LOCAL GOVERNMENT ENERGY AUDIT PROGRAM: ENERGY AUDIT REPORT

Similar documents
ENERGY AUDIT FINAL REPORT CEG PROJECT NO. 9C08134

LOCAL GOVERNMENT ENERGY AUDIT PROGRAM: ENERGY AUDIT REPORT

ENERGY AUDIT FINAL REPORT CEG PROJECT NO. 9C08134

CONCORD ENGINEERING GROUP 520 SOUTH BURNT MILL ROAD VOORHEES, NJ TELEPHONE: (856) FACSIMILE: (856)

CHERRY HILL TOWNSHIP SCHOOLS CHERRY HILL HIGH SCHOOL EAST 1750 KRESSON ROAD CHERRY HILL, NJ FACILITY ENERGY REPORT

LOCAL GOVERNMENT ENERGY AUDIT PROGRAM: ENERGY AUDIT REPORT

CONCORD ENGINEERING GROUP 520 SOUTH BURNT MILL ROAD VOORHEES, NJ TELEPHONE: (856) FACSIMILE: (856)

LOCAL GOVERNMENT ENERGY AUDIT PROGRAM: ENERGY AUDIT REPORT

EAST ORANGE SCHOOL DISTRICT DIONNE WARWICK INSTITUTE FACILITY ENERGY REPORT 120 CENTRAL AVENUE EAST ORANGE, NEW JERSEY 07017

LOCAL GOVERNMENT ENERGY AUDIT PROGRAM: ENERGY AUDIT REPORT

MAYWOOD BOARD OF EDUCATION MEMORIAL ELEMENTARY SCHOOL ENERGY ASSESSMENT. For NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO.

Energy Assessment Report Clayville Elementary School DRAFT October George Washington Highway, Clayville, RI DRAFT

EAST ORANGE SCHOOL DISTRICT GORDON PARKS ACADEMY FACILITY ENERGY REPORT 99 GREENWOOD AVENUE EAST ORANGE, NEW JERSEY 07017

VOORHEES TOWNSHIP BOARD OF EDUCATION OSAGE ELEMENTARY SCHOOL 128 E CHEWS LANDING RD, VOORHEES, NJ, FACILITY ENERGY REPORT

CONCORD ENGINEERING GROUP 520 SOUTH BURNT MILL ROAD VOORHEES, NJ TELEPHONE: (856) FACSIMILE: (856)

HOWELL TOWNSHIP SCHOOLS TAUNTON ELEMENTARY SCHOOL FACILITY ENERGY REPORT 4 TAUNTON DR HOWELL, NJ 07731

BRICK TOWNSHIP BOARD OF EDUCATION EMMA HAVENS YOUNG ELEMENTARY SCHOOL 43 DRUM POINT ROAD BRICK, NJ FACILITY ENERGY REPORT

ENERGY AUDIT FINAL REPORT

PATERSON CHARTER SCHOOL K-6 CAMPUS FACILITY ENERGY REPORT 276 WABASH AVENUE PATERSON, NEW JERSEY 07502

Local Government Energy Audit:

MONROE TOWNSHIP MUNICIPAL BUILDING FACILITY ENERGY REPORT 1 MUNICIPAL PLAZA MONROE TOWNSHIP, NEW JERSEY 08831

Local Government Energy Audit: Energy Audit Report

Local Government Energy Audit:

Local Government Energy Audit:

Establishing a Baseline, Energy Audits and Energy Star s Portfolio Manager

LOGO. Trivium Level II Energy Audit

Local Government Energy Audit:

ENERGY AUDIT REPORTS SUMMARY

2/17/2017. Energy Accounting & Education. Topics (Electricity) Creating Electricity

For Point. Prepared For City of Nunapitchuk. June 14, 2012 ANTHC DEHE

ELMER ELEMENTARY SCHOOL 207 Front Street, Elmer NJ 08318

Energy Auditing for Schools. Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007

Multifamily Net Zero Retrofit Market: Technical and Cost Benchmarks for San Francisco

CHERRY HILL TOWNSHIP SCHOOLS THOMAS PAINE ELEMENTARY 4001 CHURCH ROAD CHERRY HILL, NJ FACILITY ENERGY REPORT

ENGLEWOOD CLIFFS PUBLIC SCHOOLS UPPER SCHOOL ELEMENTARY SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO.

MOORESTOWN TOWNSHIP PUBLIC SCHOOLS GEORGE BAKER ELEMENTARY SCHOOL FACILITY ENERGY REPORT 139 WEST MAPLE AVENUE MOORESTOWN, NJ 08057

Comprehensive Energy Audit For. Savoonga Water Treatment Plant

MERCHANTVILLE-PENNSAUKEN WATER COMMISSION WOODBINE AVENUE TREATMENT PLANT ENERGY ASSESSMENT

Comprehensive Energy Audit For Sleetmute Water Treatment Plant

ENERGY AUDIT. 123 Main Street Mississauga, Ontario. January 1, Report To: Mr. John Smith Smith Printing Company.

WAKE TECHNICAL COMMUNITY COLLEGE SUSTAINABLE ENERGY PLAN. Energy Plan

GLOUCESTER TOWNSHIP BOARD OF EDUCATION C.W. LEWIS MIDDLE SCHOOL / DEPARTMENT OF INSTRUCTION FACILITY ENERGY REPORT 875 ERIAL ROAD BLACKWOOD, NJ 08012

Comprehensive Energy Audit For Chevak Vacuum Plant

WEST DEPTFORD TOWNSHIP PUBLIC SCHOOL DISTRICT OAKVIEW ELEMENTARY SCHOOL FACILITY ENERGY REPORT 350 DUBOIS AVENUE WOODBURY, NJ 08096

Analysis of the Energy Savings Potential in K-5 Schools in Hot and Humid Climates. Jeff S. Haberl, Ph.D., P.E.

FACILITY ENERGY REPORT

Local Government Energy Audit:

ENERGY AUDIT FINAL REPORT CEG PROJECT NO. 9C08134

Energy Benchmarking Report for Mt. Pleasant Elementary School. Millville, NJ

Somerset Hills School District JUNE Final Energy Audit Report

ENERGY AUDIT FINAL REPORT CEG PROJECT NO. 9C08134

ELIAS BOUDINOT ELEMENTARY SCHOOL Pearl and Ellis Street, Burlington NJ 08016

Local Government Energy Audit:

BELLMAWR BOROUGH SCHOOL DISTRICT BELL OAKS MIDDLE SCHOOL 256 ANDERSON AVENUE BELLMAWR, NJ FACILITY ENERGY REPORT

MOORESTOWN TOWNSHIP PUBLIC SCHOOLS SOUTH VALLEY ELEMENTARY SCHOOL FACILITY ENERGY REPORT 210 SOUTH STANWICK ROAD MOORESTOWN, NJ 08057

ENERGY MANAGEMENT PLAN - HEADQUARTERS. ABC Winery 123 1st Street Franklin, NJ 12345

Comprehensive Energy Audit For Kongiganak Health Clinic

Local Government Energy Audit:

Energy Audit. Prepared For: Ewing Township School District. Contact Brian S. Falkowski Business Administrator

Energy Benchmarking Report for Bacon Elementary School. Millville, NJ

ENERGY AUDIT FINAL REPORT CEG PROJECT NO. 9C08134

CREDIT COMPLIANCE (Please complete the color coded criteria(s) based on the option path selected)

Lawrence Township Municipal Building / EMS Garage 357 Main Street Cedarville, NJ 08311

CLIFTON PUBLIC SCHOOLS PUBLIC SCHOOL #4 194 WEST SECOND STREET CLIFTON, NEW JERSEY FACILITY ENERGY REPORT

Sample Reports. for. HAP v4.80 Example Problem

ROXBURY TOWNSHIP PUBLIC LIBRARY ENERGY ASSESSMENT. for NEW JERSEY BUREAU OF PUBLIC UTILITIES

FINAL - Energy Audit. Prepared For: Delran Board of Education. Christopher Russo, Ed.D. Business Administrator / Board Secretary

FINAL - Energy Audit. Prepared For: Delran Board of Education. Christopher Russo, Ed.D. Business Administrator / Board Secretary

Energy Benchmarking Report for Mill Pond Elementary School Lanoka Harbor, NJ

For. Prepared For ANTHC DEHE

Compr For & Washeteria

MILFORD BOARD OF EDUCATION MILFORD PUBLIC SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO

LEAP ACADEMY UNIVERSITY CHARTER SCHOOL UPPER SCHOOL FACILITY ENERGY REPORT 549 COOPER STREET CAMDEN, NEW JERSEY 08102

Hamilton Board of Education Robinson Elementary School Hamilton, NJ 08610

ENGLEWOOD CLIFFS PUBLIC SCHOOLS NORTH CLIFF ELEMENTARY SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO.

Local Government Energy Audit:

BRICK TOWNSHIP BOE LOCAL GOVERNMENT ENERGY AUDITS. Presented By: John Marchiafava, PE, CGD.

ROXBURY TOWNSHIP TOWN HALL / POLICE DEPARTMENT ENERGY ASSESSMENT. for NEW JERSEY BUREAU OF PUBLIC UTILITIES CHA PROJECT NO

LOCAL GOVERNMENT ENERGY AUDIT PROGRAM FOR NEW JERSEY BOARD OF PUBLIC UTILITIES

ENERGY AUDIT. Prepared For: Wayne Public School District. John D. Maso, Director of Facilities Mgmt. Office of Building Services

NEW BRUNSWICK BOARD OF EDUCATION WOODROW WILSON SCHOOL FACILITY ENERGY REPORT 133 TUNISON ROAD NEW BRUNSWICK, NJ 08901

MOORESTOWN TOWNSHIP PUBLIC SCHOOLS MOORESTOWN HIGH SCHOOL FACILITY ENERGY REPORT 350 BRIDGEBORO ROAD MOORESTOWN, NJ 08057

MEDFORD TOWNSHIP SCHOOL DISTRICT TAUNTON FORGE ELEMENTARY 32 EVERGREEN TRAIL MEDFORD, NEW JERSEY FACILITY ENERGY REPORT

BELLMAWR BOROUGH SCHOOL DISTRICT ETHEL M. BURKE ELEMENTARY SCHOOL 112 SOUTH BLACK HORSE PIKE BELLMAWR, NJ FACILITY ENERGY REPORT

University of Minnesota Duluth Civil Engineering Building

Energy Benchmarking Report for Forked River Elementary School Forked River, NJ

Comprehensive Energy Audit For Pitkas Point Tribal Office

Geoff Howland. Value Development Manager

LOCAL GOVERNMENT ENERGY AUDIT PROGRAM: ENERGY AUDIT REPORT

CITY OF LINWOOD CITY HALL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO February 2011.

MEDFORD TOWNSHIP SCHOOL DISTRICT MEMORIAL MIDDLE SCHOOL 55 MILL STREET MEDFORD, NJ FACILITY ENERGY REPORT

White Paper ENVELOPE-FIRST APPROACH TO NET-ZERO ENERGY BUILDINGS

LIBRARY ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC

Compr For. Prepared For City of Teller. Prepared By: ANTHC DEHE Energy

Results and Recommendations from Energy Audit of Shageluk. For VEEP Grants Village of Shageluk, Alaska

UPPER TOWNSHIP SCHOOL DISTRICT UPPER TOWNSHIP ELEMENTARY SCHOOL ENERGY ASSESSMENT. for NEW JERSEY BOARD OF PUBLIC UTILITIES CHA PROJECT NO.

Energy Audit. Town of Charlemont. Town Hall. 157 Main Street Charlemont, MA August 31, 2018

Whitemarsh Township Municipal Building

WALDWICK BOARD OF EDUCATION WALDWICK MIDDLE & HIGH SCHOOL FACILITY ENERGY REPORT 155 WYCOFF AVENUE WALDWICK, NJ 07463

ENERGY AUDIT INDIAN HILLS HIGH SCHOOL RAMAPO HIGH SCHOOL. Prepared For: Ramapo Indian Hills Regional High School District

Transcription:

LOCAL GOVERNMENT ENERGY AUDIT PROGRAM: ENERGY AUDIT REPORT PREPARED FOR: GEORGE J. MITCHELL ELEMENTARY SCHOOL 950 ROUTE 539 LITTLE EGG HARBOR TWP, NJ 08087 ATTN: MS. LYNN COATES SCHOOL BUSINESS ADMINISTRATOR / BOARD SECRETARY PREPARED BY: CONCORD ENGINEERING GROUP 520 S. BURNT MILL ROAD VOORHEES, NJ 08043 TELEPHONE: (856) 427-0200 FACSIMILE: (856) 427-6529 WWW.CEG-INC.NET CEG CONTACT: KEVIN BLANKENBUEHLER ME, DIRECTOR OF ENERGY SERVICES EMAIL: KBLANK@CEG-INC.NET REPORT ISSUANCE: FINAL, APRIL 15, 2011 PROJECT NO:

TABLE OF CONTENTS I. EXECUTIVE SUMMARY... 3 II. INTRODUCTION... 10 III. METHOD OF ANALYSIS... 11 IV. HISTORIC ENERGY CONSUMPTION/COST... 13 A. ENERGY USAGE / TARIFFS... 13 B. ENERGY USE INDEX (EUI)... 19 C. EPA ENERGY BENCHMARKING SYSTEM... 21 V. FACILITY DESCRIPTION... 22 VI. MAJOR EQUIPMENT LIST... 25 VII. ENERGY CONSERVATION MEASURES... 26 VIII. RENEWABLE/DISTRIBUTED ENERGY MEASURES... 45 IX. ENERGY PURCHASING AND PROCUREMENT STRATEGY... 48 X. INSTALLATION FUNDING OPTIONS... 54 XI. ADDITIONAL RECOMMENDATIONS... 57 Appendix A ECM Cost & Savings Breakdown Appendix B New Jersey Smart Start Program Incentives Appendix C Portfolio Manager Statement of Energy Performance Appendix D Major Equipment List Appendix E Investment Grade Lighting Audit Appendix F Renewable / Distributed Energy Measures Calculations Appendix G Energy Model Results April 15, 2011 FINAL Page 1 of 58

REPORT DISCLAIMER The information contained within this report, including any attachment(s), is intended solely for use by the named addressee(s). If you are not the intended recipient, or a person designated as responsible for delivering such messages to the intended recipient, you are not authorized to disclose, copy, distribute or retain this report, in whole or in part, without written authorization from, 520 S. Burnt Mill Road, Voorhees, NJ 08043. This report may contain proprietary, confidential or privileged information. If you have received this report in error, please notify the sender immediately. Thank you for your anticipated cooperation. April 15, 2011 FINAL Page 2 of 58

I. EXECUTIVE SUMMARY This report presents the findings of the energy audit conducted for: Little Egg Harbor Township School District George J. Mitchell Elementary School 950 Route 539 Little Egg Harbor Township, NJ 08087 District Contact Person: Facility Contact Person: Lynn Coates Tina Konyha This audit is performed in connection with the New Jersey Clean Energy - Local Government Program. The energy audit is conducted to promote the mission of the office of Clean Energy, which is to use innovation and technology to solve energy and environmental problems in a way that improves the State s economy. This can be achieved through the wiser and more efficient use of energy. The annual energy costs at this facility are as follows: Electricity $ 181,232 Natural Gas $ 41,083 Total $ 222,315 The potential annual energy cost savings for each energy conservation measure (ECM) and renewable energy measure (REM) are shown below in Table 1. Be aware that the ECM s and REM s are not additive because of the interrelation of some of the measures. This audit is consistent with an ASHRAE level 2 audit. The cost and savings for each measure is ± 20%. The evaluations are based on engineering estimations and industry standard calculation methods. More detailed analyses would require engineering simulation models, hard equipment specifications, and contractor bid pricing. April 15, 2011 FINAL Page 3 of 58

Table 1 Financial Summary Table ENERGY CONSERVATION MEASURES (ECM's) ECM NO. DESCRIPTION NET INSTALLATION COST A ANNUAL SAVINGS B SIMPLE PAYBACK (Yrs) SIMPLE LIFETIME ROI ECM #1 Solar Thermal Domestic Hot Water System $80,000 $7,145 11.2 123.3% ECM #2 Electric VAV to Hot Water VAV with High efficiency $272,420 $13,560 20.1-25.3% Bil ECM #3 Replace CRT Monitors $16,100 $2,058 7.8 91.7% ECM #4 Demand Control Ventilation Utilized in Gym and Cafeteria $3,000 $2,780 1.1 1290.0% ECM #5 HVAC Schedule Adjustments $3,000 $3,326 0.9 1563.0% ECM #6 Occupancy Controlled Power Strips $2,700 $315 8.6 75.0% ECM #7 Lighting Upgrade $11,531 $3,489 3.3 353.9% ECM #8 Lighting Controls $9,550 $5,686 1.7 793.1% RENEWABLE ENERGY MEASURES (REM's) ECM NO. DESCRIPTION NET INSTALLATION COST ANNUAL SAVINGS SIMPLE PAYBACK (Yrs) SIMPLE LIFETIME ROI REM #1 305.9 KW Solar PV System $1,911,875 $164,866 11.6 115.6% Notes: A. Cost takes into consideration applicable NJ Smart StartTM incentives. B. Savings takes into consideration applicable maintenance savings. The estimated demand and energy savings for each ECM and REM is shown below in Table 2. The descriptions in this table correspond to the ECM s and REM s listed in Table 1. April 15, 2011 FINAL Page 4 of 58

Table 2 Estimated Energy Savings Summary Table ENERGY CONSERVATION MEASURES (ECM's) ANNUAL UTILITY REDUCTION ECM NO. DESCRIPTION ELECTRIC DEMAND (KW) ELECTRIC CONSUMPTION (KWH) NATURAL GAS (THERMS) ECM #1 Solar Thermal Domestic Hot Water System 0.0 50,320.0 0.0 ECM #2 Electric VAV to Hot Water VAV with High efficiency 0.0 160,532.0 (7,271.0) Bil ECM #3 Replace CRT Monitors 0.0 14,490.0 0.0 ECM #4 Demand Control Ventilation Utilized in Gym and Cafeteria 0.0 2,399.0 1,922.0 ECM #5 HVAC Schedule Adjustments 0.0 23,190.0 26.0 ECM #6 Occupancy Controlled Power Strips 0.0 2,250.0 0.0 ECM #7 Lighting Upgrade 9.4 24,570.0 0.0 ECM #8 Lighting Controls 13.2 40,043.0 0.0 RENEWABLE ENERGY MEASURES (REM's) ANNUAL UTILITY REDUCTION ECM NO. DESCRIPTION ELECTRIC DEMAND (KW) ELECTRIC CONSUMPTION (KWH) NATURAL GAS (THERMS) REM #1 305.9 KW Solar PV System 0.0 335093.0 0.0 April 15, 2011 FINAL Page 5 of 58

The Energy Conservation Measures (ECMs) identified within the report represents the potential annual savings at the facility. It is recommended to consider all ECMs as part of the school district s initiative to save energy, reduce emissions, and lower operating costs. Concord Engineering Group (CEG) recommends proceeding with the implementation of all ECM s that provide a calculated simple payback at or under ten (10) years. All of the ECM s presented in this report have been categorized into three groups defined as Short-term (or Fast) Paybacks ranging from 0 to 5 years, Medium-term Paybacks ranging from 5 to 10 years, and Long-term Paybacks of over 10 years to assist the District in prioritizing projects. Short-term Payback Energy Conservation Measures: The following Energy Conservation Measures (ECMs) identified with a simple payback of 0 to 5 years are considered very cost effective and should be considered a high priority for the District. It should be noted that in many cases ECM s lying in this range can be performed utilizing qualified in house staff that can further reduce the payback period. ECM #4: Demand Control Ventilation in Gym & Cafeteria Active demand control ventilation allows the modulation of outside air in the system depending on occupancy. The cafeteria and gymnasium are occupied intermittently throughout the day and are currently being monitored by CO 2 sensors in the return air ducts. Setting these already build in controls to Active could allow the facility to see savings. ECM #5: HVAC Schedule Adjustments The use of a controls contractor in adjusting the setting for the HVAC system could have significant savings. Currently the building is operating on a more aggressive controls scheme, while setting back certain temperatures to a more conservative level could help the system run at an optimal level. In addition to temperature adjustments, the school could look further into changing the run times for occupied and unoccupied settings to see greater savings. ECM #7: Lighting Upgrade Lighting retrofits throughout the facility is a straight forward conservation measure that is prescriptive in nature and provides substantial savings for the investment. Lighting retrofits are a good example of ECMs that can be implemented with qualified in house staff to reduce the installation cost and further reduce paybacks. Throughout most of the school the measure includes replacing existing 700 series T-8 fluorescent lamps with new higher efficiency T-8 lamps. This upgrade also includes installation of high bay T-5 fixtures to replace the existing metal halide fixtures. In addition it is recommended to utilize CFL lamps in lieu of all existing incandescent lamps throughout the school district. Overall lighting upgrades represent one of the most easily implemented ECMs and are highly recommended. April 15, 2011 FINAL Page 6 of 58

ECM #8: Lighting Controls Similar to lighting upgrades, lighting controls are very simple upgrades and can save considerable energy. Lighting controls do not require replacement of the fixture and typically can save more energy than lighting upgrades alone. Lighting controls will automatically turn off lights when spaces and rooms are not occupied. Lighting controls provide the maximum savings in spaces that have changing occupancy schedules throughout the day such as the classrooms after school hours, labs, music rooms, media centers, etc. Lighting controls is highly recommended in addition to the lighting upgrade ECMs. (It is important to note that ECMs are calculated as stand-alone ECMs and therefore the total savings will be slightly less than the sum of both individual ECMs (Lighting Upgrade and Lighting Controls). The discrepancy between additive ECMs is within the tolerances for this level of analysis (+/- 20%).) Medium-term Payback Energy Conservation Measures: The following Energy Conservation Measures (ECMs) identified with a simple payback of 5 to 10 years are considered cost effective and should be considered by the District. In many cases these measures can provide significant savings, however the costs to implement are higher, stretching the payback beyond five years. ECM #3: Replace CRT Monitors Modern computer monitors are flat screen LCD panels that are far more efficient than older style cathode ray-tube (CRT) monitors. Typical energy use of a flat screen monitor is approximately 1/3 of the energy used by a CRT monitor. A large portion of the computer monitors throughout the facility are CRT style monitors. This represents a significant energy savings potential. It is recommended to replace the existing CRT monitors with flat screen monitors to take advantage of the energy savings as well as other ergonomic benefits of modern LCD monitors. ECM #6: Occupancy Controlled Power Strips Plug loads within buildings are becoming a larger and larger portion of the total energy use all types of facilities. Plug loads are most dominant in combination with computers and computer equipment. The installation of occupancy controlled power strips would allow daily occurrences such as a fully run computer system for the complete duration of the day to become reduced and turned off while no one is operating the computer system. It is recommended the District review implementation of this ECM especially in computer labs and offices where computer and computer accessories are left on during long periods of unoccupied times. April 15, 2011 FINAL Page 7 of 58

Long-term Payback Energy Conservation Measures: The following Energy Conservation Measures (ECMs) identified with a simple payback of over 10 years. The ECMs that have much longer paybacks are considered capital improvement ECMs. These typically have high installation costs that are more difficult to justify based solely on the energy savings associated with the improvement. Despite the long paybacks, these ECMs in many cases provide valuable and much needed infrastructure improvements for the facility. These ECMs include boiler upgrades, HVAC equipment upgrades, etc. It should also be noted that projects under a 15 year payback should be reviewed in the event the District wishes to move forward with an Energy Savings Improvement Program where these projects could be included that program. ECM #1: Solar Thermal Domestic Hot Water Electric Heat is an inefficient way to heat domestic hot water inherently due to the higher cost per Btu of heat produced. Much of the building is heated with electric hot water heaters located in isolated areas from a natural gas line or the ability to be properly vented. Due to this fact Solar Thermal is recommended to help supplement the need to operate the electric hot water heaters. ECM #2: Electric VAV to Hot Water VAV with New Condensing Boilers Electric Heat is an inefficient way to heat a building inherently due to the higher cost per Btu of heat produced. In this ECM the replacement of electric reheat in the VAV boxes to hot water heat produced by gas fired boilers would provide a much more cost effective alternative to heating. This measure also requires installation of condensing boilers that can provide a heating efficiency ranging from 85% to 99%. While very efficient these boilers are costly to implement. It is recommended the District review this ECM for future implementation when the equipment has reached the end of its useful life or the building is being renovated. Combined Project Approach: Although only individual projects with a simple payback of 10 years and less are considered financially self sustaining, it is important to consider how multiple projects can be combined together. When ECMs are aggregated into a single project, the lower cost ECMs provide valuable savings to offset the higher cost ECMs. Likewise when multiple facilities are aggregated together into a single entity energy efficiency project, the same benefits are seen on a larger scale. The Energy Savings Improvement Program (ESIP) allows for financing of any combination of energy efficiency projects across multiple facilities into one large project. The term of the financing must be under 15 years and the savings provides the revenue for the financing cost. The combination of ECMs provides Little Egg Harbor Township School District with the opportunity to implement a large portion of the ECMs identified within George J. Mitchell Elementary School. The program financing allows for the implementation with no upfront cost to the District. Implementation of an ESIP provides significant benefits and should be strongly considered by the District. April 15, 2011 FINAL Page 8 of 58

Renewable Energy Measures: The Mitchell School is an excellent candidate for the installation of additional photovoltaic arrays. Given the school has electric heat the installation of solar electric generation could significantly reduce the grid electricity purchased by the school. Parking lot solar canopies should be considered in the front and side parking lots of the school; due to the limited available roof space (Further detail is provided in Appendix F). Considering the long payback period for the installation of a solar system utilizing self financing, bonding, or capital dollars it is recommended the District consider alternative financing approaches, such as a Power Purchase Agreement (or PPA). The PPA would require the District to put little to no upfront out of pocket dollars in order to install and maintain the system, the only requirement of the district would be to purchase the power generated at an agreed upon rate to be below their existing utility rate. CEG recommends the Owner review all alternative funding options before deciding to not implement this renewable energy measure. In addition to the ECMs and REMs, there are maintenance and operational measures that can provide significant energy savings and provide immediate benefit. The ECMs listed above represent investments that can be made to the facility which are justified by the savings seen overtime. However, the maintenance items and small operational improvements below are typically achievable with on site staff or maintenance contractors and in turn have the potential to provide substantial operational savings compared to the costs associated. The following are recommendations which should be considered a priority in achieving an energy efficient building: 1. Chemically clean the condenser and evaporator coils periodically to optimize efficiency. Poorly maintained heat transfer surfaces can reduce efficiency 5-10%. 2. Maintain all weather stripping on entrance doors. 3. Clean all light fixtures to maximize light output. 4. Provide more frequent air filter changes to decrease overall system power usage and maintain better IAQ. 5. Educate staff and students on awareness of wasteful energy practices such as leaving lights on unnecessarily, leaving on of non-essential computer and/or equipment at the end of the day, leaving of outside doors/windows open as a means to control room temperature, etc. Overall, the George J. Mitchell Elementary School appears to be operating at a high efficiency level compared to other schools in the region. With the implementation of the above recommended measures the Little Egg Harbor School District will realize further energy savings at the George J. Mitchell Elementary School. April 15, 2011 FINAL Page 9 of 58

