Zurn Z886. 6" Perma-Trench. Installation Instructions

Similar documents
LINEAR DRAINAGE. Z886 Perma-Trench. 6" Perma-Trench Installation Instructions

Linear Drainage Z886. Perma-Trench. Installation Instructions. 100mm Clear Opening

Zurn Z874. Trench Drain System. Installation Instructions

Zurn Z874. Trench Drain System. Installation Instructions

Linear Drainage ZF806 ZF812

FLO-THRU ACCESSORIES Above are some of the trench drain components typical to an installation. Double check your order to ensure that you have all com

ZURN INDUSTRIES, INC., FLO-THRU DIV.,

Z HIGH- CAPACITY TRENCH

Above are some of the trench drain components typical to an installation. Double check your order to ensure that you have all components particular to

Z884 SHALLOW TRENCH DRAIN SYSTEM INSTALLATION INSTRUCTIONS

II TECHNICAL INSTALLATION GUIDE

INSTALLATION GUIDE PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

TF-14. TF-14 Installation Guide

Installation Instructions

TFX - Toggle Lock Installation Guide

Hi-Cap Slotted Drainage System Surface Drainage

ACO DRAIN Site Installation Manual

BioPrism Solid Surface

Spec-Tran Specified Transportation Systems

Installation Guide. MEA-JOSAM 100 & 200 Size Pro-Plus Trench Drain

Installation Guide. MEA-JOSAM 300 Size Pro-Plus Trench Drain

BioPrism Solid Surface

90% Design Submittal Stormwater Drainage Calculations Parking Garage CDRL

INSTALLATION INSTRUCTIONS

Installation Guide. MEA-JOSAM Pro-Plus Trench Drain

ZS880 Linear Shower Drain Installation Instructions

DRAINAGE SOLUTIONS SINCE 1908 SURFACE DRAINAGE. Installation Guide ARMTEC.COM

TraffikDrain. 2 bolts per half meter grates for removable grate option

SMITH/ACO DRAINAGE SYSTEMS

GB-20. Submittal Specifications Installation Application Specific Details

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

Multi-Piece Shower with Trench Drain

10 [254] E1 E2 ½ LEDGE TO SUPPORT GRATE. SUFFIX Perforated stainless steel (Type 304) 4 no hub bottom outlet -BO4 assembly

The Most Advanced Name in Water Management Solutions TM. The most cost-effective slotted and trench surface drain systems.

Multi-Piece Shower with Trench Drain

Multi-Piece Shower with Trench Drain

SV24. Submittal Special Precautions Specifications Installation. 12½" (31.8 cm) 12½" (31.8 cm) 12" (30.5 cm) 12" (30.5 cm) 12" (30.

SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES

INSTALLING A POUR-IN-PLACE DOCK LEVELER (EH & RR)

GB-75. Submittal Specifications Installation Application Specific Details

INSTALLATION MANUAL KOCH

Precast Concrete Trench Drain Systems INSTALLATION INSTRUCTIONS

Enviro-Flo II Trench Drain System Competitive Comparison Guide

GB-75. High Efficiency Grease Interceptor Technical Data. Submittal Specifications Installation Application Specific Details

SECTION ALUMINUM HANDRAIL SYSTEMS

simple, efficient, and cost effective floor and surface drainage system

fusion shower pan on wood joists installation guide

Revision Date: April 01, Premier Vinyl Enclosure

Freedom Barrier Free Shower Pan Installation Instructions

Freedom Barrier Free Shower Pan Installation Instructions

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

US Pool Lift Model #114 (Independence) Installation Guide

PRODUCT INFORMATION Dero Hoop Rack

Impression Graphic panels

Inigo Console Table INSTALLATION INSTRUCTIONS P74300, P A Page 1 of 5

Rough-in frame and flush-mount panel installation instructions

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.

Series. 26 Wide NEENAH Unbolted Heavy Duty Trench Drain Grates and Frames

TYPE "A" CATCH BASIN

Console Table Legs & Console Table Top

Guidelines to installing the ACO Sport range of products

PowerDrain Section. Technical Handbook and Product Catalog. Heavy duty trench drainage

Multi-Piece EasyStep Product Installation Instructions

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Typical Installation Details

ACO DRAIN Site Installation Manual Polymer Concrete Drain Systems

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

FS-TRIO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

1. Include plans, elevations, sections, details, and attachments to other work.

Underground Exhaust System

Never ones to rest on our laurels, at NDS we ve taken our popular, easy-to-install Pro Series Channel Drain and made it even better.

