedule Sidewalk Permit Fee See Schedule Driveways Permit Fee 75.00 Culvert Pipes Permit Fee See Schedule Curb and Gutter Permit Fee See Schedule Re-Inspection Fee 75.00 Special Requested Inspections 250.00 Certificate of Occupancy 75.00 Pool Plan Approval/Inspection 330.00 plus $250.00 for Building Permit (An additional $75.00 charge for each approval/inspection over the required 6 approval/inspection processes) Sprinkler/Irrigation 75.00 Permit/Inspection An additional $75.00 charge will apply for each additional required plan approval/inspection over the normally required approval/inspection process. This applies to each permit required by builder.

RESIDENTIAL PERMIT/INSPECTION APPLICATION AND FEES Project Street Address Location: Roman Forest - Lot Block Section Start Date Project Valuation Owners Name Phone Builders Information Name Address City, State, Zip Required items for Logging Permit: Proof of Liability Insurance ($100,000.00 minimum) $2000.00 Cash or Surety Bond (Refundable) Adherence to Ordinance 218 A logging permit is needed for any resident or builder that will be cutting down 7 or more trees that are 4 in diameter within a 12-month calendar year. The permit holder, in signing below, has received, read and fully understands the terms, conditions, penalties, and associated requirements enacted by the City of Roman Forest Ordinance No. 218. Signature

Building Permit Application Homeowner Name: Address: Date: Permit Valuation/Sq. Ft. Fee Calculation Fee Culvert Permit and Inspection $75.00 $ Logging Permit $250.00 $ T-Pole/Saw Pole Permit $75.00 $ City Building Permit $750.00 $ Building Plan Approval/Inspection See Schedule $ Administrative Fee $75.00 $ Plumbing Permit Fee $75.00 $ Electrical Permit Fee $75.00 $ Mechanical Permit Fee $75.00 $ HVAC Permit Fee See Schedule $ Parking and Paved Area Permit Fee See Schedule $ Sidewalk Permit Fee See Schedule $ Driveways Permit Fee $75.00 $ Culvert Pipes Permit Fee See Schedule $ Curb and Gutter Permit Fee See Schedule $ Re-Inspection Fee $75.00 $ Pool Plan Approval/Inspection $330.00 plus $250.00 for Building Permit (An additional $75.00 charge for each approval/inspection over the $ required 6 approval/inspection processes) Sprinkler/Irrigation Permit/Inspection $75.00 $ Special Requested Inspections $250.00 $ Certificate of Occupancy $75.00 $ Deposit for Certificate of Occupancy Deposit will be returned upon final completion of inspections and issued with a Certificate of Occupancy. $500.00 Total $ An additional $75.00 charge will apply for each additional required plan approval/inspection over the normally required approval/inspection process. This applies to each permit required by builder.

RESIDENTIAL PERMIT/INSPECTION FEES 25% of Building Plan Approval/Inspection due at the time the plans are dropped off for approval. Each additional plan approval and/or inspection beyond the required number of inspections will be an additional $75.00 per approval and/or inspection. 2013 PERMIT FEE SCHEDULE Valuation Table *Use this table to determine fees when noted in the fee schedule $0.01 - $7,000 $75.00 (NOTE: The minimum permit fee is $75.00) $7,001 - $150,000 $75.00 for the first $7,000 plus $4.12 for every additional $1,000 in valuation or fraction thereof $150,001 - $200,000 $626.30 for the first $150,000 plus $3.87 for every additional $1,000 in valuation or fraction thereof $200,001 - $300,000 $820.16 for the first $200,000 plus $3.61 for every additional $1,000 in valuation or fraction thereof $300,001 - $500,000 $1,181.46 for the first $300,000 plus $3.35 for every additional $1,000 in valuation or fraction thereof $500,001 - $1,000,000 $1,852.46 for the first $500,000 plus $3.09 for every additional $1,000 in valuation or fraction thereof $1,000,001 - $5,000,000 $3,400.91 for the first $1,000,000 plus $2.83 for every additional $1,000 in valuation or fraction thereof $5,000,001 - $50,000,000 $14,756.21 for the first $5,000,000 plus $1.54 for every additional $1,000 in valuation or fraction thereof $50,000,001 and up $84,436.46 for the first $50,000,000 plus $1.03 for every additional $1,000 in valuation or fraction thereof PARKING LOTS, PAVED AREAS AND SIDEWALKS Parking lot or paved area $75.00 for the first 1,000 sq. ft. or part thereof. $2.58 for each additional 1,000 sq. ft. or part thereof Sidewalks $75.00 for the first 100 lineal ft. $8.77 for each additional 100 lineal ft. Driveways $75.00 Culvert pipes (not in driveways) $75.00 for the first 100 lineal ft. $8.77 for each additional 100 lineal ft. Curb and Gutter $75.00 for the first 100 lineal ft. $8.77 for each additional 100 lineal ft. HVAC FEES Minimum Fee $75.00 Ventilation systems or heat only systems (other than boilers) $75.00 plus 2.0 % of valuation Commercial and industrial process refrigeration systems $75.00 plus $8.77 per ton Repairs or alterations to existing HVAC or refrigeration systems $75.00 plus 2.0 % of valuation Except: Ducts and grilles in a lease space, where total valuation is less than $500.00: $75.00 for each lease space Temporary Operation Inspection $75.00 Boiler installation based on Btu input and/or HP $75.00 plus, $4.12 per BHP or part thereof Boiler Repair Permit $75.00 Certificate of Approval $75.00 Annual Boiler Inspection Fee $75.00