II. INTRODUCTION The comprehensive energy audit covers the 106,374 square foot George Mitchell Elementary School, which includes the following spaces: Auditorium, cafeteria, classrooms, offices, and gymnasium. Electrical and natural gas utility information is collected and analyzed for one full year s energy use of the building. The utility information allows for analysis of the building s operational characteristics; calculate energy benchmarks for comparison to industry averages, estimated savings potential, and baseline usage/cost to monitor the effectiveness of implemented measures. A computer spreadsheet is used to calculate benchmarks and to graph utility information (see the utility profiles below). The Energy Use Index (EUI) is established for the building. Energy Use Index (EUI) is expressed in British Thermal Units/square foot/year (BTU/ft 2 /yr), which is used to compare energy consumption to similar building types or to track consumption from year to year in the same building. The EUI is calculated by converting the annual consumption of all energy sources to BTU s and dividing by the area (gross square footage) of the building. Blueprints (where available) are utilized to verify the gross area of the facility. The EUI is a good indicator of the relative potential for energy savings. A low EUI indicates less potential for energy savings, while a high EUI indicates poor building performance therefore a high potential for energy savings. Existing building architectural and engineering drawings (where available) are utilized for additional background information. The building envelope, lighting systems, HVAC equipment, and controls information gathered from building drawings allow for a more accurate and detailed review of the building. The information is compared to the energy usage profiles developed from utility data. Through the review of the architectural and engineering drawings a building profile can be defined that documents building age, type, usage, major energy consuming equipment or systems, etc. The preliminary audit information is gathered in preparation for the site survey. The site survey provides critical information in deciphering where energy is spent and opportunities exist within a facility. The entire site is surveyed to inventory the following to gain an understanding of how each facility operates: Building envelope (roof, windows, etc.) Heating, ventilation, and air conditioning equipment (HVAC) Lighting systems and controls Facility-specific equipment The building site visit is performed to survey all major building components and systems. The site visit includes detailed inspection of energy consuming components. Summary of building occupancy schedules, operating and maintenance practices, and energy management programs provided by the building manager are collected along with the system and components to determine a more accurate impact on energy consumption. April 15, 2011 FINAL Page 10 of 58

III. METHOD OF ANALYSIS Post site visit work includes evaluation of the information gathered, researching possible conservation opportunities, organizing the audit into a comprehensive report, and making recommendations on HVAC, lighting and building envelope improvements. Data collected is processed using energy engineering calculations to anticipate energy usage for each of the proposed energy conservation measures (ECMs). The actual building s energy usage is entered directly from the utility bills provided by the owner. The anticipated energy usage is compared to the historical data to determine energy savings for the proposed ECMs. It is pertinent to note, that the savings noted in this report are not additive. The savings for each recommendation is calculated as standalone energy conservation measures. Implementation of more than one ECM may in some cases affect the savings of each ECM. The savings may in some cases be relatively higher if an individual ECM is implemented in lieu of multiple recommended ECMs. For example implementing reduced operating schedules for inefficient lighting will result in a greater relative savings. Implementing reduced operating schedules for newly installed efficient lighting will result in a lower relative savings, because there is less energy to be saved. If multiple ECM s are recommended to be implemented, the combined savings is calculated and identified appropriately. ECMs are determined by identifying the building s unique properties and deciphering the most beneficial energy saving measures available that meet the specific needs of the facility. The building construction type, function, operational schedule, existing conditions, and foreseen future plans are critical in the evaluation and final recommendations. Energy savings are calculated base on industry standard methods and engineering estimations. Energy consumption is calculated based on manufacturer s cataloged information when new equipment is proposed. Cost savings are calculated based on the actual historical energy costs for the facility. Installation costs include labor and equipment costs to estimate the full up-front investment required to implement a change. Costs are derived from Means Cost Data, industry publications, and local contractors and equipment suppliers. The NJ Smart Start Building program incentives savings (where applicable) are included for the appropriate ECM s and subtracted from the installed cost. Maintenance savings are calculated where applicable and added to the energy savings for each ECM. The life-time for each ECM is estimated based on the typical life of the equipment being replaced or altered. The costs and savings are applied and a simple payback, simple lifetime savings, and simple return on investment are calculated. See below for calculation methods: April 15, 2011 FINAL Page 11 of 58

ECM Calculation Equations: Simple Payback Net Cost = Yearly Savings ( Yearly Savings ECM Lifetime ) Simple Lifetime Savings = Simple Lifetime ROI = ( Simple Lifetime Savings Net Cost) Net Cost ( Yearly Ma enance Savings ECM Lifetime ) Lifetime Ma int enance Savings = int Internal Rate of Re turn = N Cash Flow of n= 0 1 ( + IRR ) Period n Net Pr esent Value = N Cash Flow of n= 0 1 ( + DR) Period n Net Present Value calculations based on Interest Rate of 3%. April 15, 2011 FINAL Page 12 of 58

IV. HISTORIC ENERGY CONSUMPTION/COST A. Energy Usage / Tariffs The energy usage for the facility has been tabulated and plotted in graph form as depicted within this section. Each energy source has been identified and monthly consumption and cost noted per the information provided by the Owner. The electric usage profile represents the actual electrical usage for the facility. Atlantic City (ACE) provides electricity to four meters at the facility under their Monthly General Service rate for three meters and Annual General Service for one meter. The school has contracted South Jersey Energy, a Third Party Supplier (TPS), to provide electric commodity supply (generation) service. The electric utility measures consumption in kilowatt-hours (KWH) and maximum demand in kilowatts (KW). One KWH usage is equivalent to 1000 watts running for one hour. One KW of electric demand is equivalent to 1000 watts running at any given time. The basic usage charges are shown as generation service and delivery charges along with several nonutility generation charges. Rates used in this report reflect the historical data received for the facility. The gas usage profile shows the actual natural gas energy usage for the facility. New Jersey Natural Gas provides natural gas to the facility under the General Service - Large (GSL) rate structure. The school has contracted Pepco Energy Service, a Third Party Supplier (TPS), to provide gas commodity supply (generation) service. The gas utility measures consumption in cubic feet x 100 (CCF), and converts the quantity into Therms of energy. One Therm is equivalent to 100,000 BTUs of energy. The overall cost for utilities is calculated by dividing the total cost by the total usage. Based on the utility history provided, the average cost for utilities at this facility is as follows: Description Electricity Natural Gas Average 14.2 / kwh $1.27 / Therm April 15, 2011 FINAL Page 13 of 58

Table 3 Electricity Billing Data ELECTRIC USAGE SUMMARY Utility Provider: Atlantic City Electric Rate: x3 MGS, x1 AGS Meter No: 105744001, 93485220, 98186632, 75767058 Account # 0467 6619 9999, 0149 4009 9998, 0750 3949 9894, 0149 1609 9956 Third Party Utility South Jersey Energy TPS Meter / Acct No: 0467 6619 9999 & 0149 4009 9998 MONTH OF USE CONSUMPTION KWH DEMAND TOTAL BILL Jan-10 128,712 377.2 $17,866 Feb-10 123,047 368.5 $17,091 Mar-10 91,650 297.0 $13,008 Apr-10 81,743 307.0 $11,779 May-10 83,290 371.1 $12,056 Jun-10 122,381 387.0 $17,290 Jul-10 104,502 375.8 $14,738 Aug-10 89,249 324.6 $12,664 Sep-10 123,311 417.5 $17,394 Oct-10 99,245 414.0 $14,475 Nov-10 90,531 419.6 $13,450 Dec-10 134,501 421.3 $19,422 Totals 1,272,162 421.3 Max $181,232 AVERAGE DEMAND 373.4 KW average AVERAGE RATE $0.142 $/kwh April 15, 2011 FINAL Page 14 of 58

Table 3A Solar PV System Generation SOLAR PV GENERATION SUMMARY Solar Panel Brand : Solar World System Size : 28 kw MONTH OF USE GENERATION KWH ENERGY SAVINGS Jan-10 2,001 $284 Feb-10 2,290 $325 Mar-10 3,101 $440 Apr-10 3,465 $492 May-10 3,905 $555 Jun-10 3,778 $536 Jul-10 3,831 $544 Aug-10 3,557 $505 Sep-10 3,119 $443 Oct-10 2,620 $372 Nov-10 1,894 $269 Dec-10 1,684 $239 Totals 35,245 $5,005 Note: The generation data listed above has been estimated by PV Watts Version 1.0 due to the lack of sufficient data during the 2010 fiscal year. April 15, 2011 FINAL Page 15 of 58

Figure 1 Electricity Usage Profile April 15, 2011 FINAL Page 16 of 58

Table 4 Natural Gas Billing Data NATURAL GAS USAGE SUMMARY Utility Provider: New Jersey Natural Gas Rate: GSL Meter No: 00846539 Point of Delivery ID: 22-006-6686-5Y Third Party Utility Provider: Pepco Energy Service TPS Meter No: 22000666865Y MONTH OF USE CONSUMPTION (THERMS) TOTAL BILL Nov-10 3,036.41 $1,660.15 Oct-10 1,849.55 $1,149.54 Sep-10 586.87 $601.22 Aug-10 339.82 $494.39 Jul-10 262.33 $449.74 May-10 804.76 $1,405.35 Apr-10 1,600.27 $2,447.56 Mar-10 3,266.75 $4,632.46 Feb-10 5,760.93 $7,908.45 Jan-10 6,289.78 $8,525.70 Dec-09 6,815.84 $9,216.65 Nov-09 1,771.76 $2,591.49 TOTALS 32,385.07 $41,082.70 AVERAGE RATE: $1.27 $/THERM April 15, 2011 FINAL Page 17 of 58

Figure 2 Natural Gas Usage Profile April 15, 2011 FINAL Page 18 of 58

B. Energy Use Index (EUI) Energy Use Index (EUI) is a measure of a building s annual energy utilization per square foot of building. This calculation is completed by converting all utility usage consumed by a building for one year, to British Thermal Units (BTU) and dividing this number by the building square footage. EUI is a good measure of a building s energy use and is utilized regularly for comparison of energy performance for similar building types. The Oak Ridge National Laboratory (ORNL) Buildings Technology Center under a contract with the U.S. Department of Energy maintains a Benchmarking Building Energy Performance Program. The ORNL website determines how a building s energy use compares with similar facilities throughout the U.S. and in a specific region or state. Source use differs from site usage when comparing a building s energy consumption with the national average. Site energy use is the energy consumed by the building at the building site only. Source energy use includes the site energy use as well as all of the losses to create and distribute the energy to the building. Source energy represents the total amount of raw fuel that is required to operate the building. It incorporates all transmission, delivery, and production losses, which allows for a complete assessment of energy efficiency in a building. The type of utility purchased has a substantial impact on the source energy use of a building. The EPA has determined that source energy is the most comparable unit for evaluation purposes and overall global impact. Both the site and source EUI ratings for the building are provided to understand and compare the differences in energy use. The site and source EUI for this facility is calculated as follows: Building Site EUI = ( Electric Usage in kbtu + Gas Usage in kbtu) Building Square Footage Building Source ( Electric Usage in kbtu X SS Ratio + Gas Usage in kbtu EUI = Building Square Footage X SS Ratio) April 15, 2011 FINAL Page 19 of 58

Table 5 Facility Energy Use Index (EUI) Calculation ENERGY USE INTENSITY CALCULATION SITE SITE- SOURCE BUILDING USE ENERGY TYPE ENERGY SOURCE ENERGY kwh Therms Gallons kbtu RATIO kbtu ELECTRIC 1,307,407.0 4,463,487 3.340 14,908,048 NATURAL GAS 32,385.1 3,238,507 1.047 3,390,717 TOTAL 7,701,994 18,298,765 *Site - Source Ratio data is provided by the Energy Star Performance Rating Methodology for Incorporating Source Energy Use document issued Dec 2007. BUILDING AREA 106,374 SQUARE FEET BUILDING SITE EUI 72.40 kbtu/sf/yr BUILDING SOURCE EUI 172.02 kbtu/sf/yr Figure 3 below depicts a national EUI grading for the source use of Elementary Schools. Figure 3 Source Energy Use Intensity Distributions: Elementary Schools SOURCE EUI = 172.0 It should be noted that while the School produces Zero Emission or Green/Renewable Energy through its on site solar system, the selling/trading of the Solar Renewable Energy Certificates (SREC) by the district transfers ownership rights of the Green or Zero Emission characteristics of this energy to the purchaser of the SREC. While the school still utilizes the electricity produced by the system, it is unable to take credit for the renewable properties of this energy such as emissions reductions or source energy credit. Therefore the Source Energy Use Intensity for the electricity generated by the solar system is the same as that purchased from the grid. April 15, 2011 FINAL Page 20 of 58

C. EPA Energy Benchmarking System The United States Environmental Protection Agency (EPA) in an effort to promote energy management has created a system for benchmarking energy use amongst various end users. The benchmarking tool utilized for this analysis is entitled Portfolio Manager. The Portfolio Manager tool allows tracking and assessment of energy consumption via the template forms located on the ENERGY STAR website (www.energystar.gov). The importance of benchmarking for local government municipalities is becoming more important as utility costs continue to increase and emphasis is being placed on carbon reduction, greenhouse gas emissions and other environmental impacts. Based on information gathered from the ENERGY STAR website, Government agencies spend more than $10 billion a year on energy to provide public services and meet constituent needs. Furthermore, energy use in commercial buildings and industrial facilities is responsible for more than 50 percent of U.S. carbon dioxide emissions. It is vital that local government municipalities assess facility energy usage, benchmark energy usage utilizing Portfolio Manager, set priorities and goals to lessen energy usage and move forward with priorities and goals. In accordance with the Local Government Program, CEG has created an ENERGY STAR account for the municipality to access and monitoring the facility s yearly energy usage as it compares to facilities of similar type. The login page for the account can be accessed at the following web address; the username and password are also listed below: https://www.energystar.gov/istar/pmpam/index.cfm?fuseaction=login.login User Name: Password: Security Question: Security Answer: LEHschools lgeaceg2010 What city were you born in? littleeggharbor The utility bills and other information gathered during the energy audit process are entered into the Portfolio Manager. The following is a summary of the results for the facility: Table 6 ENERGY STAR Performance Rating ENERGY STAR PERFORMANCE RATING FACILITY DESCRIPTION George J. Mitchell Elementary School ENERGY PERFORMANCE RATING NATIONAL AVERAGE 50 50 Refer to Statement of Energy Performance Appendix for the detailed energy summary. April 15, 2011 FINAL Page 21 of 58

V. FACILITY DESCRIPTION The 106,374 SF George J. Mitchell Elementary School is a one story facility comprised of classrooms, gymnasium, cafeteria, kitchen, administrative offices, corridors, bathrooms and mechanical rooms. The total number of occupants at the George Mitchell Elementary School building is approximately 1,156 including students, teachers and the custodial staff. The facility is open between the hours of 6:45 AM and 6:00 PM for school hours, before-school and afterschool programs. Custodial services usually take place between the hours of 3:30 PM and 11:30 PM. The facility is closed on weekends. A portion of the facility remains open during summer months for various social programs and cleaning in the building. Actual occupancy use is minimal. However, the owner keeps the building at design temperature to control the temperature and humidity for staff and the programs that are occurring at the facility during the summer months. Exterior walls are 4 brick veneer with 8 CMU construction. There is a 1 ¾ inch air space and 1 inch rigid insulation in all exterior walls. The windows throughout the facility are in good condition and appear to be maintained. Typical windows throughout the facility are 1 insulated low-e, tinted and tempered glass with aluminum frames. Roll down shades are utilized through the facility for occupant comfort. The shades are valuable because they help to reduce heat loss in the winter and reduce solar heat gain in the summer. The majority of the roof is sloped with shingles but a portion of the roof is constructed of a flat EPDM (ethylene propylene diene monomer) rubber style roof where most of the HVAC equipment was located. The insulation below the roof consists of ½ inch recovery board and rigid insulation as well as batt insulation above the ceiling. The original building was built in 1951. Renovations to the building occurred in 1959, 1964, 1976, 1999 and 2009. HVAC Systems Packaged rooftop units (RTU) 1, 2 and 3 serve area A, B and the middle region of the school. There are two (2) Trane models YCH360 and YCH480 with a nominal cooling capacity of 30 and 40 tons with heating capacities of 350 and 400 MBH. These RTU s are variable air volume (VAV) units with step control, modulating gas heat, static pressure sensor in the duct, unit mounted control supply fan VFD, full economizer with exhaust fans, and heat recovery. In addition these units are equipped with demand ventilation control (DVC). They are three (3) years old, in good condition and have 12 years until they are past their expected ASHRAE useful service life. Packaged rooftop units (RTU) 4 and 5 serve the cafeteria. These units are Aaon model RM-013 with nominal cooling capacity of 13 tons and heating capacities of 180 MBH. These RTU s are constant volume units with enthalpy economizers with motorized relief, outside air dampers, CO2 sensors, and 2-stage cooling. Outside air dampers are controlled by CO2 sensors from 0% to minimum outside air. Additionally, these units have hot gas reheat dehumidification, modulating gas heat and demand ventilation control (DVC) options. They are three (3) years old, in good condition and have 12 years until they are past their expected ASHRAE useful service life. April 15, 2011 FINAL Page 22 of 58

Packaged rooftop unit (RTU) 6 serves the gymnasium, RTU 7 serves the library and RTU 8 serves area D. Rooftop unit 6 is Aaon model RM-020, RTU 7 is Aaon model RM-010 and rooftop 8 is Trane model YCH-600, with nominal cooling capacities of 20, 10 and 50 tons and heating capacities of 270, 350 and 400 MBH, respectively. These RTU s are constant volume units with enthalpy economizers with motorized relief, outside air dampers, CO2 sensors, and 2- stage cooling. Outside air dampers are controlled by CO2 sensors from 0% to minimum outside air. Additionally, these units have hot gas reheat dehumidification, modulating gas heat and demand ventilation control (DVC) options. They are three (3) years old, in good condition and have 12 years until they are past their expected ASHRAE useful service life. Packaged rooftop unit (RTU) 9 serves the new addition to the school. There is one (1) Aaon model RN-060 with a nominal cooling capacity of 60 tons and with a heating capacity of 540 MBH. This RTU is a variable air volume (VAV) unit with step control, modulating gas heat, static pressure sensor in the duct, unit mounted control supply fan VFD, full economizer with exhaust fans, and heat recovery. In addition this unit is equipped with demand ventilation control (DVC). The unit is three (3) years old, in good condition and has 12 years until it is past the expected ASHRAE useful service life. There are several low capacity split systems which serve computer room, kitchen, original building offices and library. These split systems have a capacity range from 1 to 5 tons. Manufacturers include Daikin, Carrier and Fujitsu. The new addition that was built in 2007 gained two (2) Aerco Modulex boilers with an input capacity of 418 MBH and an output capacity of 390 MBH. These boilers have a high efficiency of approximately 93% and are capable of modulating to satisfy varying loads. The new wing utilizes these boilers in combination with a direct expansion Aaon rooftop unit with gas heating. The rooftop provides enough heat to maintain a certain designated temperature, then the hot water variable air volume boxes will condition the preheated air from the rooftop to the designated room setpoint. The original building contains two (2) Weil McLain boilers model CGA-7 with an input capacity of 210 MBH and an output capacity of 175 MBH. These units were installed during the 1999 renovation and they currently serve the baseboard heat for the original building. During the survey, CEG was advised that these boilers have been turned off and are not in use. Rooftop units with gas heat completely condition all areas of the existing building, coupled with VAV s with electric reheat. The electric VAV s are an inefficient way to heat the system and consume a large amount of electricity, resulting in high electric bills which George J. Mitchell is currently observing. Exhaust System The exhaust for the offices, classrooms, bathrooms and the corridors is provided by roof exhausters and integral exhaust fans within the rooftop units. The exhaust fans operate based on the facility occupancy schedule. April 15, 2011 FINAL Page 23 of 58

The kitchen includes one (1) large commercial exhaust hood, which provides exhaust for the cooking appliances. The hood is 4ft x 14ft and operates at constant speed between 5 AM and 2 PM. The hood is manually controlled with wall switches. HVAC System Controls The entire George J. Mitchell Elementary School is controlled by a central DDC (Direct Digital Control) system manufactured by TAC. The DDC system encompasses night set back, morning warm-up, temperature set-points and HVAC schedules. Domestic Hot Water Domestic hot water for the restrooms in the new wing is provided by one (1) 100 gallon, A.O. Smith gas fired hot water heaters, capacity of 199 MBH. The domestic hot water is circulated throughout the new addition by a hot water re-circ pump. The circulation pump is controlled by an aqua stat. The original building is served by several domestic hot water systems located in different sections of the building. In total there are thirteen (13) other domestic hot water heaters within the building, eleven (11) of which are electric hot water heaters and serve the classroom sinks and bathrooms, and two (2) which are gas fired and serve main bathroom areas. For further information regarding the domestic hot water systems please refer to the Major Equipment List Appendix. Lighting Typical lighting throughout building is fluorescent tube lay-in fixtures with T-8 lamps and electronic ballasts. The gymnasium is equipped with HID light fixtures. There are additional areas within the elementary school which contain T-12 lamps and magnetic ballasts which are scattered randomly. Photovoltaic System The school currently houses a 28 kilowatt rooftop solar array overtop the Cafetorium. The system is comprised of 160 Solar World SW 175 panels rated at 175 watts each. The system has been installed and operating since December 2009 and can produce approximately 35,000 kilowatt-hours annually. April 15, 2011 FINAL Page 24 of 58

VI. MAJOR EQUIPMENT LIST The equipment list contains major energy consuming equipment that through implementation of energy conservation measures could yield substantial energy savings. The list shows the major equipment in the facility and all pertinent information utilized in energy savings calculations. An approximate age was assigned to the equipment in some cases if a manufactures date was not shown on the equipment s nameplate. The ASHRAE service life for the equipment along with the remaining useful life is also shown in the Appendix. Refer to the Major Equipment List Appendix for this facility. April 15, 2011 FINAL Page 25 of 58

VII. ENERGY CONSERVATION MEASURES ECM #1: Solar Domestic Hot Water System Description: George J. Mitchell Elementary School operates with a nearly year round demand for hot water production. The hot water is supplied by large electric water heaters in certain areas of the school. Electricity is one of the most expensive sources of domestic hot water production. Therefore, installation of a solar thermal hot water heating system is an economical option for offsetting the electricity usage and demand for this facility. This ECM includes the installation of a solar thermal system to produce domestic hot water. The system includes solar thermal panels mounted over the roof of the A wing which serves offices and classrooms and B wing near the existing hot water heaters located in classroom closet areas between two rooms. This installation also includes piping distribution to the domestic hot water tanks, a pre-heat hot water heat exchanger and pumps for glycol distribution, and controls. The system features a pre-heat tank with the existing tanks still in place as a back-up means for hot water production to ensure no loss of hot water production. The calculations are based on Viesmann Flat Plat collectors model VITOSOL 200F or equivalent. It is recommended the owner retain a professional engineer to confirm equipment sizing and finalize design as well as the structural integrity of the existing structure to support the installation of the new panels Energy Savings Calculations: Existing Domestic Hot Water Parameters: Avg. Electricity Cost = $0.142/kWh Existing Domestic Water Heating Efficiency = 100% Estimated monthly domestic HW usage* = 4,241 kwh * Equals to 4% of total energy usage of the facility based on U.S. Energy Information Administration - EIA, Commercial Buildings Energy Consumption Survey, CBECs Solar Thermal System Parameters: See the Solar Domestic Hot Water Heater Appendix for detailed calculations. Solar Thermal System Production: 50,320 kwh/yr * Assumed 50% of production utilized during July and August. Solar Heat Solar Sys Heat % = DHW Load ( kwh) ( kwh) April 15, 2011 FINAL Page 26 of 58

Calculation results are summarized in the table below. SOLAR THERMAL SYSTEM CALCULATIONS ECM INPUTS EXISTING PROPOSED SAVINGS ECM INPUTS HW Heaters Solar Thermal Sys w/ HW Heaters - Annual DHW Load (kwh) 50,886 50,886 - Ave Monthly Electricity Usage for DHW (kwh) Hot Water Heating Efficiency (%) Solar Thermal Sys. Production (kwh) Solar Thermal Sys. Heat % of Baseline 4,241 4,241-100% 100% - 0 50,320 50,320 0% 98.9% 99% Cost of fuel ($/kwh) $0.142 $0.142 - ECM RESULTS EXISTING PROPOSED SAVINGS Electricity Usage (kwh) 50,886 567 50,320 Energy Cost ($) $7,226 $80 $7,145 COMMENTS: ENERGY SAVINGS CALCULATIONS This ECM is based on solar thermal hot water production from the solar thermal hot water calucation appendix. Average monthly DHW usage estimated based on statistical information (4% of the annual energy usage) Installed cost of the solar thermal system including panels, piping, equipment, heat exchanger, pumps, and controls is estimated to be $80,000. April 15, 2011 FINAL Page 27 of 58

Energy Savings Summary: ECM #1 - ENERGY SAVINGS SUMMARY Installation Cost ($): $80,000 NJ Smart Start Equipment Incentive ($): $0 Net Installation Cost ($): $80,000 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $7,145 Total Yearly Savings ($/Yr): $7,145 Estimated ECM Lifetime (Yr): 25 Simple Payback 11.2 Simple Lifetime ROI 123.3% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $178,625 Internal Rate of Return (IRR) 7% Net Present Value (NPV) $44,416.94 April 15, 2011 FINAL Page 28 of 58

ECM #2: Replace Electric VAV with Hot Water VAV Description: The George J. Mitchell Elementary School s core building uses a packaged rooftop system with gas heat in conjunction with VAV (Variable Air Volume) devices equipped with electric reheat. This form of heating is very expensive due to the high cost of electricity. The use of hot water reheat VAV s would help alleviate some of the electrical consumption for the facility. In order to implement this ECM, a new hot water heating system needs to be installed. The existing boilers are currently not in operation due to the rooftop packaged unit s ability to satisfy the load sufficiently without supplementary conditioning. Additionally, there is no hot water piping in the area above the ceiling where the hot water VAV s would be located. With the installation of new condensing hot water boilers which have efficiencies as high as 96%, the new system will operate at almost the same efficiency as the last but will cost less due to the use of natural gas which is much cheaper than electric. This ECM includes the installation of two (2) Aerco modulating boilers model MLX 757, fortynine (49) hot water VAV boxes and a new piping system for connecting the new boilers with the VAV boxes. This ECM also includes the decommissioning of the two (2) existing Weil McLain boilers as well as the electric VAV s currently in use. Energy Savings Calculations: Savings Calculations were calculated with energy modeling software, Trane Trace 700 version 6.2.6.5, to compare the existing conditions to the alternative energy conservation measure. The model was built using existing information collected and provided by the school regarding lighting power density, occupancy profiles, HVAC information, and available floor plans. April 15, 2011 FINAL Page 29 of 58

Energy Savings Summary: ECM #2 - ENERGY SAVINGS SUMMARY Installation Cost ($): $275,070 NJ Smart Start Equipment Incentive ($): $2,650 Net Installation Cost ($): $272,420 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $13,560 Total Yearly Savings ($/Yr): $13,560 Estimated ECM Lifetime (Yr): 15 Simple Payback 20.1 Simple Lifetime ROI -25.3% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $203,400 Internal Rate of Return (IRR) -3% Net Present Value (NPV) ($110,541.60) April 15, 2011 FINAL Page 30 of 58