B. Fiberglass for construction in back lot easements placed on cast-in-place base.

Rytec Corporation One Cedar Parkway Jackson, WI GO-RYTEC (262)

SECTION STORM SEWER COLLECTION SYSTEM

PS 3000 Installation Manual Step-By-Step Procedures C.9. DOOR AND WINDOW OPENINGS C.9.1 PREPARE IN ADVANCE. C.9.2 VBUCK CONSTRUCTION.

STRUCTURAL STEEL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING

Multi-Piece EasyStep Product Installation Instructions

Pre-Sloped Drain System

Important: Before You Start

Freedom One-Piece Barrier Free Showers Installation Instructions

Cornerview Shower Enclosure & Base

Instruction and Safety Manual Resilient Sound Isolation Clips (SIC Clips)

Welcome: What is U-Drain? Drain Materials. Flow

Pre-Installation See detail page for general notes concerning trim accessories, holes, fasteners, gaskets, caulking and support columns.

6032 SH 3P Residential Shower Installation Instructions Gelcoat & Solid Surface Bathware

GroundTrac. Installation Manual

adjustable fusion shower pan surface mounted on subfloor installation guide

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

GGI-750. Gravity Grease Interceptor Technical Data. Submittal Special Precautions Specifications Installation

SECTION DRAINS AND CLEANOUTS. 1. Division 7 - Thermal and Moisture Protection Piping (Plumbing).

DETAIL INSTRUCTION No. 1

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

3/4/5 LBS SJ. Low Base 3, 4 and 5 piece Showers with SnapJoint. Installation Instructions

SYSTEMS LTD. Leader in Linear Drain Solutions. A Publication of. Page 1. Randy Franzke. Cellar Master Supplies. Phone:

Expansion Joint Covers

Transcription:

Zurn Z886 6" Perma-Trench Installation Instructions

Z886 Accessories 6" [152mm] Wide Trench Drain System Below are the components of the Z886 trench drain typical to an installation. Check your order to verify you have all components particular to your job before beginning your installation. Contact customer service at 877-ZURN-NOW should additional material be required. 2

Z886 Tools Required Tape Measure Phillips Head Screwdriver Hammer Utility Knife Marker Cordless Drill Reciprocating Saw Ear Protection Safety Glasses Gloves Hole Saw Caulk Gun 3

Z886 Encasement Four-inch new concrete encasement is minimum. Guidelines for reinforcing an encasement would be to use the same thick - ness and reinforcing used in the surrounding concrete slab. Concrete must be vibrated to remove air voids in encasement, especially under the frame rails. Specifying engineer is responsible for concrete encasement and reinforcing based upon application and local codes. Excavation Trench excavation must include the minimum of 4 inches on both sides and underneath or the slab thickness surrounding the trench. Soft and/or shifting soil substrates may cause cracking of the concrete and consequent movement of the trench. It is critical that the concrete be poured on an adequate foundation. Verify depth of trench excavation to allow for the same thickness of concrete under and beside the trench as the surrounding slab thickness. 4

Z886 Layout Upon completion of the excavation, the channel should be placed in numeric order alongside the excavation according to the job layout. Each trench section has a trench identifi ca - tion number and flow direction indicating its sequence within the system. It is best to work from the deep or outlet end to the shallow. Grates are not installed at this time. Four (4) shipping/installation bars per channel; recommended spacing is approximately 3"-6" from end of rail for end pieces and 26"-29" from end of rail for center pieces. All shipping/ installation bar locations are approximate. 5

Z886 End Outlet Connection Options Step 1 When installing end cap or end outlet, remove by cutting with saw the 1-1/4" male overlap connection as shown. Step 2 Once overlap is removed, trim end cap/end outlet to desired height. Step 3 Attach end outlet or end cap to the channel with hardware provided. Attaching End Caps and Outlets Make sure all overlaps on trench are trimmed off prior to installing the end caps to ensure the finish installation has a frame above the trench channel. This ensures each trench will have a grate on it. 6