Memo to Contractors: When the form boards are set a surveyor needs to verify that the new building will be located behind the building line as per the plat of Roman Forest Sections One and Two. Construction and/or remodeling work must not begin before 6:30 a.m. and must be completed by 7:30 p.m. No concrete trucks over 2 tons will be allowed on the jobsite before 6:30 a.m. This includes all City of Roman Forest streets. Anyone not complying with the above will be issued a citation for noise disturbance. Concrete trucks will be ordered from the City of Roman Forest and at the Officers discretion may be ticketed for the same offense. Chris Parr City of Roman Forest I, the undersigned, do hereby understand the above memo and agree to these requirements. Contractor Date

Required Inspections Every inspection may not apply to every project and the order of inspections may vary. 1. Plumbing Underground 2. Electrical Underground 3. Foundation Pre-Pour 4. Framing 5. Plumbing Rough In 6. HVAC Rough In 7. Electrical Rough In 8. Sawpole 9. Electrical Meter Release 10. Gas Meter Release 11. Storm Drainage Underground 12. Building Sewer 13. Building Water Service 14. Parking Lot Pre-Pour 15. Plumbing Final 16. Electrical Final 17. HVAC Final 18. Building Final An additional $75.00 charge will apply for each additional required plan approval/inspection over the normally required approval/inspection process. This applies to each permit required by builder.

Electrical Requirements Additional 1. All copper wiring 2. Minimum service, 150 amp 40 circuit panel 1/0 copper, 5/8-8ft. copper clad, ground rod #4, #6 bonds to water pipe 3. All major appliances on dedicated circuit, dishwasher, disposal, trash compact, microwave, freezer, dryer, washer, blower for heater, etc. 4. Must have plug in the attic and a weather-proof G.F.C.I. A/C 5. Must have #14 wire minimum for plug circuits 6. No more than 8 outlets per circuit 7. Two (2) - dedicated circuits for kitchen and appliance circuits 8. Dedicated G.F.C.I. circuits for bathroom 9. Must have four (4) wires for dryer, ovens, cook-tops and stoves 10. All islands and floor plugs must be terminated at accessible pull box and at each end of conduit 11. All PVC run above ground should be schedule 80 12. All wire should be terminated in boxes, excluding dishwasher & disposal 13. Electrical heat should have disconnect or breaker at heater 14. All sub-feeds to sub-panels should be four (4) wires copper 6-4 minimum for 60 amps 4-4 minimum for 100 amps 2-4 minimum for 120 amps 15. All fans should be mounted on approved fan type box with 2X4 headers 16. If electric hot water heater is in the attic it should have disconnect at heater 17. All whirlpools are to be on a separate protected circuit 18. All shower-lights less than 8 ft. should be G.F.C.I. 19. All plugs and switches should have screws, not quick connect wire in back 20. Smoke detectors must be in all sleeping areas and immediate vicinity outside each sleeping area, top of stairs, at each floor in excess of 1 floor Randy Mason Building Inspector City of Roman Forest