ECM #3: Computer Monitor Replacement Description: The computers throughout the school utilize a mixture of CRT computer monitors and LCD computer monitors. Computers are located throughout the school and are becoming a larger and larger portion of a facility s energy usage. The CRT computer monitors are outdated and have several disadvantages such as; significantly increased higher energy consumption, uses large amount of desk space, poor picture quality, distortions and flickering image, secular glare problems, and high weight, and electromagnetic emissions. Many of these drawbacks are difficult to quantify except for the energy use. CRT monitors use considerably more energy than an alternative flat panel LCD monitor. Replacement of the existing CRT monitors with LCD monitors saves considerable energy as well as provides other ergonomic benefits. Based on the site survey it was noted that there are 50 LCD monitor and 161 CRT monitors. Some of the monitors were left in screen saver mode, which is deceiving since this mode only saves the computer screen from image burn in, however it does not save on energy consumption. The average operating hours for all computers and monitors is estimated based on the site survey observations. Energy consumption of computer monitors is based on averages for power usage of various computer monitors. This ECM includes replacement of all existing CRT monitors with LCD flat panel monitors throughout the facility. Installation costs were neglected for this ECM with the intention that this ECM would be replaced by the township. The calculations are based on the following operating assumptions: Energy Savings Calculations: No. of CRT Monitors: 161 Operating Weeks per Yr: 36 Hrs per Week: 50 (10 hrs per day estimated average) # of Electric Usage = Computers Monitor Power 1000 W KW ( W ) Operation ( Hrs) Energy Cost = Electric Usage $ kwh ( kwh) Ave Elec Cost April 15, 2011 FINAL Page 31 of 58

COMPUTER MONITOR CALCULATIONS ECM INPUTS EXISTING PROPOSED SAVINGS ECM INPUTS CRT Monitors LCD Monitor # of Computers 161 161 Monitor Power Cons. (W) 75 25 Operating Hrs per Week 50 50 Operating Weeks per Yr 36 36 Elec Cost ($/kwh) 0.142 0.142 ENERGY SAVINGS CALCULATIONS ECM RESULTS EXISTING PROPOSED SAVINGS Electric Usage (kwh) 21,735 7,245 14,490 Energy Cost ($) $3,086 $1,029 $2,058 COMMENTS: CRT Monitor consumption based on Dell CRT monitor M/N: CRT- E771MM. Operating hours estimated. Installation cost of new monitors is estimated based on current pricing for a 17 LCD monitor on the market today. No labor costs were included for replacing the existing monitors with the new monitors. No incentives are available for installation of computer monitors. Net cost per monitor was estimated to be $100. Installation Costs: # Monitors X Cost per Monitor 161 Monitors X $100 per Monitor $16,100 April 15, 2011 FINAL Page 32 of 58

Energy Savings Summary: ECM #3 - ENERGY SAVINGS SUMMARY Installation Cost ($): $16,100 NJ Smart Start Equipment Incentive ($): $0 Net Installation Cost ($): $16,100 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $2,058 Total Yearly Savings ($/Yr): $2,058 Estimated ECM Lifetime (Yr): 15 Simple Payback 7.8 Simple Lifetime ROI 91.7% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $30,870 Internal Rate of Return (IRR) 10% Net Present Value (NPV) $8,468.27 April 15, 2011 FINAL Page 33 of 58

ECM #4: Demand Controlled Ventilation in Gym & Cafeteria Description: Demand Controlled Ventilation (DCV) is a means to provide active, zone level control of ventilation for spaces within a facility. The basic premise behind DCV is monitoring indoor CO2 levels versus outdoor CO2 levels in order to provide proper ventilation to the spaces within the facility as well as saving costly dollars treating unconditioned ventilation air. Carbon dioxide ventilation control or demand controlled ventilation (DCV) allows for the measurement and control of outside air ventilation levels to a target cfm/person ventilation rate in the space (i.e., 15 cfm/person) based on the number of people in the space. It is a direct measure of ventilation effectiveness and is a method whereby buildings can regain active and automatic zone level ventilation control, without having to open windows. The fixed ventilation approach depends on a set-it-and-forget-it methodology that is completely unresponsive to changes in the way spaces are utilized/occupied or how equipment is maintained. A DCV system utilizes various control algorithms to maintain a base ventilation rate. The system monitors space CO2 levels and the algorithm automatically adjusts the outdoor and return air dampers to provide the quantity of outdoor air to maintain the required CO2 level in the space. System designs are normally designed for maximum occupancy and the ventilation rates are designed for this (maximum) occupancy. In areas where occupancy swings are prevalent there is ample opportunity to reduce outdoor air quantity to satisfy the needs of the actual number of occupants present. By initiating the active controls for the DCV system, energy savings are realized by the reduced quantities of outdoor air that do not require heating and cooling energy from the steam and chilled water plants. RTU-4 and RTU-5 together condition the cafeteria while RTU-6 conditions the gymnasium. There is already a demand control ventilation system installed for all of these units with CO 2 sensors in the return air duct, modulating control of exhaust air fans with a VFD and a mode enable sensor option for the supply, return and outside air. From information gathered from the building manager and observations of the controls for these units, it is assumed that the demand control ventilation option is not on an active setting; therefore the possible savings with the current system can be optimized with further investigation into the controls for these areas. It is assumed that these units are only utilizing the CO 2 sensors as monitoring devices and not actively controlling the system. This ECM will encompass a visit from a controls vendor which will assess the system and enable the active controls for these air handling units demand control ventilation system. This system allows the air handling units to respond to changes in occupancy and therefore reduce the amount of outside air that has to be conditioned. Outside air accounts for a large portion of the energy consumption in the HVAC system, especially in high occupancy spaces. The U.S. Department of Energy sponsored a study to analyze energy savings achieved through various types of building system controls. The referenced savings is based on the Advanced Sensors and Controls for Building Applications: Market Assessment and Potential R&D Pathways, document posted for public use April 2005. The study has found that commercial buildings have the potential to achieve significant energy savings through the use of building controls. The average energy savings are as follows based on the report: April 15, 2011 FINAL Page 34 of 58

Demand Control Ventilation 10% - 15%. Energy savings achieved through Demand Control Ventilation average 10%-15%. Savings resulting from the implementation of this ECM for energy management controls are approximately 4% of the total HVAC energy cost for this system. The only component included is software programming. Cost of programming = 20 Hours x $150/Hr = $3,000 Energy Savings Calculations: Savings Calculations were calculated with energy modeling software, Trane Trace 700 version 6.2.6.5, to compare the existing conditions to the alternative energy conservation measure. The model was built using existing information collected and provided by the school regarding lighting power density, occupancy profiles, HVAC information, and available floor plans. Energy Savings Summary: ECM #4 - ENERGY SAVINGS SUMMARY Installation Cost ($): $3,000 NJ Smart Start Equipment Incentive ($): $0 Net Installation Cost ($): $3,000 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $2,780 Total Yearly Savings ($/Yr): $2,780 Estimated ECM Lifetime (Yr): 15 Simple Payback 1.1 Simple Lifetime ROI 1290.0% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $41,700 Internal Rate of Return (IRR) 93% Net Present Value (NPV) $30,187.46 April 15, 2011 FINAL Page 35 of 58

ECM #5: HVAC Scheduling Adjustments Description: Typical HVAC operation hours for the George J. Mitchell Elementary School are between 5:00 AM to 7:00 PM Monday through Friday. Cleaning and maintenance for the building is typically take care of during the weekdays at night between 7:00 PM and 11:00 PM. There is no weekend operation. It was observed through the building survey, which included a review of the controls setup for the building, that the temperature set-points and setbacks for the school may not have been running at the most optimal setting. In looking through some of the settings, it was noted that the building was running on the following schedule: Heating Season Monday-Friday (5:00 AM 7 PM) = approximately 70 F on average Monday-Friday (7:00 PM 5:00 AM) = setback to a range of 61 F-63 F Weekends = setback to a range of 61 F-63 F Cooling Season Monday-Friday (5:00 AM 7 PM) = 71 F Global set-point Monday-Friday (7:00 PM 5:00 AM) = 81 F setback Weekends = 81 F setback CEG recommends setting the DDC system setpoints more conservatively for a system of this type. This ECM will utilize the ASHRAE 55 Standard for Thermal Comfort in choosing temperature set-points. The recommended DDC set points for heating/cooling in the spaces are as follows: Heating Season Monday-Friday (5:00 AM 7 PM) = 70 F Monday-Friday (7:00 PM 5:00 AM) = 65 F Weekends = 65 F Cooling Season Monday-Friday (5:00 AM 7 PM) = 75 F Global set-point Monday-Friday (7:00 PM 5:00 AM) = 80 F setback Weekends = 80 F setback Due to the fact that a control scheme is already in place for this building, minor adjustments to the system have the possibility of showing savings for a low cost output up-front. In addition, further savings could be realized by limiting the Hours of Operation and reducing the time that the HVAC system is set in an occupied mode. April 15, 2011 FINAL Page 36 of 58

Energy Savings Calculations: Savings Calculations were calculated with energy modeling software, Trane Trace 700 version 6.2.6.5, to compare the existing conditions to the alternative energy conservation measure. The model was built using existing information collected and provided by the school regarding lighting power density, occupancy profiles, HVAC information, and available floor plans. Energy Savings Summary: ECM #5 - ENERGY SAVINGS SUMMARY Installation Cost ($): $3,000 NJ Smart Start Equipment Incentive ($): $0 Net Installation Cost ($): $3,000 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $3,326 Total Yearly Savings ($/Yr): $3,326 Estimated ECM Lifetime (Yr): 15 Simple Payback 0.9 Simple Lifetime ROI 1563.0% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $49,890 Internal Rate of Return (IRR) 111% Net Present Value (NPV) $36,705.57 April 15, 2011 FINAL Page 37 of 58

ECM #6: Occupancy Controlled Power Strips Description: Plug loads in buildings are increasingly becoming a majority share of electrical consumption annually, as HVAC and lighting technologies are becoming more efficient and more energy is being utilized by other equipment. The Elementary School computer lab has approximately thirty computers used by students. During the survey it was noted that many of these computers were on and operating while no one was using the work station. To reduce idle power draw load from the computer and peripheral equipment while not in use, CEG recommends the installation of Watt Stopper IDP-3050 occupancy controlled power strip. The power strip has the same features of a typical strip except it is fitted with an infrared occupancy sensor. The sensor reads when an occupant is using their workstation and insures all equipment is fully powered, however when an occupant is not present the strip shuts power off to devices plugged into the control outlets of the strip. Installing these power strips could substantially reduce energy waste due to plugged in equipment. The intent of this ECM is to provide control of ancillary devices such as computer monitors, speakers, printers, phone charges, task lights, and etc. that can be shut off by the control outlets when the user is not present. Energy Savings Calculations: The manufacturer has estimated that typical savings for their power strip can save 75 kilowatthours per work station or more. POWER STRIP SAVINGS CALCULATIONS ECM INPUTS Number of Computers 30 Power Strip Information Manufacturer Watt Stopper Model IDP-3050 Savings per Workstation (kwh/yr) 75 Electric Cost ($/kwh) $0.140 Total Electric Savings, kwh 2,250 Total Cost Savings $315.00 April 15, 2011 FINAL Page 38 of 58

Energy Savings Summary: ECM #6 - ENERGY SAVINGS SUMMARY Installation Cost ($): $2,700 NJ Smart Start Equipment Incentive ($): $0 Net Installation Cost ($): $2,700 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $315 Total Yearly Savings ($/Yr): $315 Estimated ECM Lifetime (Yr): 15 Simple Payback 8.6 Simple Lifetime ROI 75.0% Simple Lifetime Maintenance Savings 0 Simple Lifetime Savings $4,725 Internal Rate of Return (IRR) 8% Net Present Value (NPV) $1,060.45 April 15, 2011 FINAL Page 39 of 58

ECM #7: Lighting Upgrade Retrofits and Re-lamping Description: The majority of the lighting throughout the George J. Mitchell Elementary School building is provided with fluorescent fixtures with older generation, 700 series 32W T8 lamps and electronic ballasts. Although 700 series T8 lamps are considered fairly efficient, further energy savings can be achieved by replacing the existing T8 lamps with new generation, 800 series 28W T8 lamps without compromising light output. CEG recommends, re-lamping all of the fixtures with 28W T8 lamps. In addition, some of the storage areas, locker room and gym areas, offices, auditorium, classrooms, restrooms and kitchen areas still have a variety of older fixtures with T12 lamps with magnetic ballasts, incandescent lamps and incandescent exit signs. It is recommended to retrofit or replace all of the T12 fixtures and the incandescent lights in these areas with high efficiency fluorescent T8 fixtures with electronic ballasts or compact fluorescent lamps. This ECM includes re-lamping of the existing fluorescent fixtures with 800 series, 28W T8 lamps. The ECM also includes retrofit of all T12 fixtures with T8 fixtures with electronic ballasts in the building. The new, energy efficient T8 fixtures will provide adequate lighting and will save on electrical costs due to better performance of the lamp and ballasts. This ECM also includes maintenance savings through the reduced number of lamps replaced per year. The expected lamp life of a T8 lamp is approximately 30,000 burn-hours, in comparison to the existing T12 lamps which is approximately 20,000 burn-hours. The facility will need approximately 33% less lamps replaced per year for each one for one fixture replaced. The ECM also includes replacement of any incandescent lamps with compact fluorescent lamps. Compact fluorescent lamps (CFL s) were designed to be direct replacements for the standard incandescent lamps which are common to table lamps, spot lights, hi-hats, bathroom vanity lighting, etc. The light output of the CFL has been designed to resemble the incandescent lamp. The color rendering index (CRI) of the CFL is much higher than standard fluorescent lighting, and therefore provides a much truer light. The CFL is available in a myriad of shapes and sizes depending on the specific application. Typical replacements are: a 13-Watt CFL for a 60-Watt incandescent lamp, an 18-Watt CFL for a 75-Watt incandescent lamp, and a 26-Watt CFL for a 100-Watt incandescent lamp. The CFL is also available for a number of brightness colors that is indicated by the Kelvin rating. A 2700K CFL is the warmest color available and is closest in color to the incandescent lamp. CFL s are also available in 3000K, 3500K, and 4100K. The 4100K would be the brightest or coolest output. A CFL can be chosen to screw right into your existing fixtures, or hardwired into your existing fixtures. Where the existing fixture is controlled by a dimmer switch, the CFL bulb must be compatible with a dimmer switch. In some locations the bulb replacement will need to be tested to make sure the larger base of the CFL will fit into the existing fixture. The energy usage of an incandescent compared to a compact fluorescent approximately 3 to 4 times greater. In addition to the energy savings, compact fluorescent fixtures burn-hours are 8 to 15 times longer than incandescent fixtures ranging from 6,000 to 15,000 burn-hours compared to incandescent fixtures ranging from 750 to 1000 burnhours. However, the maintenance savings due to reduced lamp replacement is offset by the higher cost of the CFL s compared to the incandescent lamps. April 15, 2011 FINAL Page 40 of 58

Energy Savings Calculations: The Investment Grade Lighting Audit Appendix outlines the hours of operation, proposed retrofits, costs, savings, and payback periods for each set of fixtures in the each building. Rebates and Incentives: There are incentives available from NJ Smart Start Program for the retrofits in this ECM. Incentives are calculated as follows: From the Smart Start Incentive appendix, the retrofit of a T-12 fixture to a T-5 or T-8 fixture or the retrofit of existing 32 watt T-8 system to reduced wattage (28w/25w 4') warrants the following incentive: $10 per fixture. (# of 1 4 lampfixtures $10) = 1129 $10 $11,290 Smart Start Incentive= = From the Smart Start Incentive appendix, the replacement of an HID, T12 or incandescent with wattage ranging from 400-999 watts warrants the following incentive: $100 per fixture. (# of HIDfixtures $100) = 38 $100 $3800 Smart Start Incentive= = Total Savings = $11,290 + $3,800 = $15,090 April 15, 2011 FINAL Page 41 of 58

Energy Savings Summary: ECM #7 - ENERGY SAVINGS SUMMARY Installation Cost ($): $26,621 NJ Smart Start Equipment Incentive ($): $15,090 Net Installation Cost ($): $11,531 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $3,489 Total Yearly Savings ($/Yr): $3,489 Estimated ECM Lifetime (Yr): 15 Simple Payback 3.3 Simple Lifetime ROI 353.9% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $52,334 Internal Rate of Return (IRR) 30% Net Present Value (NPV) $30,119.38 April 15, 2011 FINAL Page 42 of 58

ECM #8: Lighting Controls Upgrade Occupancy Sensors Description: Some of the lights in the school building are left on unnecessarily. In many cases the lights are left on because of the inconvenience to manually switch lights off when a room is left or on when a room is first occupied. This is common in rooms that are occupied for only short periods and only a few times per day. In some instances lights are left on due to the misconception that it is better to keep the lights on rather than to continuously switch lights on and off. Although increased switching reduces lamp life, the energy savings outweigh the lamp replacement costs. The payback timeframe for when to turn the lights off is approximately two minutes. If the lights are expected to be off for at least a two minute interval, then it pays to shut them off. Lighting controls come in many forms. Sometimes an additional switch is adequate to provide reduced lighting levels when full light output is not needed. Occupancy sensors detect motion and will switch the lights on when the room is occupied. Occupancy sensors can either be mounted in place of a current wall switch, or on the ceiling to cover large areas. The U.S. Department of Energy sponsored a study to analyze energy savings achieved through various types of building system controls. The referenced savings is based on the Advanced Sensors and Controls for Building Applications: Market Assessment and Potential R&D Pathways, document posted for public use April 2005. The study has found that commercial buildings have the potential to achieve significant energy savings through the use of building controls. The average energy savings are as follows based on the report: Occupancy Sensors for Lighting Control 20% - 28% energy savings. Savings resulting from the implementation of this ECM for energy management controls are estimated to be 10% of the total light energy controlled by occupancy sensors and daylight sensors (The majority of the savings is expected to be after school hours when rooms are left with lights on) This ECM includes installation of ceiling type sensors for individual offices, classrooms, large bathrooms, and libraries. Sensors shall be manufactured by Sensorswitch, Watt Stopper or equivalent. The Investment Grade Lighting Audit Appendix of this report includes the summary of lighting controls implemented in this ECM and outlines the proposed controls, costs, savings, and payback periods. The calculations adjust the lighting power usage by the applicable percent savings for each area that includes lighting controls. Energy Savings Calculations: Energy Savings = Savings. = Energy Savings (% Savings Controlled Light Energy ( kwh/yr) ) $ kwh ( kwh) Ave Elec Cost April 15, 2011 FINAL Page 43 of 58

Cost and Incentives: Installation cost per dual-technology sensors (Basis: Sensor switch or equivalent) are as follows: Sensor - Remote Mount Sensor - Switch Mount $160 per installation $75 per installation Cost includes material and labor. From the NJ Smart Start Program Incentives Appendix, the installation of a lighting control device warrants the following incentive: Occupancy Sensor Fixture Mounted (existing facility only) = $20 per sensor Occupancy Sensor Remote Mounted (existing facility only) = $35 per sensor (# of wall mount $ 20) + (#of ceiling mount $35) ( 20 wall mount $ 20) + (72 ceiling mount $35) $2,720 Smart Start Incentive = Smart Start Incentive = = Energy Savings Summary: ECM #8 - ENERGY SAVINGS SUMMARY Installation Cost ($): $12,270 NJ Smart Start Equipment Incentive ($): $2,720 Net Installation Cost ($): $9,550 Maintenance Savings ($/Yr): $0 Energy Savings ($/Yr): $5,686 Total Yearly Savings ($/Yr): $5,686 Estimated ECM Lifetime (Yr): 15 Simple Payback 1.7 Simple Lifetime ROI 793.1% Simple Lifetime Maintenance Savings $0 Simple Lifetime Savings $85,290 Internal Rate of Return (IRR) 59% Net Present Value (NPV) $58,329.10 April 15, 2011 FINAL Page 44 of 58

VIII. RENEWABLE/DISTRIBUTED ENERGY MEASURES Globally, renewable energy has become a priority affecting international and domestic energy policy. The State of New Jersey has taken a proactive approach, and has recently adopted in its Energy Master Plan a goal of 30% renewable energy by 2020. To help reach this goal New Jersey created the Office of Clean Energy under the direction of the Board of Public Utilities and instituted a Renewable Energy Incentive Program to provide additional funding to private and public entities for installing qualified renewable technologies. A renewable energy source can greatly reduce a building s operating expenses while producing clean environmentally friendly energy. CEG has assessed the feasibility of installing renewable energy measures (REM) for the George Mitchell Elementary School in Little Egg Harbor Township utilizing renewable technologies and concluded that there is potential for solar energy generation. The solar photovoltaic system calculation summary will be concluded as REM#1 within this report. Solar Generation Solar energy produces clean energy and reduces a building s carbon footprint. This is accomplished via photovoltaic panels which mounted generally in a southerly facing exposure. Flat roof, as well as sloped areas can be utilized; flat areas will have the panels turned to an optimum solar absorbing angle. Parking lots can also be utilized for the installation of a solar array. A truss system can be installed that is high enough to park vehicles under the array and no parking lot area is lost. The state of NJ has instituted a program in which one Solar Renewable Energy Certificate (SREC) is given to the Owner for every 1000 kwh of generation. SREC s can be sold anytime on the market at their current market value. The value of the credit varies upon the current need of the power companies. The average value per credit is around $350, this value was used in our financial calculations. This equates to $0.35 per kwh generated. The Mitchell School already has a roof mounted solar system sized at 28 kilowatts, after further review of available roof space CEG believes that due to the large amount of equipment on the remaining areas of the roof that a ground mounted parking lot canopy system would be much more advantageous for the school to pursue. An area of 19,556 S.F. can be utilized for a PV system as depicted in the Renewable / Distributed Energy Measures Calculation Appendix. Using this square footage it was determined that a system size of 305.9 kilowatts could be installed. A system of this size has an estimated kilowatt hour production of 335,093 KWh annually, reducing the overall utility bill by approximately 26.34% percent. A detailed financial analysis can be found in the Renewable / Distributed Energy Measures Calculation Appendix. This analysis illustrates the payback of the system over a 25 year period. The eventual degradation of the solar panels and the price of accumulated SREC s are factored into the payback. The proposed photovoltaic array layout is designed based on the specifications for the Sun Power SPR-230 panel. This panel has a DC rated full load output of 230 watts, and has a total panel conversion efficiency of 18%. Although panels rated at higher wattages are available through Sun Power and other various manufacturers, in general most manufacturers who produce April 15, 2011 FINAL Page 45 of 58

commercially available solar panels produce a similar panel in the 200 to 250 watt range. This provides more manufacturer options to the public entity if they wish to pursue the proposed solar recommendation without losing significant system capacity. The array system capacity was sized on available parking lot space at the existing facility and existing electric load limitation. Estimated solar array generation was then calculated based on the National Renewable Energy Laboratory PVWatts Version 1.0 Calculator. In order to calculate the array generation an appropriate location with solar data on file must be selected. In addition the system DC rated kilowatt (kw) capacity must be inputted, a DC to AC de-rate factor, panel tilt angle, and array azimuth angle. The DC to AC de-rate factor is based on the panel nameplate DC rating, inverter and transformer efficiencies (95%), mismatch factor (98%), diodes and connections (100%), dc and ac wiring(98%, 99%), soiling, (95%), system availability (95%), shading (if applicable), and age(new/100%). The overall DC to AC de-rate factor has been calculated at an overall rating of 77%. The PVWatts Calculator program then calculates estimated system generation based on average monthly solar irradiance and user provided inputs. The monthly energy generation and offset electric costs from the PVWatts calculator is shown in the Renewable/Distributed Energy Measures Calculation Appendix. The proposed solar array is qualified by the New Jersey Board of Public Utilities Net Metering Guidelines as a Class I Renewable Energy Source. These guidelines allow onsite customer generation using renewable energy sources such as solar and wind with a capacity of 2 megawatts (MW) or less. This limits a customer system design capacity to being a net user and not a net generator of electricity on an annual basis. Although these guidelines state that if a customer does net generate (produce more electricity than they use), the customer will be credited those kilowatt-hours generated to be carried over for future usage on a month to month basis. Then, on an annual basis if the customer is a net generator the customer will then be compensated by the utility the average annual PJM Grid LMP price per kilowatt-hour for the over generation. Due to the aforementioned legislation, the customer is at limited risk if they generate more than they use at times throughout the year. With the inefficiency of today s energy storage systems, such as batteries, the added cost of storage systems is not warranted and was not considered in the proposed design. Direct purchase involves the school paying for 100% of the total project cost upfront via one of the methods noted in the Installation Funding Options section below. Calculations include a utility inflation rate as well as the degradation of the solar panels over time. Based on our calculations the following is the payback period: Table 7 Financial Summary Photovoltaic System FINANCIAL SUMMARY - PHOTOVOLTAIC SYSTEM PAYMENT TYPE SIMPLE PAYBACK, Yrs. INTERNAL RATE OF RETURN Direct Purchase 11.60 7.56% *The solar energy measure is shown for reference in the executive summary Renewable Energy Measure (REM) table April 15, 2011 FINAL Page 46 of 58

Given the large amount of capital required by the school to invest in a solar system through a Direct Purchase CEG does not recommend the school pursue this route. It would be more advantageous for the school to solicit Power Purchase Agreement (PPA) Providers who will own, operate, and maintain the system for a period of 15 years. During this time the PPA Provider would sell all of the electric generated by the Solar Arrays to the school at a reduced rate compared to their existing electric rate. CEG has performed a preliminary analysis that shows the potential benefits to the school in reduce electric pricing over the life of the agreement. It is estimated that the school could potentially see a reduction in electric rate from 5% to 15% and thus the analysis performed shows three alternative pricing elements based on a 1 cent, 1.5 cent, and 2 cent rate reduction. The following table shows the potential year 1 electric cost savings for each of these alternative prices. Further detail is shown in the Renewable/Distributed Energy Measures Calculation Appendix of the cost benefit to the school over the life of the agreement. Wind Generation Table 8 Summary PPA Analysis POWER PURCHASE AGREEMENT SUMMARY Solar System Size (kw) 305.90 Annual Solar System Production (kwh) 335,093 Existing Utility Electric Rate ($/kwh) $0.142 Existing Electric Utility Cost $47,583 Analysis - 1 Year 1 PPA Electric Rate ($/kwh) $0.132 Year 1 PPA Electric Cost $44,232 Electric Cost Savings Year 1 $3,351 Analysis - 2 Year 1 PPA Electric Rate ($/kwh) $0.127 Year 1 PPA Electric Cost $42,557 Electric Cost Savings Year 1 $5,026 Analysis - 3 Year 1 PPA Electric Rate ($/kwh) $0.122 Year 1 PPA Electric Cost $40,881 Electric Cost Savings Year 1 $6,702 In addition to the Solar Analysis, CEG also conducted a review of the applicability of wind energy for the facility. Wind energy production is another option available through the Renewable Energy Incentive Program. Wind turbines of various types can be utilized to produce clean energy on a per building basis. Cash incentives are available per kwh of electric usage. Based on CEG s review of the applicability of wind energy for the facility, it was determined that the while average wind speed is adequate to support commercial size wind turbines the site space available is very limited. Therefore CEG does not recommend wind generation. April 15, 2011 FINAL Page 47 of 58

IX. ENERGY PURCHASING AND PROCUREMENT STRATEGY Load Profile: Load Profile analysis was performed to determine the seasonal energy usage of the facility. Irregularities in the load profile will indicate potential problems within the facility. Consequently based on the profile a recommendation will be made to remedy the irregularity in energy usage. For this report, the facility s energy consumption data was gathered in table format and plotted in graph form to create the load profile. Refer to The Electric and Natural Gas Usage Profiles included within this report to reference the respective electricity and natural gas usage load profiles. Electricity: The electricity usage profile demonstrates a steady year long load profile for facilities that have occupancy during the summer months. The average monthly usage for all accounts combined is 171,656 kwh with highest usage during June. The historical usage profile is beneficial and will allow for more competitive energy prices when shopping for alternative suppliers mainly due to the relatively flat load profile. Third Party Supplier (TPS) electric commodity contracts that offer s a firm, fixed price for 100% of the facilities electric requirements and are lower than the Atlantic City Electric s (AECO) BGS-FP default rate are recommended. Natural Gas: The Natural Gas Usage Profile demonstrates a very typical natural gas (heat load) profile. The summer months June through August have very little consumption. This load profile will yield less favorable natural gas pricing when shopping for alternative suppliers. This is because the higher winter month consumption will yield higher pricing which will not be offset by the summer month consumption. Nymex commodity pricing is generally higher in the winter months of November March and lower in the summer months of April October. Obtaining a flat load profile, (usage is similar each month), will yield optimum natural gas pricing when shopping for alternative suppliers. Third Party Supplier (TPS) natural gas commodity contracts that offer a product structure to include either 1) a fixed basis rate with a market based Nymex/commodity rate or 2) a fixed basis rate with fixed Nymex/commodity winter rate (Nov March) and market based Nymex/commodity rate for the summer months (April October) for 100% of the facilities metered natural gas requirements are both recommended due to current market pricing. April 15, 2011 FINAL Page 48 of 58