Z886 Bottom Outlet Connection Option Step 1 Score both sides of the rib with the utility knife. Step 2 Tap rib with a hammer to remove rib when necessary. Scrap Step 3 Attach bottom outlet to channel with hardware provided. Step 4 Cut out hole with hole saw that matches inside diameter of outlet. 7

Z886 Channel Connection Step 1 When job layout calls for male-to-male channel connection, cut male ends to be flush with end of integral frame on the ends that will be connected. Step 2 Screw the ribs together with the hardware provided. This method can also be used if you have a female-to-female connection. Z886 Neutral Cut Channel Connection Step 1 Cut a 1-1/4" by 13/16" section out of the end of the channel. This enables the end to act as a male end. Step 2 After removing the cutouts, attach channel through the female connection with hardware provided. 8

Z886 Connecting The Trench Step 1 Cut joint connector to height. It should fit snug on the radius portion of the trench to just below the upper lip of the channel. Step 2 Attach to the channels with the hardware provided. Z886 Connecting The Trench With Sidewalls Step 1 When using sidewalls with a joint connector, be sure to keep the trimmed pieces to attach to the sidewall portion of the trench using the hardware provided. Step 2 Attach to the channels with the hardware provided. 9

Z886 Connecting The Trench Channels should be installed from deep or outlet end to shallow end. This allows the next shallower channel s male connection to easily set onto the previous channel lip. Stake in place with No. 4 rebar (by others) and attach with the provided connection hardware. Sealing Channel connections are designed to be a good seal, meaning concrete aggregate will not intrude into the trench. Silicone sealant may be used as a gasket between the channels for a better seal. Channel connections may be welded with an HDPE welding gun for the best seal. Connections The maximum gap between frames is 1/4". Rebar length dictated by trench depth and substrate for positive anchoring while setting to resist floating. 10

Z886 Catch Basins Cut Channel Install Step 1 To make connection to a basin, invert the basin and channel and trace the outline of the channel onto the basin. This should be done for all sizes of basins. Step 2 Cutting the hole in the basin can be easily accomplished with the use of a hand saw or power reciprocating saw. Cut out the material inside of the traced area, including the upper lip under the frame. Do not cut the frame. Step 3 After the channel outline is removed from the catch basin, cut the inlet adapter to the height of the hole in the basin. Secure the inlet adapter to the basin using the hardware provided. Be sure to use silicone caulk or construction adhesive to seal the adapter to the basin. Step 4 Slide the male end of the channel into the inlet adapter, attaching them together with the supplied hardware and silicone caulk or construction adhesive. 11

Z886 Catch Basins Full Channel Install Step 1 To make connection to a basin, invert the basin and channel and trace the outline of the channel onto the basin. This should be done for all sizes of basins. Then remove the mechanical joint. Step 2 Cutting the hole in the basin can be easily accomplished with the use of a hand saw or power reciprocating saw. Cut out the material inside of the traced area. Step 3 Slide the male end of the channel into the basin attaching them together with the supplied hardware and silicone caulk or construction adhesive through the ribbing. 12

Z886 Catch Basins Full Channel Install With Heavy-Duty Frame Step 1 To make connection to a basin, invert the basin and channel and trace the outline of the channel onto the basin. This should be done for all sizes of basins. Step 2 Cutting the hole in the basin can be easily accomplished with the use of a hand saw or power reciprocating saw. Cut out the material inside of the traced area. Step 3 After the channel outline is removed from the catch basin, cut the inlet adapter to just under the top of the mechanical joint. Secure the inlet adapter to the basin using the hardware provided. Be sure to use silicone caulk or construction adhesive to seal the adapter to the basin. Step 4 Slide the male end of the channel into the inlet adapter attaching them together with the supplied hardware and silicone caulk or construction adhesive. 13

Z886 Setting The Trench New Construction Typically, a trench system is assembled from the outlet back. Starting with the deepest section or catch basin, set the first channel utilizing the integral rebar clip anchoring system. Rebar clips are on both sides of each trench drain for easy attachment to No. 4 rebar stakes. Slide the rebar into the rebar clips. Then drive the stakes into the ground for positive anchoring. Secure the trench to the rebar stakes with the hardware provided with bag No. 841. Adjust the trench to the desired elevation and repeat the process with the next channel. Set trench on rebar 1" above final grade this allows final elevation adjustment with a hammer prior to pouring concrete. It is recommended to pour concrete the same day the trench is set. Recess trench 1/8" below finish grade to ensure positive flow into trench grate. 14