Tariff Analysis: Electricity: The facilities receive electrical service through Atlantic City Electric (AECO) on AGS-Sec (Annual General Service Secondary) and MGS (Monthly General Service). The facilities have contracted a Third Party Supplier (TPS) to provide electric commodity service. Current Third Party Supplier Terms and Conditions are unknown. For electric supply (generation) service, the client has a choice to either use AECO s default service rate BGS-FP or contract with a Third Party Supplier (TPS) to supply electric. Each year since 2002, the four New Jersey Electric Distribution Companies (EDCs) - Public Service Gas & Electric Company (PSE&G), Atlantic City Electric Company (ACE), Jersey Central Power & Light Company (JCP&L), and Rockland Electric Company (RECO) - have procured several billion dollars of electric supply to serve their Basic Generation Service (BGS) customers through a statewide auction process held in February. BGS refers to the service of customers who are not served by a third party supplier or competitive retailer. This service is sometimes known as Standard Offer Service, Default Service, or Provider of Last Resort Service. The Auction Process has consisted of two auctions that are held concurrently, one for larger customers on an hourly price plan (BGS-CIEP) and one for smaller commercial and residential customers on a fixed-price plan (BGS-FP). This facility s rate structure is based on the fixedprice plan (BGS-FP). The utility, Atlantic City Electric will continue to be responsible for maintaining the existing network of wires, pipes and poles that make up the delivery system, which will serve all consumers, regardless of whom they choose to purchase their electricity or natural gas from. AECO s delivery service rate includes the following charges: Customer Service Charge, Distribution Charge, Market Transition, Transition Bond Charge, Non Utility Generation Charge, Societal Benefits Charge (SBC), Infrastructure Investment Charge, System Control Charge, Regulatory Assets Recovery Charge, and Regional Greenhouse Gas Initiative Charge. Natural Gas: The school facilities currently receives natural gas distribution service through New Jersey Natural Gas (NJNG) on rate schedule GSL (General Service Large). The Frong Pond facility receive natural gas supply service (BGSS) through the utility, NJNG, and the GJ Mitchell facility receives Third Party natural gas supply service. Current Third Party Supplier Terms and Conditions are unknown. For natural gas supply service, the client has a choice to either use NJNG s default service rate BGSS or contract with a Third Party Supplier (TPS) to supply natural gas. NJNG provides basic gas supply service (BGSS) to customers who choose not to shop from a Third Party Supplier (TPS) for natural gas commodity. The option is essential to protect the April 15, 2011 FINAL Page 49 of 58

reliability of service to consumers as well as protecting consumers if a third party supplier defaults or fails to provide commodity service. Please refer to the links below for a recap of monthly natural gas BGSS charges from NJNG. https://www.njng.com/pdf/mar2011largecommercialpricetable.pdf The utility, NJNG is responsible for maintaining the existing network of underground pipes that make up the delivery system, which will serve all consumers, regardless of whom they choose to purchase their natural gas from. NJNG s delivery service rates include the following charges: Customer Service Charge, Delivery Charge, and Balancing Charges. Electric and Natural Gas Commodities Market Overview: Current electricity and natural gas market pricing has remained relatively stable over the last year. Commodity pricing in 2008 marked historical highs in both natural gas and electricity commodity. Commodity pricing commencing spring of 2009 continuing through 2011, has decreased dramatically over 2008 historic highs and continues to be favorable for locking in long term (2-5 year) contracts with 3 rd Party Supplier s for both natural gas and electricity supply requirements. It is important to note that both natural gas and electric commodity market prices are moved by supply and demand, political conditions, market technicals and trader sentiment. This market is continuously changing Energy commodity pricing is also correlated to weather forecasts. Because weather forecasts are dependable only in the short-term, prolonged temperature extremes can really cause extreme price swings. April 15, 2011 FINAL Page 50 of 58

Short Term Energy Outlook - US Energy Information Administration (3/08/2011): U.S. Natural Gas Prices. The Henry Hub spot price averaged $4.09 per MMBtu in February 2011, $0.40 per MMBtu less than the average spot price in January 2011. EIA expects that the Henry Hub spot price will average $4.10 per MMBtu in 2011, a drop of $0.29 per MMBtu from the 2010 average. EIA expects the natural gas market to begin to tighten in 2012, with the Henry Hub spot price increasing to an average of $4.58 per MMBtu. Uncertainty over future natural gas prices is slightly lower this year compared with last year at this time. Natural gas futures for May 2011 delivery (for the 5-day period ending March 3) averaged $3.98 per MMBtu, and the average implied volatility over the same period was 33 percent. This produced lower and upper bounds for the 95-percent confidence interval for May 2011 contracts of $3.09 per MMBtu and $5.11 per MMBtu, respectively. At this time last year, the natural gas May 2010 futures contract averaged $4.77 per MMBtu and implied volatility averaged 39 percent. The corresponding lower and upper limits of the 95-percent confidence interval were $3.57 per MMBtu and $6.39 per MMBtu. U.S. Electricity Retail Prices. During 2010, retail prices for electricity distributed to the residential sector averaged 11.58 cents per kilowatthour, about the same level as in 2009. EIA expects residential prices to rise by 1.0 percent in 2011, followed by an increase of 0.5 percent in 2012. The effect of lower generation fuel costs in 2011 should be more evident in retail prices for electricity distributed to the industrial sector, which EIA projects will fall 1.6 percent during 2011 and then rise 0.2 percent next year. April 15, 2011 FINAL Page 51 of 58

Pricing includes both utility distribution and energy commodity charges. April 15, 2011 FINAL Page 52 of 58

Recommendations: 1. CEG recommends an aggregated approach for 3 rd party commodity supply procurement strategies for both electric and natural gas supply service. Aggregating the usage of all facilities for electricity and natural gas supply service, would allow the facilities to either continue to achieve or achieve a reduction in commodity supply costs. Energy commodities are among the most volatile of all commodities, however at this point and time, energy is extremely competitive and contract terms longer than 12 months are desirable. Contracts due to expire in the near term would continue to yield favorable pricing. It is important to aggregate usage where available and take advantage of these current market prices quickly, before energy increases. Overall, after review of the utility consumption, billing, and current commodity pricing outlook, CEG recommends that the facilities continue to participate in the energy supply aggregation group for electricity and explore options for utilizing an energy supply aggregation for natural gas for all facilities. Many aggregation groups utilize the advisement of a 3 rd party unbiased Energy Consulting Firm experienced in the aggregation of and procurement of retail electricity and natural gas commodity. It is important to note that the Energy Consulting Firm should incorporate a rational, defensible strategy for purchasing commodity in volatile markets based upon the following: Budgets that reflect sound market intelligence An understanding of historical prices and trends Awareness of seasonal opportunities (e.g. shoulder months) Negotiation of fair contractual terms An aggressive, market based price CEG recommends that the school district consider utilizing a third party utility billing-auditing service to further analyze historical utility invoices such as water, sewer, natural gas and electric for incorrect billings and rate tariff optimization services. This service can be based on a shared savings model with no cost to the school district. The service could provide refunds on potential incorrect billings that may have been passed through by the utilities and paid by the school. April 15, 2011 FINAL Page 53 of 58

X. INSTALLATION FUNDING OPTIONS CEG has reviewed various funding options for the facility owner to utilize in subsidizing the costs for installing the energy conservation measures noted within this report. Below are a few alternative funding methods: i. Energy Savings Improvement Program (ESIP) Public Law 2009, Chapter 4 authorizes government entities to make energy related improvements to their facilities and par for the costs using the value of energy savings that result from the improvements. The Energy Savings Improvement Program (ESIP) law provides a flexible approach that can allow all government agencies in New Jersey to improve and reduce energy usage with minimal expenditure of new financial resources. ii. iii. iv. Municipal Bonds Municipal bonds are a bond issued by a city or other local government, or their agencies. Potential issuers of municipal bonds include cities, counties, redevelopment agencies, school districts, publicly owned airports and seaports, and any other governmental entity (or group of governments) below the state level. Municipal bonds may be general obligations of the issuer or secured by specified revenues. Interest income received by holders of municipal bonds is often exempt from the federal income tax and from the income tax of the state in which they are issued, although municipal bonds issued for certain purposes may not be tax exempt. Power Purchase Agreement Public Law 2008, Chapter 3 authorizes contractor of up to fifteen (15) years for contracts commonly known as power purchase agreements. These are programs where the contracting unit (Owner) procures a contract for, in most cases, a third party to install, maintain, and own a renewable energy system. These renewable energy systems are typically solar panels, windmills or other systems that create renewable energy. In exchange for the third party s work of installing, maintaining and owning the renewable energy system, the contracting unit (Owner) agrees to purchase the power generated by the renewable energy system from the third party at agreed upon energy rates. Pay For Performance The New Jersey Smart Start Pay for Performance program includes incentives based on savings resulted from implemented ECMs. The program is available for all buildings that were audited as part of the NJ Clean Energy s Local Government Program. The facility s participation in the program is assisted by an approved program partner. An Energy Reduction Plan is created with the facility and approved partner to shown at least 15% reduction in the building s current energy use. Multiple energy conservation measures implemented together are applicable toward the total savings of at least 15%. No more than 50% of the total energy savings can result from lighting upgrades / changes. April 15, 2011 FINAL Page 54 of 58

Total incentive is capped at 50% of the project cost. The program savings is broken down into three benchmarks; Energy Reduction Plan, Project Implementation, and Measurement and Verification. Each step provides additional incentives as the energy reduction project continues. The benchmark incentives are as follows: 1. Energy Reduction Plan Upon completion of an energy reduction plan by an approved program partner, the incentive will grant $0.10 per square foot between $5,000 and $50,000, and not to exceed 50% of the facility s annual energy expense. (Benchmark #1 is not provided in addition to the local government energy audit program incentive.) 2. Project Implementation Upon installation of the recommended measures along with the Substantial Completion Construction Report, the incentive will grant savings per KWH or Therm based on the program s rates. Minimum saving must be 15%. (Example $0.11 / kwh for 15% savings, $0.12/ kwh for 17% savings, and $1.10 / Therm for 15% savings, $1.20 / Therm for 17% saving, ) Increased incentives result from projected savings above 15%. 3. Measurement and Verification Upon verification 12 months after implementation of all recommended measures, that actual savings have been achieved, based on a completed verification report, the incentive will grant additional savings per kwh or Therm based on the program s rates. Minimum savings must be 15%. (Example $0.07 / kwh for 15% savings, $0.08/ kwh for 17% savings, and $0.70 / Therm for 15% savings, $0.80 / Therm for 17% saving, ) Increased incentives result from verified savings above 15%. v. Energy Efficiency and Conservation Block Grants The EECGB rebate provides supplemental funding up to $20,000 for counties and local government entities to implement energy conservation measures. The EECGB funding is provided through the American Recovery and Reinvestment Act (ARRA). The local government must be among the eligible local government entities listed on the NJ Clean Energy website as follows - http://njcleanenergy.com/commercialindustrial/programs/eecbg-eligible-entities. This program is limited to municipalities and counties that have not already received grants directly through the US department of Energy. This incentive is provided in addition to the other NJ Clean Energy program funding. This program s incentive is considered the entity s capital and therefore can be applied to the LGEA program s requirements to implement the recommended energy conservation measures totaling at least 25% of the energy audit cost. Additional requirements of this program are as follows: April 15, 2011 FINAL Page 55 of 58

1. The entity must utilize additional funding through one or more of the NJ Clean Energy programs such as Smart Start, Direct Install, and Pay for Performance. 2. The EECBG funding in combination with other NJ Clean Energy programs may not exceed the total cost of the energy conservation measures being implemented. 3. Envelope measures are applicable only if recommended by the LGEA energy audit and if the energy audit was completed within the past 12 months. 4. New construction and previously installed measures are not eligible for the EECBG rebate. 5. Energy conservation measures eligible for the EECBG must fall within the list of approved energy conservation measures. The complete list of eligible measures and other program requirements are included in the EECBG Complete Application Package. The application package is available on the NJ Clean Energy website - http://njcleanenergy.com/commercial-industrial/programs/energyefficiency-and-conservation-block-grants. CEG recommends the Owner review the use of the above-listed funding options in addition to utilizing their standard method of financing for facilities upgrades in order to fund the proposed energy conservation measures. April 15, 2011 FINAL Page 56 of 58

XI. ADDITIONAL RECOMMENDATIONS The following recommendations include no cost/low cost measures, Operation & Maintenance (O&M) items, and water conservation measures with attractive paybacks. These measures are not eligible for the Smart Start Buildings incentives from the office of Clean Energy but save energy none the less. A. Chemically clean the condenser and evaporator coils periodically to optimize efficiency. Poorly maintained heat transfer surfaces can reduce efficiency 5-10%. B. Maintain all weather stripping on windows and doors. C. Clean all light fixtures to maximize light output. D. Provide more frequent air filter changes to decrease overall system power usage and maintain better IAQ. E. Confirm that outside air economizers on the rooftop units are functioning properly to take advantage of free cooling and avoid excess outside air during occupied periods. F. Educate staff and students on awareness of wasteful energy practices such as leaving lights on unnecessarily, leaving on of non-essential computer and/or equipment at the end of the day, leaving of outside doors/windows open as a means to control room temperature, etc. April 15, 2011 FINAL Page 57 of 58

XII. ENERGY AUDIT ASSUMPTIONS The assumptions utilized in this energy audit include but are not limited to following: A. Cost Estimates noted within this report are based on industry accepted costing data such as RS Means TM Cost Data, contractor pricing and engineering estimates. All cost estimates for this level of auditing are +/- 20%. Prevailing wage rates for the specified region has been utilized to calculate installation costs. The cost estimates indicated within this audit should be utilized by the owner for prioritizing further project development post the energy audit. Project development would include investment grade auditing and detailed engineering. B. Energy savings noted within this audit are calculated utilizing industry standard procedures and accepted engineering assumptions. For this level of auditing, energy savings are not guaranteed. C. Information gathering for each facility is strongly based on interviews with operations personnel. Information dependent on verbal feedback is used for calculation assumptions including but not limited to the following: a. operating hours b. equipment type c. control strategies d. scheduling D. Information contained within the major equipment list is based on the existing owner documentation where available (drawings, O&M manuals, etc.). If existing owner documentation is not available, catalog information is utilized to populate the required information. E. Equipment incentives and energy credits are based on current pricing and status of rebate programs. Rebate availability is dependent on the individual program funding and applicability. F. Equipment (HVAC, Plumbing, Electrical, & Lighting) noted within an ECM recommendation is strictly noted as a basis for calculation of energy savings. The owner should use this equipment information as a benchmark when pursuing further investment grade project development and detailed engineering for specific energy conservation measures. Utility bill annual averages are utilized for calculation of all energy costs unless otherwise noted. Accuracy of the utility energy usage and costs are based on the information provided. Utility information including usage and costs is estimated where incomplete data is provided. April 15, 2011 FINAL Page 58 of 58

APPENDIX A 1 of 1 ECM COST & SAVINGS BREAKDOWN CONCORD ENGINEERING GROUP Little Egg Harbor Township School District - George J. Mitchell Elementary School ECM ENERGY AND FINANCIAL COSTS AND SAVINGS SUMMARY ECM NO. DESCRIPTION MATERIAL INSTALLATION COST LABOR REBATES, INCENTIVES NET INSTALLATION COST YEARLY SAVINGS ECM LIFETIME LIFETIME ENERGY SAVINGS ENERGY MAINT. / SREC TOTAL (Yearly Saving * ECM Lifetime) LIFETIME MAINTENANCE SAVINGS (Yearly Maint Svaing * ECM Lifetime) LIFETIME ROI (Lifetime Savings - Net Cost) / (Net Cost) SIMPLE PAYBACK (Net cost / Yearly Savings) INTERNAL RATE OF RETURN (IRR) NET PRESENT VALUE (NPV) ($) ($) ($) ($) ($/Yr) ($/Yr) ($/Yr) (Yr) ($) ($) (%) (Yr) ($) ($) ECM #1 Solar Thermal Domestic Hot Water System $64,000 $16,000 $0 $80,000 $7,145 $0 $7,145 25 $178,625 $0 123.3% 11.2 7.45% $44,416.94 ECM #2 Electric VAV to Hot Water VAV with High efficiency Boilers $137,535 $137,535 $2,650 $272,420 $13,560 $0 $13,560 15 $203,400 $0-25.3% 20.1-3.45% ($110,541.60) ECM #3 Replace CRT Monitors $16,100 $0 $0 $16,100 $2,058 $0 $2,058 15 $30,870 $0 91.7% 7.8 9.51% $8,468.27 ECM #4 Demand Control Ventilation Utilized in Gym and Cafeteria $0 $3,000 $0 $3,000 $2,780 $0 $2,780 15 $41,700 $0 1290.0% 1.1 92.66% $30,187.46 ECM #5 HVAC Schedule Adjustments $0 $3,000 $0 $3,000 $3,326 $0 $3,326 15 $49,890 $0 1563.0% 0.9 110.87% $36,705.57 ECM #6 Occupancy Controlled Power Strips $2,700 $0 $0 $2,700 $315 $0 $315 15 $4,725 $0 75.0% 8.6 7.98% $1,060.45 ECM #7 Lighting Upgrade $21,297 $5,324 $15,090 $11,531 $3,489 $0 $3,489 15 $52,334 $0 353.9% 3.3 29.64% $30,119.38 ECM #8 Lighting Controls $9,816 $2,454 $2,720 $9,550 $5,686 $0 $5,686 15 $85,290 $0 793.1% 1.7 59.49% $58,329.10 REM RENEWABLE ENERGY AND FINANCIAL COSTS AND SAVINGS SUMMARY REM #1 305.9 KW Solar PV System $1,911,875 $0 $0 $1,911,875 $47,583 $117,283 $164,866 25 $4,121,650 $2,932,075 115.6% 11.6 7.05% $958,961.01 Notes: 1) The variable Cn in the formulas for Internal Rate of Return and Net Present Value stands for the cash flow during each period. 2) The variable DR in the NPV equation stands for Discount Rate 3) For NPV and IRR calculations: From n=0 to N periods where N is the lifetime of ECM and Cn is the cash flow during each period.

Appendix B Page 1 of 4 520 BURNT MILL ROAD VOORHEES, NEW JERSEY 08043 PHONE: (856) 427-0200 FAX: (856) 427-6508 SmartStart Building Incentives The NJ SmartStart Buildings Program offers financial incentives on a wide variety of building system equipment. The incentives were developed to help offset the initial cost of energy-efficient equipment. The following tables show the current available incentives as of February 15, 2011: Electric Chillers Water-Cooled Chillers $12 - $170 per ton Air-Cooled Chillers $8 - $52 per ton Energy Efficiency must comply with ASHRAE 90.1-2007 Gas Cooling Gas Absorption Chillers $185 - $400 per ton Gas Engine-Driven Chillers Calculated through custom measure path) Desiccant Systems $1.00 per cfm gas or electric Electric Unitary HVAC Unitary AC and Split Systems $73 - $92 per ton Air-to-Air Heat Pumps $73 - $92 per ton Water-Source Heat Pumps $81 per ton Packaged Terminal AC & HP $65 per ton Central DX AC Systems $40- $72 per ton Dual Enthalpy Economizer Controls $250 Occupancy Controlled Thermostat (Hospitality & Institutional Facility) $75 per thermostat Energy Efficiency must comply with ASHRAE 90.1-2007 Gas Fired Boilers < 300 MBH Gas Fired Boilers 300-1500 MBH Gas Heating $300 per unit $1.75 per MBH Gas Fired Boilers 1500-4000 MBH $1.00 per MBH Gas Fired Boilers > 4000 MBH (Calculated through Custom Measure Path) Gas Furnaces $300 - $400 per unit, AFUE 92%

Appendix B Page 2 of 4 Ground Source Heat Pumps $450 per ton, EER 16 Closed Loop $600 per ton, EER 18 $750 per ton, EER 20 Energy Efficiency must comply with ASHRAE 90.1-2007 Variable Frequency Drives Variable Air Volume $65 - $155 per hp Chilled-Water Pumps $60 per VFD rated hp Compressors $5,250 to $12,500 per drive Cooling Towers 10 hp $60 per VFD rated hp Natural Gas Water Heating Gas Water Heaters 50 gallons, 0.67 energy factor or better $50 per unit Gas-Fired Water Heaters > 50 gallons $1.00 - $2.00 per MBH Gas-Fired Booster Water Heaters Gas Fired Tankless Water Heaters $17 - $35 per MBH $300 per unit Prescriptive Lighting Retro fit of T12 to T-5 or T-8 Lamps $10 per fixture w/electronic Ballast in Existing (1-4 lamps) Facilities Replacement of T12 with new T-5 or T-8 Lamps w/electronic Ballast in $25 per fixture (1-4 lamps) Existing Facilities Replacement of incandescent with screw-in PAR 38 or PAR 30 (CFL) bulb T-8 reduced Wattage (28w/25w 4, 1-4 lamps) Lamp & ballast replacement Hard-Wired Compact Fluorescent Metal Halide w/pulse Start Including Parking Lot $7 per bulb $10 per fixture $25 - $30 per fixture $25 per fixture T-5 and T-8 High Bay Fixtures $16 - $200 per fixture HID 100w Retrofit with induction lamp, power coupler and generator (must be 30% less watts/fixture than HID system) HID 100w Replacement with new HID 100w $50 per fixture $70 per fixture

Appendix B Page 3 of 4 LED New Exit Sign Fixture Existing Facility < 75 kw Existing Facility > 75 kw Prescriptive Lighting - LED $20 per fixture $10 per fixture LED Display Case Lighting $30 per display case LED Shelf-Mtd. Display & Task Lights $15 per linear foot LED Portable Desk Lamp $20 per fixture LED Wall-wash Lights LED Recessed Down Lights LED Outdoor Pole/Arm-Mounted Area and Roadway Luminaries LED Outdoor Pole/Arm-Mounted Decorative Luminaries $30 per fixture $35 per fixture $175 per fixture $175 per fixture LED Outdoor Wall-Mounted Area Luminaries $100 per fixture LED Parking Garage Luminaries LED Track or Mono-Point Directional Lighting Fixtures LED High-Bay and Low-Bay Fixtures for Commercial & Industrial Bldgs. LED High-Bay-Aisle Lighting $100 per fixture $50 per fixture $150 per fixture $150 per fixture LED Bollard Fixtures $50 per fixture LED Linear Panels (2x2 Troffers only) $100 per fixture LED Fuel Pump Canopy LED Refrigerator/Freezer case lighting replacement of fluorescent in medium and low temperature display case $100 per fixture $42 per 5 foot $65 per 6 foot

Appendix B Page 4 of 4 Lighting Controls Occupancy Sensors Wall Mounted $20 per control Remote Mounted $35 per control Daylight Dimmers $25 per fixture Occupancy Controlled hi-low Fluorescent Controls $25 per fixture controlled Lighting Controls HID or Fluorescent Hi-Bay Controls Occupancy hi-low $75 per fixture controlled Daylight Dimming $75 per fixture controlled Daylight Dimming - office $50 per fixture controlled Premium Motors Three-Phase Motors $45 - $700 per motor Fractional HP Motors Electronic Communicated Motors $40 per electronic communicated motor (replacing shaded pole motors in refrigerator/freezer cases) Other Equipment Incentives $1.00 per watt per SF below program incentive threshold, currently 5% more Performance Lighting energy efficient than ASHRAE 90.1-2007 for New Construction and Complete Renovation Custom Electric and Gas Equipment not prescriptive Incentives $0.16 KWh and $1.60/Therm of 1st year savings, or a buy down to a 1 year payback on estimated savings. Custom Measures Minimum required savings of 75,000 KWh or 1,500 Therms and a IRR of at least 10%. Multi Measures Bonus 15%

OMB No. 2060-0347 STATEMENT OF ENERGY PERFORMANCE George J. Mitchell Elementary School Appendix C Page 1 of 2 Building ID: 2602818 For 12-month Period Ending: November 30, 2010 1 Date SEP becomes ineligible: N/A Date SEP Generated: March 03, 2011 Facility George J. Mitchell Elementary School 950 Router 539 little egg harbor, NJ 08087 Year Built: 1951 Gross Floor Area (ft 2 ): 106,374 Facility Owner Little Egg Harbor School District 307 Frog Pond Road little egg harbor, NJ 08087 Primary Contact for this Facility Lynn Coates 307 Frog Pond Road little egg harbor, NJ 08087 Energy Performance Rating 2 (1-100) 50 Site Energy Use Summary 3 Electricity - Grid Purchase(kBtu) 4,241,977 Electricity - On-Site Solar(kBtu) 125,138 Natural Gas (kbtu) 4 3,061,332 Total Energy (kbtu) 7,428,447 Energy Intensity 5 Site (kbtu/ft 2 /yr) 70 Source (kbtu/ft 2 /yr) 165 Emissions (based on site energy use) Greenhouse Gas Emissions (MtCO 2 e/year) Electric Distribution Utility N/A N/A National Average Comparison National Average Site EUI 70 National Average Source EUI 165 % Difference from National Average Source EUI 0% Building Type K-12 School Stamp of Certifying Professional Based on the conditions observed at the time of my visit to this building, I certify that the information contained within this statement is accurate. Meets Industry Standards 6 for Indoor Environmental Conditions: Ventilation for Acceptable Indoor Air Quality N/A Acceptable Thermal Environmental Conditions N/A Adequate Illumination N/A Certifying Professional Michael Fischette 520 south burnt mill road voorhees, NJ 08043 Notes: 1. Application for the ENERGY STAR must be submitted to EPA within 4 months of the Period Ending date. Award of the ENERGY STAR is not final until approval is received from EPA. 2. The EPA Energy Performance Rating is based on total source energy. A rating of 75 is the minimum to be eligible for the ENERGY STAR. 3. Values represent energy consumption, annualized to a 12-month period. 4. Natural Gas values in units of volume (e.g. cubic feet) are converted to kbtu with adjustments made for elevation based on Facility zip code. 5. Values represent energy intensity, annualized to a 12-month period. 6. Based on Meeting ASHRAE Standard 62 for ventilation for acceptable indoor air quality, ASHRAE Standard 55 for thermal comfort, and IESNA Lighting Handbook for lighting quality. The government estimates the average time needed to fill out this form is 6 hours (includes the time for entering energy data, Licensed Professional facility inspection, and notarizing the SEP) and welcomes suggestions for reducing this level of effort. Send comments (referencing OMB control number) to the Director, Collection Strategies Division, U.S., EPA (2822T), 1200 Pennsylvania Ave., NW, Washington, D.C. 20460. EPA Form 5900-16

Statement of Energy Performance 2010 George J. Mitchell Elementary School 950 Router 539 little egg harbor, NJ 08087 Portfolio Manager Building ID: 2602818 Appendix C Page 2 of 2 The energy use of this building has been measured and compared to other similar buildings using the Environmental Protection Agency s (EPA s) Energy Performance Scale of 1 100, with 1 being the least energy efficient and 100 the most energy efficient. For more information, visit energystar.gov/benchmark. This building s score 50 1 50 100 Least Efficient Average Most Efficient This building uses 165 kbtu per square foot per year.* *Based on source energy intensity for the 12 month period ending November 2010 Buildings with a score of 75 or higher may qualify for EPA s ENERGY STAR. I certify that the information contained within this statement is accurate and in accordance with U.S. Environmental Protection Agency s measurement standards, found at energystar.gov Date of certification Date Generated: 03/03/2011

MAJOR EQUIPMENT LIST Concord Engineering Group Little Egg Harbor Township SD - George Mitchell Elementary School Appendix D Page 1 of 11 Rooftop / AC Units Tag AC-9 AC-6 Packaged Rooftop Unit Packaged Rooftop Unit Unit Type AC Heat Pump w/ Gas Heat w/ Gas Heat Qty 1 1 1 Location Roof of new wing Roof above data room of new wing Roof Adjacent to Gym Area Served New wing Data room new wing Gym Manufacturer AAON Daikin AAON Model # RN-060-3-A-BA14-3C9 RXS12DVJU RM-020-3-A-BB12-349 Serial # 200811-BNGX04373 E005274 200806-AMGP43039 Cooling Type DX, R410-A DX, R410-A DX, R410-A Cooling Capacity (Tons) 60 Tons 11,500 Btu/h 20 Tons Cooling Efficiency (SEER/EER) 12.2 EER 16 SEER 11.5 EER Heating Type Gas HX 11,500 Btu/h Gas HX Heating Input (MBH) 540 MBH 11,500 Btu/h 270 MBH Efficiency 80% 8.8 HSPF 80% Fuel Nat Gas Heat Pump Nat Gas Approx Age 3 3 3 ASHRAE Service Life 15 15 15 Remaining Life Comments

Appendix D Page 2 of 11 Rooftop / AC Units Tag HRU-1 AC-3 Unit Type Energy Recovery Unit Split System Packaged Rooftop Unit w/ Gas Heat Qty 1 1 1 Location Roof Above Kitchen Roof Above Kitchen Middle Area Roof Area Served Kitchen Kitchen Middle Area Manufacturer Semco EMI AAON Model # FV2000V-6RN4AB S1CA2000D00 RN-026-3-A-BA14-3C9 Serial # 47901/MO44080-01 1-08-H-5287-30 200806-BNGS03808 Cooling Type Wheel Only DX, R-22 DX, R410-A Cooling Capacity (Tons) 2000 CFM 12,000 Btu/h 26 Tons Cooling Efficiency (SEER/EER) N/A 12.9 EER 12 EER Heating Type N/A N/A Gas HX Heating Input (MBH) N/A N/A 540 MBH Efficiency N/A N/A 80% Fuel N/A N/A Nat Gas Approx Age 3 3 3 ASHRAE Service Life 15 15 15 Remaining Life 12 12 12 Comments 2 HP Supply / 2 HP Exhaust

Appendix D Page 3 of 11 Rooftop / AC Units Tag AC-4,5 AC-7 AC-1 Packaged Rooftop Unit Packaged Rooftop Unit Packaged Rooftop Unit Unit Type w/ Gas Heat w/ Gas Heat w/ Gas Heat Qty 2 1 1 Location Cafeteria Roof Roof Above Library "A" Area Roof Area Served Cafeteria Library "A" Area Manufacturer AAON AAON Trane Model # RM-013-3-A-BA12-339 RM-010-3-A-BB12-359 YCH360A4MW2A6E Serial # 200806-AMGK43011 200806-AMGJ42696 C08E04329 Cooling Type DX, R410-A DX, R410A DX, R-22 Cooling Capacity (Tons) 13 Tons 10 Tons 30 Tons Cooling Efficiency (SEER/EER) 10.8 EER 11 EER 10 EER Heating Type Gas HX Gas HX Gas HX Heating Input (MBH) 180 MBH 351 350 MBH Efficiency 80% 81% 80% Fuel Nat Gas Nat Gas Nat Gas Approx Age 3 3 3 ASHRAE Service Life 15 15 15 Remaining Life 12 12 12 Comments

Rooftop / AC Units Tag AC-2 Unit Type Packaged Rooftop Unit w/ Gas Heat Split System Split System Qty 1 2 1 Location "B" Area Roof Outside Kitchen exterior wall Appendix D Page 4 of 11 Outside Kitchen exterior wall Area Served "B" Area Kitchen Kitchen Manufacturer Trane Fujitsu Fujitsu Model # YCH480A4RW2A7M Indoor ASU30C1 Outdoor A0U30C1 Indoor AWU36CX Outdoor A0U36CX Serial # C08E04331 T001106 BBN 002046 Cooling Type DX, R-22 DX, R-22 DX, R-22 Cooling Capacity (Tons) 40 Tons 29,500 Btu/h 33,000 Btu/h Cooling Efficiency (SEER/EER) 9.5 EER - - Heating Type Gas HX N/A N/A Heating Input (MBH) 400 MBH N/A N/A Efficiency 80% N/A N/A Fuel Nat Gas N/A N/A Approx Age 3 5 6 ASHRAE Service Life 15 15 15 Remaining Life 12 10 9 Comments

Rooftop / AC Units Appendix D Page 5 of 11 Tag AC-8 Unit Type Split System Packaged Rooftop Unit Ductless Split Systems w/ Gas Heat Qty 1 1 5 Location Outside Library Wall "D" Area Roof Area Served Library "D" Area Above Original Building Offices Original Building Offices Manufacturer York Trane Carrier Model # H1RA060S46G YCH600 38CKC036 / 38CKC060 Serial # W0D5971527 - - Cooling Type DX, R-22 DX, R-22 DX, R-22 Cooling Capacity (Tons) 5 Tons 50 Tons 3 Tons / 5 Tons Cooling Efficiency (SEER/EER) 12 SEER 9 EER 10 SEER Heating Type N/A Gas HX N/A Heating Input (MBH) N/A 400 MBH N/A Efficiency N/A 80% N/A Fuel N/A Nat Gas N/A Approx Age 5 3 3 ASHRAE Service Life 15 15 15 Remaining Life 10 12 12 Comments

MAJOR EQUIPMENT LIST Concord Engineering Group Little Egg Harbor Township SD - George Mitchell Elementary School Appendix D Page 6 of 11 Boilers Tag Boiler-1 & 2 Unit Type Modular Boilers Gas Fired Boiler Qty 2 2 Location Area Served Mechanical Room in new addition VAV Units/Baseboard Heat in new wing Old Building boiler room Old building baseboard Manufacturer Aerco Weil McLain Model # MLX-454 CGA-7-PIDN Serial # - - Input Capacity (MBH) 418 MBH 210 MBH Rated Output Capacity (MBH) 390 MBH 175 MBH Approx. Efficiency % 93% 83% Fuel Nat Gas Nat Gas Approx Age 3 11 ASHRAE Service Life 30 30 Remaining Life 27 19 Comments These units are turned off

MAJOR EQUIPMENT LIST Concord Engineering Group Little Egg Harbor Township SD - George Mitchell Elementary School Appendix D Page 7 of 11 Domestic Water Heaters Tag Unit Type HWH-1 High efficiency hot water heater Electric Hot Water Heaters Electric Hot Water Heaters Qty 1 1 1 Location new wing mechanical room Janitor Closet Janitor Closet Area Served new wing Bathrooms Bathrooms Manufacturer A.O. Smith A.O. Smith John Wood Model # BTH-100 100 EJCS 20 200 JW40TDE Serial # 0828M001324 0947J007352 9406172936 Size (Gallons) 100 Gallon 19 Gallon 40 Gallon Input Capacity (MBH/KW) 199 MBH 2500 Watts 4500 Watts Recovery (Gal/Hr) 230.18 Gal/Hr - - Efficiency % 96% 100.00% 100.00% Fuel Nat Gas Electric Electric Approx Age 3 3 17 ASHRAE Service Life 12 12 12 Remaining Life 9 9 (5) Comments No insulation

Domestic Hot Water Heaters Tag Unit Type Electric Hot Water Heater Gas Fired Domestic Hot Waster Heater Appendix D Page 8 of 11 Gas Fired Domestic Hot Waster Heater Qty 7 1 1 Location Classroom closets Janitor Closet Janitor Closet Area Served classroom sinks Bathrooms Bathrooms Manufacturer State State State Model # P63010MSK PR650NBRTN SBFT512DNE Serial # K0020848 D02213401 G00104781 Size (Gallons) 30 Gallons 50 Gallons 75 Gallons Input Capacity (MBH/KW) 1500 Watts 40 MBH 120 MBH Recovery (Gal/Hr) - 33.9 Gal/Hr 113.4 Gal/Hr Efficiency % 100% - - Fuel Electric Nat Gas Nat Gas Approx Age 3 9 11 ASHRAE Service Life 12 12 12 Remaining Life 9 3 1 Comments

Appendix D Page 9 of 11 Domestic Hot Water Heaters Tag Unit Type Electric Hot Water Heater Electric Hot Water Heater Qty 1 1 Location Janitor Closet Janitor Closet Area Served Bathrooms Bathrooms Manufacturer A.O. Smith Bradford White Model # ECS4200 MII80A243CF49 Serial # 0930A025257 BC6010211 Size (Gallons) 40 Gallons 80 Gallons Input Capacity (MBH/KW) 4500 Watts 24 KW Recovery (Gal/Hr) - - Efficiency % 100% 100.00% Fuel Electric Electric Approx Age 3 7 ASHRAE Service Life 12 12 Remaining Life 9 5 Comments

Pumps Tag HWP-1 & 2 Unit Type Base Mounted End Suction Pumps Qty 2 Location Area Served MAJOR EQUIPMENT LIST Concord Engineering Group Little Egg Harbor Township SD - George Mitchell Elementary School New wing mechanical room HW boilers Appendix D Page 10 of 11 Manufacturer Model # Bell & Gossett 1510 Series Serial # C075435-02 Horse Power Flow Motor Info 1.5 HP 55 GPM @ 30 FTHD WEG Motors Electrical Power 208/1/60 RPM 1740 RPM Motor Efficiency % 86.5% Approx Age 3 ASHRAE Service Life 20 Remaining Life 17 Comments HW Pump VFD: 94% 132F Supply & 129F Return

Appendix D Page 11 of 11 MAJOR EQUIPMENT LIST Concord Engineering Group Little Egg Harbor Township SD - George Mitchell Elementary School Unit Heaters Tag Unit Type Unit Heaters Unit Heaters Qty 1 3 Location Maintenance Area Maintenance Area Area Served Maintenance Area Maintenance Area Manufacturer Reznor Reznor Model # SCE 125 Series 100 Model F Serial # EAZ066H5N03645 - Heating Type Gas Fired HX Gas Fired HX Heating Capacity (MBH) 125 MBH ~50 MBH CFM 3,000 - RPM/HP - - GPM N/A N/A Approx Age 15 15 Ashrae Service Life 20 20 Remaining Life 5 5 Comments

Investment Grade Lighting Audit Appendix E-1 Page 1 of 28 CEG Job #: Project: Little Egg Harbor BOE - George J. Mitchell Elementary School George J. Mitchell Elementary School KWH COST: $0.142 Address: 950 Route 539 Litlle Egg Harbor, NJ 08087 Building SF: 106,374 ECM #1: Lighting Upgrade - General EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback FIRST FLOOR 4 Receiving 3200 9 4 114 1.03 3,283.2 $466.21 9 3 T8 2x4 75 0.68 2160 $306.72 $95.00 $855.00 0.35 1123.2 $159.49 5.36 28 Receiving Storage 1000 1 1 Surface Mounted 135 W Incandescent Medium Base 135 0.14 135.0 $19.17 1 2 Replace Fixture With 2-L T8 28Watt Surface Wrap 52 0.05 52 $7.38 $95.00 $95.00 0.08 83 $11.79 8.06 28 322 Storage 1000 1 1 Surface Mounted 135 W Incandescent Medium Base 135 0.14 135.0 $19.17 1 2 Replace Fixture With 2-L T8 28Watt Surface Wrap 52 0.05 52 $7.38 $95.00 $95.00 0.08 83 $11.79 8.06 24 315 Kitchen Storage 1000 2 4 8' 4 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Strip 114 0.23 228.0 $32.38 2 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 98 0.20 196 $27.83 $28.00 $56.00 0.03 32 $4.54 12.32 3 315 Kitchen Storage Lav 1000 1 2 2-L 34W U T8 2x2 73 0.07 73.0 $10.37 1 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.05 47 $6.67 $100.00 $100.00 0.03 26 $3.69 27.09 28 325 Kitchen Storage 1000 1 1 Surface Mounted 135 W Incandescent Medium Base 135 0.14 135.0 $19.17 1 2 Replace Fixture With 2-L T8 28Watt Surface Wrap 52 0.05 52 $7.38 $95.00 $95.00 0.08 83 $11.79 8.06 29 327 Kitchen 2700 26 2 2-L 34W T12 2x4 82 2.13 5,756.4 $817.41 26 2 Re-Ballast & Re-Lamp w/ T8 Ballast and Sylvania FO28/841/XP/SS/ECO 52 1.35 3650.4 $518.36 $124.00 $3,224.00 0.78 2106 $299.05 10.78 30 327 Kitchen Locker 1000 1 1 Surface Mounted 90 W Incandescent Medium Base 90 0.09 90.0 $12.78 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.06 64 $9.09 2.20 30 327 Kit. Locker Lav 1000 1 1 Surface Mounted 90 W Incandescent Medium Base 90 0.09 90.0 $12.78 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.06 64 $9.09 2.20 20 307 Cafetorium 3200 24 1 400w MV Hi-Bay w/ Lens 465 11.16 35,712.0 $5,071.10 24 6 2x4 54w T5HO 6 Lamp w/reflecter 354 8.50 27187.2 $3,860.58 $240.00 $5,760.00 2.66 8524.8 $1,210.52 4.76 28 307 Stage 500 8 1 Surface Mounted 135 W Incandescent Medium Base 135 1.08 540.0 $76.68 8 2 Replace Fixture With 2-L T8 28Watt Surface Wrap 52 0.42 208 $29.54 $95.00 $760.00 0.66 332 $47.14 16.12 5 307 Stage Stair 3200 4 2 2-L 32W T8 2x4 Surface Wrap Prismatic Lens 58 0.23 742.4 $105.42 4 2 Relamp w/ Sylvania FO28/841/XP/SS/ECO 52 0.21 665.6 $94.52 $14.00 $56.00 0.02 76.8 $10.91 5.13 5 306 Storage 1000 8 2 2-L 32W T8 2x4 Surface Wrap Prismatic Lens 58 0.46 464.0 $65.89 8 2 Relamp w/ Sylvania FO28/841/XP/SS/ECO 52 0.42 416 $59.07 $14.00 $112.00 0.05 48 $6.82 16.43 42 Boys Lav 3200 2 2 2-L 34W T12 2x4 Surface Wrap Prismatic Lens 82 0.16 524.8 $74.52 2 2 Replace Fixture With 2-L T8 28Watt Surface Wrap 52 0.10 332.8 $47.26 $95.00 $190.00 0.06 192 $27.26 6.97 42 Girls Lav 3200 2 2 2-L 34W T12 2x4 Surface Wrap Prismatic Lens 82 0.16 524.8 $74.52 2 2 Replace Fixture With 2-L T8 28Watt Surface Wrap 52 0.10 332.8 $47.26 $95.00 $190.00 0.06 192 $27.26 6.97 43 152 Vestibule 3200 3 1 Recessed Can with CFL Quad Lamp 26 0.08 249.6 $35.44 3 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00

Investment Grade Lighting Audit Appendix E-1 Page 2 of 28 EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 4 151 Lobby 3200 4 4 114 0.46 1,459.2 $207.21 4 3 T8 2x4 75 0.30 960 $136.32 $95.00 $380.00 0.16 499.2 $70.89 5.36 4 150 Corridor 3200 6 4 114 0.68 2,188.8 $310.81 6 3 T8 2x4 75 0.45 1440 $204.48 $95.00 $570.00 0.23 748.8 $106.33 5.36 44 105 Storage 1000 1 1 Surface Mounted 26 W CFL 26 0.03 26.0 $3.69 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00 28 104 Storage 1000 1 1 Surface Mounted 135 W Incandescent Medium Base 135 0.14 135.0 $19.17 1 2 Replace Fixture With 2-L T8 28Watt Surface Wrap 52 0.05 52 $7.38 $95.00 $95.00 0.08 83 $11.79 8.06 1 Main Lobby 3200 6 3 3-L 32W T8 2x4 85 0.51 1,632.0 $231.74 6 3 Relamp w/ Sylvania FO28/841/XP/SS/ECO 78 0.47 1497.6 $212.66 $21.00 $126.00 0.04 134.4 $19.08 6.60 4 Main Vestibule 3200 6 4 114 0.68 2,188.8 $310.81 6 3 T8 2x4 75 0.45 1440 $204.48 $95.00 $570.00 0.23 748.8 $106.33 5.36 45 Main Vestibule 3200 2 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.12 384.0 $54.53 2 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.05 166.4 $23.63 $20.00 $40.00 0.07 217.6 $30.90 1.29 4 102 Office 2700 5 4 114 0.57 1,539.0 $218.54 5 3 T8 2x4 75 0.38 1012.5 $143.78 $95.00 $475.00 0.20 526.5 $74.76 6.35 3 102 Office 2700 2 2 2-L 34W U T8 2x2 73 0.15 394.2 $55.98 2 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.09 253.8 $36.04 $100.00 $200.00 0.05 140.4 $19.94 10.03 46 102 Office 2700 1 1 Recessed Can Fixture 60 W Incandescent Medium Base 60 0.06 162.0 $23.00 1 1 Re-Lamp 13 W CFL Medium Base Lamp 13 0.01 35.1 $4.98 $20.00 $20.00 0.05 126.9 $18.02 1.11 3 102 Office Closet 1000 1 2 2-L 34W U T8 2x2 73 0.07 73.0 $10.37 1 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.05 47 $6.67 $100.00 $100.00 0.03 26 $3.69 27.09 30 102 Office Lav 1000 1 1 Surface Mounted 90 W Incandescent Medium Base 90 0.09 90.0 $12.78 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.06 64 $9.09 2.20 45 102 Office Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14 45 100 Principal Office 3200 2 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.12 384.0 $54.53 2 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.05 166.4 $23.63 $20.00 $40.00 0.07 217.6 $30.90 1.29 4 101 Conference 1000 2 4 114 0.23 228.0 $32.38 2 3 T8 2x4 75 0.15 150 $21.30 $95.00 $190.00 0.08 78 $11.08 17.15 4 103 Main Office/Sec 3200 3 4 114 0.34 1,094.4 $155.40 3 3 T8 2x4 75 0.23 720 $102.24 $95.00 $285.00 0.12 374.4 $53.16 5.36 4 103.2 Shared Conference 1000 4 4 114 0.46 456.0 $64.75 4 3 T8 2x4 75 0.30 300 $42.60 $95.00 $380.00 0.16 156 $22.15 17.15 4 109 Office 3200 2 4 114 0.23 729.6 $103.60 2 3 T8 2x4 75 0.15 480 $68.16 $95.00 $190.00 0.08 249.6 $35.44 5.36 4 103.1 CST Office 3200 5 4 114 0.57 1,824.0 $259.01 5 3 T8 2x4 75 0.38 1200 $170.40 $95.00 $475.00 0.20 624 $88.61 5.36

Investment Grade Lighting Audit Appendix E-1 Page 3 of 28 EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 4 108 CST 3200 2 4 114 0.23 729.6 $103.60 2 3 T8 2x4 75 0.15 480 $68.16 $95.00 $190.00 0.08 249.6 $35.44 5.36 4 110 CST 3200 3 4 114 0.34 1,094.4 $155.40 3 3 T8 2x4 75 0.23 720 $102.24 $95.00 $285.00 0.12 374.4 $53.16 5.36 47 114 Storage 1000 2 2 1x4, 2-Lamp, 34w T12, Mag. Ballast, Surface Mnt., 82 0.16 164.0 $23.29 2 2 1 Lamp, 28w T8, Elect. Ballast; retrofit 52 0.10 104 $14.77 $100.00 $200.00 0.06 60 $8.52 23.47 4 114.1 Corridor 3200 1 4 114 0.11 364.8 $51.80 1 3 T8 2x4 75 0.08 240 $34.08 $95.00 $95.00 0.04 124.8 $17.72 5.36 3 114.1 Corridor 3200 2 2 2-L 34W U T8 2x2 73 0.15 467.2 $66.34 2 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.09 300.8 $42.71 $100.00 $200.00 0.05 166.4 $23.63 8.46 4 Early Child 3200 4 4 114 0.46 1,459.2 $207.21 4 3 T8 2x4 75 0.30 960 $136.32 $95.00 $380.00 0.16 499.2 $70.89 5.36 4 115 Nurse 3200 6 4 114 0.68 2,188.8 $310.81 6 3 T8 2x4 75 0.45 1440 $204.48 $95.00 $570.00 0.23 748.8 $106.33 5.36 3 115 Nurse Lav 3200 1 2 2-L 34W U T8 2x2 73 0.07 233.6 $33.17 1 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.05 150.4 $21.36 $100.00 $100.00 0.03 83.2 $11.81 8.46 44 115 Nurse Storage 1000 1 1 Surface Mounted 26 W CFL 26 0.03 26.0 $3.69 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00 45 127 Electric 1000 2 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.12 120.0 $17.04 2 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.05 52 $7.38 $20.00 $40.00 0.07 68 $9.66 4.14 1 Corridor 3200 5 3 3-L 32W T8 2x4 85 0.43 1,360.0 $193.12 5 3 Relamp w/ Sylvania FO28/841/XP/SS/ECO 78 0.39 1248 $177.22 $21.00 $105.00 0.04 112 $15.90 6.60 1 Corridor 3200 13 3 3-L 32W T8 2x4 85 1.11 3,536.0 $502.11 13 3 Relamp w/ Sylvania FO28/841/XP/SS/ECO 78 1.01 3244.8 $460.76 $21.00 $273.00 0.09 291.2 $41.35 6.60 1 Corridor 3200 2 3 3-L 32W T8 2x4 85 0.17 544.0 $77.25 2 3 Relamp w/ Sylvania FO28/841/XP/SS/ECO 78 0.16 499.2 $70.89 $21.00 $42.00 0.01 44.8 $6.36 6.60 1 Vestibule 3200 1 3 3-L 32W T8 2x4 85 0.09 272.0 $38.62 1 3 Relamp w/ Sylvania FO28/841/XP/SS/ECO 78 0.08 249.6 $35.44 $21.00 $21.00 0.01 22.4 $3.18 6.60 48 205 Pre-K Clsrm 3200 8 4 114 0.91 2,918.4 $414.41 8 3 Replace Fixture w/ 4-L 28 Watt T8 2x4 104 0.83 2662.4 $378.06 $100.00 $800.00 0.08 256 $36.35 22.01 45 205 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14 48 203 Pre-K Clsrm 3200 8 4 114 0.91 2,918.4 $414.41 8 3 Replace Fixture w/ 4-L 28 Watt T8 2x4 104 0.83 2662.4 $378.06 $100.00 $800.00 0.08 256 $36.35 22.01 45 203 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14 48 207 Pre-K Clsrm 3200 8 4 114 0.91 2,918.4 $414.41 8 3 Replace Fixture w/ 4-L 28 Watt T8 2x4 104 0.83 2662.4 $378.06 $100.00 $800.00 0.08 256 $36.35 22.01

Investment Grade Lighting Audit Appendix E-1 Page 4 of 28 EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 45 207 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14 48 209 Pre-K Clsrm 3200 8 4 114 0.91 2,918.4 $414.41 8 3 Replace Fixture w/ 4-L 28 Watt T8 2x4 104 0.83 2662.4 $378.06 $100.00 $800.00 0.08 256 $36.35 22.01 45 209 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14 48 211 Pre-K Clsrm 3200 8 4 114 0.91 2,918.4 $414.41 8 3 Replace Fixture w/ 4-L 28 Watt T8 2x4 104 0.83 2662.4 $378.06 $100.00 $800.00 0.08 256 $36.35 22.01 45 211 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14 45 211 Pre-K Clsrm Stor 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14 48 210 Pre-K Clsrm 3200 8 4 114 0.91 2,918.4 $414.41 8 3 Replace Fixture w/ 4-L 28 Watt T8 2x4 104 0.83 2662.4 $378.06 $100.00 $800.00 0.08 256 $36.35 22.01 45 210 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14 45 210 Pre-K Clsrm Rear 0 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 0.0 $0.00 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 0 $0.00 $20.00 $20.00 0.03 0 $0.00 0.00 48 208 Pre-K Clsrm 3200 8 4 114 0.91 2,918.4 $414.41 8 3 Replace Fixture w/ 4-L 28 Watt T8 2x4 104 0.83 2662.4 $378.06 $100.00 $800.00 0.08 256 $36.35 22.01 45 208 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14 48 206 Pre-K Clsrm 3200 8 4 114 0.91 2,918.4 $414.41 8 3 Replace Fixture w/ 4-L 28 Watt T8 2x4 104 0.83 2662.4 $378.06 $100.00 $800.00 0.08 256 $36.35 22.01 45 206 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14 48 204 Pre-K Clsrm 3200 8 4 114 0.91 2,918.4 $414.41 8 3 Replace Fixture w/ 4-L 28 Watt T8 2x4 104 0.83 2662.4 $378.06 $100.00 $800.00 0.08 256 $36.35 22.01 45 204 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14 41 301 Library 3200 13 4 114 1.48 4,742.4 $673.42 13 4 Relamp w/ Sylvania FO28/841/XP/SS/ECO 104 1.35 4326.4 $614.35 $28.00 $364.00 0.13 416 $59.07 6.16 22 301 Library 3200 11 2 Recessed Can With 2-13Watt CF Lamps 26 0.29 915.2 $129.96 11 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00 41 303 Library Office 3200 2 4 114 0.23 729.6 $103.60 2 4 Relamp w/ Sylvania FO28/841/XP/SS/ECO 104 0.21 665.6 $94.52 $28.00 $56.00 0.02 64 $9.09 6.16 41 302 IDF 1000 1 4 114 0.11 114.0 $16.19 1 4 Relamp w/ Sylvania FO28/841/XP/SS/ECO 104 0.10 104 $14.77 $28.00 $28.00 0.01 10 $1.42 19.72