Z886 Setting The Trench Blockout, Retrofit, Hanging An alternative means of installation is to suspend the trench drain as shown. Wooden braces to hang the trench run can be attached to the drain body through the grate lockdown bars as illustrated below. A 1 8" shim or as required 15

Z886-FGF SUSPENDED INSTALATION 6" [152] WIDE TRENCH DRAIN W/ CLASS F DUCTILE IRON FRAME & GRATE Dimensional Data (inches and [ mm ]) are Subject to Manufacturing Tolerances and Change Without Notice ENGINEERING SPECIFICATION: Zurn Z886-DGF Class F Ductile Iron Grate. Ductile Iron conforms to ASTM specification A536-84, Grade 80-55-06. Grate is designed to withstand class F900 Loading per the DIN 19580 specification. REV. DATE: 1/04/06 C.N. NO. 101843 *REGULARLY FURNISHED UNLESS OTHERWISE SPECIFIED DWG. NO. FT885 PRODUCT NO. Z886-FGF ZURN INDUSTRIES, INC., FLO-THRU DIV., 2640 South Work Street, Falconer, NY 14733 Phone: 716/665-1132, Fax: 716/665-1135, World Wide Web: www.zurn.com In Canada: ZURN INDUSTRIES LIMITED, 3544 Nashua Drive, Mississauga, Ontario L4V1L2, Phone: 905\405-8272 Fax: 905\405-1292

Z886 Concrete Pour and Finish Pour the concrete around the three sides of the trench drain. Be certain to adequately vibrate the concrete as it is being placed. Proper vibration will eliminate any unwanted voids within the concrete pour. If sidewalls are used, a first and second pour are recommended. Verify layout is correct prior to pouring concrete. Remove shipping/installation bars as you finish troweling. Placing Concrete Adhere to check that the trench drain is in the location required per the layout drawings prior to pouring concrete. Standard concrete practices with expansion and crack induction joints shall be followed based upon local codes and standards. The trench drain shall not be used as an expansion joint. The use of nominal 1x6 (3/4" x 5-1/2") lumber supplied by others may be used to keep channel clear during the concrete pour. Finish troweling should be done to set the top edge of the trench drain 1/8" below the floor grade. Remember to compensate for the concrete shrink that may occur during cure so that the edge of the trench drain does not protrude above the finished floor grade. 16

Z886 Internal Sidewall Extension Bracing Installation With Sidewall Extensions Use reinforcing every 10" per bracing schedule (bracing provided by others). Standard 2 x 4 s Height Determined By Invert 17

Z886 Sidewall Concrete Pour Step 1 Set the channel to the correct height. Step 2 Install reinforcing per bracing schedule (bracing provided by others). Step 3 Using the standard concrete pouring method, pour concrete so it is about 8" from the top of the trench. Step 4 Remove internal sidewall bracing. Step 5 Pour the remaining concrete, remove shipping/installation bars, and use standard finishing practices to finish the concrete. 18

Z886 Installing Grates After the concrete has been poured, vibrated, and given sufficient time to dry, grate lockdown bolts must be installed. The center of the grate should straddle the tie strap that spans the frame. The exception is when both channels and frames are cut. To place these grates, line up the lockdown hole in the grate with the lockdown hole in the tie strap. Lockdown bolts can be installed using a 1/2" socket. Locking Down Grates Start all lockdown bolts on each grate into the lockdown prior to tightening them down. There may be gaps up to 1/4" to ensure all grates will lockdown. 19

ZURN INDUSTRIES, LLC FLO-THRU OPERATION 1801 PITTSBURGH AVENUE, ERIE, PA, U.S.A. 16502 PHONE: 814/455-0921 FAX: 814/875-1402 www.zurn.com In Canada: ZURN INDUSTRIES LIMITED 3544 NASHUA DRIVE, MISSISSAUGA, ONTARIO LV4 1L2 PHONE: 905/405-8272 FAX: 905/405-1292 Form No. FT994, Rev. 5/11