Investment Grade Lighting Audit Appendix E-1 Page 5 of 28 EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 41 304 CPU Lab 3200 8 4 114 0.91 2,918.4 $414.41 8 4 Relamp w/ Sylvania FO28/841/XP/SS/ECO 104 0.83 2662.4 $378.06 $28.00 $224.00 0.08 256 $36.35 6.16 41 305 OT/PT 3200 8 4 114 0.91 2,918.4 $414.41 8 4 Relamp w/ Sylvania FO28/841/XP/SS/ECO 104 0.83 2662.4 $378.06 $28.00 $224.00 0.08 256 $36.35 6.16 5 405 Storage/Old Boiler 1000 1 2 2-L 32W T8 2x4 Surface Wrap Prismatic Lens 58 0.06 58.0 $8.24 1 2 Relamp w/ Sylvania FO28/841/XP/SS/ECO 52 0.05 52 $7.38 $14.00 $14.00 0.01 6 $0.85 16.43 45 405 Storage/Old Boiler 1000 2 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.12 120.0 $17.04 2 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.05 52 $7.38 $20.00 $40.00 0.07 68 $9.66 4.14 45 405 Storage/Old Boiler Entry 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14 44 405 Electric 1000 1 1 Surface Mounted 26 W CFL 26 0.03 26.0 $3.69 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00 49 400 Classroom 3200 2 4 Pendant Mounted, 4 Lamp 34w T-12 Eggcrate Fixture 156 0.31 998.4 $141.77 4 2 Replace Fixture With 2-L T8 28Watt Surface Wrap 52 0.21 665.6 $94.52 $95.00 $380.00 0.10 332.8 $47.26 8.04 5 401 Classroom 3200 18 2 2-L 32W T8 2x4 Surface Wrap Prismatic Lens 58 1.04 3,340.8 $474.39 18 2 Relamp w/ Sylvania FO28/841/XP/SS/ECO 52 0.94 2995.2 $425.32 $14.00 $252.00 0.11 345.6 $49.08 5.13 45 403 Storage 1000 2 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.12 120.0 $17.04 2 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.05 52 $7.38 $20.00 $40.00 0.07 68 $9.66 4.14 30 403 Storage (Small Room) 1000 1 1 Surface Mounted 90 W Incandescent Medium Base 90 0.09 90.0 $12.78 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.06 64 $9.09 2.20 5 402 Classroom 3200 18 2 2-L 32W T8 2x4 Surface Wrap Prismatic Lens 58 1.04 3,340.8 $474.39 18 2 Relamp w/ Sylvania FO28/841/XP/SS/ECO 52 0.94 2995.2 $425.32 $14.00 $252.00 0.11 345.6 $49.08 5.13 50 Copy Room 3200 2 4 Surface Mounted, 4 Lamp 34w T-12 Fixture 156 0.31 998.4 $141.77 4 2 Replace Fixture With 2-L T8 28Watt Surface Wrap 52 0.21 665.6 $94.52 $95.00 $380.00 0.10 332.8 $47.26 8.04 45 Copy Room Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14 5 501 Pre-K Clsrm 3200 18 2 2-L 32W T8 2x4 Surface Wrap Prismatic Lens 58 1.04 3,340.8 $474.39 18 2 Relamp w/ Sylvania FO28/841/XP/SS/ECO 52 0.94 2995.2 $425.32 $14.00 $252.00 0.11 345.6 $49.08 5.13 45 501 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14 5 502 Pre-K Clsrm 3200 18 2 2-L 32W T8 2x4 Surface Wrap Prismatic Lens 58 1.04 3,340.8 $474.39 18 2 Relamp w/ Sylvania FO28/841/XP/SS/ECO 52 0.94 2995.2 $425.32 $14.00 $252.00 0.11 345.6 $49.08 5.13 45 502 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14 5 503 Pre-K Clsrm 3200 20 2 2-L 32W T8 2x4 Surface Wrap Prismatic Lens 58 1.16 3,712.0 $527.10 20 2 Relamp w/ Sylvania FO28/841/XP/SS/ECO 52 1.04 3328 $472.58 $14.00 $280.00 0.12 384 $54.53 5.13 45 503 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14

Investment Grade Lighting Audit Appendix E-1 Page 6 of 28 EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 1 Corridor 3200 1 3 3-L 32W T8 2x4 85 0.09 272.0 $38.62 1 3 Relamp w/ Sylvania FO28/841/XP/SS/ECO 78 0.08 249.6 $35.44 $21.00 $21.00 0.01 22.4 $3.18 6.60 1 Corridor 3200 12 3 3-L 32W T8 2x4 85 1.02 3,264.0 $463.49 12 3 Relamp w/ Sylvania FO28/841/XP/SS/ECO 78 0.94 2995.2 $425.32 $21.00 $252.00 0.08 268.8 $38.17 6.60 5 504 Classroom 3200 15 2 2-L 32W T8 2x4 Surface Wrap Prismatic Lens 58 0.87 2,784.0 $395.33 15 2 Relamp w/ Sylvania FO28/841/XP/SS/ECO 52 0.78 2496 $354.43 $14.00 $210.00 0.09 288 $40.90 5.13 5 505 Classroom 3200 18 2 2-L 32W T8 2x4 Surface Wrap Prismatic Lens 58 1.04 3,340.8 $474.39 18 2 Relamp w/ Sylvania FO28/841/XP/SS/ECO 52 0.94 2995.2 $425.32 $14.00 $252.00 0.11 345.6 $49.08 5.13 5 506 Classroom 3200 18 2 2-L 32W T8 2x4 Surface Wrap Prismatic Lens 58 1.04 3,340.8 $474.39 18 2 Relamp w/ Sylvania FO28/841/XP/SS/ECO 52 0.94 2995.2 $425.32 $14.00 $252.00 0.11 345.6 $49.08 5.13 3 Boys Lav 3200 2 2 2-L 34W U T8 2x2 73 0.15 467.2 $66.34 2 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.09 300.8 $42.71 $100.00 $200.00 0.05 166.4 $23.63 8.46 3 Girls Lav 3200 2 2 2-L 34W U T8 2x2 73 0.15 467.2 $66.34 2 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.09 300.8 $42.71 $100.00 $200.00 0.05 166.4 $23.63 8.46 44 Boys Lav Closet 1000 1 1 Surface Mounted 26 W CFL 26 0.03 26.0 $3.69 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00 44 Closet 1000 1 1 Surface Mounted 26 W CFL 26 0.03 26.0 $3.69 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00 44 Kiln Room 1000 1 1 Surface Mounted 26 W CFL 26 0.03 26.0 $3.69 1 0 No Change 0 0.00 0 $0.00 $0.00 $0.00 0.00 0 $0.00 0.00 45 IDF 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60.0 $8.52 1 1 Re-Lamp 26 W CFL Medium Base Lamp 26 0.03 26 $3.69 $20.00 $20.00 0.03 34 $4.83 4.14 5 511 Classroom 3200 18 2 2-L 32W T8 2x4 Surface Wrap Prismatic Lens 58 1.04 3,340.8 $474.39 18 2 Relamp w/ Sylvania FO28/841/XP/SS/ECO 52 0.94 2995.2 $425.32 $14.00 $252.00 0.11 345.6 $49.08 5.13 5 508 Classroom 3200 18 2 2-L 32W T8 2x4 Surface Wrap Prismatic Lens 58 1.04 3,340.8 $474.39 18 2 Relamp w/ Sylvania FO28/841/XP/SS/ECO 52 0.94 2995.2 $425.32 $14.00 $252.00 0.11 345.6 $49.08 5.13 51 Electric 1000 1 1 Surface Mounted, 1 Lamp 34w T-12 Fixture 40 0.04 40.0 $5.68 1 1 Replace Fixture With 1-L T8 28Watt Surface Wrap 26 0.03 26 $3.69 $95.00 $95.00 0.01 14 $1.99 47.79 51 Custodial 1000 1 1 Surface Mounted, 1 Lamp 34w T-12 Fixture 40 0.04 40.0 $5.68 1 1 Replace Fixture With 1-L T8 28Watt Surface Wrap 26 0.03 26 $3.69 $95.00 $95.00 0.01 14 $1.99 47.79 55 Boys lav 8760 4 2 2-L 32W T8 Wall Bracket w/ Prismatic Lens 58 0.23 2,032.3 $288.59 4 2 Relamp - Sylvania Lamp FO28/841/SS/ECO 52 0.21 1822.08 $258.74 $14.00 $56.00 0.02 210.24 $29.85 1.88 55 Girls Lav 8760 3 2 2-L 32W T8 Wall Bracket w/ Prismatic Lens 58 0.17 1,524.2 $216.44 3 2 Relamp - Sylvania Lamp FO28/841/SS/ECO 52 0.16 1366.56 $194.05 $14.00 $42.00 0.02 157.68 $22.39 1.88 4 515 Classroom 3200 4 4 114 0.46 1,459.2 $207.21 4 3 T8 2x4 75 0.30 960 $136.32 $95.00 $380.00 0.16 499.2 $70.89 5.36 4 515A Classroom 3200 4 4 114 0.46 1,459.2 $207.21 4 3 T8 2x4 75 0.30 960 $136.32 $95.00 $380.00 0.16 499.2 $70.89 5.36

Investment Grade Lighting Audit Appendix E-1 Page 7 of 28 EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 4 514 Classroom 3200 6 4 114 0.68 2,188.8 $310.81 6 3 T8 2x4 75 0.45 1440 $204.48 $95.00 $570.00 0.23 748.8 $106.33 5.36 4 517 SGI 3200 3 4 114 0.34 1,094.4 $155.40 3 3 T8 2x4 75 0.23 720 $102.24 $95.00 $285.00 0.12 374.4 $53.16 5.36 4 516 Classroom 3200 6 4 114 0.68 2,188.8 $310.81 8 3 T8 2x4 75 0.60 1920 $272.64 $95.00 $760.00 0.08 268.8 $38.17 19.91 4 520 Classroom 3200 6 4 114 0.68 2,188.8 $310.81 8 3 T8 2x4 75 0.60 1920 $272.64 $95.00 $760.00 0.08 268.8 $38.17 19.91 4 518 SGI 3200 2 4 114 0.23 729.6 $103.60 2 3 T8 2x4 75 0.15 480 $68.16 $95.00 $190.00 0.08 249.6 $35.44 5.36 4 519 SGI 3200 2 4 114 0.23 729.6 $103.60 2 3 T8 2x4 75 0.15 480 $68.16 $95.00 $190.00 0.08 249.6 $35.44 5.36 4 525 SGI 3200 2 4 114 0.23 729.6 $103.60 2 3 T8 2x4 75 0.15 480 $68.16 $95.00 $190.00 0.08 249.6 $35.44 5.36 4 526 Pre-K Clsrm 3200 12 4 114 1.37 4,377.6 $621.62 12 3 T8 2x4 75 0.90 2880 $408.96 $95.00 $1,140.00 0.47 1497.6 $212.66 5.36 3 526 Pre-K Clsrm Lav 1000 1 2 2-L 34W U T8 2x2 73 0.07 73.0 $10.37 1 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.05 47 $6.67 $100.00 $100.00 0.03 26 $3.69 27.09 4 526 Pre-K Clsrm Stor 1000 1 4 114 0.11 114.0 $16.19 1 3 T8 2x4 75 0.08 75 $10.65 $95.00 $95.00 0.04 39 $5.54 17.15 4 527 Pre-K Clsrm 3200 12 4 114 1.37 4,377.6 $621.62 12 3 T8 2x4 75 0.90 2880 $408.96 $95.00 $1,140.00 0.47 1497.6 $212.66 5.36 3 527 Pre-K Clsrm Lav 1000 1 2 2-L 34W U T8 2x2 73 0.07 73.0 $10.37 1 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.05 47 $6.67 $100.00 $100.00 0.03 26 $3.69 27.09 4 527 Pre-K Clsrm Stor 1000 1 4 114 0.11 114.0 $16.19 1 3 T8 2x4 75 0.08 75 $10.65 $95.00 $95.00 0.04 39 $5.54 17.15 4 521 Classroom 3200 8 4 114 0.91 2,918.4 $414.41 8 3 T8 2x4 75 0.60 1920 $272.64 $95.00 $760.00 0.31 998.4 $141.77 5.36 4 522 Classroom 3200 8 4 114 0.91 2,918.4 $414.41 8 3 T8 2x4 75 0.60 1920 $272.64 $95.00 $760.00 0.31 998.4 $141.77 5.36 4 523 Classroom 3200 8 4 114 0.91 2,918.4 $414.41 8 3 T8 2x4 75 0.60 1920 $272.64 $95.00 $760.00 0.31 998.4 $141.77 5.36 4 524 Classroom 3200 8 4 114 0.91 2,918.4 $414.41 8 3 T8 2x4 75 0.60 1920 $272.64 $95.00 $760.00 0.31 998.4 $141.77 5.36 56 528 Storage/IDF 1000 3 2 2-L T12 F40 1x4 Surface Mtd. W/ Sleeves 80 0.24 240.0 $34.08 3 2 Replace Fixture With 2-L T8 28Watt Surface Wrap 52 0.16 156 $22.15 $95.00 $285.00 0.08 84 $11.93 23.89 4 529 Kindergarten 3200 12 4 114 1.37 4,377.6 $621.62 12 3 T8 2x4 75 0.90 2880 $408.96 $95.00 $1,140.00 0.47 1497.6 $212.66 5.36

Investment Grade Lighting Audit Appendix E-1 Page 8 of 28 EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 3 529 Kindergarten Lav 1000 1 2 2-L 34W U T8 2x2 73 0.07 73.0 $10.37 1 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.05 47 $6.67 $100.00 $100.00 0.03 26 $3.69 27.09 4 529 Kindergarten Stor 1000 1 4 114 0.11 114.0 $16.19 1 3 T8 2x4 75 0.08 75 $10.65 $95.00 $95.00 0.04 39 $5.54 17.15 4 530 Kindergarten 3200 12 4 114 1.37 4,377.6 $621.62 12 3 T8 2x4 75 0.90 2880 $408.96 $95.00 $1,140.00 0.47 1497.6 $212.66 5.36 3 530 Kindergarten Lav 1000 1 2 2-L 34W U T8 2x2 73 0.07 73.0 $10.37 1 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.05 47 $6.67 $100.00 $100.00 0.03 26 $3.69 27.09 4 530 Kindergarten Stor 1000 1 4 114 0.11 114.0 $16.19 1 3 T8 2x4 75 0.08 75 $10.65 $95.00 $95.00 0.04 39 $5.54 17.15 4 601 Vice Principal 3200 2 4 114 0.23 729.6 $103.60 2 3 T8 2x4 75 0.15 480 $68.16 $95.00 $190.00 0.08 249.6 $35.44 5.36 4 602 Science Lab 3200 15 4 114 1.71 5,472.0 $777.02 15 3 T8 2x4 75 1.13 3600 $511.20 $95.00 $1,425.00 0.59 1872 $265.82 5.36 4 602 Science Lab Stor 1000 2 4 114 0.23 228.0 $32.38 2 3 T8 2x4 75 0.15 150 $21.30 $95.00 $190.00 0.08 78 $11.08 17.15 4 618 Custodial 1000 3 4 114 0.34 342.0 $48.56 3 3 T8 2x4 75 0.23 225 $31.95 $95.00 $285.00 0.12 117 $16.61 17.15 4 616 Data 1000 2 4 114 0.23 228.0 $32.38 2 3 T8 2x4 75 0.15 150 $21.30 $95.00 $190.00 0.08 78 $11.08 17.15 57 612 Boiler 1000 4 4 4-L T8 F32 1x8 Surface/Pendant 114 0.46 456.0 $64.75 4 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.42 416 $59.07 $28.00 $112.00 0.04 40 $5.68 19.72 52 610 Classroom 3200 9 4 114 1.03 3,283.2 $466.21 9 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.94 2995.2 $425.32 $28.00 $252.00 0.09 288 $40.90 6.16 53 610 Classroom Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79 52 608 Classroom 3200 9 4 114 1.03 3,283.2 $466.21 9 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.94 2995.2 $425.32 $28.00 $252.00 0.09 288 $40.90 6.16 53 608 Classroom Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79 52 608A Classroom 3200 9 4 114 1.03 3,283.2 $466.21 9 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.94 2995.2 $425.32 $28.00 $252.00 0.09 288 $40.90 6.16 53 608A Classroom Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79 52 609 Classroom 3200 9 4 114 1.03 3,283.2 $466.21 9 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.94 2995.2 $425.32 $28.00 $252.00 0.09 288 $40.90 6.16 53 609 Classroom Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79

Investment Grade Lighting Audit Appendix E-1 Page 9 of 28 EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 52 609A Classroom 3200 9 4 114 1.03 3,283.2 $466.21 9 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.94 2995.2 $425.32 $28.00 $252.00 0.09 288 $40.90 6.16 53 609A Classroom Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79 52 611 Classroom 3200 9 4 114 1.03 3,283.2 $466.21 9 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.94 2995.2 $425.32 $28.00 $252.00 0.09 288 $40.90 6.16 53 611 Classroom Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79 52 613 Classroom 3200 9 4 114 1.03 3,283.2 $466.21 9 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.94 2995.2 $425.32 $28.00 $252.00 0.09 288 $40.90 6.16 53 613 Classroom Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79 53 Womens Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79 53 Mens Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79 52 615 Classroom 3200 9 4 114 1.03 3,283.2 $466.21 9 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.94 2995.2 $425.32 $28.00 $252.00 0.09 288 $40.90 6.16 53 615 Classroom Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79 52 603 Nurse 3200 5 4 114 0.57 1,824.0 $259.01 5 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.52 1664 $236.29 $28.00 $140.00 0.05 160 $22.72 6.16 53 603 Nurse Shower/Bath 3200 1 3 3-L 32W T8 2x4 85 0.09 272.0 $38.62 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 240 $34.08 $21.00 $21.00 0.01 32 $4.54 4.62 52 603 Rest Area 3200 2 4 114 0.23 729.6 $103.60 2 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.21 665.6 $94.52 $28.00 $56.00 0.02 64 $9.09 6.16 52 617 Classroom 3200 9 4 114 1.03 3,283.2 $466.21 9 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.94 2995.2 $425.32 $28.00 $252.00 0.09 288 $40.90 6.16 53 617 Classroom Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79 52 620 Storage 1000 3 4 114 0.34 342.0 $48.56 3 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.31 312 $44.30 $28.00 $84.00 0.03 30 $4.26 19.72 52 622 Teacher Room 3200 8 4 114 0.91 2,918.4 $414.41 8 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.83 2662.4 $378.06 $28.00 $224.00 0.08 256 $36.35 6.16 52 619 Classroom 3200 9 4 114 1.03 3,283.2 $466.21 9 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.94 2995.2 $425.32 $28.00 $252.00 0.09 288 $40.90 6.16 53 619 Classroom Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79

Investment Grade Lighting Audit Appendix E-1 Page 10 of 28 EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 52 621 Classroom 3200 9 4 114 1.03 3,283.2 $466.21 9 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.94 2995.2 $425.32 $28.00 $252.00 0.09 288 $40.90 6.16 53 621 Classroom Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79 52 623 Classroom 3200 9 4 114 1.03 3,283.2 $466.21 9 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.94 2995.2 $425.32 $28.00 $252.00 0.09 288 $40.90 6.16 53 623 Classroom Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79 52 625 Classroom 3200 9 4 114 1.03 3,283.2 $466.21 9 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.94 2995.2 $425.32 $28.00 $252.00 0.09 288 $40.90 6.16 53 625 Classroom Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79 52 624 Classroom 3200 9 4 114 1.03 3,283.2 $466.21 9 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.94 2995.2 $425.32 $28.00 $252.00 0.09 288 $40.90 6.16 53 624 Classroom Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79 52 626 Classroom 3200 9 4 114 1.03 3,283.2 $466.21 9 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.94 2995.2 $425.32 $28.00 $252.00 0.09 288 $40.90 6.16 53 626 Classroom Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79 52 628 Classroom 3200 9 4 114 1.03 3,283.2 $466.21 9 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.94 2995.2 $425.32 $28.00 $252.00 0.09 288 $40.90 6.16 53 628 Classroom Lav 1000 1 3 3-L 32W T8 2x4 85 0.09 85.0 $12.07 1 3 Relamp - Sylvania Lamp FO28/841/SS/ECO 75 0.08 75 $10.65 $21.00 $21.00 0.01 10 $1.42 14.79 4 414 Kindergarten 3200 12 4 114 1.37 4,377.6 $621.62 12 3 T8 2x4 75 0.90 2880 $408.96 $95.00 $1,140.00 0.47 1497.6 $212.66 5.36 3 414 Kindergarten Lav 1000 1 2 2-L 34W U T8 2x2 73 0.07 73.0 $10.37 1 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.05 47 $6.67 $100.00 $100.00 0.03 26 $3.69 27.09 4 414 Kindergarten Stor 1000 3 4 114 0.34 342.0 $48.56 3 3 T8 2x4 75 0.23 225 $31.95 $95.00 $285.00 0.12 117 $16.61 17.15 4 416 Time Out 1000 2 4 114 0.23 228.0 $32.38 2 3 T8 2x4 75 0.15 150 $21.30 $95.00 $190.00 0.08 78 $11.08 17.15 4 413 Kindergarten 3200 12 4 114 1.37 4,377.6 $621.62 12 3 T8 2x4 75 0.90 2880 $408.96 $95.00 $1,140.00 0.47 1497.6 $212.66 5.36 3 413 Kindergarten Lav 1000 1 2 2-L 34W U T8 2x2 73 0.07 73.0 $10.37 1 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.05 47 $6.67 $100.00 $100.00 0.03 26 $3.69 27.09 4 413 Kindergarten Stor 1000 3 4 114 0.34 342.0 $48.56 3 3 T8 2x4 75 0.23 225 $31.95 $95.00 $285.00 0.12 117 $16.61 17.15

Investment Grade Lighting Audit Appendix E-1 Page 11 of 28 EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 4 412 Kindergarten 3200 12 4 114 1.37 4,377.6 $621.62 12 3 T8 2x4 75 0.90 2880 $408.96 $95.00 $1,140.00 0.47 1497.6 $212.66 5.36 4 412 Kindergarten Lav 1000 1 4 114 0.11 114.0 $16.19 1 3 T8 2x4 75 0.08 75 $10.65 $95.00 $95.00 0.04 39 $5.54 17.15 3 412 Kindergarten Stor 3200 1 2 2-L 34W U T8 2x2 73 0.07 233.6 $33.17 1 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.05 150.4 $21.36 $100.00 $100.00 0.03 83.2 $11.81 8.46 4 418 Storage 1000 2 4 114 0.23 228.0 $32.38 2 3 T8 2x4 75 0.15 150 $21.30 $95.00 $190.00 0.08 78 $11.08 17.15 4 Boys Lav 8760 3 4 114 0.34 2,995.9 $425.42 3 3 T8 2x4 75 0.23 1971 $279.88 $95.00 $285.00 0.12 1024.92 $145.54 1.96 4 Girls Lav 8760 3 4 114 0.34 2,995.9 $425.42 3 3 T8 2x4 75 0.23 1971 $279.88 $95.00 $285.00 0.12 1024.92 $145.54 1.96 3 Custodial 1000 1 2 2-L 34W U T8 2x2 73 0.07 73.0 $10.37 1 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.05 47 $6.67 $100.00 $100.00 0.03 26 $3.69 27.09 20 415 Gymnasium 3200 14 1 400w MV Hi-Bay w/ Lens 465 6.51 20,832.0 $2,958.14 14 6 2x4 54w T5HO 6 Lamp w/reflecter 354 4.96 15859.2 $2,252.01 $240.00 $3,360.00 1.55 4972.8 $706.14 4.76 4 417 PE Office 3200 2 4 114 0.23 729.6 $103.60 2 3 T8 2x4 75 0.15 480 $68.16 $95.00 $190.00 0.08 249.6 $35.44 5.36 4 Gym Storage 1000 2 4 114 0.23 228.0 $32.38 2 3 T8 2x4 75 0.15 150 $21.30 $95.00 $190.00 0.08 78 $11.08 17.15 4 316 Custodial 3200 6 4 114 0.68 2,188.8 $310.81 6 3 T8 2x4 75 0.45 1440 $204.48 $95.00 $570.00 0.23 748.8 $106.33 5.36 4 316A Custodial Office 3200 2 4 114 0.23 729.6 $103.60 2 3 T8 2x4 75 0.15 480 $68.16 $95.00 $190.00 0.08 249.6 $35.44 5.36 57 317 Mechanical 1000 8 4 4-L T8 F32 1x8 Surface/Pendant 114 0.91 912.0 $129.50 8 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.83 832 $118.14 $28.00 $224.00 0.08 80 $11.36 19.72 4 Mens 8760 4 4 114 0.46 3,994.6 $567.23 4 3 T8 2x4 75 0.30 2628 $373.18 $95.00 $380.00 0.16 1366.56 $194.05 1.96 4 Womens 8760 4 4 114 0.46 3,994.6 $567.23 4 3 T8 2x4 75 0.30 2628 $373.18 $95.00 $380.00 0.16 1366.56 $194.05 1.96 4 411 Kindergarten 3200 12 4 114 1.37 4,377.6 $621.62 12 3 T8 2x4 75 0.90 2880 $408.96 $95.00 $1,140.00 0.47 1497.6 $212.66 5.36 3 411 Kindergarten Lav 1000 1 2 2-L 34W U T8 2x2 73 0.07 73.0 $10.37 1 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.05 47 $6.67 $100.00 $100.00 0.03 26 $3.69 27.09 4 411 Kindergarten Stor 1000 1 4 114 0.11 114.0 $16.19 1 3 T8 2x4 75 0.08 75 $10.65 $95.00 $95.00 0.04 39 $5.54 17.15 4 320 Old Teacher Lounge 3200 9 4 114 1.03 3,283.2 $466.21 9 3 T8 2x4 75 0.68 2160 $306.72 $95.00 $855.00 0.35 1123.2 $159.49 5.36

Investment Grade Lighting Audit Appendix E-1 Page 12 of 28 EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 4 410 Kindergarten 3200 12 4 114 1.37 4,377.6 $621.62 12 3 T8 2x4 75 0.90 2880 $408.96 $95.00 $1,140.00 0.47 1497.6 $212.66 5.36 3 410 Kindergarten Lav 1000 1 2 2-L 34W U T8 2x2 73 0.07 73.0 $10.37 1 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.05 47 $6.67 $100.00 $100.00 0.03 26 $3.69 27.09 4 410 Kindergarten Stor 1000 1 4 114 0.11 114.0 $16.19 1 3 T8 2x4 75 0.08 75 $10.65 $95.00 $95.00 0.04 39 $5.54 17.15 4 409 Kindergarten 3200 12 4 114 1.37 4,377.6 $621.62 12 3 T8 2x4 75 0.90 2880 $408.96 $95.00 $1,140.00 0.47 1497.6 $212.66 5.36 3 409 Kindergarten Lav 1000 1 2 2-L 34W U T8 2x2 73 0.07 73.0 $10.37 1 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.05 47 $6.67 $100.00 $100.00 0.03 26 $3.69 27.09 4 409 Kindergarten Stor 1000 1 4 114 0.11 114.0 $16.19 1 3 T8 2x4 75 0.08 75 $10.65 $95.00 $95.00 0.04 39 $5.54 17.15 4 408 Kindergarten 3200 12 4 114 1.37 4,377.6 $621.62 12 3 T8 2x4 75 0.90 2880 $408.96 $95.00 $1,140.00 0.47 1497.6 $212.66 5.36 3 408 Kindergarten Lav 1000 1 2 2-L 34W U T8 2x2 73 0.07 73.0 $10.37 1 3 3 Lamp, 17w T8, Elect. Ballast; retrofit 47 0.05 47 $6.67 $100.00 $100.00 0.03 26 $3.69 27.09 4 408 Kindergarten Stor 1000 1 4 114 0.11 114.0 $16.19 1 3 T8 2x4 75 0.08 75 $10.65 $95.00 $95.00 0.04 39 $5.54 17.15 4 407 Science 3200 9 4 114 1.03 3,283.2 $466.21 9 3 T8 2x4 75 0.68 2160 $306.72 $95.00 $855.00 0.35 1123.2 $159.49 5.36 4 407 Science Storage 1000 1 4 114 0.11 114.0 $16.19 1 3 T8 2x4 75 0.08 75 $10.65 $95.00 $95.00 0.04 39 $5.54 17.15 4 TV Room 1000 3 4 114 0.34 342.0 $48.56 3 3 T8 2x4 75 0.23 225 $31.95 $95.00 $285.00 0.12 117 $16.61 17.15 4 Custodial Room 3200 6 4 114 0.68 2,188.8 $310.81 6 3 T8 2x4 75 0.45 1440 $204.48 $95.00 $570.00 0.23 748.8 $106.33 5.36 57 Maintenance Room 3200 4 4 4-L T8 F32 1x8 Surface/Pendant 114 0.46 1,459.2 $207.21 4 4 Relamp - Sylvania Lamp FO28/841/SS/ECO 104 0.42 1331.2 $189.03 $28.00 $112.00 0.04 128 $18.18 6.16 58 Maintenance Room 3200 2 4 4-L T12 F34 1x8 Surface/Pendant 156 0.31 998.4 $141.77 2 4 Replace Fixture With 4-L T8 28Watt Surface/Pendant 104 0.21 665.6 $94.52 $110.00 $220.00 0.10 332.8 $47.26 4.66 28 220 Storage 1000 1 1 Surface Mounted 135 W Incandescent Medium Base 135 0.14 135.0 $19.17 1 2 Replace Fixture With 2-L T8 28Watt Surface Wrap 52 0.05 52 $7.38 $95.00 $95.00 0.08 83 $11.79 8.06 28 205 PTA 3200 2 1 Surface Mounted 135 W Incandescent Medium Base 135 0.27 864.0 $122.69 2 2 Replace Fixture With 2-L T8 28Watt Surface Wrap 52 0.10 332.8 $47.26 $95.00 $190.00 0.17 531.2 $75.43 2.52 4 222 Corridor 3200 5 4 114 0.57 1,824.0 $259.01 5 3 T8 2x4 75 0.38 1200 $170.40 $95.00 $475.00 0.20 624 $88.61 5.36 4 222 Corridor 3200 5 4 114 0.57 1,824.0 $259.01 5 3 T8 2x4 75 0.38 1200 $170.40 $95.00 $475.00 0.20 624 $88.61 5.36

Investment Grade Lighting Audit Appendix E-1 Page 13 of 28 EXISTING LIGHTING PROPOSED LIGHTING SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Retro-Unit Watts Total kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 54 222 Corridor 3200 3 3 3-L 32W T8 2x4 85 0.26 816.0 $115.87 3 3 T8 2x4 78 0.23 748.8 $106.33 $95.00 $285.00 0.02 67.2 $9.54 29.87 54 234 Corridor 3200 8 3 3-L 32W T8 2x4 85 0.68 2,176.0 $308.99 8 3 T8 2x4 78 0.62 1996.8 $283.55 $95.00 $760.00 0.06 179.2 $25.45 29.87 4 223 Lobby 3200 3 4 114 0.34 1,094.4 $155.40 3 3 T8 2x4 75 0.23 720 $102.24 $95.00 $285.00 0.12 374.4 $53.16 5.36 4 357 Corridor 3200 2 4 114 0.23 729.6 $103.60 2 3 T8 2x4 75 0.15 480 $68.16 $95.00 $190.00 0.08 249.6 $35.44 5.36 54 357 Corridor 3200 6 3 3-L 32W T8 2x4 85 0.51 1,632.0 $231.74 6 3 T8 2x4 78 0.47 1497.6 $212.66 $95.00 $570.00 0.04 134.4 $19.08 29.87 54 200/300 Corridor 3200 15 3 3-L 32W T8 2x4 85 1.28 4,080.0 $579.36 15 3 T8 2x4 78 1.17 3744 $531.65 $95.00 $1,425.00 0.11 336 $47.71 29.87 4 200 Corridor 3200 3 4 114 0.34 1,094.4 $155.40 3 3 T8 2x4 75 0.23 720 $102.24 $95.00 $285.00 0.12 374.4 $53.16 5.36 4 222 Corridor 3200 11 4 114 1.25 4,012.8 $569.82 11 3 T8 2x4 75 0.83 2640 $374.88 $95.00 $1,045.00 0.43 1372.8 $194.94 5.36 54 338 Corridor 3200 23 3 3-L 32W T8 2x4 85 1.96 6,256.0 $888.35 23 3 T8 2x4 78 1.79 5740.8 $815.19 $95.00 $2,185.00 0.16 515.2 $73.16 29.87 54 357 Corridor 3200 13 3 3-L 32W T8 2x4 85 1.11 3,536.0 $502.11 13 3 T8 2x4 78 1.01 3244.8 $460.76 $95.00 $1,235.00 0.09 291.2 $41.35 29.87 54 630 Corridor 3200 3 3 3-L 32W T8 2x4 85 0.26 816.0 $115.87 3 3 T8 2x4 78 0.23 748.8 $106.33 $95.00 $285.00 0.02 67.2 $9.54 29.87 54 629 Corridor 3200 6 3 3-L 32W T8 2x4 85 0.51 1,632.0 $231.74 6 3 T8 2x4 78 0.47 1497.6 $212.66 $95.00 $570.00 0.04 134.4 $19.08 29.87 54 627 Corridor 3200 22 3 3-L 32W T8 2x4 85 1.87 5,984.0 $849.73 22 3 T8 2x4 78 1.72 5491.2 $779.75 $95.00 $2,090.00 0.15 492.8 $69.98 29.87 54 607 Corridor 3200 14 3 3-L 32W T8 2x4 85 1.19 3,808.0 $540.74 14 3 T8 2x4 78 1.09 3494.4 $496.20 $95.00 $1,330.00 0.10 313.6 $44.53 29.87 54 600 Corridor 3200 13 3 3-L 32W T8 2x4 85 1.11 3,536.0 $502.11 13 3 T8 2x4 78 1.01 3244.8 $460.76 $95.00 $1,235.00 0.09 291.2 $41.35 29.87 Totals 320 187 39.88 115,494.4 $16,400.20 320 173 30.06 89707.8 $12,738.51 $26,621.00 9.40 24569.8 $3,488.91 7.63 NOTES: 1. Simple Payback noted in this spreadsheet does not include Maintenance Savings and NJ Smart Start Incentives. 2. Lamp totals only include T-12 tube replacment calculations

APPENDIX E-1 14 of 28 CEG Job #: Project: Little Egg Harbor BOE - George J. Mitchell Elementary School George J. Mitchell Elementary School KWH COST: $0.142 Address: 950 Route 539 Litlle Egg Harbor, NJ 08087 Building SF: 1E+05 ECM #2: Lighting Controls EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback FIRST FLOOR 4 0 Receiving 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 28 0 Receiving Storage 1000 1 1 28 322 Storage 1000 1 1 24 315 Kitchen Storage 1000 2 4 Surface Mounted 135 W Incandescent Medium Base Surface Mounted 135 W Incandescent Medium Base 8' 4 Lamp, 32w 700 Series T8, Elect. Ballast, Pendant Mnt., Strip 135 0.135 135 19.17 1 1 No Change 135 0.12 10% 121.5 $17.25 $0.00 $0.00 0.01 13.5 $1.92 0.00 135 0.135 135 19.17 1 1 No Change 135 0.12 10% 121.5 $17.25 $0.00 $0.00 0.01 13.5 $1.92 0.00 114 0.228 228 32.376 2 4 No Change 114 0.21 10% 205.2 $29.14 $0.00 $0.00 0.02 22.8 $3.24 0.00 3 315 Kitchen Storage Lav 1000 1 2 2-L 34W U T8 2x2 73 0.073 73 10.366 1 2 No Change 73 0.07 10% 65.7 $9.33 $0.00 $0.00 0.01 7.3 $1.04 0.00 28 325 Kitchen Storage 1000 1 1 Surface Mounted 135 W Incandescent Medium Base 135 0.135 135 19.17 1 1 No Change 135 0.12 10% 121.5 $17.25 $0.00 $0.00 0.01 13.5 $1.92 0.00 29 327 Kitchen 2700 26 2 2-L 34W T12 2x4 82 2.132 5756.4 817.4088 26 2 No Change 82 1.92 10% 5180.76 $735.67 $0.00 $0.00 0.21 575.64 $81.74 0.00 30 327 Kitchen Locker 1000 1 1 30 327 Kit. Locker Lav 1000 1 1 Surface Mounted 90 W Incandescent Medium Base Surface Mounted 90 W Incandescent Medium Base 90 0.09 90 12.78 1 1 No Change 90 0.08 10% 81 $11.50 $0.00 $0.00 0.01 9 $1.28 0.00 90 0.09 90 12.78 1 1 No Change 90 0.08 10% 81 $11.50 $0.00 $0.00 0.01 9 $1.28 0.00 20 307 Cafetorium 3200 24 1 400w MV Hi-Bay w/ Lens 465 11.16 35712 5071.104 24 1 No Change 465 10.04 10% 32140.8 $4,563.99 $0.00 $0.00 1.12 3571.2 $507.11 0.00 28 307 Stage 500 8 1 Surface Mounted 135 W Incandescent Medium Base 135 1.08 540 76.68 8 1 No Change 135 0.97 10% 486 $69.01 $0.00 $0.00 0.11 54 $7.67 0.00 5 307 Stage Stair 3200 4 2 2-L 32W T8 2x4 Surface Wrap 58 0.232 742.4 105.4208 4 2 No Change 58 0.21 10% 668.16 $94.88 $0.00 $0.00 0.02 74.24 $10.54 0.00 5 306 Storage 1000 8 2 2-L 32W T8 2x4 Surface Wrap 58 0.464 464 65.888 8 2 No Change 58 0.42 10% 417.6 $59.30 $0.00 $0.00 0.05 46.4 $6.59 0.00 42 0 Boys Lav 3200 2 2 2-L 34W T12 2x4 Surface Wrap 82 0.164 524.8 74.5216 2 2 No Change 82 0.15 10% 472.32 $67.07 $0.00 $0.00 0.02 52.48 $7.45 0.00

APPENDIX E-1 15 of 28 EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 42 0 Girls Lav 3200 2 2 2-L 34W T12 2x4 Surface Wrap 82 0.164 524.8 74.5216 2 2 No Change 82 0.15 10% 472.32 $67.07 $0.00 $0.00 0.02 52.48 $7.45 0.00 43 152 Vestibule 3200 3 1 Recessed Can with CFL Quad Lamp 26 0.078 249.6 35.4432 3 1 No Change 26 0.07 10% 224.64 $31.90 $0.00 $0.00 0.01 24.96 $3.54 0.00 4 151 Lobby 3200 4 4 114 0.456 1459.2 207.2064 4 4 No Change 114 0.41 10% 1313.28 $186.49 $0.00 $0.00 0.05 145.92 $20.72 0.00 4 150 Corridor 3200 6 4 114 0.684 2188.8 310.8096 6 4 No Change 114 0.62 10% 1969.92 $279.73 $0.00 $0.00 0.07 218.88 $31.08 0.00 44 105 Storage 1000 1 1 Surface Mounted 26 W CFL 26 0.026 26 3.692 1 1 No Change 26 0.02 10% 23.4 $3.32 $0.00 $0.00 0.00 2.6 $0.37 0.00 28 104 Storage 1000 1 1 Surface Mounted 135 W Incandescent Medium Base 135 0.135 135 19.17 1 1 No Change 135 0.12 10% 121.5 $17.25 $0.00 $0.00 0.01 13.5 $1.92 0.00 1 0 Main Lobby 3200 6 3 3-L 32W T8 2x4 Recessed 85 0.51 1632 231.744 6 3 No Change 85 0.46 10% 1468.8 $208.57 $0.00 $0.00 0.05 163.2 $23.17 0.00 4 0 Main Vestibule 3200 6 4 114 0.684 2188.8 310.8096 6 4 No Change 114 0.62 10% 1969.92 $279.73 $0.00 $0.00 0.07 218.88 $31.08 0.00 45 0 Main Vestibule 3200 2 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.12 384 54.528 2 1 No Change 60 0.11 10% 345.6 $49.08 $0.00 $0.00 0.01 38.4 $5.45 0.00 4 102 Office 2700 5 4 114 0.57 1539 218.538 5 4 No Change 114 0.51 10% 1385.1 $196.68 $0.00 $0.00 0.06 153.9 $21.85 0.00 3 102 Office 2700 2 2 2-L 34W U T8 2x2 73 0.146 394.2 55.9764 2 2 No Change 73 0.13 10% 354.78 $50.38 $0.00 $0.00 0.01 39.42 $5.60 0.00 46 102 Office 2700 1 1 Recessed Can Fixture 60 W Incandescent Medium Base 60 0.06 162 23.004 1 1 No Change 60 0.05 10% 145.8 $20.70 $0.00 $0.00 0.01 16.2 $2.30 0.00 3 102 Office Closet 1000 1 2 2-L 34W U T8 2x2 73 0.073 73 10.366 1 2 No Change 73 0.07 10% 65.7 $9.33 $0.00 $0.00 0.01 7.3 $1.04 0.00 30 102 Office Lav 1000 1 1 45 102 Office Lav 1000 1 1 Surface Mounted 90 W Incandescent Medium Base Surface Mounted 60 W Fixture w/ Incandescent Medium Base 90 0.09 90 12.78 1 1 No Change 90 0.08 10% 81 $11.50 $0.00 $0.00 0.01 9 $1.28 0.00 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00 45 100 Principal Office 3200 2 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.12 384 54.528 2 1 Sensor - Switch Mnt. 60 0.11 10% 345.6 $49.08 $75.00 $75.00 0.01 38.4 $5.45 13.75 4 101 Conference 1000 2 4 114 0.228 228 32.376 2 4 Sensor - Switch Mnt. 114 0.21 10% 205.2 $29.14 $75.00 $75.00 0.02 22.8 $3.24 23.17

APPENDIX E-1 16 of 28 EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 4 103 Main Office/Sec 3200 3 4 114 0.342 1094.4 155.4048 3 4 No Change 114 0.31 10% 984.96 $139.86 $0.00 $0.00 0.03 109.44 $15.54 0.00 4 103.2 Shared Conference 1000 4 4 114 0.456 456 64.752 4 4 114 0.41 10% 410.4 $58.28 $160.00 $160.00 0.05 45.6 $6.48 24.71 4 109 Office 3200 2 4 114 0.228 729.6 103.6032 2 4 Sensor - Switch Mnt. 114 0.21 10% 656.64 $93.24 $75.00 $75.00 0.02 72.96 $10.36 7.24 4 103.1 CST Office 3200 5 4 114 0.57 1824 259.008 5 4 114 0.51 10% 1641.6 $233.11 $160.00 $160.00 0.06 182.4 $25.90 6.18 4 108 CST 3200 2 4 114 0.228 729.6 103.6032 2 4 Sensor - Switch Mnt. 114 0.21 10% 656.64 $93.24 $75.00 $75.00 0.02 72.96 $10.36 7.24 4 110 CST 3200 3 4 114 0.342 1094.4 155.4048 3 4 Sensor - Switch Mnt. 114 0.31 10% 984.96 $139.86 $75.00 $75.00 0.03 109.44 $15.54 4.83 47 114 Storage 1000 2 2 1x4, 2-Lamp, 34w T12, Mag. Ballast, Surface Mnt., 82 0.164 164 23.288 2 2 No Change 82 0.15 10% 147.6 $20.96 $0.00 $0.00 0.02 16.4 $2.33 0.00 4 114.1 Corridor 3200 1 4 114 0.114 364.8 51.8016 1 4 No Change 114 0.10 10% 328.32 $46.62 $0.00 $0.00 0.01 36.48 $5.18 0.00 3 114.1 Corridor 3200 2 2 2-L 34W U T8 2x2 73 0.146 467.2 66.3424 2 2 No Change 73 0.13 10% 420.48 $59.71 $0.00 $0.00 0.01 46.72 $6.63 0.00 4 0 Early Child 3200 4 4 114 0.456 1459.2 207.2064 4 4 114 0.41 10% 1313.28 $186.49 $160.00 $160.00 0.05 145.92 $20.72 7.72 4 115 Nurse 3200 6 4 114 0.684 2188.8 310.8096 6 4 No Change 114 0.62 10% 1969.92 $279.73 $0.00 $0.00 0.07 218.88 $31.08 0.00 3 115 Nurse Lav 3200 1 2 2-L 34W U T8 2x2 73 0.073 233.6 33.1712 1 2 No Change 73 0.07 10% 210.24 $29.85 $0.00 $0.00 0.01 23.36 $3.32 0.00 44 115 Nurse Storage 1000 1 1 Surface Mounted 26 W CFL 26 0.026 26 3.692 1 1 No Change 26 0.02 10% 23.4 $3.32 $0.00 $0.00 0.00 2.6 $0.37 0.00 45 127 Electric 1000 2 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.12 120 17.04 2 1 No Change 60 0.11 10% 108 $15.34 $0.00 $0.00 0.01 12 $1.70 0.00 1 0 Corridor 3200 5 3 3-L 32W T8 2x4 Recessed 85 0.425 1360 193.12 5 3 No Change 85 0.38 10% 1224 $173.81 $0.00 $0.00 0.04 136 $19.31 0.00 1 0 Corridor 3200 13 3 3-L 32W T8 2x4 Recessed 85 1.105 3536 502.112 13 3 No Change 85 0.99 10% 3182.4 $451.90 $0.00 $0.00 0.11 353.6 $50.21 0.00 1 0 Corridor 3200 2 3 3-L 32W T8 2x4 Recessed 85 0.17 544 77.248 2 3 No Change 85 0.15 10% 489.6 $69.52 $0.00 $0.00 0.02 54.4 $7.72 0.00

APPENDIX E-1 17 of 28 EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 1 0 Vestibule 3200 1 3 3-L 32W T8 2x4 Recessed 85 0.085 272 38.624 1 3 No Change 85 0.08 10% 244.8 $34.76 $0.00 $0.00 0.01 27.2 $3.86 0.00 48 205 Pre-K Clsrm 3200 8 4 114 0.912 2918.4 414.4128 8 4 114 0.82 10% 2626.56 $372.97 $160.00 $160.00 0.09 291.84 $41.44 3.86 45 205 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00 48 203 Pre-K Clsrm 3200 8 4 114 0.912 2918.4 414.4128 8 4 114 0.82 10% 2626.56 $372.97 $160.00 $160.00 0.09 291.84 $41.44 3.86 45 203 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00 48 207 Pre-K Clsrm 3200 8 4 114 0.912 2918.4 414.4128 8 4 114 0.82 10% 2626.56 $372.97 $160.00 $160.00 0.09 291.84 $41.44 3.86 45 207 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00 48 209 Pre-K Clsrm 3200 8 4 114 0.912 2918.4 414.4128 8 4 114 0.82 10% 2626.56 $372.97 $160.00 $160.00 0.09 291.84 $41.44 3.86 45 209 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00 48 211 Pre-K Clsrm 3200 8 4 114 0.912 2918.4 414.4128 8 4 114 0.82 10% 2626.56 $372.97 $160.00 $160.00 0.09 291.84 $41.44 3.86 45 211 Pre-K Clsrm Lav 1000 1 1 45 211 Pre-K Clsrm Stor 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00 48 210 Pre-K Clsrm 3200 8 4 114 0.912 2918.4 414.4128 8 4 114 0.82 10% 2626.56 $372.97 $160.00 $160.00 0.09 291.84 $41.44 3.86 45 210 Pre-K Clsrm Lav 1000 1 1 45 210 Pre-K Clsrm Rear 0 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00 60 0.06 0 0 1 1 No Change 60 0.05 10% 0 $0.00 $0.00 $0.00 0.01 0 $0.00 0.00 48 208 Pre-K Clsrm 3200 8 4 114 0.912 2918.4 414.4128 8 4 114 0.82 10% 2626.56 $372.97 $160.00 $160.00 0.09 291.84 $41.44 3.86 45 208 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00

APPENDIX E-1 18 of 28 EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 48 206 Pre-K Clsrm 3200 8 4 114 0.912 2918.4 414.4128 8 4 114 0.82 10% 2626.56 $372.97 $160.00 $160.00 0.09 291.84 $41.44 3.86 45 206 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00 48 204 Pre-K Clsrm 3200 8 4 114 0.912 2918.4 414.4128 8 4 114 0.82 10% 2626.56 $372.97 $160.00 $160.00 0.09 291.84 $41.44 3.86 45 204 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00 41 301 Library 3200 13 4 114 1.482 4742.4 673.4208 13 4 No Change 114 1.33 10% 4268.16 $606.08 $0.00 $0.00 0.15 474.24 $67.34 0.00 22 301 Library 3200 11 2 Recessed Can With 2-13Watt CF Lamps 26 0.286 915.2 129.9584 11 2 No Change 26 0.26 10% 823.68 $116.96 $0.00 $0.00 0.03 91.52 $13.00 0.00 41 303 Library Office 3200 2 4 114 0.228 729.6 103.6032 2 4 114 0.21 10% 656.64 $93.24 $160.00 $160.00 0.02 72.96 $10.36 15.44 41 302 IDF 1000 1 4 114 0.114 114 16.188 1 4 No Change 114 0.10 10% 102.6 $14.57 $0.00 $0.00 0.01 11.4 $1.62 0.00 41 304 CPU Lab 3200 8 4 114 0.912 2918.4 414.4128 8 4 114 0.82 10% 2626.56 $372.97 $160.00 $160.00 0.09 291.84 $41.44 3.86 41 305 OT/PT 3200 8 4 114 0.912 2918.4 414.4128 8 4 114 0.82 10% 2626.56 $372.97 $160.00 $160.00 0.09 291.84 $41.44 3.86 5 405 Storage/Old Boiler 1000 1 2 2-L 32W T8 2x4 Surface Wrap 58 0.058 58 8.236 1 2 No Change 58 0.05 10% 52.2 $7.41 $0.00 $0.00 0.01 5.8 $0.82 0.00 45 405 Storage/Old Boiler 1000 2 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.12 120 17.04 2 1 No Change 60 0.11 10% 108 $15.34 $0.00 $0.00 0.01 12 $1.70 0.00 45 405 Storage/Old Boiler Entry 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00 44 405 Electric 1000 1 1 Surface Mounted 26 W CFL 26 0.026 26 3.692 1 1 No Change 26 0.02 10% 23.4 $3.32 $0.00 $0.00 0.00 2.6 $0.37 0.00 49 400 Classroom 3200 2 4 Pendant Mounted, 4 Lamp 34w T-12 Eggcrate Fixture 156 0.312 998.4 141.7728 2 4 156 0.28 10% 898.56 $127.60 $160.00 $160.00 0.03 99.84 $14.18 11.29 5 401 Classroom 3200 18 2 2-L 32W T8 2x4 Surface Wrap 58 1.044 3340.8 474.3936 18 2 58 0.94 10% 3006.72 $426.95 $160.00 $160.00 0.10 334.08 $47.44 3.37 45 403 Storage 1000 2 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.12 120 17.04 2 1 No Change 60 0.11 10% 108 $15.34 $0.00 $0.00 0.01 12 $1.70 0.00

APPENDIX E-1 19 of 28 EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 30 403 Storage (Small Room) 1000 1 1 Surface Mounted 90 W Incandescent Medium Base 90 0.09 90 12.78 1 1 No Change 90 0.08 10% 81 $11.50 $0.00 $0.00 0.01 9 $1.28 0.00 5 402 Classroom 3200 18 2 2-L 32W T8 2x4 Surface Wrap 58 1.044 3340.8 474.3936 18 2 58 0.94 10% 3006.72 $426.95 $160.00 $160.00 0.10 334.08 $47.44 3.37 50 0 Copy Room 3200 2 4 Surface Mounted, 4 Lamp 34w T-12 Fixture 156 0.312 998.4 141.7728 2 4 156 0.28 10% 898.56 $127.60 $160.00 $160.00 0.03 99.84 $14.18 11.29 45 0 Copy Room Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00 5 501 Pre-K Clsrm 3200 18 2 2-L 32W T8 2x4 Surface Wrap 58 1.044 3340.8 474.3936 18 2 58 0.94 10% 3006.72 $426.95 $160.00 $160.00 0.10 334.08 $47.44 3.37 45 501 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00 5 502 Pre-K Clsrm 3200 18 2 2-L 32W T8 2x4 Surface Wrap 58 1.044 3340.8 474.3936 18 2 58 0.94 10% 3006.72 $426.95 $160.00 $160.00 0.10 334.08 $47.44 3.37 45 502 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00 5 503 Pre-K Clsrm 3200 20 2 2-L 32W T8 2x4 Surface Wrap 58 1.16 3712 527.104 20 2 58 1.04 10% 3340.8 $474.39 $160.00 $160.00 0.12 371.2 $52.71 3.04 45 503 Pre-K Clsrm Lav 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00 1 0 Corridor 3200 1 3 3-L 32W T8 2x4 Recessed 85 0.085 272 38.624 1 3 No Change 85 0.08 10% 244.8 $34.76 $0.00 $0.00 0.01 27.2 $3.86 0.00 1 0 Corridor 3200 12 3 3-L 32W T8 2x4 Recessed 85 1.02 3264 463.488 12 3 No Change 85 0.92 10% 2937.6 $417.14 $0.00 $0.00 0.10 326.4 $46.35 0.00 5 504 Classroom 3200 15 2 2-L 32W T8 2x4 Surface Wrap 58 0.87 2784 395.328 15 2 58 0.78 10% 2505.6 $355.80 $160.00 $160.00 0.09 278.4 $39.53 4.05 5 505 Classroom 3200 18 2 2-L 32W T8 2x4 Surface Wrap 58 1.044 3340.8 474.3936 18 2 58 0.94 10% 3006.72 $426.95 $160.00 $160.00 0.10 334.08 $47.44 3.37 5 506 Classroom 3200 18 2 2-L 32W T8 2x4 Surface Wrap 58 1.044 3340.8 474.3936 18 2 58 0.94 10% 3006.72 $426.95 $160.00 $160.00 0.10 334.08 $47.44 3.37 3 0 Boys Lav 3200 2 2 2-L 34W U T8 2x2 73 0.146 467.2 66.3424 2 2 No Change 73 0.13 10% 420.48 $59.71 $0.00 $0.00 0.01 46.72 $6.63 0.00 3 0 Girls Lav 3200 2 2 2-L 34W U T8 2x2 73 0.146 467.2 66.3424 2 2 No Change 73 0.13 10% 420.48 $59.71 $0.00 $0.00 0.01 46.72 $6.63 0.00

APPENDIX E-1 20 of 28 EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 44 0 Boys Lav Closet 1000 1 1 Surface Mounted 26 W CFL 26 0.026 26 3.692 1 1 No Change 26 0.02 10% 23.4 $3.32 $0.00 $0.00 0.00 2.6 $0.37 0.00 44 0 Closet 1000 1 1 Surface Mounted 26 W CFL 26 0.026 26 3.692 1 1 No Change 26 0.02 10% 23.4 $3.32 $0.00 $0.00 0.00 2.6 $0.37 0.00 44 0 Kiln Room 1000 1 1 Surface Mounted 26 W CFL 26 0.026 26 3.692 1 1 No Change 26 0.02 10% 23.4 $3.32 $0.00 $0.00 0.00 2.6 $0.37 0.00 45 0 IDF 1000 1 1 Surface Mounted 60 W Fixture w/ Incandescent Medium Base 60 0.06 60 8.52 1 1 No Change 60 0.05 10% 54 $7.67 $0.00 $0.00 0.01 6 $0.85 0.00 5 511 Classroom 3200 18 2 2-L 32W T8 2x4 Surface Wrap 58 1.044 3340.8 474.3936 18 2 58 0.94 10% 3006.72 $426.95 $160.00 $160.00 0.10 334.08 $47.44 3.37 5 508 Classroom 3200 18 2 2-L 32W T8 2x4 Surface Wrap 58 1.044 3340.8 474.3936 18 2 58 0.94 10% 3006.72 $426.95 $160.00 $160.00 0.10 334.08 $47.44 3.37 51 0 Electric 1000 1 1 Surface Mounted, 1 Lamp 34w T-12 Fixture 40 0.04 40 5.68 1 1 No Change 40 0.04 10% 36 $5.11 $0.00 $0.00 0.00 4 $0.57 0.00 51 0 Custodial 1000 1 1 Surface Mounted, 1 Lamp 34w T-12 Fixture 40 0.04 40 5.68 1 1 No Change 40 0.04 10% 36 $5.11 $0.00 $0.00 0.00 4 $0.57 0.00 55 0 Boys lav 8760 4 2 2-L 32W T8 Wall Bracket w/ 58 0.232 2032.32 288.58944 4 2 No Change 58 0.21 10% 1829.088 $259.73 $0.00 $0.00 0.02 203.232 $28.86 0.00 55 0 Girls Lav 8760 3 2 2-L 32W T8 Wall Bracket w/ 58 0.174 1524.24 216.44208 3 2 No Change 58 0.16 10% 1371.816 $194.80 $0.00 $0.00 0.02 152.424 $21.64 0.00 4 515 Classroom 3200 4 4 114 0.456 1459.2 207.2064 4 4 114 0.41 10% 1313.28 $186.49 $160.00 $160.00 0.05 145.92 $20.72 7.72 4 515A Classroom 3200 4 4 114 0.456 1459.2 207.2064 4 4 114 0.41 10% 1313.28 $186.49 $160.00 $160.00 0.05 145.92 $20.72 7.72 4 514 Classroom 3200 6 4 114 0.684 2188.8 310.8096 6 4 114 0.62 10% 1969.92 $279.73 $160.00 $160.00 0.07 218.88 $31.08 5.15 4 517 SGI 3200 3 4 114 0.342 1094.4 155.4048 3 4 114 0.31 10% 984.96 $139.86 $160.00 $160.00 0.03 109.44 $15.54 10.30 4 516 Classroom 3200 6 4 114 0.684 2188.8 310.8096 6 4 114 0.62 10% 1969.92 $279.73 $160.00 $160.00 0.07 218.88 $31.08 5.15 4 520 Classroom 3200 6 4 114 0.684 2188.8 310.8096 6 4 114 0.62 10% 1969.92 $279.73 $160.00 $160.00 0.07 218.88 $31.08 5.15 4 518 SGI 3200 2 4 114 0.228 729.6 103.6032 2 4 114 0.21 10% 656.64 $93.24 $160.00 $160.00 0.02 72.96 $10.36 15.44

APPENDIX E-1 21 of 28 EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 4 519 SGI 3200 2 4 114 0.228 729.6 103.6032 2 4 114 0.21 10% 656.64 $93.24 $160.00 $160.00 0.02 72.96 $10.36 15.44 4 525 SGI 3200 2 4 114 0.228 729.6 103.6032 2 4 114 0.21 10% 656.64 $93.24 $160.00 $160.00 0.02 72.96 $10.36 15.44 4 526 Pre-K Clsrm 3200 12 4 114 1.368 4377.6 621.6192 12 4 114 1.23 10% 3939.84 $559.46 $160.00 $160.00 0.14 437.76 $62.16 2.57 3 526 Pre-K Clsrm Lav 1000 1 2 2-L 34W U T8 2x2 73 0.073 73 10.366 1 2 No Change 73 0.07 10% 65.7 $9.33 $0.00 $0.00 0.01 7.3 $1.04 0.00 4 526 Pre-K Clsrm Stor 1000 1 4 114 0.114 114 16.188 1 4 No Change 114 0.10 10% 102.6 $14.57 $0.00 $0.00 0.01 11.4 $1.62 0.00 4 527 Pre-K Clsrm 3200 12 4 114 1.368 4377.6 621.6192 12 4 114 1.23 10% 3939.84 $559.46 $160.00 $160.00 0.14 437.76 $62.16 2.57 3 527 Pre-K Clsrm Lav 1000 1 2 2-L 34W U T8 2x2 73 0.073 73 10.366 1 2 No Change 73 0.07 10% 65.7 $9.33 $0.00 $0.00 0.01 7.3 $1.04 0.00 4 527 Pre-K Clsrm Stor 1000 1 4 114 0.114 114 16.188 1 4 No Change 114 0.10 10% 102.6 $14.57 $0.00 $0.00 0.01 11.4 $1.62 0.00 4 521 Classroom 3200 8 4 114 0.912 2918.4 414.4128 8 4 114 0.82 10% 2626.56 $372.97 $160.00 $160.00 0.09 291.84 $41.44 3.86 4 522 Classroom 3200 8 4 114 0.912 2918.4 414.4128 8 4 114 0.82 10% 2626.56 $372.97 $160.00 $160.00 0.09 291.84 $41.44 3.86 4 523 Classroom 3200 8 4 114 0.912 2918.4 414.4128 8 4 114 0.82 10% 2626.56 $372.97 $160.00 $160.00 0.09 291.84 $41.44 3.86 4 524 Classroom 3200 8 4 114 0.912 2918.4 414.4128 8 4 114 0.82 10% 2626.56 $372.97 $160.00 $160.00 0.09 291.84 $41.44 3.86 56 528 Storage/IDF 1000 3 2 2-L T12 F40 1x4 Surface Mtd. W/ Sleeves 80 0.24 240 34.08 3 2 No Change 80 0.22 10% 216 $30.67 $0.00 $0.00 0.02 24 $3.41 0.00 4 529 Kindergarten 3200 12 4 114 1.368 4377.6 621.6192 12 4 114 1.23 10% 3939.84 $559.46 $160.00 $160.00 0.14 437.76 $62.16 2.57 3 529 Kindergarten Lav 1000 1 2 2-L 34W U T8 2x2 73 0.073 73 10.366 1 2 No Change 73 0.07 10% 65.7 $9.33 $0.00 $0.00 0.01 7.3 $1.04 0.00 4 529 Kindergarten Stor 1000 1 4 114 0.114 114 16.188 1 4 No Change 114 0.10 10% 102.6 $14.57 $0.00 $0.00 0.01 11.4 $1.62 0.00 4 530 Kindergarten 3200 12 4 114 1.368 4377.6 621.6192 12 4 114 1.23 10% 3939.84 $559.46 $160.00 $160.00 0.14 437.76 $62.16 2.57

APPENDIX E-1 22 of 28 EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 3 530 Kindergarten Lav 1000 1 2 2-L 34W U T8 2x2 73 0.073 73 10.366 1 2 No Change 73 0.07 10% 65.7 $9.33 $0.00 $0.00 0.01 7.3 $1.04 0.00 4 530 Kindergarten Stor 1000 1 4 114 0.114 114 16.188 1 4 No Change 114 0.10 10% 102.6 $14.57 $0.00 $0.00 0.01 11.4 $1.62 0.00 4 601 Vice Principal 3200 2 4 114 0.228 729.6 103.6032 2 4 Sensor - Switch Mnt. 114 0.21 10% 656.64 $93.24 $75.00 $75.00 0.02 72.96 $10.36 7.24 4 602 Science Lab 3200 15 4 114 1.71 5472 777.024 15 4 114 1.54 10% 4924.8 $699.32 $160.00 $160.00 0.17 547.2 $77.70 2.06 4 602 Science Lab Stor 1000 2 4 114 0.228 228 32.376 2 4 No Change 114 0.21 10% 205.2 $29.14 $0.00 $0.00 0.02 22.8 $3.24 0.00 4 618 Custodial 1000 3 4 114 0.342 342 48.564 3 4 No Change 114 0.31 10% 307.8 $43.71 $0.00 $0.00 0.03 34.2 $4.86 0.00 4 616 Data 1000 2 4 114 0.228 228 32.376 2 4 No Change 114 0.21 10% 205.2 $29.14 $0.00 $0.00 0.02 22.8 $3.24 0.00 57 612 Boiler 1000 4 4 4-L T8 F32 1x8 Surface/Pendant 114 0.456 456 64.752 4 4 No Change 114 0.41 10% 410.4 $58.28 $0.00 $0.00 0.05 45.6 $6.48 0.00 52 610 Classroom 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 53 610 Classroom Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 52 608 Classroom 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 53 608 Classroom Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 52 608A Classroom 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 53 608A Classroom Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 52 609 Classroom 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 53 609 Classroom Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 52 609A Classroom 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43

APPENDIX E-1 23 of 28 EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 53 609A Classroom Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 52 611 Classroom 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 53 611 Classroom Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 52 613 Classroom 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 53 613 Classroom Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 53 0 Womens Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 53 0 Mens Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 52 615 Classroom 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 53 615 Classroom Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 52 603 Nurse 3200 5 4 114 0.57 1824 259.008 5 4 No Change 114 0.51 10% 1641.6 $233.11 $0.00 $0.00 0.06 182.4 $25.90 0.00 53 603 Nurse Shower/Bath 3200 1 3 3-L 32W T8 2x4 Recessed 85 0.085 272 38.624 1 3 No Change 85 0.08 10% 244.8 $34.76 $0.00 $0.00 0.01 27.2 $3.86 0.00 52 603 Rest Area 3200 2 4 114 0.228 729.6 103.6032 2 4 No Change 114 0.21 10% 656.64 $93.24 $0.00 $0.00 0.02 72.96 $10.36 0.00 52 617 Classroom 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 53 617 Classroom Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 52 620 Storage 1000 3 4 114 0.342 342 48.564 3 4 No Change 114 0.31 10% 307.8 $43.71 $0.00 $0.00 0.03 34.2 $4.86 0.00 52 622 Teacher Room 3200 8 4 114 0.912 2918.4 414.4128 8 4 114 0.82 10% 2626.56 $372.97 $160.00 $160.00 0.09 291.84 $41.44 3.86 52 619 Classroom 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43

APPENDIX E-1 24 of 28 EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 53 619 Classroom Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 52 621 Classroom 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 53 621 Classroom Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 52 623 Classroom 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 53 623 Classroom Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 52 625 Classroom 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 53 625 Classroom Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 52 624 Classroom 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 53 624 Classroom Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 52 626 Classroom 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 53 626 Classroom Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 52 628 Classroom 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 53 628 Classroom Lav 1000 1 3 3-L 32W T8 2x4 Recessed 85 0.085 85 12.07 1 3 No Change 85 0.08 10% 76.5 $10.86 $0.00 $0.00 0.01 8.5 $1.21 0.00 4 414 Kindergarten 3200 12 4 114 1.368 4377.6 621.6192 12 4 114 1.23 10% 3939.84 $559.46 $160.00 $160.00 0.14 437.76 $62.16 2.57 3 414 Kindergarten Lav 1000 1 2 2-L 34W U T8 2x2 73 0.073 73 10.366 1 2 No Change 73 0.07 10% 65.7 $9.33 $0.00 $0.00 0.01 7.3 $1.04 0.00 4 414 Kindergarten Stor 1000 3 4 114 0.342 342 48.564 3 4 No Change 114 0.31 10% 307.8 $43.71 $0.00 $0.00 0.03 34.2 $4.86 0.00 4 416 Time Out 1000 2 4 114 0.228 228 32.376 2 4 No Change 114 0.21 10% 205.2 $29.14 $0.00 $0.00 0.02 22.8 $3.24 0.00

APPENDIX E-1 25 of 28 EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 4 413 Kindergarten 3200 12 4 114 1.368 4377.6 621.6192 12 4 114 1.23 10% 3939.84 $559.46 $160.00 $160.00 0.14 437.76 $62.16 2.57 3 413 Kindergarten Lav 1000 1 2 2-L 34W U T8 2x2 73 0.073 73 10.366 1 2 No Change 73 0.07 10% 65.7 $9.33 $0.00 $0.00 0.01 7.3 $1.04 0.00 4 413 Kindergarten Stor 1000 3 4 114 0.342 342 48.564 3 4 No Change 114 0.31 10% 307.8 $43.71 $0.00 $0.00 0.03 34.2 $4.86 0.00 4 412 Kindergarten 3200 12 4 114 1.368 4377.6 621.6192 12 4 114 1.23 10% 3939.84 $559.46 $160.00 $160.00 0.14 437.76 $62.16 2.57 4 412 Kindergarten Lav 1000 1 4 114 0.114 114 16.188 1 4 No Change 114 0.10 10% 102.6 $14.57 $0.00 $0.00 0.01 11.4 $1.62 0.00 3 412 Kindergarten Stor 3200 1 2 2-L 34W U T8 2x2 73 0.073 233.6 33.1712 1 2 No Change 73 0.07 10% 210.24 $29.85 $0.00 $0.00 0.01 23.36 $3.32 0.00 4 418 Storage 1000 2 4 114 0.228 228 32.376 2 4 No Change 114 0.21 10% 205.2 $29.14 $0.00 $0.00 0.02 22.8 $3.24 0.00 4 0 Boys Lav 8760 3 4 114 0.342 2995.92 425.42064 3 4 No Change 114 0.31 10% 2696.328 $382.88 $0.00 $0.00 0.03 299.592 $42.54 0.00 4 0 Girls Lav 8760 3 4 114 0.342 2995.92 425.42064 3 4 No Change 114 0.31 10% 2696.328 $382.88 $0.00 $0.00 0.03 299.592 $42.54 0.00 3 0 Custodial 1000 1 2 2-L 34W U T8 2x2 73 0.073 73 10.366 1 2 No Change 73 0.07 10% 65.7 $9.33 $0.00 $0.00 0.01 7.3 $1.04 0.00 20 415 Gymnasium 3200 14 1 400w MV Hi-Bay w/ Lens 465 6.51 20832 2958.144 14 1 No Change 465 5.86 10% 18748.8 $2,662.33 $0.00 $0.00 0.65 2083.2 $295.81 0.00 4 417 PE Office 3200 2 4 114 0.228 729.6 103.6032 2 4 Sensor - Switch Mnt. 114 0.21 10% 656.64 $93.24 $75.00 $75.00 0.02 72.96 $10.36 7.24 4 0 Gym Storage 1000 2 4 114 0.228 228 32.376 2 4 No Change 114 0.21 10% 205.2 $29.14 $0.00 $0.00 0.02 22.8 $3.24 0.00 4 316 Custodial 3200 6 4 114 0.684 2188.8 310.8096 6 4 Sensor - Switch Mnt. 114 0.62 10% 1969.92 $279.73 $75.00 $75.00 0.07 218.88 $31.08 2.41 4 316A Custodial Office 3200 2 4 114 0.228 729.6 103.6032 2 4 Sensor - Switch Mnt. 114 0.21 10% 656.64 $93.24 $75.00 $75.00 0.02 72.96 $10.36 7.24 57 317 Mechanical 1000 8 4 4-L T8 F32 1x8 Surface/Pendant 114 0.912 912 129.504 8 4 No Change 114 0.82 10% 820.8 $116.55 $0.00 $0.00 0.09 91.2 $12.95 0.00 4 0 Mens 8760 4 4 114 0.456 3994.56 567.22752 4 4 No Change 114 0.41 10% 3595.104 $510.50 $0.00 $0.00 0.05 399.456 $56.72 0.00

APPENDIX E-1 26 of 28 EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 4 0 Womens 8760 4 4 114 0.456 3994.56 567.22752 4 4 No Change 114 0.41 10% 3595.104 $510.50 $0.00 $0.00 0.05 399.456 $56.72 0.00 4 411 Kindergarten 3200 12 4 114 1.368 4377.6 621.6192 12 4 114 1.23 10% 3939.84 $559.46 $160.00 $160.00 0.14 437.76 $62.16 2.57 3 411 Kindergarten Lav 1000 1 2 2-L 34W U T8 2x2 73 0.073 73 10.366 1 2 No Change 73 0.07 10% 65.7 $9.33 $0.00 $0.00 0.01 7.3 $1.04 0.00 4 411 Kindergarten Stor 1000 1 4 114 0.114 114 16.188 1 4 No Change 114 0.10 10% 102.6 $14.57 $0.00 $0.00 0.01 11.4 $1.62 0.00 4 320 Old Teacher Lounge 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 4 410 Kindergarten 3200 12 4 114 1.368 4377.6 621.6192 12 4 114 1.23 10% 3939.84 $559.46 $160.00 $160.00 0.14 437.76 $62.16 2.57 3 410 Kindergarten Lav 1000 1 2 2-L 34W U T8 2x2 73 0.073 73 10.366 1 2 No Change 73 0.07 10% 65.7 $9.33 $0.00 $0.00 0.01 7.3 $1.04 0.00 4 410 Kindergarten Stor 1000 1 4 114 0.114 114 16.188 1 4 No Change 114 0.10 10% 102.6 $14.57 $0.00 $0.00 0.01 11.4 $1.62 0.00 4 409 Kindergarten 3200 12 4 114 1.368 4377.6 621.6192 12 4 114 1.23 10% 3939.84 $559.46 $160.00 $160.00 0.14 437.76 $62.16 2.57 3 409 Kindergarten Lav 1000 1 2 2-L 34W U T8 2x2 73 0.073 73 10.366 1 2 No Change 73 0.07 10% 65.7 $9.33 $0.00 $0.00 0.01 7.3 $1.04 0.00 4 409 Kindergarten Stor 1000 1 4 114 0.114 114 16.188 1 4 No Change 114 0.10 10% 102.6 $14.57 $0.00 $0.00 0.01 11.4 $1.62 0.00 4 408 Kindergarten 3200 12 4 114 1.368 4377.6 621.6192 12 4 114 1.23 10% 3939.84 $559.46 $160.00 $160.00 0.14 437.76 $62.16 2.57 3 408 Kindergarten Lav 1000 1 2 2-L 34W U T8 2x2 73 0.073 73 10.366 1 2 No Change 73 0.07 10% 65.7 $9.33 $0.00 $0.00 0.01 7.3 $1.04 0.00 4 408 Kindergarten Stor 1000 1 4 114 0.114 114 16.188 1 4 No Change 114 0.10 10% 102.6 $14.57 $0.00 $0.00 0.01 11.4 $1.62 0.00 4 407 Science 3200 9 4 114 1.026 3283.2 466.2144 9 4 114 0.92 10% 2954.88 $419.59 $160.00 $160.00 0.10 328.32 $46.62 3.43 4 407 Science Storage 1000 1 4 114 0.114 114 16.188 1 4 No Change 114 0.10 10% 102.6 $14.57 $0.00 $0.00 0.01 11.4 $1.62 0.00 4 0 TV Room 1000 3 4 114 0.342 342 48.564 3 4 Sensor - Switch Mnt. 114 0.31 10% 307.8 $43.71 $75.00 $75.00 0.03 34.2 $4.86 15.44

APPENDIX E-1 27 of 28 EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 4 0 Custodial Room 3200 6 4 114 0.684 2188.8 310.8096 6 4 No Change 114 0.62 10% 1969.92 $279.73 $0.00 $0.00 0.07 218.88 $31.08 0.00 57 0 Maintenance Room 3200 4 4 4-L T8 F32 1x8 Surface/Pendant 114 0.456 1459.2 207.2064 4 4 No Change 114 0.41 10% 1313.28 $186.49 $0.00 $0.00 0.05 145.92 $20.72 0.00 58 0 Maintenance Room 3200 2 4 4-L T12 F34 1x8 Surface/Pendant 156 0.312 998.4 141.7728 2 4 No Change 156 0.28 10% 898.56 $127.60 $0.00 $0.00 0.03 99.84 $14.18 0.00 28 220 Storage 1000 1 1 28 205 PTA 3200 2 1 Surface Mounted 135 W Incandescent Medium Base Surface Mounted 135 W Incandescent Medium Base 135 0.135 135 19.17 1 1 No Change 135 0.12 10% 121.5 $17.25 $0.00 $0.00 0.01 13.5 $1.92 0.00 135 0.27 864 122.688 2 1 No Change 135 0.24 10% 777.6 $110.42 $0.00 $0.00 0.03 86.4 $12.27 0.00 4 222 Corridor 3200 5 4 114 0.57 1824 259.008 5 4 No Change 114 0.51 10% 1641.6 $233.11 $0.00 $0.00 0.06 182.4 $25.90 0.00 4 222 Corridor 3200 5 4 114 0.57 1824 259.008 5 4 No Change 114 0.51 10% 1641.6 $233.11 $0.00 $0.00 0.06 182.4 $25.90 0.00 54 222 Corridor 3200 3 3 3-L 32W T8 2x4 Recessed 85 0.255 816 115.872 3 3 No Change 85 0.23 10% 734.4 $104.28 $0.00 $0.00 0.03 81.6 $11.59 0.00 54 234 Corridor 3200 8 3 3-L 32W T8 2x4 Recessed 85 0.68 2176 308.992 8 3 No Change 85 0.61 10% 1958.4 $278.09 $0.00 $0.00 0.07 217.6 $30.90 0.00 4 223 Lobby 3200 3 4 114 0.342 1094.4 155.4048 3 4 No Change 114 0.31 10% 984.96 $139.86 $0.00 $0.00 0.03 109.44 $15.54 0.00 4 357 Corridor 3200 2 4 114 0.228 729.6 103.6032 2 4 No Change 114 0.21 10% 656.64 $93.24 $0.00 $0.00 0.02 72.96 $10.36 0.00 54 357 Corridor 3200 6 3 3-L 32W T8 2x4 Recessed 85 0.51 1632 231.744 6 3 No Change 85 0.46 10% 1468.8 $208.57 $0.00 $0.00 0.05 163.2 $23.17 0.00 54 200/30 0 Corridor 3200 15 3 3-L 32W T8 2x4 Recessed 85 1.275 4080 579.36 15 3 No Change 85 1.15 10% 3672 $521.42 $0.00 $0.00 0.13 408 $57.94 0.00 4 200 Corridor 3200 3 4 114 0.342 1094.4 155.4048 3 4 No Change 114 0.31 10% 984.96 $139.86 $0.00 $0.00 0.03 109.44 $15.54 0.00 4 222 Corridor 3200 11 4 114 1.254 4012.8 569.8176 11 4 No Change 114 1.13 10% 3611.52 $512.84 $0.00 $0.00 0.13 401.28 $56.98 0.00 54 338 Corridor 3200 23 3 3-L 32W T8 2x4 Recessed 85 1.955 6256 888.352 23 3 No Change 85 1.76 10% 5630.4 $799.52 $0.00 $0.00 0.20 625.6 $88.84 0.00 54 357 Corridor 3200 13 3 3-L 32W T8 2x4 Recessed 85 1.105 3536 502.112 13 3 No Change 85 0.99 10% 3182.4 $451.90 $0.00 $0.00 0.11 353.6 $50.21 0.00

APPENDIX E-1 28 of 28 EXISTING LIGHTING PROPOSED LIGHTING CONTROLS SAVINGS CEG Room Fixture Yearly No. No. Fixture Fixt Total kwh/yr Yearly No. No. Controls Watts Total Reduction kwh/yr Yearly Unit Cost Total kw kwh/yr Yearly Yearly Simple Type No. Location Usage Fixts Lamps Type Watts kw Fixtures $ Cost Fixts Lamps Description Used kw (%) Fixtures $ Cost (INSTALLED) Cost Savings Savings $ Savings Payback 54 630 Corridor 3200 3 3 3-L 32W T8 2x4 Recessed 85 0.255 816 115.872 3 3 No Change 85 0.23 10% 734.4 $104.28 $0.00 $0.00 0.03 81.6 $11.59 0.00 54 629 Corridor 3200 6 3 3-L 32W T8 2x4 Recessed 85 0.51 1632 231.744 6 3 No Change 85 0.46 10% 1468.8 $208.57 $0.00 $0.00 0.05 163.2 $23.17 0.00 54 627 Corridor 3200 22 3 3-L 32W T8 2x4 Recessed 85 1.87 5984 849.728 22 3 No Change 85 1.68 10% 5385.6 $764.76 $0.00 $0.00 0.19 598.4 $84.97 0.00 54 607 Corridor 3200 14 3 3-L 32W T8 2x4 Recessed 85 1.19 3808 540.736 14 3 No Change 85 1.07 10% 3427.2 $486.66 $0.00 $0.00 0.12 380.8 $54.07 0.00 54 600 Corridor 3200 13 3 3-L 32W T8 2x4 Recessed 85 1.105 3536 502.112 13 3 No Change 85 0.99 10% 3182.4 $451.90 $0.00 $0.00 0.11 353.6 $50.21 0.00 Totals 1227 705 131.64 400,433.1 $56,861.50 1227 705 118.4715 360389.8 $51,175.35 $12,270.00 13.16 40043.3 $5,686.15 2.16 NOTES: 1. Simple Payback noted in this spreadsheet does not include Maintenance Savings and NJ Smart Start Incentives. 2. Lamp totals only include T-12 tube replacment calculations

Appendix F Page 1 of 2 Project Name: LGEA Solar PV Project - 305.9 kw Location: Little Egg Harbor Twp., NJ Description: Photovoltaic System - Direct Purchase Simple Payback Analysis Photovoltaic System - Direct Purchase Total Construction Cost $1,911,875 Annual kwh Production 335,093 Annual Energy Cost Reduction $47,583 Annual SREC Revenue $117,283 First Cost Premium Simple Payback: $1,911,875 11.60 Years Life Cycle Cost Analysis Analysis Period (years): 25 Financing %: 0% Financing Term (mths): 0 Maintenance Escalation Rate: 3.0% Average Energy Cost ($/kwh) $0.142 Energy Cost Escalation Rate: 3.0% Financing Rate: 0.00% SREC Value ($/kwh) $0.350 Period Additional Energy kwh Energy Cost Additional SREC Net Cash Cumulative Cash Outlay Production Savings Maint Costs Revenue Flow Cash Flow 0 $1,911,875 0 0 0 $0 (1,911,875) 0 1 $0 335,093 $47,583 $0 $117,283 $164,866 ($1,747,009) 2 $0 333,418 $49,011 $0 $116,696 $165,707 ($1,581,302) 3 $0 331,750 $50,481 $0 $116,113 $166,594 ($1,414,709) 4 $0 330,092 $51,995 $0 $115,532 $167,528 ($1,247,181) 5 $0 328,441 $53,555 $3,383 $114,954 $165,127 ($1,082,054) 6 $0 326,799 $55,162 $3,366 $114,380 $166,176 ($915,879) 7 $0 325,165 $56,817 $3,349 $113,808 $167,275 ($748,603) 8 $0 323,539 $58,521 $3,332 $113,239 $168,428 ($580,176) 9 $0 321,922 $60,277 $3,316 $112,673 $169,634 ($410,542) 10 $0 320,312 $62,085 $3,299 $112,109 $170,895 ($239,647) 11 $0 318,710 $63,948 $3,283 $111,549 $172,214 ($67,433) 12 $0 317,117 $65,866 $3,266 $110,991 $173,591 $106,158 13 $0 315,531 $67,842 $3,250 $110,436 $175,028 $281,186 14 $0 313,954 $69,878 $3,234 $109,884 $176,528 $457,714 15 $0 312,384 $71,974 $3,218 $109,334 $178,091 $635,804 16 $0 310,822 $74,133 $3,201 $108,788 $179,719 $815,524 17 $0 309,268 $76,357 $3,185 $108,244 $181,415 $996,939 18 $0 307,721 $78,648 $3,170 $107,702 $183,181 $1,180,120 19 $0 306,183 $81,007 $3,154 $107,164 $185,018 $1,365,137 20 $0 304,652 $83,437 $3,138 $106,628 $186,928 $1,552,065 21 $1 303,129 $85,941 $3,122 $106,095 $188,913 $1,740,978 22 $2 301,613 $88,519 $3,107 $105,565 $190,977 $1,931,955 23 $3 300,105 $91,174 $3,091 $105,037 $193,120 $2,125,075 24 $4 298,604 $93,910 $3,076 $104,512 $195,345 $2,320,420 25 $5 297,111 $96,727 $3,060 $103,989 $197,656 $2,518,076 Totals: 7,893,434 $1,734,849 $67,600 $2,762,702 $4,429,951 $7,992,615 Net Present Value (NPV) Internal Rate of Return (IRR) $2,518,101 7.6%

Appendix F Page 2 of 2 Building George Mitchell Parking Lot Number of Arrays 4 Panel Qty Sunpower SPR230 Panel Sq Ft Panel Total Sq Ft Total KW DC Total Annual kwh Panel Weight (33 lbs) W/SQFT 1330 14.7 19,556 305.90 335,093 43,890 15.64 115 KW 66.7 KW 82.8 KW 41.4 KW.= Proposed PV Layout Notes: 1. Estimated kwh based on the National Renewable Energy Laboratory PVWatts Version 1 Calculator Program.